-
1
-
-
14544279346
-
A mechatronics security system for the construction site
-
Abderrahim, M., Garcia, E., Diez, R., Balaguer, C., A mechatronics security system for the construction site. Automat. Constr. 14 (2005), 460–466.
-
(2005)
Automat. Constr.
, vol.14
, pp. 460-466
-
-
Abderrahim, M.1
Garcia, E.2
Diez, R.3
Balaguer, C.4
-
2
-
-
33847317416
-
A review of techniques for risk management in projects
-
Ahmed, A., Kayis, B., Amornsawadwatana, S., A review of techniques for risk management in projects. Benchmarking: Int. J. 14 (2007), 22–36.
-
(2007)
Benchmarking: Int. J.
, vol.14
, pp. 22-36
-
-
Ahmed, A.1
Kayis, B.2
Amornsawadwatana, S.3
-
3
-
-
84912570369
-
Real-time pro-active safety in construction
-
MSc Dissertation, Georgia Institute of Technology, Atlanta, USA.
-
Allread, B.S., 2009. Real-time pro-active safety in construction. MSc Dissertation, Georgia Institute of Technology, Atlanta, USA.
-
(2009)
-
-
Allread, B.S.1
-
4
-
-
79960269657
-
Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry
-
Azhar, S., Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadership Manage. Eng. 11 (2011), 241–252.
-
(2011)
Leadership Manage. Eng.
, vol.11
, pp. 241-252
-
-
Azhar, S.1
-
5
-
-
1642293550
-
A knowledge-based approach to the automatic verification of designs from CAD databases
-
Butterworth-Heinemann Oxford
-
Balachandran, M., Rosenman, M., Gero, J., A knowledge-based approach to the automatic verification of designs from CAD databases. Artificial Intelligence in Design, 1991, Butterworth-Heinemann Oxford, 757–781.
-
(1991)
Artificial Intelligence in Design
, pp. 757-781
-
-
Balachandran, M.1
Rosenman, M.2
Gero, J.3
-
6
-
-
84905239437
-
Risk management in construction projects
-
N. Banaitiene Intech
-
Banaitiene, N., Banaitis, A., Risk management in construction projects. Banaitiene, N., (eds.) Risk Management–Current Issues and Challenges, 2012, Intech, 429–448.
-
(2012)
Risk Management–Current Issues and Challenges
, pp. 429-448
-
-
Banaitiene, N.1
Banaitis, A.2
-
7
-
-
78049300426
-
Application of geographic information systems in construction safety planning
-
Bansal, V., Application of geographic information systems in construction safety planning. Int. J. Project Manage. 29 (2011), 66–77.
-
(2011)
Int. J. Project Manage.
, vol.29
, pp. 66-77
-
-
Bansal, V.1
-
8
-
-
33846850077
-
Potential of geographic information systems in building cost estimation and visualization
-
Bansal, V.K., Pal, M., Potential of geographic information systems in building cost estimation and visualization. Automat. Constr. 16 (2007), 311–322.
-
(2007)
Automat. Constr.
, vol.16
, pp. 311-322
-
-
Bansal, V.K.1
Pal, M.2
-
9
-
-
84859575621
-
Application areas and data requirements for BIM-enabled facilities management
-
Becerik-Gerber, B., Jazizadeh, F., Li, N., Calis, G., Application areas and data requirements for BIM-enabled facilities management. J. Constr. Eng. Manage. 138 (2011), 431–442.
-
(2011)
J. Constr. Eng. Manage.
, vol.138
, pp. 431-442
-
-
Becerik-Gerber, B.1
Jazizadeh, F.2
Li, N.3
Calis, G.4
-
10
-
-
75149127614
-
An integrated safety management with construction management using 4D CAD model
-
Benjaoran, V., Bhokha, S., An integrated safety management with construction management using 4D CAD model. Saf. Sci. 48 (2010), 395–403.
-
(2010)
Saf. Sci.
, vol.48
, pp. 395-403
-
-
Benjaoran, V.1
Bhokha, S.2
-
11
-
-
84865435484
-
Evaluation of accuracy of as-built 3D modeling from photos taken by handheld digital cameras
-
Bhatla, A., Choe, S.Y., Fierro, O., Leite, F., Evaluation of accuracy of as-built 3D modeling from photos taken by handheld digital cameras. Automat. Constr. 28 (2012), 116–127.
-
(2012)
Automat. Constr.
, vol.28
, pp. 116-127
-
-
Bhatla, A.1
Choe, S.Y.2
Fierro, O.3
Leite, F.4
-
12
-
-
84861047606
-
Spatial constraints in collaborative design processes
-
In: Germany, pp.
