메뉴 건너뛰기




Volumn 37, Issue 3, 2010, Pages 1899-1910

Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB

Author keywords

Bidirectional scheduling; Critical path method; Delay local search; Particle swarm optimization; Scheduling

Indexed keywords

BACKWARD SCHEDULING; BIDIRECTIONAL SCHEDULING; CLASS SCHEDULING; CRITICAL PATH METHOD; CRITICAL PATHS; DELAY LOCAL SEARCH; FEASIBLE SOLUTION; GLOBAL MINIMA; LOCAL MINIMUMS; LOCAL SEARCH; MINIMUM MAKESPAN; OPTIMAL SOLUTIONS; PARTICLE SWAM OPTIMIZATION; PARTICLE SWARM; PROCESSING TIME; RESOURCE CONSTRAINED SCHEDULING; RESOURCE-CONSTRAINED; SCHEDULING PROBLEM; SCHEDULING PROCESS; SCHEDULING RULES; SIMULATION RESULT; SOLUTION SPACE; SPEED-UPS;

EID: 70449527542     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2009.07.024     Document Type: Article
Times cited : (61)

References (30)
  • 1
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen K., and Lecocq H. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 140 2 (2003) 268-281
    • (2003) European Journal of Operational Research , vol.140 , Issue.2 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 3
    • 0036302994 scopus 로고    scopus 로고
    • A new aircrew-scheduling model for short-haul routes
    • Chang S.C. A new aircrew-scheduling model for short-haul routes. Journal of Air Transport Management 8 4 (2002) 249-260
    • (2002) Journal of Air Transport Management , vol.8 , Issue.4 , pp. 249-260
    • Chang, S.C.1
  • 4
    • 70349267822 scopus 로고    scopus 로고
    • Multiprocessor system scheduling with precedence and resources constraints by ant colony system
    • Chen, R. M., Lo, S. T., Wang, C. J., & Wu, C. L. (2006). Multiprocessor system scheduling with precedence and resources constraints by ant colony system. 2006 ICS Conference.
    • (2006) ICS Conference , pp. 2006
    • Chen, R.M.1    Lo, S.T.2    Wang, C.J.3    Wu, C.L.4
  • 5
    • 34547549902 scopus 로고    scopus 로고
    • Task scheduling in grid based on particle swarm optimization. Parallel and distributed computing, 2006. ISPDC '06
    • Chen, T., Zhang, B., Hao, X., & Dai, Y. (2006). Task scheduling in grid based on particle swarm optimization. Parallel and distributed computing, 2006. ISPDC '06. The fifth international symposium on (pp. 238-245).
    • (2006) The fifth international symposium on (pp , pp. 238-245
    • Chen, T.1    Zhang, B.2    Hao, X.3    Dai, Y.4
  • 6
    • 33845665257 scopus 로고    scopus 로고
    • Combining competitive scheme with slack neurons to solve real-time job scheduling problem
    • Chen R.M., Lo S.T., and Huang Y.M. Combining competitive scheme with slack neurons to solve real-time job scheduling problem. Expert Systems with Applications 33 1 (2007) 75-85
    • (2007) Expert Systems with Applications , vol.33 , Issue.1 , pp. 75-85
    • Chen, R.M.1    Lo, S.T.2    Huang, Y.M.3
  • 7
    • 0031122887 scopus 로고    scopus 로고
    • Ant colony system: A cooperative learning approach to the traveling salesman problem
    • Dorigo M., and Gambardella L.M. Ant colony system: A cooperative learning approach to the traveling salesman problem. IEEE Transactions on Evolutionary Computation 1 1 (1997) 53-66
    • (1997) IEEE Transactions on Evolutionary Computation , vol.1 , Issue.1 , pp. 53-66
    • Dorigo, M.1    Gambardella, L.M.2
  • 9
    • 0000411214 scopus 로고
    • Tabu Search - Part I
    • Glover F. (1989). Tabu Search - Part I. ORSA JOURNAL ON COMPUTING, 1(3), 190-206.
    • (1989) ORSA JOURNAL ON COMPUTING , vol.1 , Issue.3 , pp. 190-206
    • Glover, F.1
  • 11
    • 0021835689 scopus 로고
    • Neural computation of decision in optimization problems
    • Hopfield J.J., and Tank D.W. Neural computation of decision in optimization problems. Biological Cybernetics 52 (1985) 141-152
    • (1985) Biological Cybernetics , vol.52 , pp. 141-152
    • Hopfield, J.J.1    Tank, D.W.2
  • 12
    • 0033177857 scopus 로고    scopus 로고
    • Scheduling multiprocessor job with resource and timing constraints using neural network
    • Huang Y.M., and Chen R.M. Scheduling multiprocessor job with resource and timing constraints using neural network. IEEE Transactions on System, Man and Cybernetics. Part B 29 4 (1999) 490-502
