메뉴 건너뛰기




Volumn 37, Issue 5, 2007, Pages 904-916

A complete multiagent framework for robust and adaptable dynamic job shop scheduling

Author keywords

Dynamic job shop scheduling; Multiagent systems; Scheduling robustness

Indexed keywords

COMPUTATIONAL METHODS; DECISION MAKING; FAULT TOLERANCE; INFORMATION THEORY; SCHEDULING;

EID: 34548209982     PISSN: 10946977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSMCC.2007.900658     Document Type: Article
Times cited : (44)

References (38)
  • 1
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Sep
    • V. Jorge Leon, S. D. Wu, and R. H. Storer, "Robustness measures and robust scheduling for job shops," IIE Trans., vol. 26, no. 5, pp. 32-43, Sep. 1994.
    • (1994) IIE Trans , vol.26 , Issue.5 , pp. 32-43
    • Jorge Leon, V.1    Wu, S.D.2    Storer, R.H.3
  • 3
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates, and disruptions
    • May.-Jun
    • J. C. Bean, J. R. Birge, J. Mittenthal, and C. E. Noon, "Matchup scheduling with multiple resources, release dates, and disruptions," Oper. Res., vol. 39, no. 3, pp. 470-483, May.-Jun. 1991.
    • (1991) Oper. Res , vol.39 , Issue.3 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 4
    • 0000522889 scopus 로고
    • Analysis of periodic and event-driven rescheduling policies in dynamic shops
    • L. K. Church and R. Uzsoy, "Analysis of periodic and event-driven rescheduling policies in dynamic shops," Int. J. Comput. Integr. Manuf., vol. 5, no. 3, pp. 153-163, 1992.
    • (1992) Int. J. Comput. Integr. Manuf , vol.5 , Issue.3 , pp. 153-163
    • Church, L.K.1    Uzsoy, R.2
  • 5
    • 0028452692 scopus 로고
    • Agame-theoretic control approach for job shops in the presence of disruptions
    • V. J. Leon, S. D. Wu, and R. H. Storer, "Agame-theoretic control approach for job shops in the presence of disruptions," Int. J. Prod. Res., vol. 32, no. 6, pp. 1451-1476, 1994.
    • (1994) Int. J. Prod. Res , vol.32 , Issue.6 , pp. 1451-1476
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 6
    • 0022097890 scopus 로고
    • Scheduling/rescheduling in the manufacturing operating system environment
    • M. Yamamoto and S. Y. Nof, "Scheduling/rescheduling in the manufacturing operating system environment," Int. J. Prod. Res., vol. 23, no. 4, pp. 705-722, 1985.
    • (1985) Int. J. Prod. Res , vol.23 , Issue.4 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2
  • 7
    • 0032049255 scopus 로고    scopus 로고
    • Decomposition heuristics for robust job-shop scheduling
    • Apr
    • E.-S. Byeon, S. D. Wu, and R. H. Storer, "Decomposition heuristics for robust job-shop scheduling," IEEE Trans. Robot. Autom., vol. 14, no. 2, pp. 303-313, Apr. 1998.
    • (1998) IEEE Trans. Robot. Autom , vol.14 , Issue.2 , pp. 303-313
    • Byeon, E.-S.1    Wu, S.D.2    Storer, R.H.3
  • 8
    • 0000927907 scopus 로고    scopus 로고
    • A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
    • Jan.-Feb
    • S. D. Wu, E.-S. Byeon, and R. H. Storer, "A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness," Oper. Res., vol. 47, no. 1, pp. 113-124, Jan.-Feb. 1999.
    • (1999) Oper. Res , vol.47 , Issue.1 , pp. 113-124
    • Wu, S.D.1    Byeon, E.-S.2    Storer, R.H.3
  • 10
    • 0032097829 scopus 로고    scopus 로고
    • Predictable scheduling of a job shop subject to breakdowns
    • Jun
    • S.V. Mehta and R. M. Uzsoy, "Predictable scheduling of a job shop subject to breakdowns," IEEE Trans. Robot. Autom., vol. 14, no. 3, pp. 365-378, Jun. 1998.