-
Borrmann, A., Hyvärinen, J., Rank, E., 2009. Spatial constraints in collaborative design processes. In: Proceedings of the International Conference on Intelligent Computing in Engineering (ICE09), Berlin, Germany, pp. 1–8.
-
(2009)
Proceedings of the International Conference on Intelligent Computing in Engineering (ICE09), Berlin
, pp. 1-8
-
-
Borrmann, A.1
Hyvärinen, J.2
Rank, E.3
-
13
-
-
84881611317
-
The project benefits of Building Information Modelling (BIM)
-
Bryde, D., Broquetas, M., Volm, J.M., The project benefits of Building Information Modelling (BIM). Int. J. Project Manage. 31 (2013), 971–980.
-
(2013)
Int. J. Project Manage.
, vol.31
, pp. 971-980
-
-
Bryde, D.1
Broquetas, M.2
Volm, J.M.3
-
14
-
-
30844457958
-
Safety hazard identification on construction projects
-
Carter, G., Smith, S.D., Safety hazard identification on construction projects. J. Constr. Eng. Manage. 132 (2006), 197–205.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, pp. 197-205
-
-
Carter, G.1
Smith, S.D.2
-
15
-
-
84907448543
-
A BIM-based construction quality management model and its applications
-
Chen, L., Luo, H., A BIM-based construction quality management model and its applications. Automat. Constr. 46 (2014), 64–73.
-
(2014)
Automat. Constr.
, vol.46
, pp. 64-73
-
-
Chen, L.1
Luo, H.2
-
16
-
-
84881229920
-
A BIM-based system for demolition and renovation waste estimation and planning
-
Cheng, J.C., Ma, L.Y., A BIM-based system for demolition and renovation waste estimation and planning. Waste Manage. 33 (2013), 1539–1551.
-
(2013)
Waste Manage.
, vol.33
, pp. 1539-1551
-
-
Cheng, J.C.1
Ma, L.Y.2
-
17
-
-
0036605009
-
Computer-aided DSS for safety monitoring of geotechnical construction
-
Cheng, M.Y., Ko, C.H., Chang, C.H., Computer-aided DSS for safety monitoring of geotechnical construction. Automat. Constr. 11 (2002), 375–390.
-
(2002)
Automat. Constr.
, vol.11
, pp. 375-390
-
-
Cheng, M.Y.1
Ko, C.H.2
Chang, C.H.3
-
18
-
-
84898994203
-
Modeling tower crane operator visibility to minimize the risk of limited situational awareness
-
Cheng, T., Teizer, J., Modeling tower crane operator visibility to minimize the risk of limited situational awareness. J. Comput. Civ. Eng., 28, 2014, 04014004.
-
(2014)
J. Comput. Civ. Eng.
, vol.28
, pp. 04014004
-
-
Cheng, T.1
Teizer, J.2
-
19
-
-
2642531957
-
CSHM: web-based safety and health monitoring system for construction management
-
Cheung, S.O., Cheung, K.K., Suen, H.C., CSHM: web-based safety and health monitoring system for construction management. J. Saf. Res. 35 (2004), 159–170.
-
(2004)
J. Saf. Res.
, vol.35
, pp. 159-170
-
-
Cheung, S.O.1
Cheung, K.K.2
Suen, H.C.3
-
20
-
-
84863746764
-
Simulation for steel bridge erection by using BIM tools
-
In: Korea, pp.
-
Chiu, C.-T., Hsu, T.-H., Wang, M.-T., Chiu, H.-Y., 2011. Simulation for steel bridge erection by using BIM tools. In: 28th International Symposium on Automation and Robotics in Construction, ISARC 2011, IIT Madras, Seoul, Republic of Korea, pp. 560–563.
-
(2011)
28th International Symposium on Automation and Robotics in Construction, ISARC 2011, IIT Madras, Seoul, Republic o
, pp. 560-563
-
-
Chiu, C.-T.1
Hsu, T.-H.2
Wang, M.-T.3
Chiu, H.-Y.4
-
21
-
-
34247480009
-
‘Ecological land-use complementation’ for building resilience in urban ecosystems
-
Colding, J., ‘Ecological land-use complementation’ for building resilience in urban ecosystems. Landscape Urb. Plann. 81 (2007), 46–55.
-
(2007)
Landscape Urb. Plann.
, vol.81
, pp. 46-55
-
-
Colding, J.1
-
22
-
-
47249128520
-
ToolSHeDTM: the development and evaluation of a decision support tool for health and safety in construction design
-
Cooke, T., Lingard, H., Blismas, N., Stranieri, A., ToolSHeDTM: the development and evaluation of a decision support tool for health and safety in construction design. Eng., Constr. Archit. Manage. 15 (2008), 336–351.
-
(2008)
Eng., Constr. Archit. Manage.
