메뉴 건너뛰기




Volumn 34, Issue 8, 1996, Pages 2335-2351

Resource-constrained project scheduling by simulated annealing

Author keywords

[No Author keywords available]

Indexed keywords

GENETIC ALGORITHMS; HEURISTIC METHODS; PLANT MANAGEMENT; PROBLEM SOLVING; SIMULATED ANNEALING; STATISTICAL METHODS;

EID: 0030216966     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608905028     Document Type: Article
Times cited : (143)

References (54)
  • 1
    • 0001849846 scopus 로고
    • Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis
    • chapter 5, R. Slowinski and J. Weglarz (eds) (New York: Elsevier
    • Alvarez-Valdes, R. and Tamarit, J. M., 1989, Heuristic algorithms for resource-constrained project scheduling: a review and an empirical analysis. In Advances in Project Scheduling, chapter 5, R. Slowinski and J. Weglarz (eds) (New York: Elsevier).
    • (1989) Advances in Project Scheduling
    • Alvarez-Valdes, R.1    Tamarit, J.M.2
  • 2
    • 0025385096 scopus 로고
    • Solving resource-constrained project scheduling problems by A* search
    • Bell, C. E. and Park, K., 1990, Solving resource-constrained project scheduling problems by A* search. Naval Research Logistics Quarterly, 37 (1), 61-84.
    • (1990) Naval Research Logistics Quarterly , vol.37 , Issue.1 , pp. 61-84
    • Bell, C.E.1    Park, K.2
  • 3
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource-constrained project scheduling
    • Boctor, F. F., 1990, Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research, 49 (1), 3-13.
    • (1990) European Journal of Operational Research , vol.49 , Issue.1 , pp. 3-13
    • Boctor, F.F.1
  • 4
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • Boctor, F. F., 1993, Heuristics for scheduling projects with resource restrictions and several resource-duration modes. International Journal of Production Research, 31 (11), 2547-2558.
    • (1993) International Journal of Production Research , vol.31 , Issue.11 , pp. 2547-2558
    • Boctor, F.F.1
  • 5
    • 3342965465 scopus 로고
    • A new and efficient heuristic for scheduling projects with resource constraints and multiple execution modes
    • Leuven, Belgium
    • Boctor, F. F., 1994, A new and efficient heuristic for scheduling projects with resource constraints and multiple execution modes, Proceedings of the 4lh international workshop on project management and scheduling, Leuven, Belgium, pp. 63-66.
    • (1994) Proceedings of the 4Lh International Workshop on Project Management and Scheduling , pp. 63-66
    • Boctor, F.F.1
  • 9
    • 0016972372 scopus 로고
    • Heuristics for scheduling resource-constrained projects: An experimental investigation
    • Cooper, D. F., 1976, Heuristics for scheduling resource-constrained projects: an experimental investigation. Management Science, 22 (11), 1186-1194.
    • (1976) Management Science , vol.22 , Issue.11 , pp. 1186-1194
    • Cooper, D.F.1
  • 10
    • 0000813734 scopus 로고
    • An algorithm for optimal project scheduling under multiple resource constraints
    • Davis, E. W. and Heidron, G. E., 1971, An algorithm for optimal project scheduling under multiple resource constraints. Management Science, 17 (12), B803-B816.
    • (1971) Management Science , vol.17 , Issue.12 , pp. B803-B816
    • Davis, E.W.1    Heidron, G.E.2
  • 11
    • 0015725454 scopus 로고
    • Project scheduling under resource constraints: Historical review and categorization of procedures
    • Davis, E. W., 1973, Project scheduling under resource constraints: historical review and categorization of procedures. AIIE Transactions, 5 (4), 297-313
    • (1973) AIIE Transactions , vol.5 , Issue.4 , pp. 297-313
    • Davis, E.W.1
  • 12
    • 0016046551 scopus 로고
    • Networks: Resource allocation
    • Davis, E. W., 1974, Networks: Resource allocation. Industrial Engineering, 6 (4), 22-32
    • (1974) Industrial Engineering , vol.6 , Issue.4 , pp. 22-32
    • Davis, E.W.1
  • 13
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project-scheduling
    • Davis, E. W. and Patterson, J. H., 1975, A comparison of heuristic and optimum solutions in resource-constrained project-scheduling. Management Science, 21 (8), 944-955.
