-
1
-
-
0001849846
-
Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis
-
chapter 5, R. Slowinski and J. Weglarz (eds) (New York: Elsevier
-
Alvarez-Valdes, R. and Tamarit, J. M., 1989, Heuristic algorithms for resource-constrained project scheduling: a review and an empirical analysis. In Advances in Project Scheduling, chapter 5, R. Slowinski and J. Weglarz (eds) (New York: Elsevier).
-
(1989)
Advances in Project Scheduling
-
-
Alvarez-Valdes, R.1
Tamarit, J.M.2
-
2
-
-
0025385096
-
Solving resource-constrained project scheduling problems by A* search
-
Bell, C. E. and Park, K., 1990, Solving resource-constrained project scheduling problems by A* search. Naval Research Logistics Quarterly, 37 (1), 61-84.
-
(1990)
Naval Research Logistics Quarterly
, vol.37
, Issue.1
, pp. 61-84
-
-
Bell, C.E.1
Park, K.2
-
3
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource-constrained project scheduling
-
Boctor, F. F., 1990, Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research, 49 (1), 3-13.
-
(1990)
European Journal of Operational Research
, vol.49
, Issue.1
, pp. 3-13
-
-
Boctor, F.F.1
-
4
-
-
0027694317
-
Heuristics for scheduling projects with resource restrictions and several resource-duration modes
-
Boctor, F. F., 1993, Heuristics for scheduling projects with resource restrictions and several resource-duration modes. International Journal of Production Research, 31 (11), 2547-2558.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.11
, pp. 2547-2558
-
-
Boctor, F.F.1
-
5
-
-
3342965465
-
A new and efficient heuristic for scheduling projects with resource constraints and multiple execution modes
-
Leuven, Belgium
-
Boctor, F. F., 1994, A new and efficient heuristic for scheduling projects with resource constraints and multiple execution modes, Proceedings of the 4lh international workshop on project management and scheduling, Leuven, Belgium, pp. 63-66.
-
(1994)
Proceedings of the 4Lh International Workshop on Project Management and Scheduling
, pp. 63-66
-
-
Boctor, F.F.1
-
6
-
-
0345368274
-
-
Report 5, Department of Civil Engineering, University of Illinois, Urbana, IL
-
Brand, J. D, Meyer, W. L. and Shaffer, L. R., 1964, The resource scheduling problem in construction. Report 5, Department of Civil Engineering, University of Illinois, Urbana, IL.
-
(1964)
The Resource Scheduling Problem in Construction.
-
-
Brand, J.D.1
Meyer, W.L.2
Shaffer, L.R.3
-
7
-
-
0023362513
-
Project scheduling with resource constraints: A branch and bound approach
-
Christofides, N., Alvarez-Valdes, R. and Tamarit, J. M., 1987, Project scheduling with resource constraints: a branch and bound approach. European Journal of Operational Research, 29 (2), 262-273.
-
(1987)
European Journal of Operational Research
, vol.29
, Issue.2
, pp. 262-273
-
-
Christofides, N.1
Alvarez-Valdes, R.2
Tamarit, J.M.3
-
9
-
-
0016972372
-
Heuristics for scheduling resource-constrained projects: An experimental investigation
-
Cooper, D. F., 1976, Heuristics for scheduling resource-constrained projects: an experimental investigation. Management Science, 22 (11), 1186-1194.
-
(1976)
Management Science
, vol.22
, Issue.11
, pp. 1186-1194
-
-
Cooper, D.F.1
-
10
-
-
0000813734
-
An algorithm for optimal project scheduling under multiple resource constraints
-
Davis, E. W. and Heidron, G. E., 1971, An algorithm for optimal project scheduling under multiple resource constraints. Management Science, 17 (12), B803-B816.
