메뉴 건너뛰기




Volumn 36, Issue 11, 2004, Pages 1107-1124

Improving scheduling robustness via preprocessing and dynamic adaptation

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; CONSTRAINT THEORY; ITERATIVE METHODS; LAGRANGE MULTIPLIERS; MATHEMATICAL MODELS; OPERATIONS RESEARCH; OPTIMIZATION; RANDOM PROCESSES;

EID: 4744347235     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1080/07408170490500681     Document Type: Article
Times cited : (18)

References (31)
  • 2
    • 0347969199 scopus 로고
    • Taking into account the rescheduling problem during the scheduling phase
    • Baptiste, P. and Favrel, J. (1993) Taking into account the rescheduling problem during the scheduling phase. Production Planning and Control, 4, 349-360.
    • (1993) Production Planning and Control , vol.4 , pp. 349-360
    • Baptiste, P.1    Favrel, J.2
  • 3
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates and disruptions
    • Bean, J.C., Birge, J.R., Mittenthal, J. and Noon, C.E. (1991) Matchup scheduling with multiple resources, release dates and disruptions. Operations Research, 39(3), 470-483.
    • (1991) Operations Research , vol.39 , Issue.3 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 5
  • 11
    • 0040621775 scopus 로고    scopus 로고
    • Experimental investigation of iterative simulation-based scheduling in dynamic and stochastic job shops
    • Kutanoglu E. and Sabuncuoglu, I. (2001) Experimental investigation of iterative simulation-based scheduling in dynamic and stochastic job shops. Journal of Manufacturing Systems, 20(4), 264-279.
    • (2001) Journal of Manufacturing Systems , vol.20 , Issue.4 , pp. 264-279
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 12
    • 4744363603 scopus 로고    scopus 로고
    • Technical report, Operations Research and Industrial Engineering Program, Department of Mechanical Engineering, The University of Texas at Austin, Austin, TX
    • Kutanoglu, E. and Wu, S.D. (2002) Scaling-based heuristics for job shop scheduling under deterministic and stochastic conditions. Technical report, Operations Research and Industrial Engineering Program, Department of Mechanical Engineering, The University of Texas at Austin, Austin, TX.
    • (2002) Scaling-Based Heuristics for Job Shop Scheduling Under Deterministic and Stochastic Conditions
    • Kutanoglu, E.1    Wu, S.D.2
  • 13
    • 0031069765 scopus 로고    scopus 로고
    • Heuristic, optimal, static, and dynamic schedules when processing times are uncertain
    • Lawrence, S.R. and Sewell, E.C. (1997) Heuristic, optimal, static, and dynamic schedules when processing times are uncertain. Journal of Operations Management, 15, 71-82.
    • (1997) Journal of Operations Management , vol.15 , pp. 71-82
    • Lawrence, S.R.1    Sewell, E.C.2
  • 14
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling
    • Leon, V.J., Wu, S.D. and Storer R.H. (1994) Robustness measures and robust scheduling. IIE Transactions, 26(5), 32-43.
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 15
    • 4744340804 scopus 로고    scopus 로고
    • Technical report, Operations Research and Industrial Engineering Program, Department of Mechanical Engineering, The University of Texas, Austin, TX
    • Ling, R. and Kutanoglu, E. (2002) A scaling-based heuristic for resource-constrained project scheduling problems. Technical report, Operations Research and Industrial Engineering Program, Department of Mechanical Engineering, The University of Texas, Austin, TX.
    • (2002) A Scaling-Based Heuristic for Resource-Constrained Project Scheduling Problems
    • Ling, R.1    Kutanoglu, E.2
  • 24
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker, A., Watters, L. and Wolfe, P. (1969) Multiproject scheduling with limited resources: a zero-one programming approach. Management Science: Theory, 16(1), 93-108.
    • (1969) Management Science: Theory , vol.16 , Issue.1 , pp. 93-108
    • Pritsker, A.1    Watters, L.2    Wolfe, P.3
  • 25
    • 0000580617 scopus 로고
    • A price-directed approach to real-time scheduling of production operations
    • Roundy, R.O., Maxwell, W.L., Herer, Y.T., Tayur, S.R. and Getzler, A.W. (1991) A price-directed approach to real-time scheduling of production operations. IIE Transactions, 23(2), 149-160.
    • (1991) IIE Transactions , vol.23 , Issue.2 , pp. 149-160
    • Roundy, R.O.1    Maxwell, W.L.2    Herer, Y.T.3    Tayur, S.R.4    Getzler, A.W.5
  • 26
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalainen, A.P.J. and Morton, T.E. (1987) Priority rules for job shops with weighted tardiness costs. Management Science, 33(8), 1035-1047.
    • (1987) Management Science , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 28
    • 0000927907 scopus 로고    scopus 로고
    • A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
    • Wu, S.D., Byeon, E.S. and Storer, R.H. (1999) A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness. Operations Research, 47(1), 113-124.
    • (1999) Operations Research , vol.47 , Issue.1 , pp. 113-124
    • Wu, S.D.1    Byeon, E.S.2    Storer, R.H.3
  • 29
    • 0042156822 scopus 로고
    • A rescheduling procedure for manufacturing systems under random disruptions
    • Springer-Verlag
    • Wu, S.D., Storer, R.H. and Chang, P.C. (1992) A rescheduling procedure for manufacturing systems under random disruptions, in New Directions for OR in Manufacturing, Springer-Verlag.
    • (1992) New Directions for OR in Manufacturing
    • Wu, S.D.1    Storer, R.H.2    Chang, P.C.3
  • 30
    • 0027224847 scopus 로고
    • One machine rescheduling heuristics with efficiency and stability as criteria
    • Wu, S.D., Storer, R.H. and Chang, P.C. (1993) One machine rescheduling heuristics with efficiency and stability as criteria. Computers & Operations Research, 20, 1-14.
    • (1993) Computers and Operations Research , vol.20 , pp. 1-14
    • Wu, S.D.1    Storer, R.H.2    Chang, P.C.3
  • 31
    • 0022097890 scopus 로고
    • Scheduling/rescheduling in the manufacturing operating system environment
    • Yamamoto, M. and Nof, S.Y. (1985) Scheduling/rescheduling in the manufacturing operating system environment. International Journal of Production Research, 23(4), 705-722.
    • (1985) International Journal of Production Research , vol.23 , Issue.4 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.