메뉴 건너뛰기




Volumn 132, Issue 2, 2011, Pages 279-291

Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm

Author keywords

Flexible job shop scheduling problem; Machine breakdowns; Robust; Stable

Indexed keywords

ANALYSIS OF VARIANCE (ANOVA); GENETIC ALGORITHMS; MACHINE SHOP PRACTICE; SCHEDULING;

EID: 79957742860     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2011.04.020     Document Type: Article
Times cited : (210)

References (64)
  • 1
    • 79956341072 scopus 로고    scopus 로고
    • An efficient hybridized genetic algorithm architecture for the flexible job-shop scheduling problem
    • doi:10.1007/s10696-010-9067-y
    • Al-Hinai, N.; ElMekkawy, T.; 2011. An efficient hybridized genetic algorithm architecture for the flexible job-shop scheduling problem. Flexible Services and Manufacturing Journal 23, 6485. doi:10.1007/s10696-010-9067-y.
    • (2011) Flexible Services and Manufacturing Journal , vol.23 , pp. 64-85
    • Al-Hinai, N.1    Elmekkawy, T.2
  • 2
    • 0030174509 scopus 로고    scopus 로고
    • The single-machine absolute-deviation early-tardy problem with random completion times
    • U.M. Al-Turki, J. Mittenthal, and M. Raghavachari The single-machine absolute-deviation early-tardy problem with random completion times Naval Research Logistics 43 1996 573 587 (Pubitemid 126527544)
    • (1996) Naval Research Logistics , vol.43 , Issue.4 , pp. 573-587
    • Al-Turki, U.M.1    Mittenthal, J.2    Raghavachari, M.3
  • 4
    • 0038522575 scopus 로고    scopus 로고
    • Insertion techniques for static and dynamic resource-constrained project scheduling
    • C. Artigues, P. Michelon, and S. Reusser Insertion techniques for static and dynamic resource-constrained project scheduling European Journal of Operational Research 149 2003 249 267
    • (2003) European Journal of Operational Research , vol.149 , pp. 249-267
    • Artigues, C.1    Michelon, P.2    Reusser, S.3
  • 5
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • H. Aytug, M.A. Lawley, K. McKay, S. Moha, and R. Uzsoy Executing production schedules in the face of uncertainties: a review and some future directions European Journal of Operational Research 161 2005 86 110
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Moha, S.4    Uzsoy, R.5
  • 6
    • 84878607496 scopus 로고    scopus 로고
    • Creating Robust Solutions by Means of Evolutionary Algorithms
    • Parallel Problems Solving from Nature - PPSN V
    • Branke, J.; 1998. Creating robust solutions by means of evolutionary algorithms. In: Proceedings of the Parallel Problem Solving from Nature V - PPSN V, LNCS, vol. 1498/1998, pp. 119128. (Pubitemid 128145943)
    • (1998) Lecture Notes in Computer Science , Issue.1498 , pp. 119-128
    • Branke, J.1
  • 7
    • 34250084648 scopus 로고
    • Routing and scheduling in a flexible job shop by tabu search
    • P. Brandimarte Routing and scheduling in a flexible job shop by tabu search Annals of Operations Research 41 1993 157 183
    • (1993) Annals of Operations Research , vol.41 , pp. 157-183
    • Brandimarte, P.1
  • 9
    • 0032049255 scopus 로고    scopus 로고
    • Decomposition heuristics for robust job-shop scheduling
    • PII S1042296X98020989
    • E. Byeon, S.D. Wu, and R.H. Storer Decomposition heuristics for robust job-shop scheduling IEEE Transactions on Robotics and Automation 14 2 1998 303 313 (Pubitemid 128754319)
    • (1998) IEEE Transactions on Robotics and Automation , vol.14 , Issue.2 , pp. 303-313
    • Byeon, E.-S.1    Wu, S.D.2    Storer, R.H.3
  • 10
    • 33845626540 scopus 로고    scopus 로고
    • Proposal of a performance measurement system for the evaluation of scheduling solutions
    • S. Cavalieri, and S. Terzi Proposal of a performance measurement system for the evaluation of scheduling solutions International Journal of Manufacturing Technology and Management 8 1/2/3 2006 248 263 (Pubitemid 44947822)
    • (2006) International Journal of Manufacturing Technology and Management , vol.8 , Issue.1-3 , pp. 248-263
    • Cavalieri, S.1    Terzi, S.2
  • 11
    • 0030392840 scopus 로고    scopus 로고
    • Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties
    • X. Cai, and F.S. Tu Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties Naval Research Logistics 43 1996 1127 1146 (Pubitemid 126562429)
