-
1
-
-
5344241048
-
Systems Analysis for Port Planning
-
Agerschou, H. and Korsgaard, J. 1969. Systems Analysis for Port Planning.Dock Harb.Auth. 49: 411-415.
-
(1969)
Dock Harb.Auth.
, vol.49
, pp. 411-415
-
-
Agerschou, H.1
Korsgaard, J.2
-
2
-
-
0026137217
-
Mathematical Programming Formulations for Machine Scheduling: A Survey
-
Blazewicz, J., Dror, M., and Weglarz, J. 1991. Mathematical Programming Formulations for Machine Scheduling: A Survey. EurJ.Opnl.Res. 51: 283-300.
-
(1991)
EurJ.Opnl.Res.
, vol.51
, pp. 283-300
-
-
Blazewicz, J.1
Dror, M.2
Weglarz, J.3
-
3
-
-
5344269325
-
Optimal Scheduling of Transport Improvements to Cater for Growing Traffic Congestion
-
Buckley, D.J. and Gooneratne, S.G. 1974. Optimal Scheduling of Transport Improvements to Cater for Growing Traffic Congestion. J.Trans.Econ.Policy 8: 122-135.
-
(1974)
J.Trans.Econ.Policy
, vol.8
, pp. 122-135
-
-
Buckley, D.J.1
Gooneratne, S.G.2
-
5
-
-
0023397887
-
The Median Shortest Path Problem: A Multiobjective Approach to Analyze Cost vs. Accessibility in the Design of Transportation Networks
-
Current,J.R., ReVelle,C.S., and Cohon,J.L. 1987. The Median Shortest Path Problem: A Multiobjective Approach to Analyze Cost vs. Accessibility in the Design of Transportation Networks. Trans.Sci. 21: 188-197.
-
(1987)
Trans.Sci.
, vol.21
, pp. 188-197
-
-
Current, J.R.1
ReVelle, C.S.2
Cohon, J.L.3
-
6
-
-
0024686408
-
The Crane Scheduling Problem
-
Daganzo, C.F. 1989. The Crane Scheduling Problem. Trans.Res. 23B:159-175.
-
(1989)
Trans.Res.
, vol.23 B
, pp. 159-175
-
-
Daganzo, C.F.1
-
7
-
-
0025476403
-
The Productivity of Multipurpose Seaport Terminals
-
Daganzo,C.F. 1990. The Productivity of Multipurpose Seaport Terminals. Trans.Sci. 24: 205-216.
-
(1990)
Trans.Sci.
, vol.24
, pp. 205-216
-
-
Daganzo, C.F.1
-
9
-
-
84974857094
-
How Useful are Queue Models in Port Investment Decisions for Container Berths?
-
Edmond, E.D. and Maggs, R.P. 1978. How Useful are Queue Models in Port Investment Decisions for Container Berths?. J.Opl.Res.Soc., 29, 741-750.
-
(1978)
J.Opl.Res.Soc.
, vol.29
, pp. 741-750
-
-
Edmond, E.D.1
Maggs, R.P.2
-
12
-
-
0025436513
-
A Branch and Bound Solution Method for the Crane Scheduling Problem
-
Peterkofsky, R.I. and Daganzo,C.F. 1990. A Branch and Bound Solution Method for the Crane Scheduling Problem. Trans.Res. 24B: 159-172.
-
(1990)
Trans.Res.
, vol.24 B
, pp. 159-172
-
-
Peterkofsky, R.I.1
Daganzo, C.F.2
-
13
-
-
0023983079
-
PORTPLAN, Decision Support System for Port Terminals
-
Van Hee, K.M., Huitink, B., and Leegwater, D.K. 1988. PORTPLAN, Decision Support System for Port Terminals. Eur.J.Opnl.Res. 34: 249-261.
-
(1988)
Eur.J.Opnl.Res.
, vol.34
, pp. 249-261
-
-
Van Hee, K.M.1
Huitink, B.2
Leegwater, D.K.3
-
14
-
-
0023980879
-
Decision Support System for Container Terminal Planning
-
Van Hee, K.M. and Wijbrands, R.J. 1988. Decision Support System for Container Terminal Planning. Eur.J.Opnl.Res. 34: 262-272.
-
(1988)
Eur.J.Opnl.Res.
, vol.34
, pp. 262-272
-
-
Van Hee, K.M.1
Wijbrands, R.J.2
-
15
-
-
5344252212
-
The Use of Waiting Line Theory in Planning Expansion of Port Facilities
-
White, I.R.P. 1972. The Use of Waiting Line Theory in Planning Expansion of Port Facilities. Dock Harb.Auth. 52: 423-427.
-
(1972)
Dock Harb.Auth.
, vol.52
, pp. 423-427
-
-
White, I.R.P.1
|