메뉴 건너뛰기




Volumn 103, Issue 1, 2006, Pages 166-184

Disruption management for machine scheduling: The case of SPT schedules

Author keywords

Disruption management; Dynamic programming; Machine scheduling; SPT rule

Indexed keywords

COSTS; DYNAMIC PROGRAMMING; MATHEMATICAL MODELS; PROBLEM SOLVING; SCHEDULING;

EID: 33744966565     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2005.05.021     Document Type: Article
Times cited : (108)

References (29)
  • 4
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: a review and some future directions
    • Aytug H., Lawley M.A., McKay K., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainties: a review and some future directions. European Journal of Operational Research 161 (2005) 86-110
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 6
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates and disruptions
    • Bean J.C., Birge J.R., Mittenthal J., and Noon C.E. Matchup scheduling with multiple resources, release dates and disruptions. Operations Research 39 (1991) 470-483
    • (1991) Operations Research , vol.39 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 9
    • 3543072290 scopus 로고    scopus 로고
    • Sensitivity analysis for scheduling problems
    • Hall N.G., and Posner M.E. Sensitivity analysis for scheduling problems. Journal of Scheduling 7 (2004) 49-83
    • (2004) Journal of Scheduling , vol.7 , pp. 49-83
    • Hall, N.G.1    Posner, M.E.2
  • 10
    • 19744366708 scopus 로고    scopus 로고
    • Rescheduling for new orders
    • Hall N.G., and Potts C.N. Rescheduling for new orders. Operations Research 52 (2004) 440-453
    • (2004) Operations Research , vol.52 , pp. 440-453
    • Hall, N.G.1    Potts, C.N.2
  • 11
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • Herroelen W., and Leus R. Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research 165 (2005) 289-306
    • (2005) European Journal of Operational Research , vol.165 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 12
    • 0001880962 scopus 로고
    • Parallel machines scheduling with nonsimultaneous machine available time
    • Lee C.-Y. Parallel machines scheduling with nonsimultaneous machine available time. Discrete Applied Mathematics 30 (1991) 53-61
    • (1991) Discrete Applied Mathematics , vol.30 , pp. 53-61
    • Lee, C.-Y.1
  • 13
    • 0026897390 scopus 로고
    • Single-machine flow-time scheduling with scheduled maintenance
    • Lee C.-Y., and Liman S.D. Single-machine flow-time scheduling with scheduled maintenance. Acta Informatica 29 (1992) 375-382
    • (1992) Acta Informatica , vol.29 , pp. 375-382
    • Lee, C.-Y.1    Liman, S.D.2
  • 14
    • 9644275655 scopus 로고    scopus 로고
    • The complexity of machine scheduling for stability with a single disrupted job
    • Leus R., and Herroelen W. The complexity of machine scheduling for stability with a single disrupted job. Operations Research Letters 33 (2005) 151-156
    • (2005) Operations Research Letters , vol.33 , pp. 151-156
    • Leus, R.1    Herroelen, W.2
  • 15
    • 33744990030 scopus 로고    scopus 로고
    • Liman, S.D., 1991. Scheduling with restricted machine availability and due date. Ph.D. Dissertation, University of Florida, Gainsville, FL.
  • 18
    • 1842660094 scopus 로고    scopus 로고
    • Supply chain coordination with demand disruptions
    • Qi X., Bard J.F., and Yu G. Supply chain coordination with demand disruptions. OMEGA 32 (2004) 301-312
    • (2004) OMEGA , vol.32 , pp. 301-312
    • Qi, X.1    Bard, J.F.2    Yu, G.3
  • 20
    • 0032362468 scopus 로고    scopus 로고
    • Machine scheduling with availability constraints
    • Sanlaville E., and Schmidt G. Machine scheduling with availability constraints. ACTA Informatica 35 (1998) 795-811
    • (1998) ACTA Informatica , vol.35 , pp. 795-811
    • Sanlaville, E.1    Schmidt, G.2
  • 22
    • 0034149008 scopus 로고    scopus 로고
    • Balancing user preferences for aircraft schedule recovery during irregular operations
    • Thengvall B., Bard J.F., and Yu G. Balancing user preferences for aircraft schedule recovery during irregular operations. IIE Transactions on Operations Engineering 32 (2000) 181-193
    • (2000) IIE Transactions on Operations Engineering , vol.32 , pp. 181-193
    • Thengvall, B.1    Bard, J.F.2    Yu, G.3
  • 23
    • 0031525145 scopus 로고    scopus 로고
    • Rescheduling on a single machine with part-type dependent setup times and deadlines
    • Unal A.T., Uzsoy R., and Kiranc A.S. Rescheduling on a single machine with part-type dependent setup times and deadlines. Annals of Operations Research 70 (1997) 93-113
    • (1997) Annals of Operations Research , vol.70 , pp. 93-113
    • Unal, A.T.1    Uzsoy, R.2    Kiranc, A.S.3
  • 24
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    • Vieira G.E., Herrmann J.W., and Lin E. Rescheduling manufacturing systems: A framework of strategies, policies, and methods. Journal of Scheduling 6 (2003) 39-62
    • (2003) Journal of Scheduling , vol.6 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 25
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu S.W., Storer R.H., and Chang P.C. One-machine rescheduling heuristics with efficiency and stability as criteria. Computers & Operations Research 20 (1993) 1-14
    • (1993) Computers & Operations Research , vol.20 , pp. 1-14
    • Wu, S.W.1    Storer, R.H.2    Chang, P.C.3
  • 26
    • 1642502335 scopus 로고    scopus 로고
    • Real-time disruption management in a two-stage production and inventory system
    • Xia Y., Yang M.-H., Golany B., Gilbert S.M., and Yu G. Real-time disruption management in a two-stage production and inventory system. IIE Transactions 36 (2004) 111-125
    • (2004) IIE Transactions , vol.36 , pp. 111-125
    • Xia, Y.1    Yang, M.-H.2    Golany, B.3    Gilbert, S.M.4    Yu, G.5
  • 27
    • 24144493803 scopus 로고    scopus 로고
    • Yang, J., Qi, X., Yu, G., 2005. Disruption management in production planning. Naval Research Logistics 52, 420-442.
  • 28
    • 33745008249 scopus 로고    scopus 로고
    • Yu, G., Yang, J., 1998. Optimization applications in the airline industry. In: Du, D.-Z., Pardalos, P.M. (Eds.), Handbook of Combinatorial Optimization, vol. 2, Kluwer Academic Publishers, Norwell, MA, pp. 635-726 (Chapter 14).
  • 29


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.