메뉴 건너뛰기




Volumn 15, Issue 2, 2004, Pages 178-188

Dynamic scheduling of steel casting and milling using multi-agents

Author keywords

Contract net protocol; Dynamic scheduling; Multi agents; Steel production; Tabu search

Indexed keywords

AGILE MANUFACTURING SYSTEMS; BLAST FURNACES; CAST IRON; IRON AND STEEL PLANTS; NETWORK PROTOCOLS; PRODUCTIVITY; QUALITY CONTROL; ROBUSTNESS (CONTROL SYSTEMS); SLAB MILLS;

EID: 2442695353     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/09537280410001662466     Document Type: Article
Times cited : (81)

References (28)
  • 1
    • 84987028582 scopus 로고
    • The prize collecting travelling salesman problem
    • BALAS, E., 1989, The prize collecting travelling salesman problem. Networks, 19, 621-636.
    • (1989) Networks , vol.19 , pp. 621-636
    • Balas, E.1
  • 3
    • 0002026363 scopus 로고    scopus 로고
    • Approximation algorithms for bin-packing: A survey
    • D. Hochbaum (ed.) (Boston: PWS Publishing)
    • COFFMAN, E. G., GAREY, M. R., and JOHNSON, D., 1997, Approximation algorithms for bin-packing: a survey. In D. Hochbaum (ed.) Approximation Algorithms for NP-hard problems (Boston: PWS Publishing), pp. 46-93.
    • (1997) Approximation Algorithms for NP-hard Problems , pp. 46-93
    • Coffman, E.G.1    Garey, M.R.2    Johnson, D.3
  • 4
    • 0043271409 scopus 로고
    • Optimisation in steel rolling
    • Anna Sciomachen (ed.) (Chichester, England: John Wiley & Sons)
    • COWLING, P. I., 1995, Optimisation in steel rolling. In Anna Sciomachen (ed.) Optimisation in Industry (Chichester, England: John Wiley & Sons). pp. 55-66.
    • (1995) Optimisation in Industry , pp. 55-66
    • Cowling, P.I.1
  • 5
    • 0001110087 scopus 로고    scopus 로고
    • Integration of continuous caster and hot strip mill planning for steel production
    • COWLING, P. I., and REZIG, W., 2000, Integration of continuous caster and hot strip mill planning for steel production. Journal of Scheduling, 3(4), 185-208.
    • (2000) Journal of Scheduling , vol.3 , Issue.4 , pp. 185-208
    • Cowling, P.I.1    Rezig, W.2
  • 6
    • 0036604832 scopus 로고    scopus 로고
    • Using real-time information for effective dynamic scheduling
    • COWLING, P. I., and JOHANSSON, M., 2001, Using real-time information for effective dynamic scheduling. European Journal of Operational Research, 139(2), 230-244.
    • (2001) European Journal of Operational Research , vol.139 , Issue.2 , pp. 230-244
    • Cowling, P.I.1    Johansson, M.2
  • 11
    • 0004215426 scopus 로고    scopus 로고
    • (Eds.) Glover F. and Laguna, M., Boston: Kluwer Academic Publishers
    • GLOVER, F., 1997, Tabu search. (Eds.) Glover, F. and Laguna, M., Boston: Kluwer Academic Publishers.
    • (1997) Tabu Search
    • Glover, F.1
  • 12
    • 0033904095 scopus 로고    scopus 로고
    • On agent-based software engineering
    • JENNINGS, N. R., 2000, On agent-based software engineering. Artificial Intelligence, 117(2), 277-296.
    • (2000) Artificial Intelligence , vol.117 , Issue.2 , pp. 277-296
    • Jennings, N.R.1
  • 15
    • 0033741220 scopus 로고    scopus 로고
    • Time-bound negotiation framework for electronic commerce agents
    • LEE, K.J., CHANG,Y. S., LEE, J. K., 2000, Time-bound negotiation framework for electronic commerce agents. Decision Support Systems Journal, 28(4), 319-331.
    • (2000) Decision Support Systems Journal , vol.28 , Issue.4 , pp. 319-331
    • Lee, K.J.1    Chang, Y.S.2    Lee, J.K.3
  • 16
    • 0032049311 scopus 로고    scopus 로고
    • The hot strip Mill production scheduling problem: A tabu search approach
    • LOPEZ, L., CARTER, M. W., and GENDREAU, M., 1998, The hot strip Mill production scheduling problem: a tabu search approach. European Journal of Operational Research, 106(2-3), 317-335.
    • (1998) European Journal of Operational Research , vol.106 , Issue.2-3 , pp. 317-335
    • Lopez, L.1    Carter, M.W.2    Gendreau, M.3
  • 17
    • 0033692343 scopus 로고    scopus 로고
    • Multiagent architecture for distributed monitoring in flexible manufacturing systems (FMS)
    • Publisher: IEEE, San Francisco, USA
    • OUELHADJ, D., HANACHI, and BOUZOUIA, B., 2000, Multiagent architecture for distributed monitoring in flexible manufacturing systems (FMS). In: Proceedings of the IEEE International Conference on Robotics and Automation, Publisher: IEEE, pp. 1120-1126, San Francisco, USA.
