A bi-objective model for robust resource-constrained project scheduling
-
DOI 10.1016/j.ijpe.2004.04.002, PII S0925527304001458
-
Al Fawzan, M., & Haouari, M. (2005). A bi-objective model for robust resource-constrained project scheduling. International Journal of Production Economics, 96, 175-187. (Pubitemid 40200698)
-
(2005)
International Journal of Production Economics
, vol.96
, Issue.2
, pp. 175-187
-
-
Al-Fawzan, M.A.1
Haouari, M.2
-
4
-
-
34249902481
-
When it is worthwhile to work with the stochastic RCPSP?
-
DOI 10.1007/s10951-007-0012-1, Special Issue: Project Scheduling Under Uncertainty
-
Ballestín, F. (2007). When it is worthwhile to work with the stochastic RCPSP? Journal of Scheduling, 10(3), 153-166. (Pubitemid 46866607)
-
(2007)
Journal of Scheduling
, vol.10
, Issue.3
, pp. 153-166
-
-
Ballestin, F.1
-
5
-
-
68149180623
-
Resource-constrained project scheduling for timely project completion with stochastic activity durations
-
Ballestín, F., & Leus, R. (2009). Resource-constrained project scheduling for timely project completion with stochastic activity durations. Production and Operations Management, 18, 459-474.
-
(2009)
Production and Operations Management
, vol.18
, pp. 459-474
-
-
Ballestín, F.1
Leus, R.2
-
6
-
-
0019342681
-
Scheduling subject to resource constraints: Classification and complexity
-
Blazewicz, J., Lenstra, J., & Rinnooy Kan, A. (1983). Scheduling subject to resource constraints: classification and complexity. Discrete Applied Mathematics, 5, 11-24.
-
(1983)
Discrete Applied Mathematics
, vol.5
, pp. 11-24
-
-
Blazewicz, J.1
Lenstra, J.2
Rinnooy Kan, A.3
-
7
-
-
0032096810
-
A branch and bound algorithm for the resource-constrained project scheduling problem
-
PII S0377221797003354
-
Brucker, P., Knust, S., Schoo, A., & Thiele, O. (1998). A branch-and-bound algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 107, 272-288. (Pubitemid 128407543)
-
(1998)
European Journal of Operational Research
, vol.107
, Issue.2
, pp. 272-288
-
-
Brucker, P.1
Knust, S.2
Schoo, A.3
Thiele, O.4
-
8
-
-
0033721056
-
Estimation and evaluation of uncertainty: A minimalist first pass approach
-
Chapman, C., & Ward, S. (2000). Estimation and evaluation of uncertainty: a minimalist first pass approach. International Journal of Project Management, 18, 369-383.
-
(2000)
International Journal of Project Management
, vol.18
, pp. 369-383
-
-
Chapman, C.1
Ward, S.2
-
9
-
-
44649128530
-
A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling
-
Chtourou, H., & Haouari, M. (2008). A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling. Computers & Industrial Engineering, 55, 183-194.
-
(2008)
Computers & Industrial Engineering
, vol.55
, pp. 183-194
-
-
Chtourou, H.1
Haouari, M.2
-
10
-
-
0344894852
-
Estimating project and activity duration: A risk management approach using network analysis
-
Dawood, N. (1998). Estimating project and activity duration: a risk management approach using network analysis. Construction Management and Economics, 16, 41-48. (Pubitemid 128650946)
-
(1998)
Construction Management and Economics
, vol.16
, Issue.1
, pp. 41-48
-
-
Dawood, N.1
-
11
-
-
0031272722
-
New benchmark results for the resource-constrained project scheduling problem
-
Demeulemeester, E., & Herroelen, W. (1997). New benchmark results for the resource-constrained project scheduling problem. Management Science, 43, 1485-1492. (Pubitemid 127606206)
-
(1997)
Management Science
, vol.43
, Issue.11
, pp. 1485-1492
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
13
-
-
0026376478
-
Scheduling of project networks by job assignment
-
Drexl, A. (1991). Scheduling of project networks by job assignment. Management Science, 37, 1590-1602.