-
(1971)
Management Science
, vol.17
, Issue.12
, pp. B803-B816
-
-
Davis, E.W.1
Heidron, G.E.2
-
11
-
-
0015725454
-
Project scheduling under resource constraints: Historical review and categorization of procedures
-
Davis, E. W., 1973, Project scheduling under resource constraints: historical review and categorization of procedures. AIIE Transactions, 5 (4), 297-313
-
(1973)
AIIE Transactions
, vol.5
, Issue.4
, pp. 297-313
-
-
Davis, E.W.1
-
12
-
-
0016046551
-
Networks: Resource allocation
-
Davis, E. W., 1974, Networks: Resource allocation. Industrial Engineering, 6 (4), 22-32
-
(1974)
Industrial Engineering
, vol.6
, Issue.4
, pp. 22-32
-
-
Davis, E.W.1
-
13
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project-scheduling
-
Davis, E. W. and Patterson, J. H., 1975, A comparison of heuristic and optimum solutions in resource-constrained project-scheduling. Management Science, 21 (8), 944-955.
-
(1975)
Management Science
, vol.21
, Issue.8
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
14
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
Demeulemeester, E. and Herroelen, W., 1992, A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science, 38 (12), 1803-1818.
-
(1992)
Management Science
, vol.38
, Issue.12
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
15
-
-
0017478425
-
Scheduling a project to maximize its present value: A zero-one programming approach
-
Doersch, R. H. and Patterson, J. H., 1977, Scheduling a project to maximize its present value: a zero-one programming approach. Management Science, 23 (8), 882-889.
-
(1977)
Management Science
, vol.23
, Issue.8
, pp. 882-889
-
-
Doersch, R.H.1
Patterson, J.H.2
-
16
-
-
0027666457
-
Nonpreemptive multi-mode resource-constrained project scheduling
-
Drexel, A. and Gruenewald, J., 1993, Nonpreemptive multi-mode resource-constrained project scheduling. HE Transactions, 25 (5), 74-81.
-
(1993)
HE Transactions
, vol.25
, Issue.5
, pp. 74-81
-
-
Drexel, A.1
Gruenewald, J.2
-
18
-
-
3342915135
-
-
Technical report 56, Operations Research Center, MIT, Cambridge, MA
-
Fisher, M. L., 1970, Optimal solution of resource constrained network scheduling problems. Technical report 56, Operations Research Center, MIT, Cambridge, MA.
-
(1970)
Optimal Solution of Resource Constrained Network Scheduling Problems
-
-
Fisher, M.L.1
-
19
-
-
0015361193
-
An algorithm for project sequencing with resource constraints
-
Gorenstein, S, 1972, An algorithm for project sequencing with resource constraints. Operations Research, 20 (4), 835-850.
-
(1972)
Operations Research
, vol.20
, Issue.4
, pp. 835-850
-
-
Gorenstein, S.1
-
20
-
-
0015359193
-
On resource allocation in project networks
-
Hastings, N. A. J., 1972, On resource allocation in project networks. Operational Research Quarterly, 23 (2), 217-221
-
(1972)
Operational Research Quarterly
, vol.23
, Issue.2
, pp. 217-221
-
-
Hastings, N.A.J.1
-
21
-
-
0015404241
-
Resource-constrained project scheduling-the state of the art
-
Herroelen, W. S., 1972, Resource-constrained project scheduling-the state of the art. Operational Research Quarterly, 23 (3), 261-275.
-
(1972)
Operational Research Quarterly
, vol.23
, Issue.3
, pp. 261-275
-
-
Herroelen, W.S.1
-
23
-
-
0016962706
-
A branch and bound algorithm for use in resource allocation
-
Katsoulas, P. C. and Sadowski, R. P., 1976, A branch and bound algorithm for use in resource allocation. AIIE Transactions, 8 (2), 226-233.
-
(1976)
AIIE Transactions
, vol.8
, Issue.2
, pp. 226-233
-
-
Katsoulas, P.C.1
Sadowski, R.P.2
-
24
-
-
0002866635
-
The critical path method: Resource planning and scheduling
-
J. F. Muth and G. L. Thompson (eds) (Englewood Cliffs, NJ: Prentice-Hall
-
Kelley, J. E., Jr., 1963, The critical path method: resource planning and scheduling. In Industrial Scheduling, J. F. Muth and G. L. Thompson (eds) (Englewood Cliffs, NJ: Prentice-Hall), pp. 347-365.
