A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times

Author keywords

Combinatorial optimisation; Mathematical model; Project scheduling; Setup; Transfer times

Indexed keywords

COMBINATORIAL OPTIMIZATION; COMPUTER SIMULATION; INTEGER PROGRAMMING; MATHEMATICAL MODELS;

EID: 60649110645     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2008.07.036     Document Type: Article
Times cited : (101)

References (43)
  • 1
    • 0037211465 scopus 로고    scopus 로고
    • Managing multiple-project environments through constant work-in-progress
    • Anavi-Isakow S., and Golany B. Managing multiple-project environments through constant work-in-progress. International Journal of Project Management 21 1 (2003) 9-18
    • (2003) International Journal of Project Management , vol.21 , Issue.1 , pp. 9-18
    • Anavi-Isakow, S.1    Golany, B.2
  • 2
    • 0038522575 scopus 로고    scopus 로고
    • Insertion techniques for static and dynamic resource-constrained project scheduling
    • Artigue C., Michelon P., and Reusser S. Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research 149 2 (2003) 249-267
    • (2003) European Journal of Operational Research , vol.149 , Issue.2 , pp. 249-267
    • Artigue, C.1    Michelon, P.2    Reusser, S.3
  • 3
    • 0041033427 scopus 로고    scopus 로고
    • The effects of learning, forgetting, and relearning on decision rule performance in multiproject scheduling
    • Ash R., and Smith-Daniels D.E. The effects of learning, forgetting, and relearning on decision rule performance in multiproject scheduling. Decision Sciences 30 1 (1999) 47-82
    • (1999) Decision Sciences , vol.30 , Issue.1 , pp. 47-82
    • Ash, R.1    Smith-Daniels, D.E.2
  • 4
    • 84985756243 scopus 로고
    • A comparison of due date setting, resource assignment, and job preemption heuristics for the multiproject scheduling problem
    • Bock D.B., and Patterson J.H. A comparison of due date setting, resource assignment, and job preemption heuristics for the multiproject scheduling problem. Decision Sciences 21 2 (1990) 387-402
    • (1990) Decision Sciences , vol.21 , Issue.2 , pp. 387-402
    • Bock, D.B.1    Patterson, J.H.2
  • 8
    • 0031076814 scopus 로고    scopus 로고
    • Audit scheduling with overlapping activities and sequence-dependent setup costs
    • Dodin B., and Elimam A.A. Audit scheduling with overlapping activities and sequence-dependent setup costs. European Journal of Operational Research 97 1 (1997) 22-33
    • (1997) European Journal of Operational Research , vol.97 , Issue.1 , pp. 22-33
    • Dodin, B.1    Elimam, A.A.2
  • 9
    • 0026818081 scopus 로고
    • In a multi-resource environment, how much is enough
    • Dumond J. In a multi-resource environment, how much is enough. International Journal of Production Research 30 2 (1992) 395-410
    • (1992) International Journal of Production Research , vol.30 , Issue.2 , pp. 395-410
    • Dumond, J.1
  • 11
    • 0023824517 scopus 로고
    • Evaluating project scheduling and due date assignment procedures: An experimental analysis
    • Dumond J., and Mabert V.A. Evaluating project scheduling and due date assignment procedures: An experimental analysis. Management Science 34 1 (1988) 101-118
    • (1988) Management Science , vol.34 , Issue.1 , pp. 101-118
    • Dumond, J.1    Mabert, V.A.2
  • 12
    • 0011717163 scopus 로고
    • Towards the development of a complete multiproject scheduling system
    • Fendley L.G. Towards the development of a complete multiproject scheduling system. Journal of Industrial Engineering 19 10 (1968) 505-515
    • (1968) Journal of Industrial Engineering , vol.19 , Issue.10 , pp. 505-515
    • Fendley, L.G.1
  • 13
    • 33745718488 scopus 로고    scopus 로고
    • Managing multiple projects in the 21st century
    • Pennypacker J.S., and Dye L.D. (Eds), Dekker, New York
    • Ireland L.R. Managing multiple projects in the 21st century. In: Pennypacker J.S., and Dye L.D. (Eds). Managing multiple projects (2002), Dekker, New York 21-34
    • (2002) Managing multiple projects , pp. 21-34
    • Ireland, L.R.1
  • 14
    • 0042904335 scopus 로고
    • Unpublished Working Paper, Department of Management Science, University of Tennessee, Knoxville, USA