    • (1975) Management Science , vol.21 , Issue.8 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 14
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E. and Herroelen, W., 1992, A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science, 38 (12), 1803-1818.
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 15
    • 0017478425 scopus 로고
    • Scheduling a project to maximize its present value: A zero-one programming approach
    • Doersch, R. H. and Patterson, J. H., 1977, Scheduling a project to maximize its present value: a zero-one programming approach. Management Science, 23 (8), 882-889.
    • (1977) Management Science , vol.23 , Issue.8 , pp. 882-889
    • Doersch, R.H.1    Patterson, J.H.2
  • 16
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • Drexel, A. and Gruenewald, J., 1993, Nonpreemptive multi-mode resource-constrained project scheduling. HE Transactions, 25 (5), 74-81.
    • (1993) HE Transactions , vol.25 , Issue.5 , pp. 74-81
    • Drexel, A.1    Gruenewald, J.2
  • 19
    • 0015361193 scopus 로고
    • An algorithm for project sequencing with resource constraints
    • Gorenstein, S, 1972, An algorithm for project sequencing with resource constraints. Operations Research, 20 (4), 835-850.
    • (1972) Operations Research , vol.20 , Issue.4 , pp. 835-850
    • Gorenstein, S.1
  • 20
    • 0015359193 scopus 로고
    • On resource allocation in project networks
    • Hastings, N. A. J., 1972, On resource allocation in project networks. Operational Research Quarterly, 23 (2), 217-221
    • (1972) Operational Research Quarterly , vol.23 , Issue.2 , pp. 217-221
    • Hastings, N.A.J.1
  • 21
    • 0015404241 scopus 로고
    • Resource-constrained project scheduling-the state of the art
    • Herroelen, W. S., 1972, Resource-constrained project scheduling-the state of the art. Operational Research Quarterly, 23 (3), 261-275.
    • (1972) Operational Research Quarterly , vol.23 , Issue.3 , pp. 261-275
    • Herroelen, W.S.1
  • 23
    • 0016962706 scopus 로고
    • A branch and bound algorithm for use in resource allocation
    • Katsoulas, P. C. and Sadowski, R. P., 1976, A branch and bound algorithm for use in resource allocation. AIIE Transactions, 8 (2), 226-233.
    • (1976) AIIE Transactions , vol.8 , Issue.2 , pp. 226-233
    • Katsoulas, P.C.1    Sadowski, R.P.2
  • 24
    • 0002866635 scopus 로고
    • The critical path method: Resource planning and scheduling
    • J. F. Muth and G. L. Thompson (eds) (Englewood Cliffs, NJ: Prentice-Hall
    • Kelley, J. E., Jr., 1963, The critical path method: resource planning and scheduling. In Industrial Scheduling, J. F. Muth and G. L. Thompson (eds) (Englewood Cliffs, NJ: Prentice-Hall), pp. 347-365.
    • (1963) Industrial Scheduling , pp. 347-365
    • Kelley, J.E.1
  • 26
    • 0020087944 scopus 로고
    • Multi-project scheduling: Categorization of heuristic rules performance
    • Kurtulus, I. and Davis, E. W., 1982, Multi-project scheduling: categorization of heuristic rules performance. Management Science, 28 (2), 161-172.
    • (1982) Management Science , vol.28 , Issue.2 , pp. 161-172
    • Kurtulus, I.1    Davis, E.W.2
  • 27
    • 2742539754 scopus 로고
    • Resource allocation and multi-project scheduling (RAMPS)-a new tool in planning and control
    • Lambourn, S., 1963, Resource allocation and multi-project scheduling (RAMPS)-a new tool in planning and control. Computer Journal, 5 (4), 300-304.
    • (1963) Computer Journal , vol.5 , Issue.4 , pp. 300-304
    • Lambourn, S.1
  • 28
    • 0016025772 scopus 로고
    • Multiple allocation of resources in a network-an optimal scheduling algorithm
    • Lofts, N. R., 1974, Multiple allocation of resources in a network-an optimal scheduling algorithm. INFOR, 12(1), 25-38.
    • (1974) INFOR , vol.12 , Issue.1 , pp. 25-38
    • Lofts, N.R.1
  • 30
    • 3342876981 scopus 로고
    • A branch and bound algorithm for minimizing cost in project scheduling
    • Mason, A. T. and Moodie, C. L, 1971, A branch and bound algorithm for minimizing cost in project scheduling. Management Science, 18 (4), B158-B173.
    • (1971) Management Science , vol.18 , Issue.4 , pp. B158-B173
    • Mason, A.T.1    Moodie, C.L.2
  • 32
    • 0015742216 scopus 로고
