메뉴 건너뛰기




Volumn 2, Issue 1, 2011, Pages 45-60

Artificial bee colony for resource constrained project scheduling problem

Author keywords

Artificial bee colony; Makespan; Meta heuristic; Resource constrained project; Scheduling; Single mode

Indexed keywords


EID: 79954584606     PISSN: 19232926     EISSN: 19232934     Source Type: Journal    
DOI: 10.5267/j.ijiec.2010.04.004     Document Type: Article
Times cited : (32)

References (45)
  • 1
    • 33748299537 scopus 로고    scopus 로고
    • Bi-objective resource-constrained project scheduling with robustness and makespan criteria
    • Abbasi, B., Shadrokh, S., & Arkat, J.(2006). Bi-objective resource-constrained project scheduling with robustness and makespan criteria. Journal of Applied Mathematics and Computation, 180, 146-152.
    • (2006) Journal of Applied Mathematics and Computation , vol.180 , pp. 146-152
    • Abbasi, B.1    Shadrokh, S.2    Arkat, J.3
  • 2
    • 78049444992 scopus 로고    scopus 로고
    • A Neurogenetic approach for the resource-constrained project scheduling problem
    • doi:10.1016/j.cor.2010.01.007
    • Agarwal, A., Colak, S., & Erenguc, S.(2010). A Neurogenetic approach for the resource-constrained project scheduling problem. Computers & Operations Research, doi:10.1016/j.cor.2010.01.007.
    • (2010) Computers & Operations Research
    • Agarwal, A.1    Colak, S.2    Erenguc, S.3
  • 4
    • 79958767420 scopus 로고    scopus 로고
    • New competitive results for the stochastic resource-constrained project scheduling problem: Exploring the benefits of pre-processing
    • doi: 10.1007/s10951-009-0143-7
    • Ashtiani, B., Leus, R., & Aryanezhad, M. B.(2009). New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing. Journal of Scheduling, doi: 10.1007/s10951-009-0143-7.
    • (2009) Journal of Scheduling
    • Ashtiani, B.1    Leus, R.2    Aryanezhad, M.B.3
  • 5
    • 77951203649 scopus 로고    scopus 로고
    • Chaotic bee colony algorithms for global numerical optimization
    • Alatas B.(2010). Chaotic bee colony algorithms for global numerical optimization. Expert Systems with Applications, 37, 5682-5687.
    • (2010) Expert Systems With Applications , vol.37 , pp. 5682-5687
    • Alatas, B.1
  • 6
    • 0019342681 scopus 로고
    • Scheduling projects to resource constraints: Classification and complexity
    • Blazewicz J., Lenstra J. K., & Rinnooy Kan A. H. G.(1983). Scheduling projects to resource constraints: classification and complexity. Discrete Applied Mathematics, 5, 11-24.
    • (1983) Discrete Applied Mathematics , vol.5 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.K.2    Rinnooy, K.A.H.G.3
  • 7
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resourceconstrained project scheduling
    • Boctor, F. F.(1990). Some efficient multi-heuristic procedures for resourceconstrained project scheduling. European Journal of Operational Research, 49, 3-13.
    • (1990) European Journal of Operational Research , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 8
    • 0030216966 scopus 로고    scopus 로고
    • An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems
    • Boctor, F. F.(1996). An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems. International Journal of Production Research, 34, 2335-2351.
    • (1996) International Journal of Production Research , vol.34 , pp. 2335-2351
    • Boctor, F.F.1
  • 9
    • 0037508562 scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen, K., & Lecocq, H.(1993). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research, 149, 268-281.
    • (1993) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 10
    • 70449527542 scopus 로고    scopus 로고
    • Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB
    • Chen, R. M., Wu, C. L., Wang, C. M., & Lo, S. T.(2010). Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB. Expert Systems with Applications, 37, 1899-1910.
    • (2010) Expert Systems With Applications , vol.37 , pp. 1899-1910
    • Chen, R.M.1    Wu, C.L.2    Wang, C.M.3    Lo, S.T.4
  • 11
    • 70349267822 scopus 로고    scopus 로고
    • Multiprocessor system scheduling with precedence and resources constraints by ant colony system