    • (1999) IEEE Transactions on System, Man and Cybernetics. Part B , vol.29 , Issue.4 , pp. 490-502
    • Huang, Y.M.1    Chen, R.M.2
  • 15
    • 26444479778 scopus 로고
    • Optimization by Simulated Annealing
    • Kirkpatrick S., Gelatt Jr. C.D., and Vecchi M.P. Optimization by Simulated Annealing. Science 220 4598 (1983) 671-680
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt Jr., C.D.2    Vecchi, M.P.3
  • 17
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource-constrained project scheduling
    • Li K.Y., and Willis R.J. An iterative scheduling technique for resource-constrained project scheduling. European Journal of Operational Research 56 (1992) 370-379
    • (1992) European Journal of Operational Research , vol.56 , pp. 370-379
    • Li, K.Y.1    Willis, R.J.2
  • 18
    • 27144538861 scopus 로고    scopus 로고
    • GA-based resource-constrained project scheduling with the objective of minimizing activities' cost
    • Liu Z., and Wang H. GA-based resource-constrained project scheduling with the objective of minimizing activities' cost. Lecture Notes in Computer Science 3644 (2005) 937-946
    • (2005) Lecture Notes in Computer Science , vol.3644 , pp. 937-946
    • Liu, Z.1    Wang, H.2
  • 19
    • 34047225813 scopus 로고    scopus 로고
    • An improved PSO algorithm for resource-constrained project scheduling problem, intelligent control and automation, 2006
    • In The
    • Luo, X., Wang, D., Tang, J., & Tu, Y. (2006). An improved PSO algorithm for resource-constrained project scheduling problem, intelligent control and automation, 2006. In The sixth world congress on WCICA 2006 (Vol. 1, pp. 3514-3518).
    • (2006) sixth world congress on WCICA , vol.1 , pp. 3514-3518
    • Luo, X.1    Wang, D.2    Tang, J.3    Tu, Y.4
  • 21
    • 0041762386 scopus 로고
    • Course and classroom scheduling: An interactive computer graphics approach
    • Mathaisel D., and Comm C. Course and classroom scheduling: An interactive computer graphics approach. Journal of Systems and Software 15 (1991) 149-157
    • (1991) Journal of Systems and Software , vol.15 , pp. 149-157
    • Mathaisel, D.1    Comm, C.2
  • 23
  • 24
    • 70449532700 scopus 로고    scopus 로고
    • Project Scheduling Problem Library, PSPLIB
    • Project Scheduling Problem Library - PSPLIB: .
  • 27
    • 85115419446 scopus 로고    scopus 로고
    • Simulation scheduling in food industry application. Mathematical and statistical methods
    • Simeonov S., and Simeonovova J. Simulation scheduling in food industry application. Mathematical and statistical methods. Food Processing and Preservation 20 1 (2002) 31-37
    • (2002) Food Processing and Preservation , vol.20 , Issue.1 , pp. 31-37
    • Simeonov, S.1    Simeonovova, J.2
  • 28
    • 0032117729 scopus 로고    scopus 로고
    • A Tabu search approach for the resource-constrained project scheduling problem
    • Thomas P.R., and Salhi S. A Tabu search approach for the resource-constrained project scheduling problem. Journal of Heuristics 4 2 (1998) 123-139
    • (1998) Journal of Heuristics , vol.4 , Issue.2 , pp. 123-139
    • Thomas, P.R.1    Salhi, S.2
  • 29
    • 46149093035 scopus 로고    scopus 로고
    • Zhai, X., Tiong, R. L. K., Bjornsson, H. C., Chua, D. K. H. (2006). A simulation-ga based model for production planning in precast plant. In Proceedings of the 38th conference on winter simulation winter simulation conference (pp. 1796-1803).
    • Zhai, X., Tiong, R. L. K., Bjornsson, H. C., Chua, D. K. H. (2006). A simulation-ga based model for production planning in precast plant. In Proceedings of the 38th conference on winter simulation winter simulation conference (pp. 1796-1803).
  • 30
    • 52049124538 scopus 로고    scopus 로고
    • An improved particle swarm optimization algorithm for flowshop scheduling problem
    • Zhang C., Sun J., Zhu X., and Yang Q. An improved particle swarm optimization algorithm for flowshop scheduling problem. Information Processing Letters 108 4 (2008) 204-209
    • (2008) Information Processing Letters , vol.108 , Issue.4 , pp. 204-209
    • Zhang, C.1    Sun, J.2    Zhu, X.3    Yang, Q.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.