-
(1963)
Industrial Scheduling
, pp. 347-365
-
-
Kelley, J.E.1
-
25
-
-
3342894273
-
A heuristic algorithm for the multi-mode resource-constrained project scheduling problem
-
Leuven, Belgium
-
Kolisch, R. and Drexel, A., 1994, A heuristic algorithm for the multi-mode resource-constrained project scheduling problem. Proceedings of the 4th international workshop on project management and scheduling, Leuven, Belgium, pp. 58-62.
-
(1994)
Proceedings of the 4Th International Workshop on Project Management and Scheduling
, pp. 58-62
-
-
Kolisch, R.1
Drexel, A.2
-
26
-
-
0020087944
-
Multi-project scheduling: Categorization of heuristic rules performance
-
Kurtulus, I. and Davis, E. W., 1982, Multi-project scheduling: categorization of heuristic rules performance. Management Science, 28 (2), 161-172.
-
(1982)
Management Science
, vol.28
, Issue.2
, pp. 161-172
-
-
Kurtulus, I.1
Davis, E.W.2
-
27
-
-
2742539754
-
Resource allocation and multi-project scheduling (RAMPS)-a new tool in planning and control
-
Lambourn, S., 1963, Resource allocation and multi-project scheduling (RAMPS)-a new tool in planning and control. Computer Journal, 5 (4), 300-304.
-
(1963)
Computer Journal
, vol.5
, Issue.4
, pp. 300-304
-
-
Lambourn, S.1
-
28
-
-
0016025772
-
Multiple allocation of resources in a network-an optimal scheduling algorithm
-
Lofts, N. R., 1974, Multiple allocation of resources in a network-an optimal scheduling algorithm. INFOR, 12(1), 25-38.
-
(1974)
INFOR
, vol.12
, Issue.1
, pp. 25-38
-
-
Lofts, N.R.1
-
30
-
-
3342876981
-
A branch and bound algorithm for minimizing cost in project scheduling
-
Mason, A. T. and Moodie, C. L, 1971, A branch and bound algorithm for minimizing cost in project scheduling. Management Science, 18 (4), B158-B173.
-
(1971)
Management Science
, vol.18
, Issue.4
, pp. B158-B173
-
-
Mason, A.T.1
Moodie, C.L.2
-
31
-
-
5744249209
-
Equation of state calculations by fast computing machines
-
Metropolis, N., Rosembluth, A., Rosenbluth, M. and Teller, A., 1953. Equation of state calculations by fast computing machines. Journal of Chemical Physics, 21, 1087-1092.
-
(1953)
Journal of Chemical Physics
, vol.21
, pp. 1087-1092
-
-
Metropolis, N.1
Rosembluth, A.2
Rosenbluth, M.3
Teller, A.4
-
32
-
-
0015742216
-
Alternative methods for project scheduling with limited resources
-
Patterson, J. H., 1973, Alternative methods for project scheduling with limited resources. Naval Research Logistics Quarterly, 20 (4), 767-784.
-
(1973)
Naval Research Logistics Quarterly
, vol.20
, Issue.4
, pp. 767-784
-
-
Patterson, J.H.1
-
33
-
-
0016028677
-
A horizon-varying zero-one approach to project scheduling
-
Patterson, J. H. and Hubber, W, D., 1974, A horizon-varying zero-one approach to project scheduling. Management Science, 20 (6), 990-998.
-
(1974)
Management Science
, vol.20
, Issue.6
, pp. 990-998
-
-
Patterson, J.H.1
Hubber, W.2
-
34
-
-
0017268482
-
Scheduling a project under multiple resource constraints: A zero-one programming approach
-
Patterson, J. H., Roth, C. W., 1976, Scheduling a project under multiple resource constraints: a zero-one programming approach. AIIE Transactions, 8 (4), 449-455.
-
(1976)
AIIE Transactions
, vol.8
, Issue.4
, pp. 449-455
-
-
Patterson, J.H.1
Roth, C.W.2
-
35
-
-
0021460636
-
A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
-
Patterson, J. H., 1984, A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Management Science, 30 (7), 854-867.
