메뉴 건너뛰기




Volumn 31, Issue 7-8, 2007, Pages 645-654

Robust and stable scheduling of a single machine with random machine breakdowns

Author keywords

Breakdown; Predictive schedule; Robustness; Stability

Indexed keywords

GENETIC ALGORITHMS; JOB ANALYSIS; OPTIMIZATION; ROBUSTNESS (CONTROL SYSTEMS); SYSTEM STABILITY;

EID: 33845775683     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-005-0237-0     Document Type: Article
Times cited : (83)

References (23)
  • 2
    • 0041656170 scopus 로고
    • A classification of static scheduling problems
    • Pardalos PM (ed). World Scientific, Singapore
    • Hermann JW, Lee C-Y, Snowdon JL (1993) A classification of static scheduling problems. In: Pardalos PM (ed) Complexity in numerical optimization. World Scientific, Singapore, pp 203-253
    • (1993) Complexity in Numerical Optimization , pp. 203-253
    • Hermann, J.W.1    Lee, C.-Y.2    Snowdon, J.L.3
  • 3
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evaluation and production planning
    • Uzsoy R, Lee C-Y, Martin-Vega LA (1992) A review of production planning and scheduling models in the semiconductor industry. Part I: system characteristics, performance evaluation and production planning. IIE Trans 24:47-60
    • (1992) IIE Trans , vol.24 , pp. 47-60
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 4
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part II: Shop-floor control
    • Uzsoy R, Lee C-Y, Martin-Vega LA (1994) A review of production planning and scheduling models in the semiconductor industry. Part II: shop-floor control. IIE Trans 26:44-55
    • (1994) IIE Trans , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 5
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon VJ, Wu SD, Storer RH (1994) Robustness measures and robust scheduling for job shops. IIE Trans 26:32-43
    • (1994) IIE Trans , vol.26 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 6
    • 0032097829 scopus 로고    scopus 로고
    • Predictable scheduling of a job shop subject to breakdowns
    • Mehta SV, Uzsoy R (1998) Predictable scheduling of a job shop subject to breakdowns. IEEE Trans Robot Autom 14:365-378
    • (1998) IEEE Trans Robot Autom , vol.14 , pp. 365-378
    • Mehta, S.V.1    Uzsoy, R.2
  • 7
    • 0002054180 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine subject to breakdowns
    • Mehta SV, Uzsoy R (1999) Predictable scheduling of a single machine subject to breakdowns. Int J Comput Integr Manuf 12:15-38
    • (1999) Int J Comput Integr Manuf , vol.12 , pp. 15-38
    • Mehta, S.V.1    Uzsoy, R.2
  • 8
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdowns and sensitive jobs
    • O'Donovan R, Uzsoy R, McKay KN (1999) Predictable scheduling of a single machine with breakdowns and sensitive jobs. Int J Prod Res 37:4217-4233
    • (1999) Int J Prod Res , vol.37 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.2    McKay, K.N.3
  • 9
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu SD, Storer RH, Chang PC (1993) One-machine rescheduling heuristics with efficiency and stability as criteria. Comput Oper Res 20:1-14
    • (1993) Comput Oper Res , vol.20 , pp. 1-14
    • Wu, S.D.1    Storer, R.H.2    Chang, P.C.3
  • 10
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • Daniels RL, Kpuvelis P (1995) Robust scheduling to hedge against processing time uncertainty in single-stage production. Manage Sci 41:363-376
    • (1995) Manage Sci , vol.41 , pp. 363-376
    • Daniels, R.L.1    Kpuvelis, P.2
  • 11
    • 0033894477 scopus 로고    scopus 로고
    • Robust scheduling of a two-machine flow shop with uncertain processing times
    • Kouvelis P, Daniels RL, Vairaktarakis G (2000) Robust scheduling of a two-machine flow shop with uncertain processing times. IIE Trans 32:421-432
