메뉴 건너뛰기




Volumn 63, Issue 1, 2012, Pages 243-253

An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal

Author keywords

Berth allocation; Coupling problem; Nested loop; Quay crane assignment

Indexed keywords

APPROXIMATE SOLUTION; BERTH ALLOCATION; CONTAINER TERMINAL; COUPLING PROBLEM; INNER LOOPS; MULTI-USER; NESTED LOOPS; NUMERICAL EXPERIMENTS; OPTIMAL SOLUTIONS; OPTIMIZATION APPROACH; OUTER LOOP; QUAY CRANES; SUB-PROBLEMS;

EID: 84859030140     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2012.03.004     Document Type: Article
Times cited : (82)

References (42)
  • 2
    • 70350568773 scopus 로고    scopus 로고
    • A survey of berth allocation and quay crane scheduling problems in container terminals
    • C. Bierwirth, and F. Meisel A survey of berth allocation and quay crane scheduling problems in container terminals European Journal of Operational Research 202 3 2010 615 627
    • (2010) European Journal of Operational Research , vol.202 , Issue.3 , pp. 615-627
    • Bierwirth, C.1    Meisel, F.2
  • 7
    • 84861094338 scopus 로고    scopus 로고
    • Master's thesis, Department of Informatics and Mathematical Modelling, Technical University of Denmark, April (in Danish)
    • Christensen, C. G., & Holst, C. T. (2008). Berth allocation in container terminals. Master's thesis, Department of Informatics and Mathematical Modelling, Technical University of Denmark, April (in Danish).
    • (2008) Berth Allocation in Container Terminals
    • Christensen, C.G.1    Holst, C.T.2
  • 8
    • 28244441388 scopus 로고    scopus 로고
    • Models and tabu search heuristics for the berth-allocation problem
    • J.F. Cordeau, G. Laporte, P. Legato, and L. Moccia Models and tabu search heuristics for the berth-allocation problem Transportation Science 39 4 2005 526 538
    • (2005) Transportation Science , vol.39 , Issue.4 , pp. 526-538
    • Cordeau, J.F.1    Laporte, G.2    Legato, P.3    Moccia, L.4
  • 10
    • 69249230791 scopus 로고    scopus 로고
    • Berthing scheduling by customer service differentiation: A multi-objective approach
    • M.M. Golias, M. Boile, and S. Theofains Berthing scheduling by customer service differentiation: A multi-objective approach Transportation Research Part E 45 2009 878 892
    • (2009) Transportation Research Part e , vol.45 , pp. 878-892
    • Golias, M.M.1    Boile, M.2    Theofains, S.3
  • 11
    • 77953360763 scopus 로고    scopus 로고
    • A lambda-optimal based heuristic for the berth scheduling problem
    • M.M. Golias, M. Boile, and S. Theofains A lambda-optimal based heuristic for the berth scheduling problem Transportation Research Part C 18 2010 794 806
    • (2010) Transportation Research Part C , vol.18 , pp. 794-806
    • Golias, M.M.1    Boile, M.2    Theofains, S.3
  • 12
    • 17444376768 scopus 로고    scopus 로고
    • The berth allocation problem: Models and solution methods
    • Y. Guan, and R.K. Cheung The berth allocation problem: Models and solution methods OR Spectrum 26 1 2004 75 92
    • (2004) OR Spectrum , vol.26 , Issue.1 , pp. 75-92
    • Guan, Y.1    Cheung, R.K.2
  • 13
    • 0036794414 scopus 로고    scopus 로고
    • A multiprocessor task scheduling model for berth allocation: Heuristic and worst-case analysis
    • Y. Guan, W.Q. Xiao, R.K. Cheung, and C.L. Li A multiprocessor task scheduling model for berth allocation: Heuristic and worst-case analysis Operations Research Letters 30 5 2002 343 350
    • (2002) Operations Research Letters , vol.30 , Issue.5 , pp. 343-350
    • Guan, Y.1    Xiao, W.Q.2    Cheung, R.K.3    Li, C.L.4
  • 14
    • 77957698525 scopus 로고    scopus 로고
    • A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
    • X.L. Han, Z.Q. Lu, and L.F. Xi A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time European Journal of Operational Research 2010 1327 1340