-
(1984)
Management Science
, vol.30
, Issue.7
, pp. 854-867
-
-
Patterson, J.H.1
-
36
-
-
0000480311
-
An algorithm for a general class of precedence and resource constrained scheduling problems
-
R. Slowinski and J. Weglarz (eds), Elsevier, Amsterdam
-
Patterson, J. H., Slowinski, R., Talbot, F. B. and Weglarz, J., 1989, An algorithm for a general class of precedence and resource constrained scheduling problems. In Advances in Project Scheduling, R. Slowinski and J. Weglarz (eds), Elsevier, Amsterdam, 3-27.
-
(1989)
Advances in Project Scheduling
, pp. 3-27
-
-
Patterson, J.H.1
Slowinski, R.2
Talbot, F.B.3
Weglarz, J.4
-
37
-
-
0025701909
-
Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
-
Patterson, J. H., Talbot, F. B., Slowinski, R. and Weglarz, J., 1990, Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems. European Journal of Operational Research, 49 (1), 68-79.
-
(1990)
European Journal of Operational Research
, vol.49
, Issue.1
, pp. 68-79
-
-
Patterson, J.H.1
Talbot, F.B.2
Slowinski, R.3
Weglarz, J.4
-
38
-
-
0001541244
-
Using Tabu search for solving the resource constrained project scheduling problem
-
Leuven, Belgium
-
Pinson, E., Prins, C. and Rullier, F., 1994, Using Tabu search for solving the resource constrained project scheduling problem. Proceedings of the 4th international workshop on project management and scheduling, Leuven, Belgium, pp. 102-106.
-
(1994)
Proceedings of the 4Th International Workshop on Project Management and Scheduling
, pp. 102-106
-
-
Pinson, E.1
Prins, C.2
Rullier, F.3
-
39
-
-
0014574409
-
Multi-project scheduling with limited resources: A zero-one programming approach
-
Pritsker, A. B., Watters, L. J. and Wolfe, P. M., 1969, Multi-project scheduling with limited resources: a zero-one programming approach. Management Science, 16 (1), 93-109
-
(1969)
Management Science
, vol.16
, Issue.1
, pp. 93-109
-
-
Pritsker, A.B.1
Watters, L.J.2
Wolfe, P.M.3
-
40
-
-
0022794872
-
A comparison of heuristics for scheduling projects with cash flows and resource restrictions
-
Russel, A. H., 1986, A comparison of heuristics for scheduling projects with cash flows and resource restrictions. Management Science, 32 (10), 1291-1300.
-
(1986)
Management Science
, vol.32
, Issue.10
, pp. 1291-1300
-
-
Russel, A.H.1
-
41
-
-
0000478729
-
Solving resource-constrained network problems by implicit enumeration-nonpreemptive case
-
Schräge, L., 1970, Solving resource-constrained network problems by implicit enumeration-nonpreemptive case. Operations Research, 18 (2), 225-235.
-
(1970)
Operations Research
, vol.18
, Issue.2
, pp. 225-235
-
-
Schräge, L.1
-
42
-
-
0019047699
-
Two approaches to problems of resource allocation among project activities: A comparative study
-
Slowinski, R., 1980, Two approaches to problems of resource allocation among project activities: a comparative study. Journal of the Operational Research Society, 31 (8), 711-723.
-
(1980)
Journal of the Operational Research Society
, vol.31
, Issue.8
, pp. 711-723
-
-
Slowinski, R.1
-
43
-
-
0019586862
-
Multiobjective network scheduling with efficient use of renewable and non-renewable resources
-
Slowinski, R., 1981, Multiobjective network scheduling with efficient use of renewable and non-renewable resources. European Journal of Operational Research, 7 (3), 265-273.
-
(1981)
European Journal of Operational Research
, vol.7
, Issue.3
, pp. 265-273
-
-
Slowinski, R.1
-
44
-
-
0043156425
-
Solving the general project scheduling problem with multiple constrained resources by mathematical programming. Proceedings of the 8th IFIP Conference on Optimization Techniques
-
Berlin: Springer-Verlag
-
Slowinski, R. and Weglarz, J., 1978, Solving the general project scheduling problem with multiple constrained resources by mathematical programming. Proceedings of the 8th IFIP Conference on Optimization Techniques, Lecture Notes in Control and Information Sciences, 7 (Berlin: Springer-Verlag), pp. 278-289.
