-
1
-
-
0020193734
-
Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
-
F.B. Talbot Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case Manage Sci 28 10 1982 1197-1210
-
(1982)
Manage Sci
, vol.28
, Issue.10
, pp. 1197-1210
-
-
Talbot, F.B.1
-
2
-
-
0001424551
-
Algorithms for multi-resource generalized assignment problem
-
B. Gavish H. Pirkul Algorithms for multi-resource generalized assignment problem Manage Sci 37 6 1991 695-713
-
(1991)
Manage Sci
, vol.37
, Issue.6
, pp. 695-713
-
-
Gavish, B.1
Pirkul, H.2
-
3
-
-
0008619309
-
A branch and bound algorithm for a general class resource-constrained scheduling problem
-
PhD thesis, University of North Carolina at Chapel Hill, Chapel Hill, NC
-
Stinson JP. A branch and bound algorithm for a general class resource-constrained scheduling problem. PhD thesis, University of North Carolina at Chapel Hill, Chapel Hill, NC; 1976.
-
(1976)
-
-
Stinson, J.P.1
-
4
-
-
0030151930
-
Search heuristics for resource constrained project scheduling
-
J.K. Lee Y.D. Kim Search heuristics for resource constrained project scheduling J Operat Res Soc 47 5 1996 678-689
-
(1996)
J Operat Res Soc
, vol.47
, Issue.5
, pp. 678-689
-
-
Lee, J.K.1
Kim, Y.D.2
-
5
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
W.T. Chan D.K.H. Chua Construction resource scheduling with genetic algorithms J Constr Eng Manage ASCE 122 2 1996 125-132
-
(1996)
J Constr Eng Manage ASCE
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.T.1
Chua, D.K.H.2
-
6
-
-
0001494926
-
A genetic-algorithm-based resource-constrained construction scheduling system
-
S.S. Leu C.H. Yang A genetic-algorithm-based resource-constrained construction scheduling system Constr Manage Econ 17 1999 767-776
-
(1999)
Constr Manage Econ
, vol.17
, pp. 767-776
-
-
Leu, S.S.1
Yang, C.H.2
-
7
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource-constrained project scheduling
-
F.F. Boctor Some efficient multi-heuristic procedures for resource-constrained project scheduling Eur J Operat Res 49 1990 3-13
-
(1990)
Eur J Operat Res
, vol.49
, pp. 3-13
-
-
Boctor, F.F.1
-
8
-
-
0026171588
-
Resource strategies for dynamic project management
-
E.M. Padilla R.I. Carr Resource strategies for dynamic project management J Constr Eng Manage ASCE 111 2 1991 279-293
-
(1991)
J Constr Eng Manage ASCE
, vol.111
, Issue.2
, pp. 279-293
-
-
Padilla, E.M.1
Carr, R.I.2
-
9
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project scheduling
-
E.W. Davis J.H. Patterson A comparison of heuristic and optimum solutions in resource-constrained project scheduling Manage Sci 21 1975 944-955
-
(1975)
Manage Sci
, vol.21
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
10
-
-
0021460636
-
A comparison of exact procedures for solving the multiple constrained resource project scheduling problem
-
J. Patterson A comparison of exact procedures for solving the multiple constrained resource project scheduling problem Manage Sci 30 1984 854-867
-
(1984)
Manage Sci
, vol.30
, pp. 854-867
-
-
Patterson, J.1
-
12
-
-
0029535737
-
Particle swarm optimization
-
Piscataway, NJ
-
Kennedy J, Eberhart RC. Particle swarm optimization. In: Proceedings IEEE conference on neural networks, vol. IV, Piscataway, NJ, 1995; p. 1942-48.
-
(1995)
Proceedings IEEE Conference on Neural Networks
, vol.4
, pp. 1942-1948
-
-
Kennedy, J.1
Eberhart, R.C.2
-
14
-
-
0036073433
-
Particle swarm, genetic algorithm, and their hybrids: Optimization of a profiled corrugated horn antenna
-
San Antonio, TX
-
Robinson J, Sinton S, Rahmat-Samii Y. Particle swarm, genetic algorithm, and their hybrids: Optimization of a profiled corrugated horn antenna. In: IEEE Antennas and Propagation Society International symposium and URSI national radio science meeting, San Antonio, TX; 2002, p. 168-75.
-
(2002)
IEEE Antennas and Propagation Society International Symposium and URSI National Radio Science Meeting
, pp. 168-175
-
-
Robinson, J.1
Sinton, S.2
Rahmat-Samii, Y.3
-
16
-
-
0036464756
-
The particle swarm-explosion, stability, and convergence in a multidimensional complex space
-
M. Clerc J. Kennedy The particle swarm-explosion, stability, and convergence in a multidimensional complex space IEEE Trans Evol Comput 6 1 2002 58-73
-
(2002)
IEEE Trans Evol Comput
, vol.6
, Issue.1
, pp. 58-73
-
-
Clerc, M.1
Kennedy, J.2
-
18
-
-
84989743918
-
A new heuristic solution method in resource-constrained project scheduling
-
C.E. Bell J. Han A new heuristic solution method in resource-constrained project scheduling Naval Res Log 38 1991 315-331
-
(1991)
Naval Res Log
, vol.38
, pp. 315-331
-
-
Bell, C.E.1
Han, J.2
-
19
-
-
0025849210
-
A new approach for project scheduling with a limited resource
-
M.M. Khattab F. Choobineh A new approach for project scheduling with a limited resource Int J Prod Res 30 1991 185-198
-
(1991)
Int J Prod Res
, vol.30
, pp. 185-198
-
-
Khattab, M.M.1
Choobineh, F.2
-
20
-
-
84989730007
-
Local search techniques for the generalized resource constrained project scheduling problem
-
S.E. Sampson E.N. Weiss Local search techniques for the generalized resource constrained project scheduling problem Naval Res Log 40 1993 365-375
-
(1993)
Naval Res Log
, vol.40
, pp. 365-375
-
-
Sampson, S.E.1
Weiss, E.N.2
-
21
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
-
R. Kolisch Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation Eur J Operat Res 90 1996 320-333
-
(1996)
Eur J Operat Res
, vol.90
, pp. 320-333
-
-
Kolisch, R.1
-
22
-
-
0037475094
-
The particle swarm optimization algorithm: Convergence analysis and parameter selection
-
I.C. Trelea The particle swarm optimization algorithm: Convergence analysis and parameter selection Inform Process Lett 85 6 2003 317-325
-
(2003)
Inform Process Lett
, vol.85
, Issue.6
, pp. 317-325
-
-
Trelea, I.C.1
-
23
-
-
0036778849
-
Optimal power flow using particle swarm optimization
-
M.A. Abido Optimal power flow using particle swarm optimization Electr Power Energy Syst 24 2002 563-571
-
(2002)
Electr Power Energy Syst
, vol.24
, pp. 563-571
-
-
Abido, M.A.1
-
24
-
-
0034430526
-
A particle swarm optimization for reactive power and voltage control considering voltage security assessment
-
H. Yoshida K. Kawata Y. Fukuyama S. Takayama Y. Nakanishi A particle swarm optimization for reactive power and voltage control considering voltage security assessment IEEE Trans Power Syst 15 4 2000 1232-1239
-
(2000)
IEEE Trans Power Syst
, vol.15
, Issue.4
, pp. 1232-1239
-
-
Yoshida, H.1
Kawata, K.2
Fukuyama, Y.3
Takayama, S.4
Nakanishi, Y.5
|