    • (1998) IEEE Trans. Robot. Autom , vol.14 , Issue.3 , pp. 365-378
    • Mehta, S.V.1    Uzsoy, R.M.2
  • 11
    • 0002054180 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine subject to breakdowns
    • S. V. Mehta and R. Uzsoy, "Predictable scheduling of a single machine subject to breakdowns," Int. J. Comput. Integr. Manuf., vol. 12, no. 1, pp. 15-38, 1999.
    • (1999) Int. J. Comput. Integr. Manuf , vol.12 , Issue.1 , pp. 15-38
    • Mehta, S.V.1    Uzsoy, R.2
  • 12
    • 0026936702 scopus 로고
    • Knowledge-based production management: Approaches, results, and prospects
    • S. F. Smith, "Knowledge-based production management: Approaches, results, and prospects," Prod. Plan. Control, vol. 3, no. 4, pp. 350-380, 1992.
    • (1992) Prod. Plan. Control , vol.3 , Issue.4 , pp. 350-380
    • Smith, S.F.1
  • 13
    • 0002646899 scopus 로고
    • Knowledge-based reactive scheduling
    • E. Szelke and R. M. Kerr, "Knowledge-based reactive scheduling," Prod. Plan. Control, vol. 5, no. 2, pp. 124-145, 1994.
    • (1994) Prod. Plan. Control , vol.5 , Issue.2 , pp. 124-145
    • Szelke, E.1    Kerr, R.M.2
  • 14
    • 0028452709 scopus 로고
    • Rolling horizon algorithms for a singlemachine dynamic scheduling problem with sequence-dependent setup times
    • I. M. Ovacik and R. Uzsoy, "Rolling horizon algorithms for a singlemachine dynamic scheduling problem with sequence-dependent setup times," Int. J. Prod. Res., vol. 32, no. 6, pp. 1243-1263, 1994.
    • (1994) Int. J. Prod. Res , vol.32 , Issue.6 , pp. 1243-1263
    • Ovacik, I.M.1    Uzsoy, R.2
  • 15
    • 0036200385 scopus 로고    scopus 로고
    • Distributed manufacturing scheduling using intelligent agents
    • Jan.-Feb
    • W. Shen, "Distributed manufacturing scheduling using intelligent agents," IEEE Intell. Syst. Appl., vol. 17, no. 1, pp. 88-94, Jan.-Feb. 2002.
    • (2002) IEEE Intell. Syst. Appl , vol.17 , Issue.1 , pp. 88-94
    • Shen, W.1
  • 16
    • 0020504370 scopus 로고
    • Negotiation as a metaphor for distributed problem solving
    • R. Davis and R. G. Smith, "Negotiation as a metaphor for distributed problem solving," Artif. Intell., vol. 20, no. 1, pp. 63-109, 1983.
    • (1983) Artif. Intell , vol.20 , Issue.1 , pp. 63-109
    • Davis, R.1    Smith, R.G.2
  • 17
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in distributed problem solver
    • Dec
    • R. G. Smith, "The contract net protocol: High-level communication and control in distributed problem solver," IEEE Trans. Comput., vol. C-29, no. 12, pp. 1104-1113, Dec. 1980.
    • (1980) IEEE Trans. Comput , vol.C-29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1
  • 18
    • 84950937653 scopus 로고
    • Integrated shop floor control using autonomous agents
    • Jul
    • G.Y.-J. Lin and J. J. Solberg, "Integrated shop floor control using autonomous agents," IIE Trans., vol. 24, no. 3, pp. 57-71, Jul. 1992.
    • (1992) IIE Trans , vol.24 , Issue.3 , pp. 57-71
    • Lin, G.Y.-J.1    Solberg, J.J.2
  • 19
    • 0036574007 scopus 로고    scopus 로고
    • A negotiation scheme for autonomous agents in job shop scheduling
    • R. Macchiaroli and S. Riemma, "A negotiation scheme for autonomous agents in job shop scheduling," Int. J. Comput. Integr. Manuf., vol. 15, no. 2, pp. 222-232, 2002.
    • (2002) Int. J. Comput. Integr. Manuf , vol.15 , Issue.2 , pp. 222-232
    • Macchiaroli, R.1    Riemma, S.2
  • 20