-
(1978)
Lecture Notes in Control and Information Sciences
, vol.7
, pp. 278-289
-
-
Slowinski, R.1
Weglarz, J.2
-
45
-
-
0018011301
-
Multiple-resource constrained scheduling using branch and bound
-
Stinson, J. P., Davis, E. W. and Khumawala, B. M., 1978, Multiple-resource constrained scheduling using branch and bound. AIIE Transactions, 10 (3), 252-259.
-
(1978)
AIIE Transactions
, vol.10
, Issue.3
, pp. 252-259
-
-
Stinson, J.P.1
Davis, E.W.2
Khumawala, B.M.3
-
46
-
-
0017997005
-
An efficient integer programming algorithm with network cuts for solving resource-constrained sequencing problems
-
Talbot, F. B. and Patterson, J. H., 1978, An efficient integer programming algorithm with network cuts for solving resource-constrained sequencing problems. Management Science, 24 (11), 1163-1174.
-
(1978)
Management Science
, vol.24
, Issue.11
, pp. 1163-1174
-
-
Talbot, F.B.1
Patterson, J.H.2
-
47
-
-
0020193734
-
Resource-constrained project scheduling with time-resource trade-offs: The non-preemptive case
-
Talbot, F. B., 1982, Resource-constrained project scheduling with time-resource trade-offs: the non-preemptive case. Management Science, 28 (10), 1197-1210.
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1197-1210
-
-
Talbot, F.B.1
-
48
-
-
0017241984
-
Heuristic scheduling of activities under resource and precedence restrictions
-
Thesen, A., 1976, Heuristic scheduling of activities under resource and precedence restrictions. Management Science, 23 (4), 412-422.
-
(1976)
Management Science
, vol.23
, Issue.4
, pp. 412-422
-
-
Thesen, A.1
-
49
-
-
84945708193
-
Algorithm 520-an automatic revised simplex method for constrained resources network scheduling
-
Weglarz, J., Blazewicz, J., Cellary, W. and Slowinski, R., 1977, Algorithm 520-an automatic revised simplex method for constrained resources network scheduling. ACM Transactions on Mathematical Software, 3 (3), 295-300.
-
(1977)
ACM Transactions on Mathematical Software
, vol.3
, Issue.3
, pp. 295-300
-
-
Weglarz, J.1
Blazewicz, J.2
Cellary, W.3
Slowinski, R.4
-
50
-
-
0345119816
-
Control in resource allocation systems
-
Weglarz, J., 1980, Control in resource allocation systems. Foundation of Control Engineering, 5 (3), 159-180.
-
(1980)
Foundation of Control Engineering
, vol.5
, Issue.3
, pp. 159-180
-
-
Weglarz, J.1
-
51
-
-
0019612987
-
Project scheduling with continuously divisible doubly constrained resources
-
Weglarz, J., 1981, Project scheduling with continuously divisible doubly constrained resources. Management Science, 27 (9), 1040-1053.
-
(1981)
Management Science
, vol.27
, Issue.9
, pp. 1040-1053
-
-
Weglarz, J.1
-
52
-
-
0024032930
-
An optimization based heuristic for scheduling parallel project networks with constrained renewable resources
-
Weiss, E. N., 1988, An optimization based heuristic for scheduling parallel project networks with constrained renewable resources. IIE Transactions, 20 (2), 137-143.
-
(1988)
IIE Transactions
, vol.20
, Issue.2
, pp. 137-143
-
-
Weiss, E.N.1
-
54
-
-
0001694940
-
A heuristic model for scheduling large projects with limited resources
-
Wiest, J. D., 1967, A heuristic model for scheduling large projects with limited resources. Management Science, 13 (6), B359-B377.
-
(1967)
Management Science
, vol.13
, Issue.6
, pp. B359-B377
-
-
Wiest, J.D.1
|