-
(1991)
Management Science
, vol.37
, pp. 1590-1602
-
-
Drexl, A.1
-
15
-
-
0030270836
-
The role of the nonanticipativity constraint in commercial software for stochastic project scheduling
-
Fernandez, A. A., Armacost, R. L., & Pet-Edwards, J. (1996). The role of the non-anticipativity constraint in commercial software for stochastic project scheduling. Computers and Industrial Engineering, 31, 233-236. (Pubitemid 126380026)
-
(1996)
Computers and Industrial Engineering
, vol.31
, Issue.1-2
, pp. 233-236
-
-
Fernandez, A.A.1
Armacost, R.L.2
Pet-Edwards, J.J.A.3
-
16
-
-
0032273138
-
Understanding simulation solutions to resource constrained project scheduling problems with stochastic task durations
-
Fernandez, A. A., Armacost, R. L., & Pet-Edwards, J. (1998). Understanding simulation solutions to resource constrained project scheduling problems with stochastic task durations. Engineering Management Journal, 10, 5-13.
-
(1998)
Engineering Management Journal
, vol.10
, pp. 5-13
-
-
Fernandez, A.A.1
Armacost, R.L.2
Pet-Edwards, J.3
-
18
-
-
0030735291
-
Stochastic network project scheduling with non-consumable limited resources
-
Golenko-Ginzburg, D., & Gonik, D. (1997). Stochastic network project scheduling with non-consumable limited resources. International Journal of Production Economics, 48, 29-37. (Pubitemid 127410554)
-
(1997)
International Journal of Production Economics
, vol.48
, Issue.1
, pp. 29-37
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
19
-
-
84944813080
-
Bounds on multiprocessing timing anomalies
-
Graham, R. (1966). Bounds on multiprocessing timing anomalies. Bell System Technical Journal, 45, 1563-1581.
-
(1966)
Bell System Technical Journal
, vol.45
, pp. 1563-1581
-
-
Graham, R.1
-
20
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
Hartmann, S. (1998). A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics, 45, 733-750. (Pubitemid 128587349)
-
(1998)
Naval Research Logistics
, vol.45
, Issue.7
, pp. 733-750
-
-
Hartmann, S.1
-
21
-
-
0034559432
-
Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
-
Hartmann, S., & Kolisch, R. (2000). Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research, 127, 394-407.
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 394-407
-
-
Hartmann, S.1
Kolisch, R.2
-
22
-
-
1542502674
-
Robust and reactive project scheduling: A review and classification of procedures
-
Herroelen, W., & Leus, R. (2004). Robust and reactive project scheduling: A review and classification of procedures. International Journal of Production Research, 42(8), 1599-1620.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.8
, pp. 1599-1620
-
-
Herroelen, W.1
Leus, R.2
-
23
-
-
13444269168
-
Project scheduling under uncertainty: Survey and research potentials
-
DOI 10.1016/j.ejor.2004.04.002, PII S0377221704002401, Project Management and Scheduling
-
Herroelen, W., & Leus, R. (2005). Project scheduling under uncertainty, survey and research potentials. European Journal of Operational Research, 165(8), 289-306. (Pubitemid 40206362)
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 289-306
-
-
Herroelen, W.1
Leus, R.2
-
25
-
-
0020497533
-
Preselective strategies for the optimization of stochastic project networks under resource constraints
-
Igelmund, G., & Radermacher, F. (1983). Preselective strategies for the optimization of stochastic project networks under resource constraints. Networks, 13, 1-28. (Pubitemid 13506133)
-
(1983)
Networks
, vol.13
, Issue.1 SPR
, pp. 1-28
-
-
Igelmund, G.1
Radermacher, F.J.2
-
26
-
-
0030231487
-
Efficient priority rules for the resource-constrained project scheduling problem
-
Kolisch, R. (1996a). Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operations Management, 14, 172-192.
-
(1996)
Journal of Operations Management
, vol.14
, pp. 172-192
-
-
Kolisch, R.1
-
27
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
-
Kolisch, R. (1996b). Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research, 90, 320-333. (Pubitemid 126652217)
-
(1996)
European Journal of Operational Research
, vol.90
, Issue.2
, pp. 320-333
-
-
Kolisch, R.1
-
28
-
-
0002030301
-
Heuristic algorithms for the resource-constrained project scheduling problem: Classification and computational analysis
-
J. Weglarz (Ed.) Dordrecht: Kluwer
-
Kolisch, R., & Hartmann, S. (1999). Heuristic algorithms for the resource-constrained project scheduling problem: Classification and computational analysis. In J. Weglarz (Ed.), Project scheduling. Recent models, algorithms and applications (pp. 147-178). Dordrecht: Kluwer.