    • Alternative methods for project scheduling with limited resources
    • Patterson, J. H., 1973, Alternative methods for project scheduling with limited resources. Naval Research Logistics Quarterly, 20 (4), 767-784.
    • (1973) Naval Research Logistics Quarterly , vol.20 , Issue.4 , pp. 767-784
    • Patterson, J.H.1
  • 33
    • 0016028677 scopus 로고
    • A horizon-varying zero-one approach to project scheduling
    • Patterson, J. H. and Hubber, W, D., 1974, A horizon-varying zero-one approach to project scheduling. Management Science, 20 (6), 990-998.
    • (1974) Management Science , vol.20 , Issue.6 , pp. 990-998
    • Patterson, J.H.1    Hubber, W.2
  • 34
    • 0017268482 scopus 로고
    • Scheduling a project under multiple resource constraints: A zero-one programming approach
    • Patterson, J. H., Roth, C. W., 1976, Scheduling a project under multiple resource constraints: a zero-one programming approach. AIIE Transactions, 8 (4), 449-455.
    • (1976) AIIE Transactions , vol.8 , Issue.4 , pp. 449-455
    • Patterson, J.H.1    Roth, C.W.2
  • 35
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson, J. H., 1984, A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Management Science, 30 (7), 854-867.
    • (1984) Management Science , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 36
    • 0000480311 scopus 로고
    • An algorithm for a general class of precedence and resource constrained scheduling problems
    • R. Slowinski and J. Weglarz (eds), Elsevier, Amsterdam
    • Patterson, J. H., Slowinski, R., Talbot, F. B. and Weglarz, J., 1989, An algorithm for a general class of precedence and resource constrained scheduling problems. In Advances in Project Scheduling, R. Slowinski and J. Weglarz (eds), Elsevier, Amsterdam, 3-27.
    • (1989) Advances in Project Scheduling , pp. 3-27
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 37
    • 0025701909 scopus 로고
    • Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
    • Patterson, J. H., Talbot, F. B., Slowinski, R. and Weglarz, J., 1990, Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems. European Journal of Operational Research, 49 (1), 68-79.
    • (1990) European Journal of Operational Research , vol.49 , Issue.1 , pp. 68-79
    • Patterson, J.H.1    Talbot, F.B.2    Slowinski, R.3    Weglarz, J.4
  • 39
    • 0014574409 scopus 로고
    • Multi-project scheduling with limited resources: A zero-one programming approach
    • Pritsker, A. B., Watters, L. J. and Wolfe, P. M., 1969, Multi-project scheduling with limited resources: a zero-one programming approach. Management Science, 16 (1), 93-109
    • (1969) Management Science , vol.16 , Issue.1 , pp. 93-109
    • Pritsker, A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 40
    • 0022794872 scopus 로고
    • A comparison of heuristics for scheduling projects with cash flows and resource restrictions
    • Russel, A. H., 1986, A comparison of heuristics for scheduling projects with cash flows and resource restrictions. Management Science, 32 (10), 1291-1300.
    • (1986) Management Science , vol.32 , Issue.10 , pp. 1291-1300
    • Russel, A.H.1
  • 41
    • 0000478729 scopus 로고
    • Solving resource-constrained network problems by implicit enumeration-nonpreemptive case
    • Schräge, L., 1970, Solving resource-constrained network problems by implicit enumeration-nonpreemptive case. Operations Research, 18 (2), 225-235.
    • (1970) Operations Research , vol.18 , Issue.2 , pp. 225-235
    • Schräge, L.1
  • 42
    • 0019047699 scopus 로고
    • Two approaches to problems of resource allocation among project activities: A comparative study
    • Slowinski, R., 1980, Two approaches to problems of resource allocation among project activities: a comparative study. Journal of the Operational Research Society, 31 (8), 711-723.
    • (1980) Journal of the Operational Research Society , vol.31 , Issue.8 , pp. 711-723
    • Slowinski, R.1
  • 43
    • 0019586862 scopus 로고
    • Multiobjective network scheduling with efficient use of renewable and non-renewable resources
    • Slowinski, R., 1981, Multiobjective network scheduling with efficient use of renewable and non-renewable resources. European Journal of Operational Research, 7 (3), 265-273.