    • (1996) Naval Research Logistics , vol.43 , Issue.8 , pp. 1127-1146
    • Cai, X.1    Tu, F.S.2
  • 12
    • 44649128530 scopus 로고    scopus 로고
    • A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling
    • H. Chtourou, and M. Haouari A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling Computers & Industrial Engineering 55 2008 183 194
    • (2008) Computers & Industrial Engineering , vol.55 , pp. 183-194
    • Chtourou, H.1    Haouari, M.2
  • 13
    • 2442695353 scopus 로고    scopus 로고
    • Dynamic scheduling of steel casting and milling using multi-agents
    • P.I. Cowling, D. Ouelhadj, and S. Petrovic Dynamic scheduling of steel casting and milling using multi-agents Production Planning & Control 15 2 2004 178 188
    • (2004) Production Planning & Control , vol.15 , Issue.2 , pp. 178-188
    • Cowling, P.I.1    Ouelhadj, D.2    Petrovic, S.3
  • 14
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • R.L. Daniels, and P. Kouvelis Robust scheduling to hedge against processing time uncertainty in single-stage production Management Science 41 2 1995 363 376
    • (1995) Management Science , vol.41 , Issue.2 , pp. 363-376
    • Daniels, R.L.1    Kouvelis, P.2
  • 15
    • 13544260210 scopus 로고    scopus 로고
    • Unpublished Manuscript. Available online from http://eil.ut oronto.ca/pr ofiles/ch ris/chr is.papers.ht ml
    • Davenport, A.J. and Beck J.C.; 2002. A Survey of Techniques for Scheduling with Uncertainty. Unpublished Manuscript. Available online from 〈 http://www.eil.utoronto.ca/profiles/chris/gz/uncertainty-survey.ps 〉 or 〈 http://eil.utoronto.ca/profiles/chris/chris.papers.html 〉.
    • (2002) A Survey of Techniques for Scheduling with Uncertainty
    • Davenport, A.J.1    Beck, J.C.2
  • 16
    • 0026940322 scopus 로고
    • Identification of robust scheduling heuristics: Application of Taguchi methods in simulation studies
    • DOI 10.1016/0360-8352(92)90012-9
    • K.J. Dooley, and F. Mahmoodi Identification of robust scheduling heuristics: application of Taguchi methods in simulation studies Computers & Industrial Engineering 22 4 1992 359 368 (Pubitemid 23575237)
    • (1992) Computers and Industrial Engineering , vol.22 , Issue.4 , pp. 359-368
    • Dooley, K.J.1    Mahmoodi, F.2
  • 17
    • 77950629301 scopus 로고    scopus 로고
    • Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability
    • P. Fattahi, and A. Fallahi Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability CIRP Journal of Manufacturing Science and Technology 2 2 2010 114 123
    • (2010) CIRP Journal of Manufacturing Science and Technology , vol.2 , Issue.2 , pp. 114-123
    • Fattahi, P.1    Fallahi, A.2
  • 18
    • 34547651088 scopus 로고    scopus 로고
    • Mathematical modeling and heuristic approaches to flexible job shop scheduling problems
    • DOI 10.1007/s10845-007-0026-8
    • P. Fattahi, M. Saidi Mehrabad, and F. Jolai Mathematical modeling and heuristic approached to flexible job shop scheduling problems Journal of Intelligent Manufacturing 18 2007 331 342 (Pubitemid 47209689)
    • (2007) Journal of Intelligent Manufacturing , vol.18 , Issue.3 , pp. 331-342
    • Fattahi, P.1    Saidi Mehrabad, M.2    Jolai, F.3
  • 20
    • 0032679037 scopus 로고    scopus 로고
    • Rescheduling and optimization of schedules considering machine failure
    • B. Guo, and Y. Nonaka Rescheduling and optimization of schedules considering machine failure International Journal of Production Economics 6061 1999 503 513
    • (1999) International Journal of Production Economics , vol.6061 , pp. 503-513
    • Guo, B.1    Nonaka, Y.2
  • 21
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • DOI 10.1016/j.ejor.2004.04.002, PII S0377221704002401, Project Management and Scheduling
    • W. Herroelen, and R. Leus Project Scheduling under uncertainty: survey and research potentials European Journal of Operational Research 165 2005 289 306 (Pubitemid 40206362)
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 23
    • 1642270229 scopus 로고    scopus 로고
    • Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures
    • PII S1568494601000059
    • M.T. Jensen Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measure Applied Soft Computing 1 2001 35 52 (Pubitemid 33718563)
    • (2001) Applied Soft Computing , vol.1 , Issue.1 , pp. 35-52
