Volumn 111, Issue 2, 2008, Pages 493-508

A tabu search procedure for developing robust predictive project schedules

Author keywords

Proactive; Project scheduling; Robustness; Stability

Indexed keywords

ALGORITHMS; COMPUTATIONAL METHODS; PROJECT MANAGEMENT; ROBUSTNESS (CONTROL SYSTEMS); STOCHASTIC MODELS;

EID: 37349059632     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2007.02.003     Document Type: Article
Times cited : (121)

References (34)
  • 3
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: a review and some future directions
    • Aytug H., Lawley M., McKay K., Mohan S., and Uzoy R. Executing production schedules in the face of uncertainties: a review and some future directions. European Journal of Operational Research 161 (2005) 86-110
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.2    McKay, K.3    Mohan, S.4    Uzoy, R.5
  • 4
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints-classification and complexity
    • Blazewicz J., Lenstra J., and Rinnooy A. Scheduling subject to resource constraints-classification and complexity. Discrete Applied Mathematics 5 (1983) 11-24
    • (1983) Discrete Applied Mathematics , vol.5 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.2    Rinnooy, A.3
  • 7
    • 37349088125 scopus 로고    scopus 로고
    • Davenport, A., Beck, J., 2002. A survey of techniques for scheduling with uncertainty. Available from 〈http://tidel.mie.utoronto.ca/publications.php〉.
  • 8
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester E., and Herroelen W. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science 38 (1992) 1803-1818
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 9
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • Demeulemeester E., and Herroelen W. New benchmark results for the resource-constrained project scheduling problem. Management Science 43 (1997) 1485-1492
    • (1997) Management Science , vol.43 , pp. 1485-1492
    • Demeulemeester, E.1    Herroelen, W.2
  • 11
    • 37349073360 scopus 로고    scopus 로고
    • Drezet, L.-E., 2005. Résolution d'un problème de gestion de projets sous contraintes de ressources humaines: De l'approche prédictive à l'approche réactive. Ph.D. Thesis, Université François Rabelais Tours, France.
  • 13
    • 0001108060 scopus 로고
    • Assembly line balancing using the ranked positional weight technique
    • Helgeson W., and Birnie D. Assembly line balancing using the ranked positional weight technique. Journal of Industrial Engineering 12 (1961) 389-394
    • (1961) Journal of Industrial Engineering , vol.12 , pp. 389-394
    • Helgeson, W.1    Birnie, D.2
  • 14
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty-survey and research potentials
    • Herroelen W., and Leus R. Project scheduling under uncertainty-survey and research potentials. European Journal of Operational Research 165 2 (2005) 289-306
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 16
    • 0035254136 scopus 로고    scopus 로고
    • On the paper 'Resource-constrained project scheduling: notation, classification, models and methods' by Brucker et al
    • Herroelen W., De Reyck B., and Demeulemeester E. On the paper 'Resource-constrained project scheduling: notation, classification, models and methods' by Brucker et al. European Journal of Operational Research 128 3 (2000) 221-230
    • (2000) European Journal of Operational Research , vol.128 , Issue.3 , pp. 221-230
    • Herroelen, W.1    De Reyck, B.2    Demeulemeester, E.3
  • 17
    • 0002866635 scopus 로고
    • The critical-path method: resources planning and scheduling
    • Muth J.F., and Thompson G.L. (Eds), Prentice-Hall, Englewood Cliffs
    • Kelley J.J. The critical-path method: resources planning and scheduling. In: Muth J.F., and Thompson G.L. (Eds). Industrial Scheduling (1963), Prentice-Hall, Englewood Cliffs 347-365
    • (1963) Industrial Scheduling , pp. 347-365
    • Kelley, J.J.1
  • 19
    • 37349082259 scopus 로고    scopus 로고
    • Lambrechts, O., Demeulemeester, E., Herroelen, W., 2007. Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities. Journal of Scheduling, to appear.
  • 20
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon V., Wu S., and Storer R. Robustness measures and robust scheduling for job shops. IIE Transactions 26 5 (1994) 32-43
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 32-43
    • Leon, V.1    Wu, S.2    Storer, R.3
  • 21
    • 2942687563 scopus 로고    scopus 로고
    • Stability and resource allocation in project planning
    • Leus R., and Herroelen W. Stability and resource allocation in project planning. IIE Transactions 36 7 (2004) 1-16
    • (2004) IIE Transactions , vol.36 , Issue.7 , pp. 1-16
    • Leus, R.1    Herroelen, W.2
  • 24
    • 84888782064 scopus 로고    scopus 로고
    • Formulation and tabu search algorithm for the resource constrained project scheduling problem
    • Ribeiro C., and Hansen P. (Eds), Kluwer Academic Publishers, Dordrecht
    • Nonobe K., and Ibaraki T. Formulation and tabu search algorithm for the resource constrained project scheduling problem. In: Ribeiro C., and Hansen P. (Eds). Essays and Surveys in Metaheuristics (2002), Kluwer Academic Publishers, Dordrecht 557-588
    • (2002) Essays and Surveys in Metaheuristics , pp. 557-588
    • Nonobe, K.1    Ibaraki, T.2
  • 25
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdowns and sensitive jobs
    • O'Donovan R., Uzsoy R., and McKay K. Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research 37 (1999) 4217-4233
    • (1999) International Journal of Production Research , vol.37 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.2    McKay, K.3
  • 27
    • 0001541244 scopus 로고
    • Using tabu search for solving the resource-constrained project scheduling problem
    • Euro Working Group on Project Management and Scheduling
    • Pinson E., Prins C., and Rullier F. Using tabu search for solving the resource-constrained project scheduling problem. Fourth International Workshop on Project Management and Scheduling (1994), Euro Working Group on Project Management and Scheduling 102-106
    • (1994) Fourth International Workshop on Project Management and Scheduling , pp. 102-106
    • Pinson, E.1    Prins, C.2    Rullier, F.3
  • 28
    • 84989730007 scopus 로고
    • Local search techniques for the generalized resource constrained project scheduling problem
    • Sampson S., and Weiss E. Local search techniques for the generalized resource constrained project scheduling problem. Naval Research Logistics 40 (1993) 665-675
    • (1993) Naval Research Logistics , vol.40 , pp. 665-675
    • Sampson, S.1    Weiss, E.2
  • 29
    • 37349086101 scopus 로고    scopus 로고
    • Schatteman, D., Herroelen, W., Van de Vonder, S., Boone, A., 2006. A methodology for integrated risk management and proactive scheduling of construction projects. Research Report KBI 0622, Department of Decisions Sciences & Information Management, K.U. Leuven, (Belgium).
  • 30
    • 37349111005 scopus 로고    scopus 로고
    • Stork, F., 2001. Stochastic resource-constrained project scheduling. Ph.D. Thesis, Technical University of Berlin, School of Mathematics and Natural Sciences.
  • 33
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: a framework of strategies, policies, and methods
    • Vieira G., Herrmann J., and Lin E. Rescheduling manufacturing systems: a framework of strategies, policies, and methods. Journal of Scheduling 6 1 (2003) 39-62
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 39-62
    • Vieira, G.1    Herrmann, J.2    Lin, E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.