, vol.15
, pp. 336-351
-
-
Cooke, T.1
Lingard, H.2
Blismas, N.3
Stranieri, A.4
-
23
-
-
0029287680
-
Automatic fire-code checking using expert-system technology
-
Delis, E.A., Delis, A., Automatic fire-code checking using expert-system technology. J. Comput. Civ. Eng. 9 (1995), 141–156.
-
(1995)
J. Comput. Civ. Eng.
, vol.9
, pp. 141-156
-
-
Delis, E.A.1
Delis, A.2
-
24
-
-
84949121611
-
A framework for a BIM-based knowledge management system
-
Deshpande, A., Azhar, S., Amireddy, S., A framework for a BIM-based knowledge management system. Proc. Eng. 85 (2014), 113–122.
-
(2014)
Proc. Eng.
, vol.85
, pp. 113-122
-
-
Deshpande, A.1
Azhar, S.2
Amireddy, S.3
-
25
-
-
0242662989
-
Project risk management: a combined analytic hierarchy process and decision tree approach
-
Dey, P.K., Project risk management: a combined analytic hierarchy process and decision tree approach. Cost Eng. 44 (2002), 13–27.
-
(2002)
Cost Eng.
, vol.44
, pp. 13-27
-
-
Dey, P.K.1
-
26
-
-
84878586886
-
Development of web-based system for safety risk early warning in urban metro construction
-
Ding, L.Y., Zhou, C., Development of web-based system for safety risk early warning in urban metro construction. Autom. Constr. 34 (2013), 45–55.
-
(2013)
Autom. Constr.
, vol.34
, pp. 45-55
-
-
Ding, L.Y.1
Zhou, C.2
-
27
-
-
84862309292
-
Messy talk and clean technology: communication, problem-solving and collaboration using Building Information Modelling
-
Dossick, C.S., Neff, G., Messy talk and clean technology: communication, problem-solving and collaboration using Building Information Modelling. Eng. Proj. Org. J. 1 (2011), 83–93.
-
(2011)
Eng. Proj. Org. J.
, vol.1
, pp. 83-93
-
-
Dossick, C.S.1
Neff, G.2
-
28
-
-
70349429622
-
Automatic rule-based checking of building designs
-
Eastman, C., Lee, J., Jeong, Y., Lee, J., Automatic rule-based checking of building designs. Autom. Constr. 18 (2009), 1011–1033.
-
(2009)
Autom. Constr.
, vol.18
, pp. 1011-1033
-
-
Eastman, C.1
Lee, J.2
Jeong, Y.3
Lee, J.4
-
29
-
-
38649094993
-
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors
-
John Wiley & Sons USA
-
Eastman, C., Teicholz, P., Sacks, R., Liston, K., BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. 2011, John Wiley & Sons, USA.
-
(2011)
-
-
Eastman, C.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
30
-
-
0041119629
-
Tabular decision logic for structural design
-
Fenves, S.J., Tabular decision logic for structural design. J. Struct. Div. 92 (1966), 473–490.
-
(1966)
J. Struct. Div.
, vol.92
, pp. 473-490
-
-
Fenves, S.J.1
-
31
-
-
0010610754
-
Computer representations of design standards and building codes: US perspective
-
Fenves, S.J., Garrett, J., Kiliccote, H., Law, K., Reed, K., Computer representations of design standards and building codes: US perspective. Int. J. Constr. Inform. Technol. 3 (1995), 13–34.
-
(1995)
Int. J. Constr. Inform. Technol.
, vol.3
, pp. 13-34
-
-
Fenves, S.J.1
Garrett, J.2
Kiliccote, H.3
Law, K.4
Reed, K.5
-
32
-
-
84995948044
-
An Overview of Existing BIM Standards and Guidelines: A Report to Fiatech AutoCodes Project
-
Construction Industry Institute, The University of Texas Austin, USA
-
Fiatech, An Overview of Existing BIM Standards and Guidelines: A Report to Fiatech AutoCodes Project. 2013, Construction Industry Institute, The University of Texas, Austin, USA.
-
(2013)
-
-
Fiatech1
-
33
-
-
0004120705
-
Risk Management and Construction
-
Blackwell Scientific Oxford
-
Flanagan, R., Norman, G., Risk Management and Construction. 1993, Blackwell Scientific, Oxford.
-
(1993)
-
-
Flanagan, R.1
Norman, G.2
-
34
-
-
84912557577
-
Proactive construction safety systems and the human factor
-
Forsythe, P., Proactive construction safety systems and the human factor. Proc. Inst. Civ. Eng.: Manage., Procurement Law 167 (2014), 242–252.