    • (2010) European Journal of Operational Research , pp. 1327-1340
    • Han, X.L.1    Lu, Z.Q.2    Xi, L.F.3
  • 17
    • 0031096047 scopus 로고    scopus 로고
    • Efficient planning of berth allocation for container terminals in Asia
    • A. Imai, K. Nagaiwa, and C.W. Tat Efficient planning of berth allocation for container terminals in Asia Journal of Advanced Transportation 31 1 1997 75 94
    • (1997) Journal of Advanced Transportation , vol.31 , Issue.1 , pp. 75-94
    • Imai, A.1    Nagaiwa, K.2    Tat, C.W.3
  • 21
    • 34948830996 scopus 로고    scopus 로고
    • Berthing ships at a multi-user container terminal with a limited quay capacity
    • A. Imai, E. Nishimura, and S. Papadimitriou Berthing ships at a multi-user container terminal with a limited quay capacity Transportation Research Part E 44 1 2008 136 151
    • (2008) Transportation Research Part e , vol.44 , Issue.1 , pp. 136-151
    • Imai, A.1    Nishimura, E.2    Papadimitriou, S.3
  • 22
    • 11244335846 scopus 로고    scopus 로고
    • Berth allocation in a container port: Using a continuous location space approach
    • A. Imai, X. Sun, E. Nishimura, and S. Papadimitriou Berth allocation in a container port: Using a continuous location space approach Transportation Research Part B 39 3 2005 199 221
    • (2005) Transportation Research Part B , vol.39 , Issue.3 , pp. 199-221
    • Imai, A.1    Sun, X.2    Nishimura, E.3    Papadimitriou, S.4
  • 23
    • 77954316066 scopus 로고    scopus 로고
    • The continuous berth allocation problem: A greedy randomized adaptive search solution
    • D.H. Lee, J.H. Chen, and J.X. Cao The continuous berth allocation problem: A greedy randomized adaptive search solution Transportation Research Part E 46 2010 1017 1029
    • (2010) Transportation Research Part e , vol.46 , pp. 1017-1029
    • Lee, D.H.1    Chen, J.H.2    Cao, J.X.3
  • 24
    • 70350570900 scopus 로고    scopus 로고
    • The quay crane deployment problem at a maritime container terminal
    • Nicosia
    • Legato, P., Gullì, D., & Trunfio, R. (2008). The quay crane deployment problem at a maritime container terminal. In Proc. of the 22th European conference on modelling and simulation, Nicosia (pp. 53-59).
    • (2008) Proc. of the 22th European Conference on Modelling and Simulation , pp. 53-59
    • Legato, P.1
  • 25
    • 0032072364 scopus 로고    scopus 로고
    • Scheduling with multiple-job-on-one-processor pattern
    • C.L. Li, X. Cai, and C.Y. Lee Scheduling with multiple-job-on-one- processor pattern IIE Transactions 30 5 1998 433 445
    • (1998) IIE Transactions , vol.30 , Issue.5 , pp. 433-445
    • Li, C.L.1    Cai, X.2    Lee, C.Y.3
  • 26
    • 60549101050 scopus 로고    scopus 로고
    • A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning
    • C. Liang, Y. Huang, and Y. Yang A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning Computers and Industrial Engineering 56 3 2009 1021 1028
    • (2009) Computers and Industrial Engineering , vol.56 , Issue.3 , pp. 1021-1028
    • Liang, C.1    Huang, Y.2    Yang, Y.3
  • 27
    • 0346545785 scopus 로고    scopus 로고
    • The berth planning problem
    • A. Lim The berth planning problem Operations Research Letters 22 2 1998 105 110
    • (1998) Operations Research Letters , vol.22 , Issue.2 , pp. 105-110
    • Lim, A.1
  • 28
    • 0012296067 scopus 로고    scopus 로고
    • An effective ship berthing algorithm
    • Thomas, D. (Ed.) Morgan Kaufmann Publishers, San Francisco
    • Lim, A. (1999). An effective ship berthing algorithm. In Thomas, D. (Ed.), Proc. of the 16th international joint conference on artificial intelligence. Morgan Kaufmann Publishers, San Francisco (pp. 594-599).