    • Jensen, M.T.1
  • 24
    • 0038479948 scopus 로고    scopus 로고
    • Generating robust and flexible job shop schedules using genetic algorithms
    • M.T. Jensen Generating robust and flexible job shop schedules using genetic algorithms IEEE Transactions on Evolutionary Computation 7 3 2003 275 288
    • (2003) IEEE Transactions on Evolutionary Computation , vol.7 , Issue.3 , pp. 275-288
    • Jensen, M.T.1
  • 25
    • 0036464279 scopus 로고    scopus 로고
    • Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
    • DOI 10.1109/TSMCC.2002.1009117, PII S1094697702046801
    • I. Kacem, S. Hammadi, and P. Brone Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems IEEE Transactions on Systems, Man and Cybernetics 32 1 2002 1 13 (Pubitemid 34789920)
    • (2002) IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews , vol.32 , Issue.1 , pp. 1-13
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 26
    • 0037201140 scopus 로고    scopus 로고
    • Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
    • I. Kacem, S. Hammadi, and P. Brone Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic Mathematics and Computers in Simulation 60 2002 245 276
    • (2002) Mathematics and Computers in Simulation , vol.60 , pp. 245-276
    • Kacem, I.1    Hammadi, S.2    Brone, P.3
  • 27
    • 27844519519 scopus 로고    scopus 로고
    • Improving Schedule Robustness Via Stochastic Analysis and Dynamic Adaptation
    • Kutanoglu, E.; Wu, S.D.; 1998. Improving Schedule Robustness Via Stochastic Analysis and Dynamic Adaptation, IMSE Technical Report 98T-001.
    • (1998) IMSE Technical Report 98T-001
    • Kutanoglu, E.1    Wu, S.D.2
  • 28
    • 4744347235 scopus 로고    scopus 로고
    • Improving scheduling robustness via preprocessing and dynamic adaptation
    • E. Kutanoglu, and S.D. Wu Improving scheduling robustness via preprocessing and dynamic adaptation IIE Transactions 36 11 2004 1107 1124
    • (2004) IIE Transactions , vol.36 , Issue.11 , pp. 1107-1124
    • Kutanoglu, E.1    Wu, S.D.2
  • 30
    • 37349059632 scopus 로고    scopus 로고
    • A tabu search procedure for developing robust predictive project schedules
    • DOI 10.1016/j.ijpe.2007.02.003, PII S0925527307000722
    • O. Lambrechts, E. Demeulemeester, and W. Herroelen A tabu search procedure for developing robust predictive project schedules International Journal of Production Economics 111 2008 493 508 (Pubitemid 350299149)
    • (2008) International Journal of Production Economics , vol.111 , Issue.2 , pp. 493-508
    • Lambrechts, O.1    Demeulemeester, E.2    Herroelen, W.3
  • 31
    • 37349057485 scopus 로고    scopus 로고
    • Optimal booking of machines in a virtual job-shop with stochastic processing times to minimize total machine rental and job tardiness costs
    • DOI 10.1016/j.ijpe.2007.03.018, PII S0925527307001715
    • Z. Laslo, D. Golenko-Ginzburg, and B. Keren Optimal booking of machines in a virtual job-shop with stochastic processing times to minimize total machine rental and job tardiness costs International Journal of Production Economics 111 2008 812 821 (Pubitemid 350299171)
    • (2008) International Journal of Production Economics , vol.111 , Issue.2 , pp. 812-821
    • Laslo, Z.1    Golenko-Ginzburg, D.2    Keren, B.3
  • 32
    • 0028413979 scopus 로고
    • Scheduling flexible manufacturing systems using petri nets and heuristic search
    • D.Y. Lee, and F. DiCesare Scheduling flexible manufacturing systems using petri nets and heuristic search IEEE Transactions on Robotics and Automation 10 2 1994 123 132
    • (1994) IEEE Transactions on Robotics and Automation , vol.10 , Issue.2 , pp. 123-132
    • Lee, D.Y.1    Dicesare, F.2
  • 33
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • V.J. Leon, S.D. Wu, and R.H. Storer Robustness measures and robust scheduling for job shops IIE Transactions 26 5 1994 32 43
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 35
    • 33845775683 scopus 로고    scopus 로고
    • Robust and stable scheduling of a single machine with random machine breakdowns
    • DOI 10.1007/s00170-005-0237-0
    • L. Liu, H. Gu, and Y. Xi Robust and stable scheduling of a single machine with random machine breakdowns International Journal of Advanced Manufacturing Technology 31 2007 645 654 (Pubitemid 46005335)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.31 , Issue.7-8 , pp. 645-654