    • Kaplan, L., 1991. Resource-constrained project scheduling with setup times. Unpublished Working Paper, Department of Management Science, University of Tennessee, Knoxville, USA.
    • (1991) Resource-constrained project scheduling with setup times
    • Kaplan, L.1
  • 16
    • 0011725236 scopus 로고    scopus 로고
    • Scattered branch and bound. An adaptive search strategy applied to resource-constrained project scheduling
    • Klein R., and Scholl A. Scattered branch and bound. An adaptive search strategy applied to resource-constrained project scheduling. Central European Journal of Operations Research 7 3 (1999) 177-201
    • (1999) Central European Journal of Operations Research , vol.7 , Issue.3 , pp. 177-201
    • Klein, R.1    Scholl, A.2
  • 17
    • 0345893880 scopus 로고    scopus 로고
    • PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem
    • Klein R., and Scholl A. PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem. Mathematical Methods of Operations Research 52 3 (2000) 467-488
    • (2000) Mathematical Methods of Operations Research , vol.52 , Issue.3 , pp. 467-488
    • Klein, R.1    Scholl, A.2
  • 19
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for the resource-constrained project scheduling problem: Classification and computational analysis
    • Weglarz J. (Ed), Kluwer, Boston
    • Kolisch R., and Hartmann S. Heuristic algorithms for the resource-constrained project scheduling problem: Classification and computational analysis. In: Weglarz J. (Ed). Project Scheduling: Recent Models, Algorithms, and Applications (1999), Kluwer, Boston 147-178
    • (1999) Project Scheduling: Recent Models, Algorithms, and Applications , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 20
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • Kolisch R., and Hartmann S. Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research 174 1 (2006) 23-37
    • (2006) European Journal of Operational Research , vol.174 , Issue.1 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 21
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch R., and Padman R. An integrated survey of deterministic project scheduling. Omega 29 3 (2001) 249-272
    • (2001) Omega , vol.29 , Issue.3 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 22
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch R., Sprecher A., and Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41 10 (1995) 1693-1704
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1693-1704
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 24
    • 0020087944 scopus 로고
    • Multi-project scheduling: Categorization of heuristic rules performance
    • Kurtulus I.S., and Davis E.W. Multi-project scheduling: Categorization of heuristic rules performance. Management Science 28 2 (1982) 161-172
    • (1982) Management Science , vol.28 , Issue.2 , pp. 161-172
    • Kurtulus, I.S.1    Davis, E.W.2
  • 25
    • 0022025928 scopus 로고
    • Multi-project scheduling: Analysis of project performance
    • Kurtulus I.S., and Narula S.C. Multi-project scheduling: Analysis of project performance. IIE Transactions 17 1 (1985) 58-66
    • (1985) IIE Transactions , vol.17 , Issue.1 , pp. 58-66
    • Kurtulus, I.S.1    Narula, S.C.2
  • 26
    • 0027306874 scopus 로고
    • Resource constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
    • Lawrence S.R., and Morton T.E. Resource constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics. European Journal of Operational Research 64 2 (1993) 168-187
    • (1993) European Journal of Operational Research , vol.64 , Issue.2 , pp. 168-187
    • Lawrence, S.R.1    Morton, T.E.2
  • 27
    • 0035599853 scopus 로고    scopus 로고
    • Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
    • Lova A., and Tormos P. Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Annals of Operations Research 102 (2001) 263-286
    • (2001) Annals of Operations Research , vol.102 , pp. 263-286
    • Lova, A.1    Tormos, P.2
  • 28
    • 0034559445 scopus 로고    scopus 로고
    • A multicriteria heuristic method to improve resource allocation in multi-project scheduling
