메뉴 건너뛰기




Volumn 11, Issue 1-2, 2009, Pages 43-71

Development and analysis of scheduling decision rules for a dynamic flexible job shop production system: A simulation study

Author keywords

Business performance management; Flexible job shop; Scheduling; Simulation

Indexed keywords


EID: 63049115920     PISSN: 13684892     EISSN: 17415039     Source Type: Journal    
DOI: 10.1504/IJBPM.2009.023800     Document Type: Article
Times cited : (13)

References (43)
  • 1
    • 84969450511 scopus 로고    scopus 로고
    • Operator staffing and scheduling for an IT-help call centre
    • Alfares, H.K. (2007) 'Operator staffing and scheduling for an IT-help call centre', European Journal of Industrial Engineering, Vol. 1, No. 4, pp.414-430.
    • (2007) European Journal of Industrial Engineering , vol.1 , Issue.4 , pp. 414-430
    • Alfares, H.K.1
  • 4
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • Baker, K.R. (1984) 'Sequencing rules and due-date assignments in a job shop', Management Science, Vol. 30, No. 9, pp.1093-1104.
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 5
    • 0002563758 scopus 로고
    • Job shop scheduling with modified due-dates
    • Baker, K.R. and Kanet, J.J. (1983) 'Job shop scheduling with modified due-dates', Journal of Operations Management, Vol. 4, No. 1, pp.11-22.
    • (1983) Journal of Operations Management , vol.4 , Issue.1 , pp. 11-22
    • Baker, K.R.1    Kanet, J.J.2
  • 7
    • 34250084648 scopus 로고
    • Routing and scheduling in a flexible job shop by tabu search
    • Brandimarte, P. (1993) 'Routing and scheduling in a flexible job shop by tabu search', Annals of Operations Research, Vol. 41, No. 3, pp.157-183.
    • (1993) Annals of Operations Research , vol.41 , Issue.3 , pp. 157-183
    • Brandimarte, P.1
  • 8
    • 0031530447 scopus 로고    scopus 로고
    • Complexity of scheduling problems with multi-purpose machines
    • Brucker, P.I., Jurisch, B. and Krämer, A.I. (1997) 'Complexity of scheduling problems with multi-purpose machines', Annals of Operations Research, Vol. 70, pp.57-73.
    • (1997) Annals of Operations Research , vol.70 , pp. 57-73
    • Brucker, P.I.1    Jurisch, B.2    Krämer, A.I.3
  • 9
    • 33845626540 scopus 로고    scopus 로고
    • Proposal of a performance measurement system for the evaluation of scheduling solutions
    • Cavalieri, S. and Terzi, S. (2006) 'Proposal of a performance measurement system for the evaluation of scheduling solutions', Int. J. Manufacturing Technology and Management, Vol. 8, Nos. 1-3, pp.248-263.
    • (2006) Int. J. Manufacturing Technology and Management , vol.8 , Issue.1-3 , pp. 248-263
    • Cavalieri, S.1    Terzi, S.2
  • 11
    • 27744463120 scopus 로고    scopus 로고
    • A genetic algorithm-based approach to machine assignment problem
    • Chan, F.T.S., Wong, T.C. and Chan, L.Y. (2005) 'A genetic algorithm-based approach to machine assignment problem', International Journal of Production Research, Vol. 43, No. 12, pp.2451-2472.
    • (2005) International Journal of Production Research , vol.43 , Issue.12 , pp. 2451-2472
    • Chan, F.T.S.1    Wong, T.C.2    Chan, L.Y.3
  • 14
    • 0042261208 scopus 로고    scopus 로고
    • An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search
    • Dauzére-Pérés, S. and Paulli, J. (1997) 'An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search', Annals of Operations Research, Vol. 70, No. 0, pp.281-306.
    • (1997) Annals of Operations Research , vol.70 , Issue.0 , pp. 281-306
    • Dauzére-Pérés, S.1    Paulli, J.2
  • 15
    • 0030385077 scopus 로고    scopus 로고
    • Using metaheuristics for solving a production scheduling problem in a chemical firm. A case study