    • (2000) Proceedings of the IEEE International Conference on Robotics and Automation , pp. 1120-1126
    • Ouelhadj, D.1    Hanachi2    Bouzouia, B.3
  • 18
    • 0001538571 scopus 로고
    • Manufacturing experience with the contract net
    • M. N. Huhns, (ed.), London: Pitman
    • PARUNAK, H. V., 1987, Manufacturing experience with the contract net. In M. N. Huhns, (ed.) Distributed Artificial Intelligence, London: Pitman, pp. 285-310.
    • (1987) Distributed Artificial Intelligence , pp. 285-310
    • Parunak, H.V.1
  • 19
    • 0002435737 scopus 로고    scopus 로고
    • Applications of distributed artificial Intelligence in industry
    • G. M. P. O'Hare and N. R. Jennings (eds) (New York: Wiley Inter-science)
    • PARUNAK, H. V., 1996, Applications of distributed artificial Intelligence in industry. In G. M. P. O'Hare and N. R. Jennings (eds) Foundation of Distributed Artificial Intelligence (New York: Wiley Inter-science).
    • (1996) Foundation of Distributed Artificial Intelligence
    • Parunak, H.V.1
  • 20
    • 0032624359 scopus 로고    scopus 로고
    • A distributed architecture and negotiation protocol for scheduling in manufacturing systems
    • RAMOS, C., and SOUSA, P., 1999, A distributed architecture and negotiation protocol for scheduling in manufacturing systems. Computers in Industry, 38(2), 103-113.
    • (1999) Computers in Industry , vol.38 , Issue.2 , pp. 103-113
    • Ramos, C.1    Sousa, P.2
  • 21
    • 0003101953 scopus 로고
    • Issues in automated negotiation and electronic commerce: Extending the contract net framework
    • Victor Lesser (Ed.) (Cambridge, MA, USA: MIT Press), San Francisco, CA
    • SANDHOLM, T., and LESSER, V., 1995, Issues in automated negotiation and electronic commerce: extending the contract net framework. In Victor Lesser (Ed.) Proceedings of the First International Conference on Multi-Agent Systems (ICMAS'95) (Cambridge, MA, USA: MIT Press), San Francisco, CA, pp. 328-335.
    • (1995) Proceedings of the First International Conference on Multi-agent Systems (ICMAS'95) , pp. 328-335
    • Sandholm, T.1    Lesser, V.2
  • 23
    • 0034205722 scopus 로고    scopus 로고
    • Metaphor II: An agent-based architecture for distributed intelligent design and manufacturing
    • SHEN, W., MATURANA, F., and NORRIE, D., 2000, Metaphor II: an agent-based architecture for distributed intelligent design and manufacturing, Journal of Intelligent Manufacturing, 11(3), 237-251.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.3 , pp. 237-251
    • Shen, W.1    Maturana, F.2    Norrie, D.3
  • 25
    • 0019180974 scopus 로고
    • The contract net protocol: High level communication and control in a distributed problem solver
    • SMITH, R., G., 1980, The contract net protocol: high level communication and control in a distributed problem solver. IEEE Transactions on Computers, 29(12), 1104-1113.
    • (1980) IEEE Transactions on Computers , vol.29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1
  • 26
    • 0033741404 scopus 로고    scopus 로고
    • A multiple travelling salesman problem model for hot rolling scheduling in Shangai Baoshan Iron and steel
    • TANG, J. L., RONG, A., and YANG, Z., 2000a, A multiple travelling salesman problem model for hot rolling scheduling in Shangai Baoshan Iron and steel. European Journal of Operational Research, 124(2), 267-282.
    • (2000) European Journal of Operational Research , vol.124 , Issue.2 , pp. 267-282
    • Tang, J.L.1    Rong, A.2    Yang, Z.3
  • 27
    • 0033892353 scopus 로고    scopus 로고
    • A mathematical programming model for scheduling steelmaking-continous casting production
    • TANG, J. L., RONG, A., and YANG, Z., 2000b, A mathematical programming model for scheduling steelmaking-continous casting production. European Journal of Operational Research, 120(2), 423-435.
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 423-435
    • Tang, J.L.1    Rong, A.2    Yang, Z.3
  • 28
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • TANG, J. L., RONG, A., and YANG, Z., 2001, A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research, 133(1), 1-20.
    • (2001) European Journal of Operational Research , vol.133 , Issue.1 , pp. 1-20
    • Tang, J.L.1    Rong, A.2    Yang, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.