Executing production schedules in the face of uncertainties: a review and some future directions
-
Aytug H., Lawley M., McKay K., Mohan S., and Uzoy R. Executing production schedules in the face of uncertainties: a review and some future directions. European Journal of Operational Research 161 (2005) 86-110
-
(2005)
European Journal of Operational Research
, vol.161
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.2
McKay, K.3
Mohan, S.4
Uzoy, R.5
-
4
-
-
0019342681
-
Scheduling subject to resource constraints-classification and complexity
-
Blazewicz J., Lenstra J., and Rinnooy A. Scheduling subject to resource constraints-classification and complexity. Discrete Applied Mathematics 5 (1983) 11-24
-
(1983)
Discrete Applied Mathematics
, vol.5
, pp. 11-24
-
-
Blazewicz, J.1
Lenstra, J.2
Rinnooy, A.3
-
6
-
-
0032736579
-
Resource-constrained project scheduling: notation, classification, models and methods
-
Brucker P., Drexl A., Möhring R., Neumann K., and Pesch E. Resource-constrained project scheduling: notation, classification, models and methods. European Journal of Operational Research 112 (1999) 3-41
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
7
-
-
37349088125
-
-
Davenport, A., Beck, J., 2002. A survey of techniques for scheduling with uncertainty. Available from 〈http://tidel.mie.utoronto.ca/publications.php〉.
-
-
-
-
8
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
Demeulemeester E., and Herroelen W. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science 38 (1992) 1803-1818
-
(1992)
Management Science
, vol.38
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
9
-
-
0031272722
-
New benchmark results for the resource-constrained project scheduling problem
-
Demeulemeester E., and Herroelen W. New benchmark results for the resource-constrained project scheduling problem. Management Science 43 (1997) 1485-1492
-
(1997)
Management Science
, vol.43
, pp. 1485-1492
-
-
Demeulemeester, E.1
Herroelen, W.2
-
11
-
-
37349073360
-
-
Drezet, L.-E., 2005. Résolution d'un problème de gestion de projets sous contraintes de ressources humaines: De l'approche prédictive à l'approche réactive. Ph.D. Thesis, Université François Rabelais Tours, France.
-
-
-
-
13
-
-
0001108060
-
Assembly line balancing using the ranked positional weight technique
-
Helgeson W., and Birnie D. Assembly line balancing using the ranked positional weight technique. Journal of Industrial Engineering 12 (1961) 389-394
-
(1961)
Journal of Industrial Engineering
, vol.12
, pp. 389-394
-
-
Helgeson, W.1
Birnie, D.2
-
14
-
-
13444269168
-
Project scheduling under uncertainty-survey and research potentials
-
Herroelen W., and Leus R. Project scheduling under uncertainty-survey and research potentials. European Journal of Operational Research 165 2 (2005) 289-306
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 289-306
-
-
Herroelen, W.1
Leus, R.2
-
16
-
-
0035254136
-
On the paper 'Resource-constrained project scheduling: notation, classification, models and methods' by Brucker et al
-
Herroelen W., De Reyck B., and Demeulemeester E. On the paper 'Resource-constrained project scheduling: notation, classification, models and methods' by Brucker et al. European Journal of Operational Research 128 3 (2000) 221-230
-
(2000)
European Journal of Operational Research
, vol.128
, Issue.3
, pp. 221-230
-
-
Herroelen, W.1
De Reyck, B.2
Demeulemeester, E.3
-
17
-
-
0002866635
-
The critical-path method: resources planning and scheduling
-
Muth J.F., and Thompson G.L. (Eds), Prentice-Hall, Englewood Cliffs
-
Kelley J.J. The critical-path method: resources planning and scheduling. In: Muth J.F., and Thompson G.L. (Eds). Industrial Scheduling (1963), Prentice-Hall, Englewood Cliffs 347-365
-
(1963)
Industrial Scheduling
, pp. 347-365
-
-
Kelley, J.J.1
-
19
-
-
37349082259
-
-
Lambrechts, O., Demeulemeester, E., Herroelen, W., 2007. Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities. Journal of Scheduling, to appear.