-
(2014)
Proc. Inst. Civ. Eng.: Manage., Procurement Law
, vol.167
, pp. 242-252
-
-
Forsythe, P.1
-
35
-
-
24944572333
-
Viability of designing for construction worker safety
-
Gambatese, J.A., Behm, M., Hinze, J.W., Viability of designing for construction worker safety. J. Constr. Eng. Manage. 131 (2005), 1029–1036.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, pp. 1029-1036
-
-
Gambatese, J.A.1
Behm, M.2
Hinze, J.W.3
-
36
-
-
0001451516
-
A knowledge-based standards processor for structural component design
-
Garrett, J.H. Jr., Fenves, S.J., A knowledge-based standards processor for structural component design. Eng. Comput. 2 (1987), 219–238.
-
(1987)
Eng. Comput.
, vol.2
, pp. 219-238
-
-
Garrett, J.H.1
Fenves, S.J.2
-
37
-
-
77955711321
-
Value proposition on interoperability of BIM and collaborative working environments
-
Grilo, A., Jardim-Goncalves, R., Value proposition on interoperability of BIM and collaborative working environments. Autom. Constr. 19 (2010), 522–530.
-
(2010)
Autom. Constr.
, vol.19
, pp. 522-530
-
-
Grilo, A.1
Jardim-Goncalves, R.2
-
38
-
-
78149283543
-
Understanding and facilitating BIM adoption in the AEC industry
-
Gu, N., London, K., Understanding and facilitating BIM adoption in the AEC industry. Autom. Constr. 19 (2010), 988–999.
-
(2010)
Autom. Constr.
, vol.19
, pp. 988-999
-
-
Gu, N.1
London, K.2
-
39
-
-
84861880361
-
Using game technologies to improve the safety of construction plant operations
-
Guo, H., Li, H., Chan, G., Skitmore, M., Using game technologies to improve the safety of construction plant operations. Accid. Anal. Prev. 48 (2012), 204–213.
-
(2012)
Accid. Anal. Prev.
, vol.48
, pp. 204-213
-
-
Guo, H.1
Li, H.2
Chan, G.3
Skitmore, M.4
-
40
-
-
84878575659
-
VP-based safety management in large-scale construction projects: a conceptual framework
-
Guo, H.L., Li, H., Li, V., VP-based safety management in large-scale construction projects: a conceptual framework. Autom. Constr. 34 (2013), 16–24.
-
(2013)
Autom. Constr.
, vol.34
, pp. 16-24
-
-
Guo, H.L.1
Li, H.2
Li, V.3
-
41
-
-
0036680235
-
Integration of virtually real construction model and design-for-safety-process database
-
Hadikusumo, B.H.W., Rowlinson, S., Integration of virtually real construction model and design-for-safety-process database. Autom. Constr. 11 (2002), 501–509.
-
(2002)
Autom. Constr.
, vol.11
, pp. 501-509
-
-
Hadikusumo, B.H.W.1
Rowlinson, S.2
-
42
-
-
13944251751
-
Capturing safety knowledge using design-for-safety-process tool
-
Hadikusumo, B.H.W., Rowlinson, S., Capturing safety knowledge using design-for-safety-process tool. J. Constr. Eng. Manage. 130 (2004), 281–289.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, pp. 281-289
-
-
Hadikusumo, B.H.W.1
Rowlinson, S.2
-
43
-
-
0013031816
-
Compliance analysis for disabled access
-
Springer
-
Han, C.S., Kunz, J.C., Law, K.H., Compliance analysis for disabled access. Advances in Digital Government, 2002, Springer, 149–162.
-
(2002)
Advances in Digital Government
, pp. 149-162
-
-
Han, C.S.1
Kunz, J.C.2
Law, K.H.3
-
44
-
-
77958596448
-
BIM and Construction Management: Proven Tools, Methods, and Workflows
-
John Wiley & Sons Indiana, USA
-
Hardin, B., BIM and Construction Management: Proven Tools, Methods, and Workflows. 2011, John Wiley & Sons, Indiana, USA.
-
(2011)
-
-
Hardin, B.1
-
45
-
-
51849088974
-
Areas of application for 3D and 4D models on construction projects
-
Hartmann, T., Gao, J., Fischer, M., Areas of application for 3D and 4D models on construction projects. J. Constr. Eng. Manage. – ASCE 134 (2008), 776–785.
-
(2008)
J. Constr. Eng. Manage. – ASCE
, vol.134
, pp. 776-785
-
-
Hartmann, T.1
Gao, J.2
Fischer, M.3
-
46
-
-
84857357646
-
Aligning building information model tools and construction management methods
-
Hartmann, T., Van Meerveld, H., Vossebeld, N., Adriaanse, A., Aligning building information model tools and construction management methods. Autom. Constr. 22 (2012), 605–613.
-
(2012)
Autom. Constr.