    • 0023419094 scopus 로고
    • A distributed scheduling method for computed integrated manufacturing: The use of local area networks in cellular systems
    • M. J. Shaw, "A distributed scheduling method for computed integrated manufacturing: The use of local area networks in cellular systems," Int. J. Prod. Res., vol. 25, no. 9, pp. 1285-1303, 1987.
    • (1987) Int. J. Prod. Res , vol.25 , Issue.9 , pp. 1285-1303
    • Shaw, M.J.1
  • 21
    • 0002554619 scopus 로고
    • A flexible structure for computer-controlled manufacturing systems
    • D. M. Upton, "A flexible structure for computer-controlled manufacturing systems," Manuf. Rev., vol. 5, no. 1, pp. 58-72, 1992.
    • (1992) Manuf. Rev , vol.5 , Issue.1 , pp. 58-72
    • Upton, D.M.1
  • 22
    • 0037109642 scopus 로고    scopus 로고
    • Agent-based scheduling in production systems
    • T.-T. Dang and B. Frankovic, "Agent-based scheduling in production systems," Int. J. Prod. Res., vol. 40, no. 15, pp. 3669-3679, 2002.
    • (2002) Int. J. Prod. Res , vol.40 , Issue.15 , pp. 3669-3679
    • Dang, T.-T.1    Frankovic, B.2
  • 23
    • 0033940478 scopus 로고    scopus 로고
    • Development of a distributed cooperative scheduling system based on negotiations between scheduling agents
    • T. Kawamura, N. Kase, D. Araki, and A. Osuga, "Development of a distributed cooperative scheduling system based on negotiations between scheduling agents," Syst. Comput. Jpn., vol. 31, no. 1, 2000.
    • (2000) Syst. Comput. Jpn , vol.31 , Issue.1
    • Kawamura, T.1    Kase, N.2    Araki, D.3    Osuga, A.4
  • 24
    • 0043044736 scopus 로고    scopus 로고
    • Coordination ofmultiple agents for production management
    • J.-S. Liu and K. P. Sycara, "Coordination ofmultiple agents for production management," Ann. Oper. Res., vol. 75, pp. 235-289, 1997.
    • (1997) Ann. Oper. Res , vol.75 , pp. 235-289
    • Liu, J.-S.1    Sycara, K.P.2
  • 25
    • 0342906527 scopus 로고    scopus 로고
    • An agentmodel for incentive-based production scheduling
    • J. Váncza and A. Márkus, "An agentmodel for incentive-based production scheduling," Comput. Ind., vol. 43, no. 2, 2000.
    • (2000) Comput. Ind , vol.43 , Issue.2
    • Váncza, J.1    Márkus, A.2
  • 26
    • 0037139688 scopus 로고    scopus 로고
    • Auction-based distributed scheduling in a dynamic job shop environment
    • P. Dewan and S. Joshi, "Auction-based distributed scheduling in a dynamic job shop environment," Int. J. Prod. Res., vol. 40, no. 5, pp. 1173-1191, 2002.
    • (2002) Int. J. Prod. Res , vol.40 , Issue.5 , pp. 1173-1191
    • Dewan, P.1    Joshi, S.2
  • 27
    • 0033184840 scopus 로고    scopus 로고
    • On combinatorial auction and Lagrangean relaxation for distributed resource scheduling
    • E. Kutanoglu and S. D. Wu, "On combinatorial auction and Lagrangean relaxation for distributed resource scheduling," IIE Trans., vol. 31, no. 9, pp. 813-826, 1999.
    • (1999) IIE Trans , vol.31 , Issue.9 , pp. 813-826
    • Kutanoglu, E.1    Wu, S.D.2
  • 28
    • 0032202838 scopus 로고    scopus 로고
    • Holonic manufacturing scheduling: Architecture, cooperation mechanism, and implementation
    • L. Gou, P. B. Luh, and Y. Kyoya, "Holonic manufacturing scheduling: Architecture, cooperation mechanism, and implementation," Comput. Ind., vol. 37, pp. 213-231, 1998.
    • (1998) Comput. Ind , vol.37 , pp. 213-231
    • Gou, L.1    Luh, P.B.2    Kyoya, Y.3
  • 29
    • 0034634815 scopus 로고    scopus 로고
