메뉴 건너뛰기




Volumn 37, Issue 18, 1999, Pages 4105-4117

Workshop scheduling using practical (inaccurate) data Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment

Author keywords

[No Author keywords available]

Indexed keywords

BENCHMARKING; COMPUTER SIMULATION; COST EFFECTIVENESS; PROCESS CONTROL; RANDOM PROCESSES; ROBUSTNESS (CONTROL SYSTEMS); SCHEDULING;

EID: 0033355662     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075499189682     Document Type: Article
Times cited : (44)

References (34)
  • 2
    • 84989493292 scopus 로고
    • An experimental study of the effectiveness of rolling schedules in produc tion planning
    • Baker, K. R., 1977, An experimental study of the effectiveness of rolling schedules in produc tion planning. Decision Science, 8, 19.
    • (1977) Decision Science , vol.8 , pp. 19
    • Baker, K.R.1
  • 3
    • 0002381223 scopus 로고
    • Machine sequencing via disjunctive graphs: An implicit enumeration algor ithm
    • Balas, E., 1969, Machine sequencing via disjunctive graphs: an implicit enumeration algor ithm. Operations Research, 17, 941-957.
    • (1969) Operations Research , vol.17 , pp. 941-957
    • Balas, E.1
  • 4
    • 0029195265 scopus 로고
    • One machine scheduling with delayed precedence constraints
    • Balas, E., Lenstra, J. K. and Vazacopoulos, A., 1995, One machine scheduling with delayed precedence constraints. Management Science, 41, 94-109.
    • (1995) Management Science , vol.41 , pp. 94-109
    • Balas, E.1    Lenstra, J.K.2    Vazacopoulos, A.3
  • 5
    • 0016564279 scopus 로고
    • Critical ratio scheduling: An experimental analysis
    • Berry, W. L. and Rao, V., 1975, Critical ratio scheduling: an experimental analysis. Management Science, 22, 192-201.
    • (1975) Management Science , vol.22 , pp. 192-201
    • Berry, W.L.1    Rao, V.2
  • 8
    • 0000165767 scopus 로고
    • An algorithm for solving the job shop problem
    • Carlier, J. and Pinson, E., 1989, An algorithm for solving the job shop problem. Management Science, 35, 164-176.
    • (1989) Management Science , vol.35 , pp. 164-176
    • Carlier, J.1    Pinson, E.2
  • 9
    • 0001013257 scopus 로고
    • A practical use of Jackson’s pre-emptive schedule for solving the job shop problem
    • Carlier, J. and Pinson, E., 1990, A practical use of Jackson’s pre-emptive schedule for solving the job shop problem. Annuals of Operations Research, 26, 269-287.
    • (1990) Annuals of Operations Research , vol.26 , pp. 269-287
    • Carlier, J.1    Pinson, E.2
  • 13
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing times uncertainty in single stage production
    • Daniels, R. L. and Kouvelis, P., 1995, Robust scheduling to hedge against processing times uncertainty in single stage production. Management Science, 41, 363-376.
    • (1995) Management Science , vol.41 , pp. 363-376
    • Daniels, R.L.1    Kouvelis, P.2
  • 15
    • 0026940322 scopus 로고
    • Identification of robust scheduling heuristics: Appli cation of Taguchi methods in simulation studies
    • Dooley, K. J. and Mahmoodi, F., 1992, Identification of robust scheduling heuristics: appli cation of Taguchi methods in simulation studies. Computers and Industrial Engineering, 22, 359-368.
    • (1992) Computers and Industrial Engineering , vol.22 , pp. 359-368
    • Dooley, K.J.1    Mahmoodi, F.2
  • 16
    • 0039770263 scopus 로고
    • An implicit enumeration algorithm for the machine sequencing problem
    • Florian, M., Trepant, P. and McMahon, G., 1971, An implicit enumeration algorithm for the machine sequencing problem. Management Science, 17, B782-B792.
    • (1971) Management Science , vol.17 , pp. B782-B792
    • Florian, M.1    Trepant, P.2    Mc Mahon, G.3
  • 17
    • 0000131281 scopus 로고
    • Algorithms for solving production scheduling prob lems
    • Giffler, B. and Thompson, G. L., 1960, Algorithms for solving production scheduling prob lems. Operations Research, 8, 487-503.
    • (1960) Operations Research , vol.8 , pp. 487-503
    • Giffler, B.1    Thompson, G.L.2
  • 18
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves, C. S., 1981, A review of production scheduling. Operations Research, 29, 646-675.
    • (1981) Operations Research , vol.29 , pp. 646-675
    • Graves, C.S.1
  • 19
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon, V. J., Wu, S. D. and Storer R. H., 1994, Robustness measures and robust scheduling for job shops. IIE Transactions, 26, 32-43.
