-
2
-
-
68249120807
-
A fast heuristic for quay crane scheduling with interference constraints
-
Bierwirth, C., Meisel, F., 2009. A fast heuristic for quay crane scheduling with interference constraints. Journal of Scheduling 12(4), 345-360.
-
(2009)
Journal of Scheduling
, vol.12
, Issue.4
, pp. 345-360
-
-
Bierwirth, C.1
Meisel, F.2
-
3
-
-
70350568773
-
A survey of berth allocation and quay crane scheduling problems in container terminals
-
Bierwirth, C., Meisel, F., 2010. A survey of berth allocation and quay crane scheduling problems in container terminals. European Journal of Operational Research 202(3), 615-627.
-
(2010)
European Journal of Operational Research
, vol.202
, Issue.3
, pp. 615-627
-
-
Bierwirth, C.1
Meisel, F.2
-
4
-
-
0024686408
-
The crane scheduling problem
-
Daganzo, C.F., 1989. The crane scheduling problem. Transportation Research Part B 23(3), 159-175.
-
(1989)
Transportation Research Part B
, vol.23
, Issue.3
, pp. 159-175
-
-
Daganzo, C.F.1
-
5
-
-
33751017964
-
Double-cycling strategies for container ships and their effect on ship loading and unloading operations
-
Goodchild, A.V., Daganzo, C.F., 2006. Double-cycling strategies for container ships and their effect on ship loading and unloading operations. Transportation Science 40(4), 473-483.
-
(2006)
Transportation Science
, vol.40
, Issue.4
, pp. 473-483
-
-
Goodchild, A.V.1
Daganzo, C.F.2
-
6
-
-
1642618965
-
A crane scheduling method for port container terminals
-
Kim, K.H., Park, Y.M., 2004. A crane scheduling method for port container terminals. European Journal of Operational Research 156(3), 752-768.
-
(2004)
European Journal of Operational Research
, vol.156
, Issue.3
, pp. 752-768
-
-
Kim, K.H.1
Park, Y.M.2
-
7
-
-
38349157814
-
Quay crane scheduling with handling priority in port container terminals
-
Lee, D.H., Wang, H.Q., Miao, L., 2008. Quay crane scheduling with handling priority in port container terminals. Engineering Optimization 40(2), 179-189.
-
(2008)
Engineering Optimization
, vol.40
, Issue.2
, pp. 179-189
-
-
Lee, D.H.1
Wang, H.Q.2
Miao, L.3
-
8
-
-
1842611395
-
Crane scheduling with spatial constraints
-
Lim, A., Rodrigues, B., Xiao, F., Zhu, Y., 2004. Crane scheduling with spatial constraints. Naval Research Logistics 51(3), 386-406.
-
(2004)
Naval Research Logistics
, vol.51
, Issue.3
, pp. 386-406
-
-
Lim, A.1
Rodrigues, B.2
Xiao, F.3
Zhu, Y.4
-
9
-
-
33847695719
-
A m-parallel crane scheduling problem with a non-crossing constraint
-
Lim, A., Rodrigues, B., Xu, Z., 2007. A m-parallel crane scheduling problem with a non-crossing constraint. Naval Research Logistics 54(2), 115-127.
-
(2007)
Naval Research Logistics
, vol.54
, Issue.2
, pp. 115-127
-
-
Lim, A.1
Rodrigues, B.2
Xu, Z.3
-
10
-
-
33645678746
-
Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
-
Liu, J., Wan, Y.W., Wang, L., 2006. Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures. Naval Research Logistics 53(1), 60-74.
-
(2006)
Naval Research Logistics
, vol.53
, Issue.1
, pp. 60-74
-
-
Liu, J.1
Wan, Y.W.2
Wang, L.3
-
11
-
-
77957307373
-
A unified approach for the evaluation of quay crane scheduling models and algorithms
-
Meisel, F., Bierwirth, C., 2011. A unified approach for the evaluation of quay crane scheduling models and algorithms. Computers & Operations Research 38(3), 683-693.
-
(2011)
Computers & Operations Research
, vol.38
, Issue.3
, pp. 683-693
-
-
Meisel, F.1
Bierwirth, C.2
|