    • Fortemps, P., Ost, C., Pirlot, M., Teghem, J. and Tuyttens, D. (1996) 'Using metaheuristics for solving a production scheduling problem in a chemical firm. A case study', International Journal of Production Economics, Vol. 46, No. 1, pp.13-26.
    • (1996) International Journal of Production Economics , vol.46 , Issue.1 , pp. 13-26
    • Fortemps, P.1    Ost, C.2    Pirlot, M.3    Teghem, J.4    Tuyttens, D.5
  • 18
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • Haupt, R. (1989) 'A survey of priority rule-based scheduling', OR Spektrum, Vol. 11, No. 1, pp.3-16.
    • (1989) OR Spektrum , vol.11 , Issue.1 , pp. 3-16
    • Haupt, R.1
  • 19
    • 33751418065 scopus 로고    scopus 로고
    • An effective architecture for learning and evolving flexible job-shop schedules
    • Ho, N.B., Tay, J.C. and Lai, E.M-K. (2007) 'An effective architecture for learning and evolving flexible job-shop schedules', European Journal of Operational Research, Vol. 179, pp.316-333.
    • (2007) European Journal of Operational Research , vol.179 , pp. 316-333
    • Ho, N.B.1    Tay, J.C.2    Lai, E.M.-K.3
  • 20
    • 0032668814 scopus 로고    scopus 로고
    • Scheduling in job shops with machine breakdowns: An experimental study
    • Holthaus, O. (1999) 'Scheduling in job shops with machine breakdowns: An experimental study', Computers and Industrial Engineering, Vol. 36, No. 1, pp.137-162.
    • (1999) Computers and Industrial Engineering , vol.36 , Issue.1 , pp. 137-162
    • Holthaus, O.1
  • 22
    • 0000062615 scopus 로고
    • Tabu search for the job shop scheduling problem with multi-purpose machines
    • Hurink, J., Jurish, B. and Thole, M. (1994) 'Tabu search for the job shop scheduling problem with multi-purpose machines', OR-Spektrum, Vol. 15, No. 4, pp.205-215.
    • (1994) OR-Spektrum , vol.15 , Issue.4 , pp. 205-215
    • Hurink, J.1    Jurish, B.2    Thole, M.3
  • 25
    • 0036464279 scopus 로고    scopus 로고
    • Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
    • Kacem, I., Hammadi, S. and Borne, P. (2002) 'Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems', IEEE Transactions on Systems, Man, and Cybernetics, Part C, Vol. 32, No. 1 pp.1-13.
    • (2002) IEEE Transactions on Systems, Man, and Cybernetics, Part C , vol.32 , Issue.1 , pp. 1-13
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 28
    • 0002577337 scopus 로고    scopus 로고
    • Effective neighbourhood functions for the flexible job shop problem
    • Mastrolilli, M. and Gambardella, L.M. (1996) 'Effective neighbourhood functions for the flexible job shop problem', Journal of Scheduling Vol. 3, No. 1, pp.3-20.
    • (1996) Journal of Scheduling , vol.3 , Issue.1 , pp. 3-20
    • Mastrolilli, M.1    Gambardella, L.M.2
  • 29
    • 0008573551 scopus 로고
    • A hierarchical approach for the FMS scheduling problem
    • Paulli, J. (1995) 'A hierarchical approach for the FMS scheduling problem', European Journal of Operational Research, Vol. 86, No. 1, pp.32-42.
    • (1995) European Journal of Operational Research , vol.86 , Issue.1 , pp. 32-42
    • Paulli, J.1
  • 30
    • 40249118429 scopus 로고    scopus 로고
    • A genetic algorithm for the flexible job-shop scheduling
    • Pezzelle, F., Morganti, G. and Ciaschetti, G. (2008) 'A genetic algorithm for the flexible job-shop scheduling', Computers and Operations Research, Vol. 35, No. 10, pp.3202-3212.
    • (2008) Computers and Operations Research , vol.35 , Issue.10 , pp. 3202-3212
    • Pezzelle, F.1    Morganti, G.2    Ciaschetti, G.3
  • 33
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: A survey of simulation research