-
-
-
-
20
-
-
0028499648
-
Robustness measures and robust scheduling for job shops
-
Leon V., Wu S., and Storer R. Robustness measures and robust scheduling for job shops. IIE Transactions 26 5 (1994) 32-43
-
(1994)
IIE Transactions
, vol.26
, Issue.5
, pp. 32-43
-
-
Leon, V.1
Wu, S.2
Storer, R.3
-
21
-
-
2942687563
-
Stability and resource allocation in project planning
-
Leus R., and Herroelen W. Stability and resource allocation in project planning. IIE Transactions 36 7 (2004) 1-16
-
(2004)
IIE Transactions
, vol.36
, Issue.7
, pp. 1-16
-
-
Leus, R.1
Herroelen, W.2
-
24
-
-
84888782064
-
Formulation and tabu search algorithm for the resource constrained project scheduling problem
-
Ribeiro C., and Hansen P. (Eds), Kluwer Academic Publishers, Dordrecht
-
Nonobe K., and Ibaraki T. Formulation and tabu search algorithm for the resource constrained project scheduling problem. In: Ribeiro C., and Hansen P. (Eds). Essays and Surveys in Metaheuristics (2002), Kluwer Academic Publishers, Dordrecht 557-588
-
(2002)
Essays and Surveys in Metaheuristics
, pp. 557-588
-
-
Nonobe, K.1
Ibaraki, T.2
-
27
-
-
0001541244
-
Using tabu search for solving the resource-constrained project scheduling problem
-
Euro Working Group on Project Management and Scheduling
-
Pinson E., Prins C., and Rullier F. Using tabu search for solving the resource-constrained project scheduling problem. Fourth International Workshop on Project Management and Scheduling (1994), Euro Working Group on Project Management and Scheduling 102-106
-
(1994)
Fourth International Workshop on Project Management and Scheduling
, pp. 102-106
-
-
Pinson, E.1
Prins, C.2
Rullier, F.3
-
28
-
-
84989730007
-
Local search techniques for the generalized resource constrained project scheduling problem
-
Sampson S., and Weiss E. Local search techniques for the generalized resource constrained project scheduling problem. Naval Research Logistics 40 (1993) 665-675
-
(1993)
Naval Research Logistics
, vol.40
, pp. 665-675
-
-
Sampson, S.1
Weiss, E.2
-
29
-
-
37349086101
-
-
Schatteman, D., Herroelen, W., Van de Vonder, S., Boone, A., 2006. A methodology for integrated risk management and proactive scheduling of construction projects. Research Report KBI 0622, Department of Decisions Sciences & Information Management, K.U. Leuven, (Belgium).
-
-
-
-
30
-
-
37349111005
-
-
Stork, F., 2001. Stochastic resource-constrained project scheduling. Ph.D. Thesis, Technical University of Berlin, School of Mathematics and Natural Sciences.
-
-
-
-
31
-
-
29344454950
-
The trade-off between stability and makespan in resource-constrained project scheduling
-
Van de Vonder S., Demeulemeester E., Herroelen W., and Leus R. The trade-off between stability and makespan in resource-constrained project scheduling. International Journal of Production Research 44 2 (2005) 215-236
-
(2005)
International Journal of Production Research
, vol.44
, Issue.2
, pp. 215-236
-
-
Van de Vonder, S.1
Demeulemeester, E.2
Herroelen, W.3
Leus, R.4
-
33
-
-
0242703954
-
Rescheduling manufacturing systems: a framework of strategies, policies, and methods
-
Vieira G., Herrmann J., and Lin E. Rescheduling manufacturing systems: a framework of strategies, policies, and methods. Journal of Scheduling 6 1 (2003) 39-62
-
(2003)
Journal of Scheduling
, vol.6
, Issue.1
, pp. 39-62
-
-
Vieira, G.1
Herrmann, J.2
Lin, E.3
|