    • Lova A., Maroto C., and Tormos P. A multicriteria heuristic method to improve resource allocation in multi-project scheduling. European Journal of Operational Research 127 2 (2000) 408-424
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 408-424
    • Lova, A.1    Maroto, C.2    Tormos, P.3
  • 30
    • 84955278998 scopus 로고    scopus 로고
    • Modelling setup times in project scheduling
    • Jósefowska J., and Weglarz J. (Eds), Springer, New York
    • Mika M., Waligóra G., and Weglarz J. Modelling setup times in project scheduling. In: Jósefowska J., and Weglarz J. (Eds). Perspectives in Modern Project Scheduling (2006), Springer, New York 131-163
    • (2006) Perspectives in Modern Project Scheduling , pp. 131-163
    • Mika, M.1    Waligóra, G.2    Weglarz, J.3
  • 31
    • 0024608832 scopus 로고
    • Multiple projects-multiple resources-constrained scheduling: Some studies
    • Mohanty R.P., and Siddiq M.K. Multiple projects-multiple resources-constrained scheduling: Some studies. International Journal of Production Research 27 2 (1989) 261-280
    • (1989) International Journal of Production Research , vol.27 , Issue.2 , pp. 261-280
    • Mohanty, R.P.1    Siddiq, M.K.2
  • 34
    • 0015742216 scopus 로고
    • Alternate methods of project scheduling with limited resources
    • Patterson J.H. Alternate methods of project scheduling with limited resources. Naval Research Logistics Quarterly 20 4 (1973) 767-783
    • (1973) Naval Research Logistics Quarterly , vol.20 , Issue.4 , pp. 767-783
    • Patterson, J.H.1
  • 35
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson J.H. A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Management Science 30 7 (1984) 854-867
    • (1984) Management Science , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 36
    • 0029321203 scopus 로고
    • Management of multiple simultaneous projects: A state-of-the-art review
    • Payne J.H. Management of multiple simultaneous projects: A state-of-the-art review. International Journal of Project Management 13 3 (1995) 163-168
    • (1995) International Journal of Project Management , vol.13 , Issue.3 , pp. 163-168
    • Payne, J.H.1
  • 37
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker L.J., Watters A.A.B., and Wolfe P.M. Multiproject scheduling with limited resources: A zero-one programming approach. Management Science 16 1 (1969) 93-108
    • (1969) Management Science , vol.16 , Issue.1 , pp. 93-108
    • Pritsker, L.J.1    Watters, A.A.B.2    Wolfe, P.M.3
  • 39
    • 41449117771 scopus 로고    scopus 로고
    • Setup times and fast tracking in resource-constrained project scheduling
    • Vanhoucke M. Setup times and fast tracking in resource-constrained project scheduling. Computers and Industrial Engineering 54 4 (2008) 1062-1070
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 1062-1070
    • Vanhoucke, M.1
  • 40
    • 0028517491 scopus 로고
    • Constrained multi-project planning problems: A Lagrangian decomposition approach
    • Vercellis C. Constrained multi-project planning problems: A Lagrangian decomposition approach. European Journal of Operational Research 78 2 (1994) 267-275
    • (1994) European Journal of Operational Research , vol.78 , Issue.2 , pp. 267-275
    • Vercellis, C.1
  • 42
    • 0027612534 scopus 로고
    • A comparison of resource allocation and activity scheduling rules in a dynamic multi-project environment
    • Yang K.K., and Sum C.C. A comparison of resource allocation and activity scheduling rules in a dynamic multi-project environment. Journal of Operations Management 11 2 (1993) 207-218
    • (1993) Journal of Operations Management , vol.11 , Issue.2 , pp. 207-218
    • Yang, K.K.1    Sum, C.C.2
  • 43
    • 0031277169 scopus 로고    scopus 로고
    • An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment
    • Yang K.K., and Sum C.C. An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment. European Journal of Operational Research 103 1 (1997) 139-154
    • (1997) European Journal of Operational Research , vol.103 , Issue.1 , pp. 139-154
    • Yang, K.K.1    Sum, C.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.