    • (1981) European Journal of Operational Research , vol.7 , Issue.3 , pp. 265-273
    • Slowinski, R.1
  • 44
    • 0043156425 scopus 로고
    • Solving the general project scheduling problem with multiple constrained resources by mathematical programming. Proceedings of the 8th IFIP Conference on Optimization Techniques
    • Berlin: Springer-Verlag
    • Slowinski, R. and Weglarz, J., 1978, Solving the general project scheduling problem with multiple constrained resources by mathematical programming. Proceedings of the 8th IFIP Conference on Optimization Techniques, Lecture Notes in Control and Information Sciences, 7 (Berlin: Springer-Verlag), pp. 278-289.
    • (1978) Lecture Notes in Control and Information Sciences , vol.7 , pp. 278-289
    • Slowinski, R.1    Weglarz, J.2
  • 45
    • 0018011301 scopus 로고
    • Multiple-resource constrained scheduling using branch and bound
    • Stinson, J. P., Davis, E. W. and Khumawala, B. M., 1978, Multiple-resource constrained scheduling using branch and bound. AIIE Transactions, 10 (3), 252-259.
    • (1978) AIIE Transactions , vol.10 , Issue.3 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 46
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource-constrained sequencing problems
    • Talbot, F. B. and Patterson, J. H., 1978, An efficient integer programming algorithm with network cuts for solving resource-constrained sequencing problems. Management Science, 24 (11), 1163-1174.
    • (1978) Management Science , vol.24 , Issue.11 , pp. 1163-1174
    • Talbot, F.B.1    Patterson, J.H.2
  • 47
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource trade-offs: The non-preemptive case
    • Talbot, F. B., 1982, Resource-constrained project scheduling with time-resource trade-offs: the non-preemptive case. Management Science, 28 (10), 1197-1210.
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1197-1210
    • Talbot, F.B.1
  • 48
    • 0017241984 scopus 로고
    • Heuristic scheduling of activities under resource and precedence restrictions
    • Thesen, A., 1976, Heuristic scheduling of activities under resource and precedence restrictions. Management Science, 23 (4), 412-422.
    • (1976) Management Science , vol.23 , Issue.4 , pp. 412-422
    • Thesen, A.1
  • 49
    • 84945708193 scopus 로고
    • Algorithm 520-an automatic revised simplex method for constrained resources network scheduling
    • Weglarz, J., Blazewicz, J., Cellary, W. and Slowinski, R., 1977, Algorithm 520-an automatic revised simplex method for constrained resources network scheduling. ACM Transactions on Mathematical Software, 3 (3), 295-300.
    • (1977) ACM Transactions on Mathematical Software , vol.3 , Issue.3 , pp. 295-300
    • Weglarz, J.1    Blazewicz, J.2    Cellary, W.3    Slowinski, R.4
  • 50
    • 0345119816 scopus 로고
    • Control in resource allocation systems
    • Weglarz, J., 1980, Control in resource allocation systems. Foundation of Control Engineering, 5 (3), 159-180.
    • (1980) Foundation of Control Engineering , vol.5 , Issue.3 , pp. 159-180
    • Weglarz, J.1
  • 51
    • 0019612987 scopus 로고
    • Project scheduling with continuously divisible doubly constrained resources
    • Weglarz, J., 1981, Project scheduling with continuously divisible doubly constrained resources. Management Science, 27 (9), 1040-1053.
    • (1981) Management Science , vol.27 , Issue.9 , pp. 1040-1053
    • Weglarz, J.1
  • 52
    • 0024032930 scopus 로고
    • An optimization based heuristic for scheduling parallel project networks with constrained renewable resources
    • Weiss, E. N., 1988, An optimization based heuristic for scheduling parallel project networks with constrained renewable resources. IIE Transactions, 20 (2), 137-143.
    • (1988) IIE Transactions , vol.20 , Issue.2 , pp. 137-143
    • Weiss, E.N.1
  • 54
    • 0001694940 scopus 로고
    • A heuristic model for scheduling large projects with limited resources
    • Wiest, J. D., 1967, A heuristic model for scheduling large projects with limited resources. Management Science, 13 (6), B359-B377.
    • (1967) Management Science , vol.13 , Issue.6 , pp. B359-B377
    • Wiest, J.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.