메뉴 건너뛰기




Volumn 13, Issue 6, 2009, Pages 597-610

Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem

Author keywords

Makespan; Path relinking; Project scheduling; Resource constrained; Scatter search algorithm

Indexed keywords

ALGORITHMS; BENCHMARKING; LEARNING ALGORITHMS; SCHEDULING;

EID: 59149093294     PISSN: 14327643     EISSN: 14337479     Source Type: Journal    
DOI: 10.1007/s00500-008-0337-5     Document Type: Article
Times cited : (46)

References (32)
  • 3
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen K, Lecocq H (2003) A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. Eur J Oper Res 149:268-281
    • (2003) Eur J Oper Res , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 4
    • 0032096810 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for the resource-constrained project scheduling problem
    • Brucker P, Knust S, Schoo A, Thiele O (1998) A branch-and-bound algorithm for the resource-constrained project scheduling problem. Eur J Oper Res 107:272-288
    • (1998) Eur J Oper Res , vol.107 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 5
    • 0032736579 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, models and methods
    • Brucker P, Drexl A, Mohring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: Notation, classification, models and methods. Eur J Oper Res 112:3-41
    • (1999) Eur J Oper Res , vol.112 , pp. 3-41
    • Brucker, P.1    Drexl, A.2    Mohring, R.3    Neumann, K.4    Pesch, E.5
  • 6
    • 25444456205 scopus 로고    scopus 로고
    • A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
    • Debles D, Reyck BD, Leus R, Vanhoucke M (2006) A hybrid scatter search/ electromagnetism meta-heuristic for project scheduling. Eur J Oper Res 169:638-653
    • (2006) Eur J Oper Res , vol.169 , pp. 638-653
    • Debles, D.1    Reyck, B.D.2    Leus, R.3    Vanhoucke, M.4
  • 7
    • 1642436954 scopus 로고    scopus 로고
    • Solving the resource-constrained project scheduling problem by a variable neighborhood search
    • Fleszar K, Hindi KS (2004) Solving the resource-constrained project scheduling problem by a variable neighborhood search. Eur J Oper Res 155:402-413
    • (2004) Eur J Oper Res , vol.155 , pp. 402-413
    • Fleszar, K.1    Hindi, K.S.2
  • 8
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • Hartmann S (1998) A competitive genetic algorithm for resource-constrained project scheduling. Naval Res Logistics 45:733-50
    • (1998) Naval Res Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 9
    • 0036684673 scopus 로고    scopus 로고
    • A self-adapting genetic algorithm for project scheduling under resource constraints
    • Hartmann S (2002) A self-adapting genetic algorithm for project scheduling under resource constraints. Naval Res Logistics 49:433-448
    • (2002) Naval Res Logistics , vol.49 , pp. 433-448
    • Hartmann, S.1
  • 10
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of- the-art heuristics for the resource-constrained project scheduling problem
    • Hartmann S, Kolisch R (2000) Experimental evaluation of state-of- the-art heuristics for the resource-constrained project scheduling problem. Eur J Oper Res 127:394-407
    • (2000) Eur J Oper Res , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 11
    • 0032042933 scopus 로고    scopus 로고
    • Resource constrained project scheduling - A survey of recent developments
    • Herroelen W, Demeulemeester E, De Reyck B (1998) Resource constrained project scheduling - a survey of recent developments. Comput Oper Res 25(4):279-302
    • (1998) Comput Oper Res , vol.25 , Issue.4 , pp. 279-302
    • Herroelen, W.1    Demeulemeester, E.2    De Reyck, B.3
  • 12
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch R (1996) Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. Eur J Oper Res 90:320-33
    • (1996) Eur J Oper Res , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 13
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification computational analysis
    • In: Weglarz J(eds) Kluwer, Berlin
    • Kolisch R, Hartmann S (1999) Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification computational analysis. In: WRglarz J(eds) Project scheduling: recent models, algorithms and applications. Kluwer, Berlin, pp 147-178
    • (1999) Project Scheduling: Recent Models, Algorithms and Applications , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 14