    • Ramasesh, R. (1990) 'Dynamic job shop scheduling: A survey of simulation research', OMEGA: International Journal of Management Science, Vol. 18, pp.43-57.
    • (1990) OMEGA: International Journal of Management Science , vol.18 , pp. 43-57
    • Ramasesh, R.1
  • 34
    • 1442285828 scopus 로고    scopus 로고
    • Dynamic rescheduling that simultaneously considers efficiency and stability
    • Rangsaritratsamee, R., Ferrel, W.G. and Kurtz, M.B. (2004) 'Dynamic rescheduling that simultaneously considers efficiency and stability', Computers and Industrial Engineering, Vol. 46, No. 1, pp.1-15.
    • (2004) Computers and Industrial Engineering , vol.46 , Issue.1 , pp. 1-15
    • Rangsaritratsamee, R.1    Ferrel, W.G.2    Kurtz, M.B.3
  • 35
    • 0032000897 scopus 로고    scopus 로고
    • A study of scheduling rules of flexible manufacturing systems: A simulation approach
    • Sabuncuoglu, I. (1998) 'A study of scheduling rules of flexible manufacturing systems: A simulation approach', International Journal of Production Research, Vol. 36, No. 2, pp.527-546.
    • (1998) International Journal of Production Research , vol.36 , Issue.2 , pp. 527-546
    • Sabuncuoglu, I.1
  • 37
    • 38849162891 scopus 로고    scopus 로고
    • Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems
    • Tay, J.C. and Ho, N.B. (2008) 'Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems', Computers and Industrial Engineering, Vol. 54, No. 3, pp.453-473.
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.3 , pp. 453-473
    • Tay, J.C.1    Ho, N.B.2
  • 38
    • 0345118172 scopus 로고    scopus 로고
    • A simulation-based scheduling system for a textile plant', Int
    • Tunali, S. (2004) 'A simulation-based scheduling system for a textile plant', Int. J. Computer Applications in Technology, Vol. 19, No. 2, pp.119-124.
    • (2004) J. Computer Applications in Technology , vol.19 , Issue.2 , pp. 119-124
    • Tunali, S.1
  • 40
    • 33846487344 scopus 로고    scopus 로고
    • Simulation aided optimisation of manufacturing processes in university education
    • Weigert, G., Werner, S. and Horn, S. (2006) 'Simulation aided optimisation of manufacturing processes in university education', Int. J. Manufacturing Technology and Management, Vol. 9, Nos. 3-4, pp.372-386.
    • (2006) Int. J. Manufacturing Technology and Management , vol.9 , Issue.3-4 , pp. 372-386
    • Weigert, G.1    Werner, S.2    Horn, S.3
  • 41
    • 33845649375 scopus 로고    scopus 로고
    • Simulation-based real-time decision making for manufacturing automation systems: A review
    • Yoon, H.J. and Shen, W. (2006) 'Simulation-based real-time decision making for manufacturing automation systems: A review', Int. J. Manufacturing Technology and Management, Vol. 8, Nos. 1-3, pp.188-202.
    • (2006) Int. J. Manufacturing Technology and Management , vol.8 , Issue.1-3 , pp. 188-202
    • Yoon, H.J.1    Shen, W.2
  • 42
    • 63049137316 scopus 로고    scopus 로고
    • A simulation analysis of controlling rules for flexible pull systems
    • Yu, M-C. and Greene, T.J. (2006) 'A simulation analysis of controlling rules for flexible pull systems', Int. J. Manufacturing Research, Vol. 1, No. 3, pp.314-331.
    • (2006) Int. J. Manufacturing Research , vol.1 , Issue.3 , pp. 314-331
    • Yu, M.-C.1    Greene, T.J.2
  • 43
    • 84969452433 scopus 로고    scopus 로고
    • Yu, X., Ram, B. and Jiang, Y. (2007) 'Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups', European J. of Industrial Engineering, 1, No. 2, pp.182-199.
    • Yu, X., Ram, B. and Jiang, Y. (2007) 'Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups', European J. of Industrial Engineering, Vol. 1, No. 2, pp.182-199.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.