, vol.22
, pp. 605-613
-
-
Hartmann, T.1
Van Meerveld, H.2
Vossebeld, N.3
Adriaanse, A.4
-
47
-
-
1842832075
-
Trends of 4D CAD applications for construction planning
-
Heesom, D., Mahdjoubi, L., Trends of 4D CAD applications for construction planning. Constr. Manage. Econom. 22 (2004), 171–182.
-
(2004)
Constr. Manage. Econom.
, vol.22
, pp. 171-182
-
-
Heesom, D.1
Mahdjoubi, L.2
-
48
-
-
84896305189
-
Enhancing knowledge sharing management using BIM technology in construction
-
Ho, S.P., Tserng, H.P., Jan, S.H., Enhancing knowledge sharing management using BIM technology in construction. Sci. World J., 2013, 2013, 170498.
-
(2013)
Sci. World J.
, vol.2013
, pp. 170498
-
-
Ho, S.P.1
Tserng, H.P.2
Jan, S.H.3
-
50
-
-
79551683997
-
BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials
-
Hu, Z., Zhang, J., BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials. Autom. Constr. 20 (2011), 167–180.
-
(2011)
Autom. Constr.
, vol.20
, pp. 167-180
-
-
Hu, Z.1
Zhang, J.2
-
51
-
-
85017731119
-
-
International Labour Organization, Geneva, Switzerland.
-
ILO, 2005. Fact Sheet on Safety at Work. International Labour Organization, Geneva, Switzerland.
-
(2005)
Fact Sheet on Safety at Work
-
-
ILO1
-
52
-
-
84856744191
-
Risk Assessment of Existing Bridge Structures
-
PhD Thesis, University of Cambridge.
-
Imhof, D., 2004. Risk Assessment of Existing Bridge Structures. PhD Thesis, University of Cambridge.
-
(2004)
-
-
Imhof, D.1
-
53
-
-
84867859668
-
Optimizing location of tower cranes on construction sites through GIS and BIM integration
-
Irizarry, J., Karan, E.P., Optimizing location of tower cranes on construction sites through GIS and BIM integration. Electron. J. Inform. Technol. Constr. 17 (2012), 361–366.
-
(2012)
Electron. J. Inform. Technol. Constr.
, vol.17
, pp. 361-366
-
-
Irizarry, J.1
Karan, E.P.2
-
54
-
-
78649573321
-
-
IEC/FDIS 31010:2009, International Organization for Standardization.
-
ISO, 2009. Risk Management – Risk Assessment Techniques, IEC/FDIS 31010:2009, International Organization for Standardization.
-
(2009)
Risk Management – Risk Assessment Techniques
-
-
ISO1
-
56
-
-
84886449217
-
Exchange of parametric bridge models using a neutral data format
-
Ji, Y., Borrmann, A., Beetz, J., Obergriesser, M., Exchange of parametric bridge models using a neutral data format. J. Comput. Civ. Eng. 27 (2013), 593–606.
-
(2013)
J. Comput. Civ. Eng.
, vol.27
, pp. 593-606
-
-
Ji, Y.1
Borrmann, A.2
Beetz, J.3
Obergriesser, M.4
-
57
-
-
84931466805
-
Briefing: building information modelling and the law
-
Joyce, R., Houghton, D., Briefing: building information modelling and the law. Proc. ICE – Manage., Procurement Law 167 (2014), 114–116.
-
(2014)
Proc. ICE – Manage., Procurement Law
, vol.167
, pp. 114-116
-
-
Joyce, R.1
Houghton, D.2
-
58
-
-
27644586913
-
Knowledge Management in the Construction Industry: A Socio-Technical Perspective
-
IGI Global USA
-
Kazi, A.S., Knowledge Management in the Construction Industry: A Socio-Technical Perspective. 2005, IGI Global, USA.
-
(2005)
-
-
Kazi, A.S.1
-
59
-
-
0002856379
-
A neural network approach for early detection of program modules having high risk in the maintenance phase
-
Khoshgoftaar, T.M., Lanning, D.L., A neural network approach for early detection of program modules having high risk in the maintenance phase. J. Syst. Softw. 29 (1995), 85–91.
-
(1995)
J. Syst. Softw.
, vol.29
, pp. 85-91
-
-
Khoshgoftaar, T.M.1
Lanning, D.L.2
-
60
-
-
1942471116
-
Rapid human-assisted, obstacle avoidance system using sparse range point clouds
-
R.B. Malla A. Maji American Society of Civil Engineers New York
-
Kim, C., Haas, C.T., Liapi, K.A., McLaughlin, J., Teizer, J., Bosche, F., Rapid human-assisted, obstacle avoidance system using sparse range point clouds. Malla, R.B., Maji, A., (eds.) Engineering, Construction and Operations in Challenging Environments: Earth and Space 2004, 2004, American Society of Civil Engineers, New York, 115–122.