-
(1999)
Project Scheduling. Recent Models, Algorithms and Applications
, pp. 147-178
-
-
Kolisch, R.1
Hartmann, S.2
-
29
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
DOI 10.1016/j.ejor.2005.01.065, PII S0377221705002596
-
Kolisch, R., & Hartmann, S. (2006). Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research, 174, 23-37. (Pubitemid 44866841)
-
(2006)
European Journal of Operational Research
, vol.174
, Issue.1
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
30
-
-
0000801563
-
An integrated survey of deterministic project scheduling
-
DOI 10.1016/S0305-0483(00)00046-3, PII S0305048300000463
-
Kolisch, R., & Padman, R. (2001). An integrated survey of deterministic project scheduling. Omega, 29(3), 249-272. (Pubitemid 33662608)
-
(2001)
Omega
, vol.29
, Issue.3
, pp. 249-272
-
-
Kolisch, R.1
Padman, R.2
-
33
-
-
2942687563
-
Stability and resource allocation in project planning
-
Leus, R., & Herroelen, W. (2004). Stability and resource allocation in project planning. IIE Transactions, 36(7), 667-682.
-
(2004)
IIE Transactions
, vol.36
, Issue.7
, pp. 667-682
-
-
Leus, R.1
Herroelen, W.2
-
34
-
-
0026822242
-
An iterative scheduling technique for resource-constrained project scheduling
-
Li, K., & Willis, R. (1992). An iterative scheduling technique for resource-constrained project scheduling. European Journal of Operational Research, 56, 370-379.
-
(1992)
European Journal of Operational Research
, vol.56
, pp. 370-379
-
-
Li, K.1
Willis, R.2
-
35
-
-
84937392030
-
Scheduling under uncertainty: Optimizing against a randomizing adversary
-
Möhring, R. (2000). Scheduling under uncertainty: optimizing against a randomizing adversary. Lecture Notes in Computer Science, 1913/2000, 651-670.
-
(2000)
Lecture Notes in Computer Science
, vol.1913
, Issue.2000
, pp. 651-670
-
-
Möhring, R.1
-
36
-
-
0022152989
-
Stochastic scheduling problems I - General strategies
-
Möhring, R., Radermacher, F., & Weiss, G. (1984). Stochastic scheduling problems I - general strategies. ZOR. Zeitschrift für Operations Research, 28, 193-260.
-
(1984)
7th International Conference on the Practice and Theory of Automated Timetabling
, vol.28
, pp. 193-260
-
-
Möhring, R.1
Radermacher, F.2
Weiss, G.3
-
38
-
-
0030574808
-
A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis
-
DOI 10.1016/0377-2217(94)00272-X
-
Özdamar, L., & Ulusoy, G. (1996). A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis. European Journal of Operational Research, 89, 400-407. (Pubitemid 126386755)
-
(1996)
European Journal of Operational Research
, vol.89
, Issue.2
, pp. 400-407
-
-
Ozdamar, L.1
Ulusoy, G.2
-
39
-
-
0021460636
-
A comparison of exact procedures for solving the multiple constrained resource project scheduling problem
-
Patterson, J. (1984). A comparison of exact procedures for solving the multiple constrained resource project scheduling problem. Management Science, 30, 854-867. (Pubitemid 14602557)
-
(1984)
Management Science
, vol.30
, Issue.7
, pp. 854-867
-
-
Patterson James, H.1
-
40
-
-
1542422020
-
Minimizing risk in stochastic resource-constrained project scheduling
-
Seattle, USA
-
Pet-Edwards, J., Selim, B., Armacost, R. L., & Fernandez, A. (1998). Minimizing risk in stochastic resource-constrained project scheduling. In: Proceedings of INFORMS fall meeting, Seattle, USA.
-
(1998)
Proceedings of INFORMS Fall Meeting
-
-
Pet-Edwards, J.1
Selim, B.2
Armacost, R.L.3
Fernandez, A.4
-
42
-
-
0025547737
-
Descriptive sampling: A better approach to Monte Carlo simulation
-
Saliby, E. (1990). Descriptive sampling: a better approach to Monte Carlo simulation. Journal of the Operational Research Society, 41, 1133-1142.
-
(1990)
Journal of the Operational Research Society
, vol.41
, pp. 1133-1142
-
-
Saliby, E.1
-
43
-
-
54249164585
-
A methodology for integrated risk management and proactive scheduling of construction projects
-
Schatteman, D., Herroelen, W., Van de Vonder, S., & Boone, A. (2008). A methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134, 885-893.
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, pp. 885-893
-
-
Schatteman, D.1
Herroelen, W.2
Van De Vonder, S.3
Boone, A.4
-
44
-
-
27944499151
-
-
New York: Pearson, Prentice Hall
-
Shtub, A., Bard, J., & Globerson, S. (2005). Project management. Processes, methodologies, and Economics. New York: Pearson, Prentice Hall.
