-
2
-
-
0041656170
-
A classification of static scheduling problems
-
Pardalos PM (ed). World Scientific, Singapore
-
Hermann JW, Lee C-Y, Snowdon JL (1993) A classification of static scheduling problems. In: Pardalos PM (ed) Complexity in numerical optimization. World Scientific, Singapore, pp 203-253
-
(1993)
Complexity in Numerical Optimization
, pp. 203-253
-
-
Hermann, J.W.1
Lee, C.-Y.2
Snowdon, J.L.3
-
3
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evaluation and production planning
-
Uzsoy R, Lee C-Y, Martin-Vega LA (1992) A review of production planning and scheduling models in the semiconductor industry. Part I: system characteristics, performance evaluation and production planning. IIE Trans 24:47-60
-
(1992)
IIE Trans
, vol.24
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
-
4
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry. Part II: Shop-floor control
-
Uzsoy R, Lee C-Y, Martin-Vega LA (1994) A review of production planning and scheduling models in the semiconductor industry. Part II: shop-floor control. IIE Trans 26:44-55
-
(1994)
IIE Trans
, vol.26
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
-
5
-
-
0028499648
-
Robustness measures and robust scheduling for job shops
-
Leon VJ, Wu SD, Storer RH (1994) Robustness measures and robust scheduling for job shops. IIE Trans 26:32-43
-
(1994)
IIE Trans
, vol.26
, pp. 32-43
-
-
Leon, V.J.1
Wu, S.D.2
Storer, R.H.3
-
6
-
-
0032097829
-
Predictable scheduling of a job shop subject to breakdowns
-
Mehta SV, Uzsoy R (1998) Predictable scheduling of a job shop subject to breakdowns. IEEE Trans Robot Autom 14:365-378
-
(1998)
IEEE Trans Robot Autom
, vol.14
, pp. 365-378
-
-
Mehta, S.V.1
Uzsoy, R.2
-
7
-
-
0002054180
-
Predictable scheduling of a single machine subject to breakdowns
-
Mehta SV, Uzsoy R (1999) Predictable scheduling of a single machine subject to breakdowns. Int J Comput Integr Manuf 12:15-38
-
(1999)
Int J Comput Integr Manuf
, vol.12
, pp. 15-38
-
-
Mehta, S.V.1
Uzsoy, R.2
-
8
-
-
0033343706
-
Predictable scheduling of a single machine with breakdowns and sensitive jobs
-
O'Donovan R, Uzsoy R, McKay KN (1999) Predictable scheduling of a single machine with breakdowns and sensitive jobs. Int J Prod Res 37:4217-4233
-
(1999)
Int J Prod Res
, vol.37
, pp. 4217-4233
-
-
O'Donovan, R.1
Uzsoy, R.2
McKay, K.N.3
-
9
-
-
0027224847
-
One-machine rescheduling heuristics with efficiency and stability as criteria
-
Wu SD, Storer RH, Chang PC (1993) One-machine rescheduling heuristics with efficiency and stability as criteria. Comput Oper Res 20:1-14
-
(1993)
Comput Oper Res
, vol.20
, pp. 1-14
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.C.3
-
10
-
-
0029254356
-
Robust scheduling to hedge against processing time uncertainty in single-stage production
-
Daniels RL, Kpuvelis P (1995) Robust scheduling to hedge against processing time uncertainty in single-stage production. Manage Sci 41:363-376
-
(1995)
Manage Sci
, vol.41
, pp. 363-376
-
-
Daniels, R.L.1
Kpuvelis, P.2
-
11
-
-
0033894477
-
Robust scheduling of a two-machine flow shop with uncertain processing times
-
Kouvelis P, Daniels RL, Vairaktarakis G (2000) Robust scheduling of a two-machine flow shop with uncertain processing times. IIE Trans 32:421-432
-
(2000)
IIE Trans
, vol.32
, pp. 421-432
-
-
Kouvelis, P.1
Daniels, R.L.2
Vairaktarakis, G.3
-
12
-
-
0031189107
-
Rescheduling job shops under random disruptions
-