    • Chen, R. M., Lo, S. T., Wang, C. J., & Wu, C. L.(2006). Multiprocessor system scheduling with precedence and resources constraints by ant colony system. Proceeding of ICS Conference, 292-297.
    • (2006) Proceeding of ICS Conference , pp. 292-297
    • Chen, R.M.1    Lo, S.T.2    Wang, C.J.3    Wu, C.L.4
  • 12
    • 70449527542 scopus 로고    scopus 로고
    • Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB
    • Chen, R. M., Wu, C. L., Wang, C. M., & Lo, S. T.(2010). Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB. Expert Systems with Applications, 37, 1899-1910.
    • (2010) Expert Systems With Applications , vol.37 , pp. 1899-1910
    • Chen, R.M.1    Wu, C.L.2    Wang, C.M.3    Lo, S.T.4
  • 13
    • 73149125765 scopus 로고    scopus 로고
    • An efficient hybrid algorithm for resource-constrained project scheduling
    • Chen, W., Shi, Y. J., Teng, H. F., Lan, X. P., & Hu, L. C.(2010). An efficient hybrid algorithm for resource-constrained project scheduling. Information Sciences, 180, 1031-1039.
    • (2010) Information Sciences , vol.180 , pp. 1031-1039
    • Chen, W.1    Shi, Y.J.2    Teng, H.F.3    Lan, X.P.4    Hu, L.C.5
  • 14
    • 60349124753 scopus 로고    scopus 로고
    • Differential evolution for solving multi-mode resource-constrained project scheduling problems
    • Damak, N., Jarboui, B., Siarry, P., & Loukil, T.(2009). Differential evolution for solving multi-mode resource-constrained project scheduling problems. Computers & Operations Research, 36, 2653-2659.
    • (2009) Computers & Operations Research , vol.36 , pp. 2653-2659
    • Damak, N.1    Jarboui, B.2    Siarry, P.3    Loukil, T.4
  • 15
    • 33745748011 scopus 로고    scopus 로고
    • An Electromagnetism Meta-Heuristic For The Resource-Constrained Project Scheduling Problem
    • Debels, D., & Vanhoucke, M.(2004). An Electromagnetism Meta-Heuristic For The Resource-Constrained Project Scheduling Problem. Lecture Notes on Computer Science, 3871, 259-270.
    • (2004) Lecture Notes On Computer Science , vol.3871 , pp. 259-270
    • Debels, D.1    Vanhoucke, M.2
  • 17
    • 84958780540 scopus 로고    scopus 로고
    • New classes of lower bounds for bin-packing problems
    • Fekete, S. P., & Schepers, J.(1998). New classes of lower bounds for bin-packing problems. Lecture Notes in Computer Science, 1412, 257-270.
    • (1998) Lecture Notes In Computer Science , vol.1412 , pp. 257-270
    • Fekete, S.P.1    Schepers, J.2
  • 18
    • 35148821762 scopus 로고    scopus 로고
    • A powerful and efficient algorithm for numerical function optimization: Artificial bee colony (ABC) algorithm
    • Karaboga, D., & Basturk, B.(2007). A powerful and efficient algorithm for numerical function optimization: artificial bee colony (ABC) algorithm. Journal of Global Optimization, 39, 459-471.
    • (2007) Journal of Global Optimization , vol.39 , pp. 459-471
    • Karaboga, D.1    Basturk, B.2
  • 19
    • 67349273050 scopus 로고    scopus 로고
    • A comparative study of Artificial Bee Colony algorithm
    • Karaboga, D., & Akay, B.(2009). A comparative study of Artificial Bee Colony algorithm. Applied Mathematics and Computation, 214, 108-132.
    • (2009) Applied Mathematics and Computation , vol.214 , pp. 108-132
    • Karaboga, D.1    Akay, B.2
  • 20
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
    • J. Weglarz (Ed.), Kluwer Academic Publishers, Berlin
    • Kolisch, R., & Hartmann, S.(1999). Heuristic algorithms for solving the resource-constrained project scheduling problem: classification and computational analysis. J. Weglarz (Ed.), Project Scheduling: Recent Models, algorithms and Applications, Kluwer Academic Publishers, Berlin, 147-178.
    • (1999) Project Scheduling: Recent Models, Algorithms and Applications , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 21
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • Kolisch, R.(1996). Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operations Management, 14, 179-192.
    • (1996) Journal of Operations Management , vol.14 , pp. 179-192
    • Kolisch, R.1
  • 22
    • 60649110645 scopus 로고    scopus 로고
    • A heuristic solution framework for the resource constrained multi-project scheduling problem with sequence-dependent transfer times
