메뉴 건너뛰기




Volumn 22, Issue 9-10, 2003, Pages 669-680

mAOR: A heuristic-based reactive repair mechanism for job shop schedules

Author keywords

Job shop schedules; Schedule recovery; Schedule repair

Indexed keywords

ALGORITHMS; ARTIFICIAL INTELLIGENCE; COMPUTER SIMULATION; HEURISTIC METHODS; REPAIR; SCHEDULING;

EID: 0347413589     PISSN: 02683768     EISSN: None     Source Type: Journal    
DOI: 10.1007/s00170-003-1601-6     Document Type: Article
Times cited : (38)

References (18)
  • 3
    • 0031189107 scopus 로고    scopus 로고
    • Rescheduling job shops under random disruptions
    • Abumaizar RJ, Svestka JA (1997) Rescheduling job shops under random disruptions. Int J Prod Res 35(7):2065-2082
    • (1997) Int J Prod Res , vol.35 , Issue.7 , pp. 2065-2082
    • Abumaizar, R.J.1    Svestka, J.A.2
  • 4
    • 0034288107 scopus 로고    scopus 로고
    • Conceptual modeling of an object oriented scheduling architecture based on the shifting bottleneck procedure
    • Brandimarte P, Rigodanza M, Roero L (2000) Conceptual modeling of an object oriented scheduling architecture based on the shifting bottleneck procedure. HE Trans 32(10):921-929
    • (2000) HE Trans , vol.32 , Issue.10 , pp. 921-929
    • Brandimarte, P.1    Rigodanza, M.2    Roero, L.3
  • 5
    • 0009696054 scopus 로고
    • Directing an opportunist scheduler: An empirical investigation on reactive scenario
    • Chapman and Hall (UK)
    • Hasle G, Smith SF (1994) Directing an opportunist scheduler: an empirical investigation on reactive scenario. In: Artificial intelligence in reactive scheduling. Chapman and Hall (UK), pp 1-11
    • (1994) Artificial Intelligence in Reactive Scheduling , pp. 1-11
    • Hasle, G.1    Smith, S.F.2
  • 6
    • 0009672986 scopus 로고
    • From reactive to active scheduling by using multi agents
    • Chapman and Hall, UK
    • Henseler H (1994) From reactive to active scheduling by using multi agents. In: Artificial intelligence in reactive scheduling. Chapman and Hall, UK, pp 12-18
    • (1994) Artificial Intelligence in Reactive Scheduling , pp. 12-18
    • Henseler, H.1
  • 7
    • 0009672472 scopus 로고
    • A black board based perspective of reactive scheduling
    • Chapman and Hall, UK
    • Szelke E, Markus G (1994) A black board based perspective of reactive scheduling. In: Artificial intelligence in reactive scheduling. Chapman and Hall, UK, pp 60-77
    • (1994) Artificial Intelligence in Reactive Scheduling , pp. 60-77
    • Szelke, E.1    Markus, G.2
  • 8
    • 0028014739 scopus 로고
    • Reactive scheduling in a fuzzy-temporal framework. Knowledge based reactive scheduling
    • Dorn J, Kerr R, Thalhammer G (1994), Reactive scheduling in a fuzzy-temporal framework. Knowledge based reactive scheduling. IFIP Trans B (Applications in Technology) 8-15:39-54
    • (1994) IFIP Trans B (Applications in Technology) , vol.8-15 , pp. 39-54
    • Dorn, J.1    Kerr, R.2    Thalhammer, G.3
  • 9
    • 0028014740 scopus 로고
    • How to apply fuzzy logic to reactive production scheduling. Knowledge based reactive scheduling
    • Schmidt G (1994) How to apply fuzzy logic to reactive production scheduling. Knowledge based reactive scheduling. IFIP Trans B (Applications in Technology) B-15:57-66
    • (1994) IFIP Trans B (Applications in Technology) , vol.B-15 , pp. 57-66
    • Schmidt, G.1
  • 10
    • 0031200012 scopus 로고    scopus 로고
    • A learning reactive scheduler using CBR/L
    • Szelke E., Markus G(1997) A learning reactive scheduler using CBR/L. Comput Ind 33(1):31-46
    • (1997) Comput Ind , vol.33 , Issue.1 , pp. 31-46
    • Szelke, E.1    Markus, G.2
  • 11
    • 0029520858 scopus 로고
    • Case based knowledge acquisition for schedule optimization
    • Miyashita K (1995) Case based knowledge acquisition for schedule optimization. Artif Intell Eng 9(4):277-287
    • (1995) Artif Intell Eng , vol.9 , Issue.4 , pp. 277-287
    • Miyashita, K.1
  • 13
    • 0027961993 scopus 로고
    • Application of neural network process models in reactive scheduling. Knowledge based reactive scheduling
    • Garner BJ, Ridley GJ (1994) Application of neural network process models in reactive scheduling. Knowledge based reactive scheduling. IFIP Trans B (Applications in Technology) B-15:19-28
    • (1994) IFIP Trans B (Applications in Technology) , vol.B-15 , pp. 19-28
    • Garner, B.J.1    Ridley, G.J.2
  • 14
    • 0035272768 scopus 로고    scopus 로고
    • Application of a neural network scheduler on a real manufacturing system
    • Rovithakis GA, Perrakis SE, Christodoulou MA (2001) Application of a neural network scheduler on a real manufacturing system. IEEE Con Sy 9(2):261-270
    • (2001) IEEE Con Sy , vol.9 , Issue.2 , pp. 261-270
    • Rovithakis, G.A.1    Perrakis, S.E.2    Christodoulou, M.A.3
  • 15
    • 0033721287 scopus 로고    scopus 로고
    • The application of the parallel multi population genetic algorithms to dynamic job shop scheduling
    • Qi JG, Burns GR, Harrison DK (2000) The application of the parallel multi population genetic algorithms to dynamic job shop scheduling. Int J Adv Manuf Technol 16:609-615
    • (2000) Int J Adv Manuf Technol , vol.16 , pp. 609-615
    • Qi, J.G.1    Burns, G.R.2    Harrison, D.K.3
  • 17
    • 0009672987 scopus 로고
    • Reaktion: A system for event independent reactive scheduling
    • Chapman and Hall, UK
    • Henseler H (1994) Reaktion: a system for event independent reactive scheduling. In: Artificial intelligence in reactive scheduling. Chapman and Hall, UK, pp 19-31
    • (1994) Artificial Intelligence in Reactive Scheduling , pp. 19-31
    • Henseler, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.