Abumaizar RJ, Svestka JA (1997) Rescheduling job shops under random disruptions. Int J Prod Res 35:2065-2082
-
(1997)
Int J Prod Res
, vol.35
, pp. 2065-2082
-
-
Abumaizar, R.J.1
Svestka, J.A.2
-
13
-
-
0030786875
-
Production scheduling/rescheduling in flexible manufacturing
-
Jain AK, Elmaraghy HA (1997) Production scheduling/rescheduling in flexible manufacturing. Int J Prod Res 35:281-309
-
(1997)
Int J Prod Res
, vol.35
, pp. 281-309
-
-
Jain, A.K.1
Elmaraghy, H.A.2
-
14
-
-
0000179190
-
Rescheduling frequency in an FMS with uncertain processing times and unreliable machines
-
Sabuncuoglu I, Karabuk S (1999) Rescheduling frequency in an FMS with uncertain processing times and unreliable machines. J Manuf Syst 18:268-283
-
(1999)
J Manuf Syst
, vol.18
, pp. 268-283
-
-
Sabuncuoglu, I.1
Karabuk, S.2
-
15
-
-
30244473255
-
The scheduler's knowledge of uncertainty: The missing link
-
Browne J (ed), Elsevier, Amsterdam, The Netherlands
-
McKay KN, Safayeni FR, Buzacott JA (1989) The scheduler's knowledge of uncertainty: the missing link. In: Browne J (ed) Knowledge-based production management systems, Elsevier, Amsterdam, The Netherlands
-
(1989)
Knowledge-based Production Management Systems
-
-
McKay, K.N.1
Safayeni, F.R.2
Buzacott, J.A.3
-
16
-
-
0037118759
-
An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns
-
Alcaide D, Rodriguez-Gonzalez A, Sicilia J (2002) An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns. Eur J Oper Res 140:384-398
-
(2002)
Eur J Oper Res
, vol.140
, pp. 384-398
-
-
Alcaide, D.1
Rodriguez-Gonzalez, A.2
Sicilia, J.3
-
17
-
-
84939004610
-
Optimality and non-scalar-valued performance criteria
-
Zadeh L (1963) Optimality and non-scalar-valued performance criteria. IEEE Trans Automat Contr 8:59-60
-
(1963)
IEEE Trans Automat Contr
, vol.8
, pp. 59-60
-
-
Zadeh, L.1
-
18
-
-
0030241820
-
Multi-objective genetic algorithm and its application to flowshop scheduling
-
Murata T, Ishibuchi H, Tanaka H (1996) Multi-objective genetic algorithm and its application to flowshop scheduling. Comput Ind Eng 30:957-968
-
(1996)
Comput Ind Eng
, vol.30
, pp. 957-968
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
19
-
-
0037410718
-
A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines
-
Cochran JK, Horng S-M, Fowler JW (2003) A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Comput Oper Res 30:1087-1102
-
(2003)
Comput Oper Res
, vol.30
, pp. 1087-1102
-
-
Cochran, J.K.1
Horng, S.-M.2
Fowler, J.W.3
-
20
-
-
29344433807
-
A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs
-
DOI 10.1007/s00170-004-2249-6
-
Pasupathy T, Rajendran C, Suresh RK (2005) A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs. Int J Adv Manuf Technol. DOI 10.1007/s00170-004-2249-6
-
(2005)
Int J Adv Manuf Technol
-
-
Pasupathy, T.1
Rajendran, C.2
Suresh, R.K.3
-
22
-
-
0033899254
-
A prototype genetic algorithm enhanced multi-objective scheduler for manufacturing systems
-
Khoo LP, Lee SG, Yin XF (2000) A prototype genetic algorithm enhanced multi-objective scheduler for manufacturing systems. Int J Adv Manuf Technol 16:131-138
-
(2000)
Int J Adv Manuf Technol
, vol.16
, pp. 131-138
-
-
Khoo, L.P.1
Lee, S.G.2
Yin, X.F.3
-
23
-
-
0002629429
-
An overview of evolutionary algorithms in multiobjective optimization
-
Fonseca CM, Fleming PJ (1995) An overview of evolutionary algorithms in multiobjective optimization. Evol Comput 3:1-16
-
(1995)
Evol Comput
, vol.3
, pp. 1-16
-
-
Fonseca, C.M.1
Fleming, P.J.2
|