-
(2004)
Engineering, Construction and Operations in Challenging Environments: Earth and Space 2004
, pp. 115-122
-
-
Kim, C.1
Haas, C.T.2
Liapi, K.A.3
McLaughlin, J.4
Teizer, J.5
Bosche, F.6
-
61
-
-
85020513817
-
Parametric Form-Based Codes: Incorporation of Land-use Regulations into Building Information Models, Parametricism (SPC) ACADIA Regional 2011 Conference
-
Lincoln Nebraska, United States
-
Kim, J.B., Clayton, M.J., Yan, W., Parametric Form-Based Codes: Incorporation of Land-use Regulations into Building Information Models, Parametricism (SPC) ACADIA Regional 2011 Conference. 2011, Lincoln, Nebraska, United States, 217–223.
-
(2011)
, pp. 217-223
-
-
Kim, J.B.1
Clayton, M.J.2
Yan, W.3
-
62
-
-
84890545859
-
Improving Facility Performance Prediction by Formalizing an Activity-Space-Performance Model
-
CIFE Technical Paper 210.
-
Kim, T.W., Kavousian, A., Fischer, M., Rajagopal, R., 2012. Improving Facility Performance Prediction by Formalizing an Activity-Space-Performance Model. CIFE Technical Paper 210.
-
(2012)
-
-
Kim, T.W.1
Kavousian, A.2
Fischer, M.3
Rajagopal, R.4
-
63
-
-
84884284240
-
BIM-Based Safety Management and Communication for Building Construction
-
VTT Finland
-
Kiviniemi, M., Sulankivi, K., Kähkönen, K., Mäkelä, T., Merivirta, M.-L., BIM-Based Safety Management and Communication for Building Construction. 2011, VTT, Finland.
-
(2011)
-
-
Kiviniemi, M.1
Sulankivi, K.2
Kähkönen, K.3
Mäkelä, T.4
Merivirta, M.-L.5
-
64
-
-
0034227635
-
Feasibility study of 4D CAD in commercial construction
-
Koo, B., Fischer, M., Feasibility study of 4D CAD in commercial construction. J. Constr. Eng. Manage. 126 (2000), 251–260.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
65
-
-
84862009953
-
The IFC standard – a review of history, development, and standardization
-
Laakso, M., Kiviniemi, A., The IFC standard – a review of history, development, and standardization. Electron. J. Inform. Technol. Constr. 17 (2012), 134–161.
-
(2012)
Electron. J. Inform. Technol. Constr.
, vol.17
, pp. 134-161
-
-
Laakso, M.1
Kiviniemi, A.2
-
66
-
-
84857371393
-
D3 City project—economic impact of BIM-assisted design validation
-
Lee, G., Park, H.K., Won, J., D3 City project—economic impact of BIM-assisted design validation. Autom. Constr. 22 (2012), 577–586.
-
(2012)
Autom. Constr.
, vol.22
, pp. 577-586
-
-
Lee, G.1
Park, H.K.2
Won, J.3
-
67
-
-
77954938516
-
Computing walking distances within buildings using the universal circulation network
-
Lee, J.K., Eastman, C.M., Lee, J., Kannala, M., Jeong, Y.S., Computing walking distances within buildings using the universal circulation network. Environ. Plann. B: Plann. Des. 37 (2010), 628–645.
-
(2010)
Environ. Plann. B: Plann. Des.
, vol.37
, pp. 628-645
-
-
Lee, J.K.1
Eastman, C.M.2
Lee, J.3
Kannala, M.4
Jeong, Y.S.5
-
68
-
-
84907427611
-
Automated Checking of Building Requirements on Circulation Over a Range of Design Phases
-
PhD Thesis, Georgia Institute of Technology.
-
Lee, J.M., 2010. Automated Checking of Building Requirements on Circulation Over a Range of Design Phases. PhD Thesis, Georgia Institute of Technology.
-
(2010)
-
-
Lee, J.M.1
-
69
-
-
84863293193
-
Efficiency analysis of Set-based Design with structural building information modeling (S-BIM) on high-rise building structures
-
Lee, S.-I., Bae, J.-S., Cho, Y.S., Efficiency analysis of Set-based Design with structural building information modeling (S-BIM) on high-rise building structures. Autom. Constr. 23 (2012), 20–32.
-
(2012)
Autom. Constr.
, vol.23
, pp. 20-32
-
-
Lee, S.-I.1
Bae, J.-S.2
Cho, Y.S.3
-
70
-
-
84884289383
-
Integrating real time positioning systems to improve blind lifting and loading crane operations
-
Li, H., Chan, G., Skitmore, M., Integrating real time positioning systems to improve blind lifting and loading crane operations. Constr. Manage. Econom. 31 (2013), 596–605.