    • Liu, L.1    Gu, H.-Y.2    Xi, Y.-G.3
  • 36
    • 0031069765 scopus 로고    scopus 로고
    • Heuristic, optimal, static, and dynamic schedules when processing times are uncertain
    • PII S0272696396000903
    • S.R. Lawrence, and E.C. Sewell Heuristic, optimal, static, and dynamic schedules when processing times are uncertain Journal of Operations Management 15 1997 71 82 (Pubitemid 127410584)
    • (1997) Journal of Operations Management , vol.15 , Issue.1 , pp. 71-82
    • Lawrence, S.R.1    Sewell, E.C.2
  • 37
    • 77950298803 scopus 로고    scopus 로고
    • Development of a simulation-based decision support system for controlling stochastic flexible job shop manufacturing systems
    • I. Mahdavi, B. Shirazi, and M. Solimanpur Development of a simulation-based decision support system for controlling stochastic flexible job shop manufacturing systems Simulation Modelling Practice and Theory 18 6 2010 768 786
    • (2010) Simulation Modelling Practice and Theory , vol.18 , Issue.6 , pp. 768-786
    • Mahdavi, I.1    Shirazi, B.2    Solimanpur, M.3
  • 39
    • 0003936561 scopus 로고    scopus 로고
    • Evolutionary search and the job shop
    • Physica-Verlag
    • D.C. Mattfeld Evolutionary search and the job shop Production and Logistics 1996 Physica-Verlag
    • (1996) Production and Logistics
    • Mattfeld, D.C.1
  • 40
    • 0032097829 scopus 로고    scopus 로고
    • Predictable scheduling of a job shop subject to breakdowns
    • PII S1042296X98029176
    • S.V. Mehta, and R.M. Uzsoy Predictable scheduling of a job shop subjected to breakdowns IEEE Transactions on Robotics and Automation 14 3 1998 365 378 (Pubitemid 128752007)
    • (1998) IEEE Transactions on Robotics and Automation , vol.14 , Issue.3 , pp. 365-378
    • Mehta, S.V.1    Uzsoy, R.M.2
  • 42
    • 34248137031 scopus 로고    scopus 로고
    • A mixed integer programming formulation for the total flow time single machine robust scheduling problem with interval data
    • R. Montemanni A mixed integer programming formulation for the total flow time single machine robust scheduling problem with interval data Journal of Mathematical Modelling Algorithms 6 2007 287 296
    • (2007) Journal of Mathematical Modelling Algorithms , vol.6 , pp. 287-296
    • Montemanni, R.1
  • 46
    • 33646124013 scopus 로고    scopus 로고
    • Schedule robustness through broader solve and robustify search for partial order schedules
    • Bandini, S.; Manzoni, S. (Eds.)
    • Policella, N.; Cesta, A.; Oddi, A.; Smith, S.F.; 2005. Schedule robustness through broader solve and robustify search for partial order schedules. In: Bandini, S.; Manzoni, S. (Eds.), Proceedings of AI (*)IA 2005, Lecture Notes in Artificial Intelligence, vol. 3673, pp. 160172.
    • (2005) Proceedings of AI (*)IA 2005, Lecture Notes in Artificial Intelligence , vol.3673 , pp. 160-172
    • Policella, N.1    Cesta, A.2    Oddi, A.3    Smith, S.F.4
  • 47
    • 77949652799 scopus 로고
    • On the computational complexity of stochastic scheduling problems
    • M. Pinedo On the computational complexity of stochastic scheduling problems M. Dempster, J. Lenstra, A.R. Kan, Deterministic and Stochastic Scheduling 1982 Reidel Dordrecht
    • (1982) Deterministic and Stochastic Scheduling
    • Pinedo, M.1
  • 48
    • 33744966565 scopus 로고    scopus 로고
    • Disruption management for machine scheduling: The case of SPT schedules
    • DOI 10.1016/j.ijpe.2005.05.021, PII S0925527305002136
    • X. Qi, J.F. Bard, and G. Yu Disruption management for machine scheduling: the case of SPT schedules International Journal of Production Economics 103 2006 166 184 (Pubitemid 43866474)
    • (2006) International Journal of Production Economics , vol.103 , Issue.1 , pp. 166-184
    • Qi, X.1    Bard, J.F.2    Yu, G.3
  • 51
    • 0000179190 scopus 로고    scopus 로고
    • Rescheduling frequency in an fms with uncertain processing times and unreliable machines
    • I. Sabuncuoglu, and S. Karabuk Rescheduling frequency in an fms with uncertain processing times and unreliable machines Journal of Manufacturing 18 4 1999 268 283
    • (1999) Journal of Manufacturing , vol.18 , Issue.4 , pp. 268-283
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 53
