메뉴 건너뛰기




Volumn 175, Issue 2, 2006, Pages 707-721

A hybrid metaheuristic for the resource-constrained project scheduling problem

Author keywords

Ant colony optimization; Genetic algorithm; Local search; Metaheuristics; Project scheduling

Indexed keywords

GENETIC ALGORITHMS; METADATA; OPERATIONS RESEARCH; OPTIMIZATION; PROJECT MANAGEMENT; SCHEDULING;

EID: 33748439560     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2005.06.014     Document Type: Article
Times cited : (94)

References (43)
  • 1
    • 0041611573 scopus 로고    scopus 로고
    • A genetic algorithm for the resource-constrained project scheduling problem
    • Barbarosoǧlu G., Karabati S., Özdamar L., and Ulusoy G. (Eds), Boǧazici University Printing Office
    • Alcaraz J., and Maroto C. A genetic algorithm for the resource-constrained project scheduling problem. In: Barbarosoǧlu G., Karabati S., Özdamar L., and Ulusoy G. (Eds). Proceedings of the Sixth International Workshop on Project Management and Scheduling (1998), Boǧazici University Printing Office 7-10
    • (1998) Proceedings of the Sixth International Workshop on Project Management and Scheduling , pp. 7-10
    • Alcaraz, J.1    Maroto, C.2
  • 2
    • 0042287689 scopus 로고    scopus 로고
    • A robust genetic algorithm for resource allocation in project scheduling
    • Alcaraz J., and Maroto C. A robust genetic algorithm for resource allocation in project scheduling. Annals of Operations Research 102 (2001) 83-109
    • (2001) Annals of Operations Research , vol.102 , pp. 83-109
    • Alcaraz, J.1    Maroto, C.2
  • 3
    • 0038522575 scopus 로고    scopus 로고
    • Insertion techniques for static and dynamic resource-constrained project scheduling
    • Artigues C., Michelon P., and Reusser S. Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research 149 (2003) 249-267
    • (2003) European Journal of Operational Research , vol.149 , pp. 249-267
    • Artigues, C.1    Michelon, P.2    Reusser, S.3
  • 4
    • 0003131416 scopus 로고    scopus 로고
    • Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem
    • Voss S., Martello S., Osman I., and Roucairol C. (Eds), Kluwer, Boston
    • Baar T., Brucker P., and Knust S. Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem. In: Voss S., Martello S., Osman I., and Roucairol C. (Eds). Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization (1998), Kluwer, Boston 1-8
    • (1998) Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization , pp. 1-8
    • Baar, T.1    Brucker, P.2    Knust, S.3
  • 5
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource-constrained project scheduling
    • Boctor F.F. Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research 49 (1990) 3-13
    • (1990) European Journal of Operational Research , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 6
    • 0030216966 scopus 로고    scopus 로고
    • An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problem
    • Boctor F.F. An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problem. International Journal of Production Research 34 (1996) 2335-2351
    • (1996) International Journal of Production Research , vol.34 , pp. 2335-2351
    • Boctor, F.F.1
  • 7
    • 0043114397 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem
    • Barbarosoǧlu G., Karabati S., Özdamar L., and Ulusoy G. (Eds), Boǧazici University Printing Office
    • Bouleimen K., and Lecocq H. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem. In: Barbarosoǧlu G., Karabati S., Özdamar L., and Ulusoy G. (Eds). Proceedings of the Sixth International Workshop on Project Management and Scheduling (1998), Boǧazici University Printing Office 19-22
    • (1998) Proceedings of the Sixth International Workshop on Project Management and Scheduling , pp. 19-22
    • Bouleimen, K.1    Lecocq, H.2
  • 8
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen K., and Lecocq H. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149 (2003) 268-281
    • (2003) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 10
    • 0032096810 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for the resource-constrained project scheduling problem
    • Brucker P., Knust S., Schoo A., and Thiele O. A branch-and-bound algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research 107 (1998) 272-288
    • (1998) European Journal of Operational Research , vol.107 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 11
    • 0031188915 scopus 로고    scopus 로고