-
(2013)
Constr. Manage. Econom.
, vol.31
, pp. 596-605
-
-
Li, H.1
Chan, G.2
Skitmore, M.3
-
71
-
-
1342266616
-
Factors constraining the development of professional project management in China's construction industry
-
Liu, G., Shen, Q., Li, H., Shen, L., Factors constraining the development of professional project management in China's construction industry. Int. J. Project Manage. 22 (2004), 203–211.
-
(2004)
Int. J. Project Manage.
, vol.22
, pp. 203-211
-
-
Liu, G.1
Shen, Q.2
Li, H.3
Shen, L.4
-
72
-
-
84923317153
-
Using BIM to improve the design and construction of bridge projects: a case study of a long-span steel-box arch bridge project
-
Liu, W.P., Guo, H.L., Li, H., Li, Y., Using BIM to improve the design and construction of bridge projects: a case study of a long-span steel-box arch bridge project. Int. J. Adv. Rob. Syst., 11, 2014, 125.
-
(2014)
Int. J. Adv. Rob. Syst.
, vol.11
, pp. 125
-
-
Liu, W.P.1
Guo, H.L.2
Li, H.3
Li, Y.4
-
73
-
-
84903455047
-
Implementing earned value management using Bridge Information Modeling
-
Marzouk, M., Hisham, M., Implementing earned value management using Bridge Information Modeling. KSCE J. Civ. Eng. 18 (2014), 1302–1313.
-
(2014)
KSCE J. Civ. Eng.
, vol.18
, pp. 1302-1313
-
-
Marzouk, M.1
Hisham, M.2
-
74
-
-
71649105721
-
At-Risk Children & Youth: Resiliency Explored
-
The Haworth Integrative Healing Press NY, USA
-
McElwee, N., At-Risk Children & Youth: Resiliency Explored. 2007, The Haworth Integrative Healing Press, NY, USA.
-
(2007)
-
-
McElwee, N.1
-
75
-
-
1342331988
-
Rapid human-assisted creation of bounding models for obstacle avoidance in construction
-
McLaughlin, J., Sreenivasan, S.V., Haas, C., Liapi, K., Rapid human-assisted creation of bounding models for obstacle avoidance in construction. Comput.-Aided Civ. Inf. Eng. 19 (2004), 3–15.
-
(2004)
Comput.-Aided Civ. Inf. Eng.
, vol.19
, pp. 3-15
-
-
McLaughlin, J.1
Sreenivasan, S.V.2
Haas, C.3
Liapi, K.4
-
76
-
-
0003847850
-
The Strategic Management of Large Engineering Projects: Shaping Institutions, Risks, and Governance
-
MIT press Massachusetts, USA
-
Miller, R., Lessard, D.R., Michaud, P., Floricel, S., The Strategic Management of Large Engineering Projects: Shaping Institutions, Risks, and Governance. 2001, MIT press, Massachusetts, USA.
-
(2001)
-
-
Miller, R.1
Lessard, D.R.2
Michaud, P.3
Floricel, S.4
-
77
-
-
84897450439
-
Knowledge-assisted BIM-based visual analytics for failure root cause detection in facilities management
-
Motamedi, A., Hammad, A., Asen, Y., Knowledge-assisted BIM-based visual analytics for failure root cause detection in facilities management. Autom. Constr. 43 (2014), 73–83.
-
(2014)
Autom. Constr.
, vol.43
, pp. 73-83
-
-
Motamedi, A.1
Hammad, A.2
Asen, Y.3
-
78
-
-
84868232967
-
A knowledge-based BIM system for building maintenance
-
Motawa, I., Almarshad, A., A knowledge-based BIM system for building maintenance. Autom. Constr. 29 (2013), 173–182.
-
(2013)
Autom. Constr.
, vol.29
, pp. 173-182
-
-
Motawa, I.1
Almarshad, A.2
-
79
-
-
85020677662
-
-
OSHC, 2008. Occupational Safety and Health Statistics Bulletin Issue No. 7. Labour Department, Hong Kong Special Administrative Region.
-
OSHC, 2008. Occupational Safety and Health Statistics Bulletin Issue No. 7. Labour Department, Hong Kong Special Administrative Region.
-
-
-
-
81
-
-
84872240863
-
Building Information Modeling (BIM) partnering framework for public construction projects
-
Porwal, A., Hewage, K.N., Building Information Modeling (BIM) partnering framework for public construction projects. Autom. Constr. 31 (2013), 204–214.
-
(2013)
Autom. Constr.