    • (2000) IIE Trans , vol.32 , pp. 421-432
    • Kouvelis, P.1    Daniels, R.L.2    Vairaktarakis, G.3
  • 12
    • 0031189107 scopus 로고    scopus 로고
    • Rescheduling job shops under random disruptions
    • Abumaizar RJ, Svestka JA (1997) Rescheduling job shops under random disruptions. Int J Prod Res 35:2065-2082
    • (1997) Int J Prod Res , vol.35 , pp. 2065-2082
    • Abumaizar, R.J.1    Svestka, J.A.2
  • 13
    • 0030786875 scopus 로고    scopus 로고
    • Production scheduling/rescheduling in flexible manufacturing
    • Jain AK, Elmaraghy HA (1997) Production scheduling/rescheduling in flexible manufacturing. Int J Prod Res 35:281-309
    • (1997) Int J Prod Res , vol.35 , pp. 281-309
    • Jain, A.K.1    Elmaraghy, H.A.2
  • 14
    • 0000179190 scopus 로고    scopus 로고
    • Rescheduling frequency in an FMS with uncertain processing times and unreliable machines
    • Sabuncuoglu I, Karabuk S (1999) Rescheduling frequency in an FMS with uncertain processing times and unreliable machines. J Manuf Syst 18:268-283
    • (1999) J Manuf Syst , vol.18 , pp. 268-283
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 16
    • 0037118759 scopus 로고    scopus 로고
    • An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns
    • Alcaide D, Rodriguez-Gonzalez A, Sicilia J (2002) An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns. Eur J Oper Res 140:384-398
    • (2002) Eur J Oper Res , vol.140 , pp. 384-398
    • Alcaide, D.1    Rodriguez-Gonzalez, A.2    Sicilia, J.3
  • 17
    • 84939004610 scopus 로고
    • Optimality and non-scalar-valued performance criteria
    • Zadeh L (1963) Optimality and non-scalar-valued performance criteria. IEEE Trans Automat Contr 8:59-60
    • (1963) IEEE Trans Automat Contr , vol.8 , pp. 59-60
    • Zadeh, L.1
  • 18
    • 0030241820 scopus 로고    scopus 로고
    • Multi-objective genetic algorithm and its application to flowshop scheduling
    • Murata T, Ishibuchi H, Tanaka H (1996) Multi-objective genetic algorithm and its application to flowshop scheduling. Comput Ind Eng 30:957-968
    • (1996) Comput Ind Eng , vol.30 , pp. 957-968
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 19
    • 0037410718 scopus 로고    scopus 로고
    • A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines
    • Cochran JK, Horng S-M, Fowler JW (2003) A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Comput Oper Res 30:1087-1102
    • (2003) Comput Oper Res , vol.30 , pp. 1087-1102
    • Cochran, J.K.1    Horng, S.-M.2    Fowler, J.W.3
  • 20
    • 29344433807 scopus 로고    scopus 로고
    • A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs
    • DOI 10.1007/s00170-004-2249-6
    • Pasupathy T, Rajendran C, Suresh RK (2005) A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs. Int J Adv Manuf Technol. DOI 10.1007/s00170-004-2249-6
    • (2005) Int J Adv Manuf Technol
    • Pasupathy, T.1    Rajendran, C.2    Suresh, R.K.3
  • 22
    • 0033899254 scopus 로고    scopus 로고
    • A prototype genetic algorithm enhanced multi-objective scheduler for manufacturing systems
    • Khoo LP, Lee SG, Yin XF (2000) A prototype genetic algorithm enhanced multi-objective scheduler for manufacturing systems. Int J Adv Manuf Technol 16:131-138
    • (2000) Int J Adv Manuf Technol , vol.16 , pp. 131-138
    • Khoo, L.P.1    Lee, S.G.2    Yin, X.F.3
  • 23
    • 0002629429 scopus 로고
    • An overview of evolutionary algorithms in multiobjective optimization
    • Fonseca CM, Fleming PJ (1995) An overview of evolutionary algorithms in multiobjective optimization. Evol Comput 3:1-16
    • (1995) Evol Comput , vol.3 , pp. 1-16
    • Fonseca, C.M.1    Fleming, P.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.