    • (1994) IIE Transactions , vol.26 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 20
    • 0026946377 scopus 로고
    • An improved formulation for the job shop scheduling problem
    • Liao, C. J. and You, C. T., 1993, An improved formulation for the job shop scheduling problem. Journal of Production Research Society, 43, 1047-1054.
    • (1993) Journal of Production Research Society , vol.43 , pp. 1047-1054
    • Liao, C.J.1    You, C.T.2
  • 21
    • 0000237789 scopus 로고
    • On job shop scheduling problem
    • Manne, A. S., 1960, On job shop scheduling problem. Operations Research, 8, 219-223.
    • (1960) Operations Research , vol.8 , pp. 219-223
    • Manne, A.S.1
  • 24
    • 0028452709 scopus 로고
    • Rolling horizon algorithms for single machine dynamic scheduling problem with sequence dependent set up times
    • Ovacik, I. M. and Uzsoy, R., 1994, Rolling horizon algorithms for single machine dynamic scheduling problem with sequence dependent set up times. International Journal of Production Research, 32, 1243-1263.
    • (1994) International Journal of Production Research , vol.32 , pp. 1243-1263
    • Ovacik, I.M.1    Uzsoy, R.2
  • 25
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent set up times
    • Ovacik, I. M. and Uzsoy, R., 1995, Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent set up times. International Journal of Production Research, 33, 3173-3192.
    • (1995) International Journal of Production Research , vol.33 , pp. 3173-3192
    • Ovacik, I.M.1    Uzsoy, R.2
  • 26
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: A survey of simulation research
    • Ramasesh, R., 1990, Dynamic job shop scheduling: a survey of simulation research. OMEGA, 18, 43-57.
    • (1990) OMEGA , vol.18 , pp. 43-57
    • Ramasesh, R.1
  • 27
    • 0023437076 scopus 로고
    • A comparative analysis of the COVERT job sequencing rule using various shop performance measures
    • Russell, R. S., Darei, E. M. and Taylor, B. W., 1987, A comparative analysis of the COVERT job sequencing rule using various shop performance measures. International Journal of Production Research, 25, 1523-1540.
    • (1987) International Journal of Production Research , vol.25 , pp. 1523-1540
    • Russell, R.S.1    Darei, E.M.2    Taylor, B.W.3
  • 29
    • 0033226070 scopus 로고    scopus 로고
    • Workshop scheduling using practical (Inaccurate) data- Part 1: The performance of heuristic scheduling rules in a dynamic job shop environ ment using a rolling time horizon approach
    • Shafaei, R. and Brunn, P., 1999, Workshop scheduling using practical (inaccurate) data- Part 1: The performance of heuristic scheduling rules in a dynamic job shop environ ment using a rolling time horizon approach. International Journal of Production Research, 37, 3913-3925.
    • (1999) International Journal of Production Research , vol.37 , pp. 3913-3925
    • Shafaei, R.1    Brunn, P.2
  • 30
    • 0028406904 scopus 로고
    • A dynamic job shop scheduling frame work: A backward approach
    • Sun, D. and Lin, L., 1994, A dynamic job shop scheduling frame work: a backward approach. International Journal of Production Research, 32, 967-985.
    • (1994) International Journal of Production Research , vol.32 , pp. 967-985
    • Sun, D.1    Lin, L.2
  • 31
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalaninen, A. and Morton, T. E., 1988, Priority rules for job shops with weighted tardiness costs. Management Science, 33, 1035-1047.
    • (1988) Management Science , vol.33 , pp. 1035-1047
    • Vepsalaninen, A.1    Morton, T.E.2
  • 32
    • 0000518993 scopus 로고
    • An integer linear programming model for machine scheduling
    • Wagner, H. M., 1959, An integer linear programming model for machine scheduling. Naval Research L ogistic Quarterly, 6, 131.
    • (1959) Naval Research L Ogistic Quarterly , vol.6 , pp. 131
    • Wagner, H.M.1
  • 34
    • 0031079410 scopus 로고    scopus 로고
    • Robust deterministic scheduling in stochastic environments: The method of capacity hedge points
    • Yellig, E. J., and Mackulak, G. T., 1997, Robust deterministic scheduling in stochastic environments: the method of capacity hedge points. International Journal of Production Research, 35, 369-379
    • (1997) International Journal of Production Research , vol.35 , pp. 369-379
    • Yellig, E.J.1    Mackulak, G.T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.