-
(2005)
Project Management. Processes, Methodologies, and Economics
-
-
Shtub, A.1
Bard, J.2
Globerson, S.3
-
45
-
-
0033691202
-
Scheduling resource-constrained projects competitively at modest memory requirements
-
Sprecher, A. (2000). Scheduling resource-constrained projects competitively at modest memory requirements. Management Science, 46, 710-723.
-
(2000)
Management Science
, vol.46
, pp. 710-723
-
-
Sprecher, A.1
-
47
-
-
0032210453
-
Using tabu search to schedule activities of stochastic resource-constrained projects
-
PII S0377221797003111
-
Tsai, Y. W., & Gemmill, D. D. (1998). Using tabu search to schedule activities of stochastic resource-constrained projects. European Journal of Operational Research, 111, 129-141. (Pubitemid 128401645)
-
(1998)
European Journal of Operational Research
, vol.111
, Issue.1
, pp. 129-141
-
-
Tsai, Y.-W.1
Gemmill, D.D.2
-
48
-
-
13444257593
-
Justification and RCPSP: A technique that pays
-
DOI 10.1016/j.ejor.2004.04.008, PII S0377221704002462, Project Management and Scheduling
-
Valls, V., Ballestín, F., & Quintanilla, S. (2005). Justification and RCPSP: a technique that pays. European Journal of Operational Research, 165, 375-386. (Pubitemid 40206368)
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 375-386
-
-
Valls, V.1
Ballestin, F.2
Quintanilla, S.3
-
49
-
-
34648837872
-
A hybrid genetic algorithm for the resource-constrained project scheduling problem
-
DOI 10.1016/j.ejor.2006.12.033, PII S0377221707000616
-
Valls, V., Ballestín, F., & Quintanilla, S. (2008). Hybrid genetic algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 185, 495-508. (Pubitemid 47454671)
-
(2008)
European Journal of Operational Research
, vol.185
, Issue.2
, pp. 495-508
-
-
Valls, V.1
Ballestin, F.2
Quintanilla, S.3
-
50
-
-
19744379632
-
The use of buffers in project management: The trade-off between stability and makespan
-
DOI 10.1016/j.ijpe.2004.08.004, PII S0925527304003020
-
Van de Vonder, S., Demeulemeester, E., Herroelen, W., & Leus, R. (2005). The use of buffers in project management: The trade-off between stability and makespan. International Journal of Production Economics, 97, 227-240. (Pubitemid 40744036)
-
(2005)
International Journal of Production Economics
, vol.97
, Issue.2
, pp. 227-240
-
-
Van De Vonder, S.1
Demeulemeester, E.2
Herroelen, W.3
Leus, R.4
-
51
-
-
0023399009
-
Priority rules for job shops with weighted tardines costs
-
Vepsalainen, A., & Morton, T. (1987). Priority rules for job shops with weighted tardines costs. Management Science, 33, 1035-1047. (Pubitemid 17656065)
-
(1987)
Management Science
, vol.33
, Issue.8
, pp. 1035-1047
-
-
Vepsalainen Ari, P.J.1
Morton Thomas, E.2
-
52
-
-
0141859879
-
A fuzzy robust scheduling approach for product development projects
-
Wang, J. (2004). A fuzzy robust scheduling approach for product development projects. European Journal of Operational Research, 152, 180-194.
-
(2004)
European Journal of Operational Research
, vol.152
, pp. 180-194
-
-
Wang, J.1
-
53
-
-
0000927907
-
A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
-
Wu, S. D., Byeon, E. S., & Storer, R. H. (1999). A graph-theoretic decomposition of job shop scheduling to achieve scheduling robustness. Operations Research, 47(1), 113-124. (Pubitemid 129700862)
-
(1999)
Operations Research
, vol.47
, Issue.1
, pp. 113-124
-
-
Wu, S.D.1
Byeon, E.-S.2
Storer, R.H.3
-
54
-
-
40249114872
-
Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem
-
DOI 10.1016/j.cor.2007.02.016, PII S0305054807000585
-
Xu, N., McKee, S. A., Nozick, L. K., & Ufomata, R. (2008). Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem. Computers & Operations Research, 35, 3284-3297. (Pubitemid 351335147)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.10
, pp. 3284-3297
-
-
Xu, N.1
McKee, S.A.2
Nozick, L.K.3
Ufomata, R.4
|