Optimal booking of machines in a virtual job-shop with stochastic processing times to minimize total machine rental and job tardiness costs

Author keywords

Cyclic coordinate descent search algorithm; Job shop; Predictive schedule; Priority dispatching rule; Simulation

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; COST ACCOUNTING; ECONOMIC ANALYSIS; OPTIMIZATION; RANDOM PROCESSES;

EID: 37349057485     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2007.03.018     Document Type: Article
Times cited : (18)

References (28)
  • 1
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug H., Lawley M.A., McKay K., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research 161 (2005) 86-110
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 4
    • 0037063773 scopus 로고    scopus 로고
    • The development of gradual-priority weighting approach for the multi-objective flowshop scheduling problem
    • Chann C.P., Hsieh J.C., and Lin S.G. The development of gradual-priority weighting approach for the multi-objective flowshop scheduling problem. International Journal of Production Economics 79 (2002) 171-183
    • (2002) International Journal of Production Economics , vol.79 , pp. 171-183
    • Chann, C.P.1    Hsieh, J.C.2    Lin, S.G.3
  • 5
    • 0042154458 scopus 로고
    • Resource allocation and multi project scheduling
    • Slowinski R., and Weglarz J. (Eds), Elsevier, Amsterdam
    • Daniels R.L. Resource allocation and multi project scheduling. In: Slowinski R., and Weglarz J. (Eds). Advances in Project Scheduling (1989), Elsevier, Amsterdam
    • (1989) Advances in Project Scheduling
    • Daniels, R.L.1
  • 8
    • 0042622452 scopus 로고    scopus 로고
    • The resource allocation syndrome: the prime challenge of multi-project management?
    • Engwall M., and Jerbrant A. The resource allocation syndrome: the prime challenge of multi-project management?. International Journal of Project Management 21 (2003) 403-409
    • (2003) International Journal of Project Management , vol.21 , pp. 403-409
    • Engwall, M.1    Jerbrant, A.2
  • 10
    • 0031121279 scopus 로고    scopus 로고
    • A generalized control model for man-machine production systems with disturbances
    • Golenko-Ginzburg D., and Kats V. A generalized control model for man-machine production systems with disturbances. Computers and Industrial Engineering 32 (1996) 399-417
    • (1996) Computers and Industrial Engineering , vol.32 , pp. 399-417
    • Golenko-Ginzburg, D.1    Kats, V.2
  • 11
    • 37349089330 scopus 로고    scopus 로고
    • Chance constrained oriented dispatching rules for flexible job-shop scheduling
    • Golenko-Ginzburg D., and Laslo Z. Chance constrained oriented dispatching rules for flexible job-shop scheduling. Computer Modelling & New Technologies 8 (2004) 14-18
    • (2004) Computer Modelling & New Technologies , vol.8 , pp. 14-18
    • Golenko-Ginzburg, D.1    Laslo, Z.2
  • 13
    • 27144503749 scopus 로고    scopus 로고
    • Resource scheduling model with cost objectives for stochastic network projects
    • Gonik A. Resource scheduling model with cost objectives for stochastic network projects. Communications in Dependability and Quality Management 2 (1999) 102-108
    • (1999) Communications in Dependability and Quality Management , vol.2 , pp. 102-108
    • Gonik, A.1
  • 14
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • Herroelen W., and Leus R. Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research 165 (2005) 289-306
    • (2005) European Journal of Operational Research , vol.165 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 15
    • 37349088113 scopus 로고    scopus 로고
    • Laslo, Z., Golenko-Ginzburg, D., 2003. Decision-making model for pairwise comparison in job-shop scheduling. In: Proceedings of the First EURO/INFORMS Joint International Meeting of the New Millennium, Istanbul, 2003.
  • 22
    • 0019586862 scopus 로고
    • Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
    • Slowinski R. Multiobjective network scheduling with efficient use of renewable and nonrenewable resources. European Journal of Operational Research 7 (1981) 265-273
    • (1981) European Journal of Operational Research , vol.7 , pp. 265-273
    • Slowinski, R.1
  • 23
    • 0033102034 scopus 로고    scopus 로고
    • Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
    • Soroush H.M. Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs. European Journal of Operational Research 113 (1999) 450-468
    • (1999) European Journal of Operational Research , vol.113 , pp. 450-468
    • Soroush, H.M.1
  • 24
    • 0028768513 scopus 로고
    • The stochastic single machine scheduling problem with earliness and tardiness costs
    • Soroush H.M., and Fredendall L.D. The stochastic single machine scheduling problem with earliness and tardiness costs. European Journal of Operational Research 77 (1994) 287-302
    • (1994) European Journal of Operational Research , vol.77 , pp. 287-302
    • Soroush, H.M.1    Fredendall, L.D.2
  • 27
    • 13544263208 scopus 로고    scopus 로고
    • A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs
    • Varadharajan T.K., and Rajendran C. A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs. European Journal of Operational Research 167 (2005) 772-795
    • (2005) European Journal of Operational Research , vol.167 , pp. 772-795
    • Varadharajan, T.K.1    Rajendran, C.2
  • 28
    • 0000927907 scopus 로고    scopus 로고
    • A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
    • Wu S.D., Byeon E.S., and Storer R.H. A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness. Operations Research 47 (1999) 1-12
    • (1999) Operations Research , vol.47 , pp. 1-12
    • Wu, S.D.1    Byeon, E.S.2    Storer, R.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.