메뉴 건너뛰기




Volumn 32, Issue 5, 2000, Pages 421-432

Robust scheduling of a two-machine flow shop with uncertain processing times

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; COMPUTATIONAL METHODS; PROBABILITY; PROCESS ENGINEERING;

EID: 0033894477     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1007640726040     Document Type: Article
Times cited : (187)

References (15)
  • 1
    • 0021585421 scopus 로고
    • Stochastically minimizing the makespan in flow shops
    • Foley, R.D. and Suresh, S. (1984) Stochastically minimizing the makespan in flow shops. Naval Research Logistics Quarterly, 31, 551-557.
    • (1984) Naval Research Logistics Quarterly , vol.31 , pp. 551-557
    • Foley, R.D.1    Suresh, S.2
  • 2
    • 0019899745 scopus 로고
    • Minimizing the expected makespan in stochastic flow shops
    • Pinedo, M. (1982) Minimizing the expected makespan in stochastic flow shops. Operations Research, 30, 148-162.
    • (1982) Operations Research , vol.30 , pp. 148-162
    • Pinedo, M.1
  • 5
    • 0345901561 scopus 로고
    • Sequencing and scheduling: Algorithms and complexity
    • Graves, S.C. et al. (eds.), North Holland, Amsterdam
    • Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G. and Shmoys, D.B. (1993) Sequencing and scheduling: algorithms and complexity, in Handbooks in OR and At S, Graves, S.C. et al. (eds.), vol 4, North Holland, Amsterdam, pp. 445-522.
    • (1993) Handbooks in or and at S , vol.4 , pp. 445-522
    • Lawler, E.L.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3    Shmoys, D.B.4
  • 6
    • 33749900280 scopus 로고
    • Shaked, M. and Shantikumar, G. (eds.), Academic Press, San Diego, CA.
    • Righter, R. (1994) Stochastic scheduling, in Stochastic Orders, Shaked, M. and Shantikumar, G. (eds.), Academic Press, San Diego, CA.
    • (1994) Stochastic Scheduling, in Stochastic Orders
    • Righter, R.1
  • 7
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single stage production
    • Daniels, R. and Kouvelis, P. (1995) Robust scheduling to hedge against processing time uncertainty in single stage production. Management Science, 41, 363-376.
    • (1995) Management Science , vol.41 , pp. 363-376
    • Daniels, R.1    Kouvelis, P.2
  • 9
    • 0027005571 scopus 로고
    • Algorithms for robust single- And multiple-period layout planning for manufacturing systems
    • Kouvelis, P., Kurawarwala A.A. and Gutierrez, G.J. (1992) Algorithms for robust single- and multiple-period layout planning for manufacturing systems. European Journal of Operational Research, 63, 287-303.
    • (1992) European Journal of Operational Research , vol.63 , pp. 287-303
    • Kouvelis, P.1    Kurawarwala, A.A.2    Gutierrez, G.J.3
  • 11
    • 0003075019 scopus 로고
    • Optimal two- And three-stage production schedules with set-up times included
    • [II] Johnson, S.M. (1954) Optimal two- and three-stage production schedules with set-up times included, Naval Research Logistics Quarterly, 1, 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson II, S.M.1
  • 12
    • 0039223800 scopus 로고
    • Scheduling jobs with exponentially distributed processing times on two machines of a flow shop
    • Cunningham, A. and Dutta, S. (1973) Scheduling jobs with exponentially distributed processing times on two machines of a flow shop. Naval Research Logistics Quarterly, 16, 6981.
    • (1973) Naval Research Logistics Quarterly , vol.16 , pp. 6981
    • Cunningham, A.1    Dutta, S.2
  • 13
    • 0040680088 scopus 로고
    • Optimal policies in stochastic shop scheduling
    • Pinedo, M. (1984) Optimal policies in stochastic shop scheduling. Annals of Operations Research, 1, 305-329.
    • (1984) Annals of Operations Research , vol.1 , pp. 305-329
    • Pinedo, M.1
  • 14
    • 0022569338 scopus 로고
    • On Johnson's two machine flow shop with random processing times
    • Ku, P.S. and Niu, S.C. (1986) On Johnson's two machine flow shop with random processing times. Operations Research, 34, 130-136.
    • (1986) Operations Research , vol.34 , pp. 130-136
    • Ku, P.S.1    Niu, S.C.2
  • 15
    • 0004250779 scopus 로고
    • Elements of sequencing and scheduling
    • Dartmouth College, Hanover, NH.
    • Baker, K.R. (1994) Elements of sequencing and scheduling. Technical report, Dartmouth College, Hanover, NH.
    • (1994) Technical Report
    • Baker, K.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.