    • Krüger, D., & Scholl, A.(2009). A heuristic solution framework for the resource constrained multi-project scheduling problem with sequence-dependent transfer times. European Journal of Operational Research, 197, 492-508.
    • (2009) European Journal of Operational Research , vol.197 , pp. 492-508
    • Krüger, D.1    Scholl, A.2
  • 23
    • 77953872383 scopus 로고    scopus 로고
    • A survey of variants and extensions of the resource-constrained project scheduling problem
    • Hartmann, S., & Briskorn, D.(2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207, 1-14.
    • (2010) European Journal of Operational Research , vol.207 , pp. 1-14
    • Hartmann, S.1    Briskorn, D.2
  • 24
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resourceconstrained project scheduling
    • Hartmann, S.(1998). A competitive genetic algorithm for resourceconstrained project scheduling. Naval Research Logistics, 45, 733-750.
    • (1998) Naval Research Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 25
    • 59149093294 scopus 로고    scopus 로고
    • Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem
    • Mahdi Mobini, M. D., Rabbani, M., Amalnik, M. S., Razmi, J., & Rahimi-Vahed, A. R.(2009). Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem. Soft Computing, 13, 597-610.
    • (2009) Soft Computing , vol.1 , pp. 597-610
    • Mahdi, M.M.D.1    Rabbani, M.2    Amalnik, M.S.3    Razmi, J.4    Rahimi-Vahed, A.R.5
  • 26
    • 44849140428 scopus 로고    scopus 로고
    • A random key based genetic algorithm for the resource constrained project scheduling problem
    • Mendes, J. J., Gonalves, J. F., & Resende M.G.C.(2009). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & Operations Research, 36, 92-109.
    • (2009) Computers & Operations Research , vol.36 , pp. 92-109
    • Mendes, J.J.1    Gonalves, J.F.2    Resende, M.G.C.3
  • 27
    • 44849140428 scopus 로고    scopus 로고
    • A random key based genetic algorithm for the resource constrained project scheduling problem
    • Mendes, J. J., Gonalves, J. F., Resende, M. G. C.(2009). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & Operations Research, 36, 92-109.
    • (2009) Computers & Operations Research , vol.36 , pp. 92-109
    • Mendes, J.J.1    Gonalves, J.F.2    Resende, M.G.C.3
  • 28
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation
    • Mingozzi, A., Maniezzo, V., Ricciardelli, S., & Bianco, L.(1998). An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation. Journal of Management Science, 44, 714-729.
    • (1998) Journal of Management Science , vol.44 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 29
    • 78751634245 scopus 로고    scopus 로고
    • An Artificial Immune Algorithm for the project scheduling problem under resource constraints
    • doi:10.1016/j.asoc.2010.06.013
    • Mobini, M., Mobini Z., & Rabbani M.(2010). An Artificial Immune Algorithm for the project scheduling problem under resource constraints. Applied Soft Computing, doi:10.1016/j.asoc.2010.06.013.
    • (2010) Applied Soft Computing
    • Mobini, M.1    Mobini, Z.2    Rabbani, M.3
  • 31
    • 0037846132 scopus 로고    scopus 로고
    • Order-based neighborhoods for project scheduling with nonregular objective functions
    • Neumann, K., Schwindt, C., & Zimmermann, J.(2003). Order-based neighborhoods for project scheduling with nonregular objective functions. European Journal of Operational Research, 149, 2, 325-343.
    • (2003) European Journal of Operational Research , vol.149 , Issue.2 , pp. 325-343
    • Neumann, K.1    Schwindt, C.2    Zimmermann, J.3
  • 32
    • 79953031480 scopus 로고    scopus 로고
    • A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem
    • doi:10.1016/j.ins.2009.12.025
    • Pan, Q. K., M. Tasgetiren F., Suganthan, P. N., & Chua, T. J.(2010) A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem, Information Sciences. doi:10.1016/j.ins.2009.12.025.
    • (2010) Information Sciences
    • Pan, Q.K.1    Tasgetiren, M.2    Suganthan, P.N.3    Chua, T.J.4
  • 34
    • 33749564779 scopus 로고    scopus 로고
    • A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
    • Rabbani, M., Fatemi Ghomi, S.M.T., Jolai, F., & Lahiji, N.S.(2007). A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept. European Journal of Operational Research, 176, 794-808.