    • (1999) Proc. of the 16th International Joint Conference on Artificial Intelligence , pp. 594-599
    • Lim, A.1
  • 29
    • 57149135986 scopus 로고    scopus 로고
    • Heuristics for the integration of crane productivity in the berth allocation problem
    • F. Meisel, and C. Bierwirth Heuristics for the integration of crane productivity in the berth allocation problem Transportation Research Part E 45 2009 196 209
    • (2009) Transportation Research Part e , vol.45 , pp. 196-209
    • Meisel, F.1    Bierwirth, C.2
  • 30
    • 60449112191 scopus 로고    scopus 로고
    • The berth allocation problem: A strong formulation solved by a Lagrangean approach
    • M.F. Monaco, and M. Sammarra The berth allocation problem: A strong formulation solved by a Lagrangean approach Transportation Science 41 2 2007 265 280
    • (2007) Transportation Science , vol.41 , Issue.2 , pp. 265-280
    • Monaco, M.F.1    Sammarra, M.2
  • 34
    • 0036724291 scopus 로고    scopus 로고
    • Berth scheduling for container terminals by using a sub-gradient optimization technique
    • K.T. Park, and K.H. Kim Berth scheduling for container terminals by using a sub-gradient optimization technique Journal of the Operational Research Society 53 9 2002 1054 1062
    • (2002) Journal of the Operational Research Society , vol.53 , Issue.9 , pp. 1054-1062
    • Park, K.T.1    Kim, K.H.2
  • 35
    • 1342290320 scopus 로고    scopus 로고
    • A scheduling method for berth and quay cranes
    • Y.M. Park, and K.H. Kim A scheduling method for berth and quay cranes OR Spectrum 25 1 2003 1 23
    • (2003) OR Spectrum , vol.25 , Issue.1 , pp. 1-23
    • Park, Y.M.1    Kim, K.H.2
  • 36
    • 79960188475 scopus 로고    scopus 로고
    • Integrated intelligent techniques for remarshaling and berthing in maritime terminals
    • M.A. Salido, M.R. Molins, and F. Barber Integrated intelligent techniques for remarshaling and berthing in maritime terminals Advanced Engineering Informatics 25 3 2011 435 451
    • (2011) Advanced Engineering Informatics , vol.25 , Issue.3 , pp. 435-451
    • Salido, M.A.1    Molins, M.R.2    Barber, F.3
  • 37
    • 33845684733 scopus 로고    scopus 로고
    • A stochastic beam search for the berth allocation problem
    • F. Wang, and A. Lim A stochastic beam search for the berth allocation problem Decision Support Systems 42 4 2007 2186 2196
    • (2007) Decision Support Systems , vol.42 , Issue.4 , pp. 2186-2196
    • Wang, F.1    Lim, A.2
  • 38
    • 68649105012 scopus 로고    scopus 로고
    • Embedded simulation on a multiprocessor job scheduling system with inspection
    • K. Yang, P.S. Pulat, and Y.P. Guan Embedded simulation on a multiprocessor job scheduling system with inspection Computers & Industrial Engineering 57 2009 592 607
    • (2009) Computers & Industrial Engineering , vol.57 , pp. 592-607
    • Yang, K.1    Pulat, P.S.2    Guan, Y.P.3
  • 39
    • 79960163938 scopus 로고    scopus 로고
    • A distributed agent system for port planning and scheduling
    • X.F. Yin, L.P. Khoo, and C.H. Chen A distributed agent system for port planning and scheduling Advanced Engineering Informatics 25 3 2011 403 412
    • (2011) Advanced Engineering Informatics , vol.25 , Issue.3 , pp. 403-412
    • Yin, X.F.1    Khoo, L.P.2    Chen, C.H.3
  • 42
    • 42949129040 scopus 로고    scopus 로고
    • Study on berth and quay-crane allocation under stochastic environment in container terminal
    • P.F. Zhou, and H.G. Kang Study on berth and quay-crane allocation under stochastic environment in container terminal Systems Engineering-Theory & Practice 28 1 2008 161 169
    • (2008) Systems Engineering-Theory & Practice , vol.28 , Issue.1 , pp. 161-169
    • Zhou, P.F.1    Kang, H.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.