    • 0033355662 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data. Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment
    • R. Shafaei, and P. Brunn Workshop scheduling using practical (inaccurate) data. Part 2: an investigation of the robustness of scheduling rules in a dynamic and stochastic environment International Journal of Production Research 37 18 1999 4105 4117 (Pubitemid 30519005)
    • (1999) International Journal of Production Research , vol.37 , Issue.18 , pp. 4105-4117
    • Shafaei, R.1    Brunn, P.2
  • 54
    • 0034627943 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data - Part 3: A framework to integrate job releasing, routing and scheduling functions to create a robust predictive schedule
    • DOI 10.1080/002075400189590
    • R. Shafaei, and P. Brunn Workshop scheduling using practical (inaccurate) data Part 3: a framework to integrate job releasing, routing and scheduling functions to create a robust predictive schedule International Journal of Production Research 38 1 2000 85 99 (Pubitemid 35393637)
    • (2000) International Journal of Production Research , vol.38 , Issue.1 , pp. 85-99
    • Shafaei, R.1    Brunn, P.2
  • 58
    • 0031223521 scopus 로고    scopus 로고
    • Genetic algorithms with a robust solution searching scheme
    • PII S1089778X97093776
    • S. Tsutsui, and A. Ghosh Genetic algorithms with robust solution search scheme IEEE Transactions in Evolutionary Computation 1 3 1997 201 208 (Pubitemid 127771029)
    • (1997) IEEE Transactions on Evolutionary Computation , vol.1 , Issue.3 , pp. 201-208
    • Tsutsui, S.1    Ghosh, A.2
  • 59
    • 58549094698 scopus 로고    scopus 로고
    • Scheduling with uncertain durations: Modeling β-robust scheduling with constraints
    • C.W. Wu, K.N. Brown, and J.C. Beck Scheduling with uncertain durations: modeling β-robust scheduling with constraints Computers & Operations Research 36 2009 2348 2356
    • (2009) Computers & Operations Research , vol.36 , pp. 2348-2356
    • Wu, C.W.1    Brown, K.N.2    Beck, J.C.3
  • 60
    • 78649318482 scopus 로고    scopus 로고
    • Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system
    • V. Vinod, and R. Sridharan Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system International Journal of Production Economics 129 2011 127 146
    • (2011) International Journal of Production Economics , vol.129 , pp. 127-146
    • Vinod, V.1    Sridharan, R.2
  • 61
    • 63049115920 scopus 로고    scopus 로고
    • Development and analysis of scheduling decision rules for a dynamic flexible job shop production system
    • V. Vinod, and R. Sridharan Development and analysis of scheduling decision rules for a dynamic flexible job shop production system International Journal of Business Performance Management 11 1/2 2009 43 71
    • (2009) International Journal of Business Performance Management , vol.11 , Issue.1-2 , pp. 43-71
    • Vinod, V.1    Sridharan, R.2
  • 62
    • 0027224847 scopus 로고
    • One-Machine rescheduling heuristics with efficiency and stability as criteria
    • D.S. Wu, R.H. Storer, and P.C. Chang One-Machine rescheduling heuristics with efficiency and stability as criteria Computers in Operations Research 20 1993 1 14
    • (1993) Computers in Operations Research , vol.20 , pp. 1-14
    • Wu, D.S.1    Storer, R.H.2    Chang, P.C.3
  • 63
    • 0000927907 scopus 로고    scopus 로고
    • A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
    • S.D. Wu, E. Byeon, and R.H. Storer A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness Operations Research 47 1 1999 113 124 (Pubitemid 129700862)
    • (1999) Operations Research , vol.47 , Issue.1 , pp. 113-124
    • Wu, S.D.1    Byeon, E.-S.2    Storer, R.H.3
  • 64
    • 34548434627 scopus 로고    scopus 로고
    • Job sequencing and due date assignment in a single machine shop with uncertain processing times
    • DOI 10.1016/j.ejor.2006.10.058, PII S0377221706011441
    • Y. Xia, B. Chen, and J. Yue Job sequencing and due date assignment in a single machine shop with uncertain processing times European Journal of Operational Research 184 2008 63 75 (Pubitemid 47368924)
    • (2008) European Journal of Operational Research , vol.184 , Issue.1 , pp. 63-75
    • Xia, Y.1    Chen, B.2    Yue, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.