    • A simulated annealing algorithm for resource constrained project scheduling problems
    • Cho J.H., and Kim Y.D. A simulated annealing algorithm for resource constrained project scheduling problems. Journal of the Operational Research Society 48 (1997) 736-744
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 736-744
    • Cho, J.H.1    Kim, Y.D.2
  • 12
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester E., and Herroelen W. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science 38 12 (1992) 1803-1818
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 13
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the multiple resource-constrained project scheduling problem
    • Demeulemeester E., and Herroelen W. New benchmark results for the multiple resource-constrained project scheduling problem. Management Science 43 11 (1997) 1485-1492
    • (1997) Management Science , vol.43 , Issue.11 , pp. 1485-1492
    • Demeulemeester, E.1    Herroelen, W.2
  • 14
    • 33748427266 scopus 로고    scopus 로고
    • M. Dorigo, Optimization, learning and natural algorithms, Ph.D. Thesis, Dipartimento di Elettronica, Politecnico di Milano, Italy, 1992.
  • 15
    • 0031122887 scopus 로고    scopus 로고
    • Ant colony system: A cooperative learning approach to the traveling salesman problem
    • Dorigo M., and Gambardella L.M. Ant colony system: A cooperative learning approach to the traveling salesman problem. IEEE Transactions on Evolutionary Computations 1 1 (1997) 53-66
    • (1997) IEEE Transactions on Evolutionary Computations , vol.1 , Issue.1 , pp. 53-66
    • Dorigo, M.1    Gambardella, L.M.2
  • 16
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • Hartmann S. A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics 45 (1998) 733-750
    • (1998) Naval Research Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 17
    • 0036684673 scopus 로고    scopus 로고
    • A self-adapting genetic algorithm for project scheduling under resource constraints
    • Hartmann S. A self-adapting genetic algorithm for project scheduling under resource constraints. Naval Research Logistics 49 (2002) 433-448
    • (2002) Naval Research Logistics , vol.49 , pp. 433-448
    • Hartmann, S.1
  • 18
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • Hartmann S., and Kolisch R. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research 127 (2000) 394-407
    • (2000) European Journal of Operational Research , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 20
    • 33748413973 scopus 로고    scopus 로고
    • Y. Kochetov, A. Stolyar, Evolutionary local search with variable neighborhood search for the resource-constrained project scheduling problem, in: Proceedings of the 3rd International Workshop of Computer Science and Information Technologies, Russia, 2003.
  • 21
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • Kolisch R. Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operations Management 14 (1996) 179-192
    • (1996) Journal of Operations Management , vol.14 , pp. 179-192
    • Kolisch, R.1
  • 22
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch R. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research 90 (1996) 320-333
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 23
    • 33748420872 scopus 로고    scopus 로고
    • R. Kolisch, S. Hartmann, Experimental investigation of heuristics for resource-constrained project scheduling: An update, working paper, Technical University of Munich, Germany, 2004. Available from: .
  • 24
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch R., and Padman R. An integrated survey of deterministic project scheduling. OMEGA 29 (2001) 249-272
    • (2001) OMEGA , vol.29 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 26
  • 27
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource-constrained project scheduling
    • Li K.Y., and Willis R.J. An iterative scheduling technique for resource-constrained project scheduling. European Journal of Operational Research 56 (1992) 370-379
    • (1992) European Journal of Operational Research , vol.56 , pp. 370-379
    • Li, K.Y.1    Willis, R.J.2
  • 29
    • 0037871958 scopus 로고    scopus 로고
    • Solving project scheduling problems by minimum cut computations
    • Möhring R., Schulz A., Stork F., and Uetz M. Solving project scheduling problems by minimum cut computations. Management Science 49 3 (2003) 330-350
    • (2003) Management Science , vol.49 , Issue.3 , pp. 330-350