    • (2007) European Journal of Operational Research , vol.176 , pp. 794-808
    • Rabbani, M.1    Fatemi, G.S.M.T.2    Jolai, F.3    Lahiji, N.S.4
  • 35
    • 44649097606 scopus 로고    scopus 로고
    • Solving the resource-constrained project scheduling problem using filter-and-fan approach
    • Ranjbar, M.(2008). Solving the resource-constrained project scheduling problem using filter-and-fan approach. Journal of Applied Mathematics and Computation, 201, 313-318.
    • (2008) Journal of Applied Mathematics and Computation , vol.2 , pp. 313-318
    • Ranjbar, M.1
  • 36
    • 0033691202 scopus 로고    scopus 로고
    • Scheduling resource-constrained projects competitively at modest memory requirements
    • Sprecher, A.(2000). Scheduling resource-constrained projects competitively at modest memory requirements. Management Science, 46, 710-723.
    • (2000) Management Science , vol.46 , pp. 710-723
    • Sprecher, A.1
  • 37
    • 12344330553 scopus 로고    scopus 로고
    • On the generation of circuits and minimal forbidden sets
    • Stork, F., & Uetz, M.(2005). On the generation of circuits and minimal forbidden sets. Mathematical Programming, 102, 185-203.
    • (2005) Mathematical Programming , vol.102 , pp. 185-203
    • Stork, F.1    Uetz, M.2
  • 38
    • 46149121233 scopus 로고    scopus 로고
    • Bee colony optimization-a cooperative learning approach to complex transportation problems
    • Teodorovic, D., & Dell Orco, M.(2007). Bee colony optimization-a cooperative learning approach to complex transportation problems. Advanced OR and AI Methods in Transportation, 51-60.
    • (2007) Advanced OR and AI Methods In Transportation , pp. 51-60
    • Teodorovic, D.1    Dell, O.M.2
  • 40
    • 0032117729 scopus 로고    scopus 로고
    • A tabu search approach for the resource constrained project scheduling problem
    • Thomas, P. R., & Salhi S.(1998). A tabu search approach for the resource constrained project scheduling problem. Journal of Heuristics, 4, 123-139.
    • (1998) Journal of Heuristics , vol.4 , pp. 123-139
    • Thomas, P.R.1    Salhi, S.2
  • 41
    • 0035617605 scopus 로고    scopus 로고
    • A competitive heuristic solution technique for resource-constrained project scheduling
    • Tormos, P., & Lova, A.(2001). A competitive heuristic solution technique for resource-constrained project scheduling. Annals of Operations Research, 102, 65-81.
    • (2001) Annals of Operations Research , vol.102 , pp. 65-81
    • Tormos, P.1    Lova, A.2
  • 42
    • 33748439560 scopus 로고    scopus 로고
    • A hybrid metaheuristic for the resource-constrained project scheduling problem
    • Tseng, L.Y., & Chen, S. C.(2006). A hybrid metaheuristic for the resource-constrained project scheduling problem, European Journal of Operational Research, 175, 707-721.
    • (2006) European Journal of Operational Research , vol.175 , pp. 707-721
    • Tseng, L.Y.1    Chen, S.C.2
  • 43
    • 34648837872 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the resource-constrained project scheduling problem
    • Valls V., Ballestin F., & Quintanilla, S.(2008). A hybrid genetic algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 185, 495-508.
    • (2008) European Journal of Operational Research , vol.185 , pp. 495-508
    • Valls, V.1    Ballestin, F.2    Quintanilla, S.3
  • 44
    • 13244273704 scopus 로고    scopus 로고
    • Particle swarm optimization-based schemes for resource-constrained project scheduling
    • Zhang, H., Li, X., Li, H., & Huang, F.(2005). Particle swarm optimization-based schemes for resource-constrained project scheduling. Journal of Automation in Construction, 14, 393-404.
    • (2005) Journal of Automation In Construction , vol.14 , pp. 393-404
    • Zhang, H.1    Li, X.2    Li, H.3    Huang, F.4
  • 45
    • 30744437401 scopus 로고    scopus 로고
    • Particle swarm optimization for resource-constrained project scheduling
    • Zhang, H., Li, H., & Tam, C. M.(2006). Particle swarm optimization for resource-constrained project scheduling, International Journal of Project Management, 24, 83-92.
    • (2006) International Journal of Project Management , vol.24 , pp. 83-92
    • Zhang, H.1    Li, H.2    Tam, C.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.