    • Dynamic single-machine scheduling under distributed decision-making
    • P. Dewan and S. Joshi, "Dynamic single-machine scheduling under distributed decision-making," Int. J. Prod. Res., vol. 38, no. 16, pp. 3759-3777, 2000.
    • (2000) Int. J. Prod. Res , vol.38 , Issue.16 , pp. 3759-3777
    • Dewan, P.1    Joshi, S.2
  • 30
    • 0010353276 scopus 로고
    • Forward algorithms for forward-thinking managers
    • R. L. Schultz, Ed. Greenwich, CT: JAI
    • T. E. Morton, "Forward algorithms for forward-thinking managers," in Applications of Management Science, vol. 1, R. L. Schultz, Ed. Greenwich, CT: JAI, 1981, pp. 1-55.
    • (1981) Applications of Management Science , vol.1 , pp. 1-55
    • Morton, T.E.1
  • 31
    • 0024014219 scopus 로고
    • Modeling the performance of organizational structures
    • May-Jun
    • T. W. Malone and S. A. Smith, "Modeling the performance of organizational structures," Oper. Res., vol. 36, no. 3, pp. 421-435, May-Jun. 1988.
    • (1988) Oper. Res , vol.36 , Issue.3 , pp. 421-435
    • Malone, T.W.1    Smith, S.A.2
  • 32
    • 34548263729 scopus 로고    scopus 로고
    • A. Charnes andW.W. Cooper, Chance-constrained programming, Manage. Sci., 6, pp. 73-79, 1960.
    • A. Charnes andW.W. Cooper, "Chance-constrained programming," Manage. Sci., vol. 6, pp. 73-79, 1960.
  • 33
    • 0033721287 scopus 로고    scopus 로고
    • The application of parallel multipopulation genetic algorithms to dynamic job-shop scheduling
    • J. G. Qi, G. R. Burns, and D. K. Harrison, "The application of parallel multipopulation genetic algorithms to dynamic job-shop scheduling," Int. J. Adv. Manuf. Technol., vol. 16, pp. 609-615, 2000.
    • (2000) Int. J. Adv. Manuf. Technol , vol.16 , pp. 609-615
    • Qi, J.G.1    Burns, G.R.2    Harrison, D.K.3
  • 34
    • 0004168233 scopus 로고
    • J. Muth and G. Thompson, Eds, Englewood Cliffs, NJ: Prentice-Hall
    • J. Muth and G. Thompson, Eds., Industrial Scheduling. Englewood Cliffs, NJ: Prentice-Hall, 1963.
    • (1963) Industrial Scheduling
  • 35
    • 0035247584 scopus 로고    scopus 로고
    • Comparison of constraint logic programming and distributed problem solving: A case study for interactive, efficient, and practicable job-shop scheduling
    • D. Trentesaux, P. Pesin, and C. Tahon, "Comparison of constraint logic programming and distributed problem solving: A case study for interactive, efficient, and practicable job-shop scheduling," Comput. Ind. Eng., vol. 29, pp. 187-211, 2001.
    • (2001) Comput. Ind. Eng , vol.29 , pp. 187-211
    • Trentesaux, D.1    Pesin, P.2    Tahon, C.3
  • 36
    • 0042747219 scopus 로고    scopus 로고
    • LEKIN, New York University, New York
    • LEKIN, The Stern School of Business, New York University, New York, 2001.
    • (2001) The Stern School of Business
  • 37
    • 0016929914 scopus 로고
    • Due dates in job shop scheduling
    • S. Eilon and I. G. Chowdhury, "Due dates in job shop scheduling," Int. J. Prod. Res., vol. 14, no. 2, pp. 223-237, 1976.
    • (1976) Int. J. Prod. Res , vol.14 , Issue.2 , pp. 223-237
    • Eilon, S.1    Chowdhury, I.G.2
  • 38
    • 34250097087 scopus 로고
    • Algorithms and codes for the assignment problem
    • G. Carpaneto, S. Martello, and P. Toth, "Algorithms and codes for the assignment problem," Ann. Oper. Res., vol. 13, pp. 193-223, 1988.
    • (1988) Ann. Oper. Res , vol.13 , pp. 193-223
    • Carpaneto, G.1    Martello, S.2    Toth, P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.