Scheduling with uncertain durations: Modeling β-robust scheduling with constraints

Author keywords

Constraints; Robust optimization; Scheduling; Uncertainty

Indexed keywords

MACHINERY; NORMAL DISTRIBUTION; RANDOM VARIABLES;

EID: 58549094698     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2008.08.008     Document Type: Article
Times cited : (50)

References (16)
  • 1
    • 0031268742 scopus 로고    scopus 로고
    • Beta-robust scheduling for single-machine systems with uncertain processing times
    • Daniels R.L., and Carrillo J.E. Beta-robust scheduling for single-machine systems with uncertain processing times. IIE Transactions 29 (1997) 977-985
    • (1997) IIE Transactions , vol.29 , pp. 977-985
    • Daniels, R.L.1    Carrillo, J.E.2
  • 3
    • 58549115366 scopus 로고    scopus 로고
    • E.S. Oliveira, Solving single-track railway scheduling problem using constraint programming. PhD thesis, The University of Leeds, UK; 2001.
    • E.S. Oliveira, Solving single-track railway scheduling problem using constraint programming. PhD thesis, The University of Leeds, UK; 2001.
  • 4
    • 10644284878 scopus 로고    scopus 로고
    • A two-stage hybrid local search for the vehicle routing problem with time windows
    • Bent R., and Van Hentenryck P. A two-stage hybrid local search for the vehicle routing problem with time windows. Transportation Science 38 4 (2004) 515-530
    • (2004) Transportation Science , vol.38 , Issue.4 , pp. 515-530
    • Bent, R.1    Van Hentenryck, P.2
  • 5
    • 58549096812 scopus 로고    scopus 로고
    • H. Gao, Building robust schedules using temporal protection-an empirical study of constraint-based scheduling under machine failure uncertainty. Master's thesis, Department of Industrial Engineering, University of Toronto; 1995.
    • H. Gao, Building robust schedules using temporal protection-an empirical study of constraint-based scheduling under machine failure uncertainty. Master's thesis, Department of Industrial Engineering, University of Toronto; 1995.
  • 8
    • 0037232234 scopus 로고    scopus 로고
    • Branching constraint satisfaction problems and Markov decision problems compared
    • Fowler D.W., and Brown K.N. Branching constraint satisfaction problems and Markov decision problems compared. Annals of Operations Research 118 (2003) 85-100
    • (2003) Annals of Operations Research , vol.118 , pp. 85-100
    • Fowler, D.W.1    Brown, K.N.2
  • 9
    • 34249039309 scopus 로고    scopus 로고
    • Proactive algorithms for job shop scheduling with probabilistic durations
    • Beck J.C., and Wilson N. Proactive algorithms for job shop scheduling with probabilistic durations. Journal of Artificial Intelligence Research 28 (2007) 183-232
    • (2007) Journal of Artificial Intelligence Research , vol.28 , pp. 183-232
    • Beck, J.C.1    Wilson, N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.