    • Möhring, R.1    Schulz, A.2    Stork, F.3    Uetz, M.4
  • 30
    • 0031192667 scopus 로고    scopus 로고
    • A genetic algorithm for multi-mode resource constrained project scheduling problem
    • Mori M., and Tseng C.C. A genetic algorithm for multi-mode resource constrained project scheduling problem. European Journal of Operational Research 100 (1997) 134-141
    • (1997) European Journal of Operational Research , vol.100 , pp. 134-141
    • Mori, M.1    Tseng, C.C.2
  • 31
    • 0038527513 scopus 로고    scopus 로고
    • Formulation and tabu search algorithm for the resource constrained project scheduling problem
    • Ribeiro C.C., and Hansen P. (Eds), Kluwer Academic Publishers
    • Nonobe K., and Ibaraki T. Formulation and tabu search algorithm for the resource constrained project scheduling problem. In: Ribeiro C.C., and Hansen P. (Eds). Essays and Surveys in Metaheuristics (2001), Kluwer Academic Publishers 557-588
    • (2001) Essays and Surveys in Metaheuristics , pp. 557-588
    • Nonobe, K.1    Ibaraki, T.2
  • 33
    • 0030231464 scopus 로고    scopus 로고
    • An iterative local constraint based analysis for solving the resource constrained project scheduling problem
    • Özdamar L., and Ulusoy G. An iterative local constraint based analysis for solving the resource constrained project scheduling problem. Journal of Operations Management 14 (1996) 193-208
    • (1996) Journal of Operations Management , vol.14 , pp. 193-208
    • Özdamar, L.1    Ulusoy, G.2
  • 34
    • 0030574808 scopus 로고    scopus 로고
    • A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis
    • Özdamar L., and Ulusoy G. A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis. European Journal of Operational Research 89 (1996) 400-407
    • (1996) European Journal of Operational Research , vol.89 , pp. 400-407
    • Özdamar, L.1    Ulusoy, G.2
  • 35
    • 4444294743 scopus 로고    scopus 로고
    • LSSPER: Solving the resource-constrained project scheduling problem with larger neighborhood search
    • Palpant M., Artigues C., and Michelon P. LSSPER: Solving the resource-constrained project scheduling problem with larger neighborhood search. Annals of Operations Research 131 (2004) 237-257
    • (2004) Annals of Operations Research , vol.131 , pp. 237-257
    • Palpant, M.1    Artigues, C.2    Michelon, P.3
  • 36
    • 33748436285 scopus 로고    scopus 로고
    • L.Y. Tseng, S.C. Liang, A hybrid metaheuristic and its application to the traveling salesman problem, IEEE Transactions on Evolutionary Computation, submitted for publication.
  • 37
    • 84974870375 scopus 로고
    • Heuristic performance and network/resource characteristics in resource-constrained project scheduling
    • Ulusoy G., and Özdamar L. Heuristic performance and network/resource characteristics in resource-constrained project scheduling. Journal of the Operational Research Society 40 (1989) 1145-1152
    • (1989) Journal of the Operational Research Society , vol.40 , pp. 1145-1152
    • Ulusoy, G.1    Özdamar, L.2
  • 38
    • 0028396719 scopus 로고
    • A constraint-based perspective in resource constrained project scheduling
    • Ulusoy G., and Özdamar L. A constraint-based perspective in resource constrained project scheduling. International Journal of Production Research 32 (1994) 693-705
    • (1994) International Journal of Production Research , vol.32 , pp. 693-705
    • Ulusoy, G.1    Özdamar, L.2
  • 39
    • 33748439440 scopus 로고    scopus 로고
    • V. Valls, M.A. Perez, M.S. Quintanilla, Heuristic performance in large resource-constrained projects, Technical report, Department of Statistics and Operations Research, Universitat de Valencia, Valencia, Spain, 1992.
  • 41
    • 13444257593 scopus 로고    scopus 로고
    • A population-based approach to the resource-constrained project scheduling problem
    • Valls V., Ballestin F., and Quintanilla S. A population-based approach to the resource-constrained project scheduling problem. Annals of Operations Research 165 (2005) 375-386
    • (2005) Annals of Operations Research , vol.165 , pp. 375-386
    • Valls, V.1    Ballestin, F.2    Quintanilla, S.3
  • 42
    • 33748432021 scopus 로고    scopus 로고
    • V. Valls, F. Ballestin, S. Quintanilla, A hybrid genetic algorithm for the RCPSP with the peak crossover operator, The Eighth International Workshop on Project Management and Scheduling, 2002. Available from: .
  • 43


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.