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • Kolisch R, Hartmann S (2006) Experimental investigation of heuristics for resource-constrained project scheduling: An update. Eur J Oper Res 174:23-37
    • (2006) Eur J Oper Res , vol.174 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 15
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch R, Padman R (2001) An integrated survey of deterministic project scheduling. Omega 29:249-272
    • (2001) Omega , vol.29 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 16
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB-a project scheduling problem library
    • Kolisch R, Sprecher A (1997) PSPLIB-a project scheduling problem library. Eur J Oper Res 96:205-216
    • (1997) Eur J Oper Res , vol.96 , pp. 205-216
    • Kolisch, R.1    Sprecher, A.2
  • 18
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource-constrained project scheduling
    • Li KY, Willis RJ (1992) An iterative scheduling technique for resource-constrained project scheduling. Eur J Oper Res 56:370-379
    • (1992) Eur J Oper Res , vol.56 , pp. 370-379
    • Li, K.Y.1    Willis, R.J.2
  • 20
    • 84888782064 scopus 로고    scopus 로고
    • Formulation and tabu search algorithm for the resource constrained project scheduling problem
    • In: Ribeiro CC, Hansen P(eds) Kluwer, Dordrecht
    • Nonobe K, Ibaraki T (2002) Formulation and tabu search algorithm for the resource constrained project scheduling problem. In: Ribeiro CC, Hansen P(eds) Essays and surveys in metaheuristics. Kluwer, Dordrecht, pp 557-588
    • (2002) Essays and Surveys in Metaheuristics , pp. 557-588
    • Nonobe, K.1    Ibaraki, T.2
  • 22
    • 4444294743 scopus 로고    scopus 로고
    • LSSPER: Solving the resource-constrained project scheduling problem with large neighborhood search
    • Palpant M, Artigues C, Michelon P (2004) LSSPER: Solving the resource-constrained project scheduling problem with large neighborhood search. Ann Oper Res 131:237-257
    • (2004) Ann Oper Res , vol.131 , pp. 237-257
    • Palpant, M.1    Artigues, C.2    Michelon, P.3
  • 23
    • 0035546606 scopus 로고    scopus 로고
    • A high-performance exact method for the resource-constrained project scheduling problem
    • Reza Zamani M (2001) A high-performance exact method for the resource-constrained project scheduling problem. Comput Oper Res 28:1387-1401
    • (2001) Comput Oper Res , vol.28 , pp. 1387-1401
    • Reza Zamani, M.1
  • 24
    • 0035617605 scopus 로고    scopus 로고
    • A competitive heuristic solution technique for resource-constrained project scheduling
    • Tormos P, Lova A (2001) A competitive heuristic solution technique for resource-constrained project scheduling. Ann Oper Res 102:65-81
    • (2001) Ann Oper Res , vol.102 , pp. 65-81
    • Tormos, P.1    Lova, A.2
  • 28
    • 4444364098 scopus 로고    scopus 로고
    • A population based approach to the resource-constrained project scheduling problem
    • Valls V, Ballestin F, Quintanilla MS (2004) A population based approach to the resource-constrained project scheduling problem. Ann Oper Res 131:305-324
    • (2004) Ann Oper Res , vol.131 , pp. 305-324
    • Valls, V.1    Ballestin, F.2    Quintanilla, M.S.3
  • 29
    • 0035922498 scopus 로고    scopus 로고
    • Scheduling projects with linear time dependent cash flows to maximize the net present value
    • Vanhoucke M, Demeulemeester E, Herroelen W (2001) Scheduling projects with linear time dependent cash flows to maximize the net present value. Int J Prod Res 39:3159-3181
    • (2001) Int J Prod Res , vol.39 , pp. 3159-3181
    • Vanhoucke, M.1    Demeulemeester, E.2    Herroelen, W.3
  • 30
    • 25444489943 scopus 로고    scopus 로고
    • Scatter search for project scheduling with resource availability cost
    • Yamashita DS, Armentano VA, Laguna M (2006) Scatter search for project scheduling with resource availability cost. Eur J Oper Res 169:623-637
    • (2006) Eur J Oper Res , vol.169 , pp. 623-637
    • Yamashita, D.S.1    Armentano, V.A.2    Laguna, M.3
  • 31
    • 30744437401 scopus 로고    scopus 로고
    • Particle swarm optimization for resource-constrained project scheduling
    • Zhang H, Li H, Tam CM (2006) Particle swarm optimization for resource-constrained project scheduling. Int J Project Manage 24:83-92
    • (2006) Int J Project Manage , vol.24 , pp. 83-92
    • Zhang, H.1    Li, H.2    Tam, C.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.