, vol.31
, pp. 204-214
-
-
Porwal, A.1
Hewage, K.N.2
-
82
-
-
80053167267
-
Integration of safety in design through the use of building information modeling, In: 2011 ASCE International Workshop on Computing in Civil Engineering, June 19, 2011 – June 22, 2011
-
American Society of Civil Engineers (ASCE), Miami, FL, United States, pp. 698–705.
-
Qi, J., Issa, R.R.A., Hinze, J., Olbina, S., 2011. Integration of safety in design through the use of building information modeling, In: 2011 ASCE International Workshop on Computing in Civil Engineering, June 19, 2011 – June 22, 2011. American Society of Civil Engineers (ASCE), Miami, FL, United States, pp. 698–705.
-
(2011)
-
-
Qi, J.1
Issa, R.R.A.2
Hinze, J.3
Olbina, S.4
-
83
-
-
84948977994
-
A National Infrastructure for Managing Land Information—Research Snapshot
-
The University of Melbourne
-
Rajabifard, A., Williamson, I., Kalantari, M., A National Infrastructure for Managing Land Information—Research Snapshot. 2012, The University of Melbourne.
-
(2012)
-
-
Rajabifard, A.1
Williamson, I.2
Kalantari, M.3
-
84
-
-
0025413488
-
Logic-based approach for modeling organization of design standards
-
Rasdorf, W.J., Lakmazaheri, S., Logic-based approach for modeling organization of design standards. J. Comput. Civ. Eng. 4 (1990), 102–123.
-
(1990)
J. Comput. Civ. Eng.
, vol.4
, pp. 102-123
-
-
Rasdorf, W.J.1
Lakmazaheri, S.2
-
85
-
-
38649099349
-
Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice
-
Sacks, R., Barak, R., Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice. Autom. Constr. 17 (2008), 439–449.
-
(2008)
Autom. Constr.
, vol.17
, pp. 439-449
-
-
Sacks, R.1
Barak, R.2
-
86
-
-
84863165665
-
Three-dimensional information model-based bridge engineering in Korea
-
Shim, C.-S., Lee, K.-M., Kang, L.S., Hwang, J., Kim, Y., Three-dimensional information model-based bridge engineering in Korea. Struct. Eng. Int. 22 (2012), 8–13.
-
(2012)
Struct. Eng. Int.
, vol.22
, pp. 8-13
-
-
Shim, C.-S.1
Lee, K.-M.2
Kang, L.S.3
Hwang, J.4
Kim, Y.5
-
87
-
-
85020655501
-
Achieving Automated Code Checking with Ease, a White Paper, novaCITYNETS Pte Ltd
-
, Singapore.
-
Solihin, W., 2004. Achieving Automated Code Checking with Ease, a White Paper, novaCITYNETS Pte Ltd., Singapore.
-
(2004)
-
-
Solihin, W.1
-
88
-
-
84985084394
-
Defining virtual reality: dimensions determining telepresence
-
Steuer, J., Defining virtual reality: dimensions determining telepresence. J. Commun. 42 (1992), 73–93.
-
(1992)
J. Commun.
, vol.42
, pp. 73-93
-
-
Steuer, J.1
-
89
-
-
84996583326
-
Utilization of BIM-based automated safety checking in construction planning
-
In: Australia, pp.
-
Sulankivi, K., Zhang, S., Teizer, J., Eastman, C.M., Kiviniemi, M., Romo, I., Granholm, L., 2013. Utilization of BIM-based automated safety checking in construction planning. In: Proceedings of International CIB World Building Congress 2013, Brisbane, Australia, pp. 5–9.
-
(2013)
Proceedings of International CIB World Building Congress 2013, Brisbane
, pp. 5-9
-
-
Sulankivi, K.1
Zhang, S.2
Teizer, J.3
Eastman, C.M.4
Kiviniemi, M.5
Romo, I.6
Granholm, L.7
-
90
-
-
0030575591
-
Uncertainty in fault tree analysis: a fuzzy approach
-
Suresh, P., Babar, A., Raj, V.V., Uncertainty in fault tree analysis: a fuzzy approach. Fuzzy Sets Syst. 83 (1996), 135–141.
-
(1996)
Fuzzy Sets Syst.
, vol.83
, pp. 135-141
-
-
Suresh, P.1
Babar, A.2
Raj, V.V.3
-
91
-
-
0035398703
-
Knowledge-based approach to construction project risk management
-
Tah, J., Carr, V., Knowledge-based approach to construction project risk management. J. Comput. Civ. Eng. 15 (2001), 170–177.
-
(2001)
J. Comput. Civ. Eng.
, vol.15
, pp. 170-177
-
-
Tah, J.1
Carr, V.2
-
92
-
-
2942611032
-
Identifying elements of poor construction safety management in China
-
Tam, C.M., Zeng, S.X., Deng, Z.M., Identifying elements of poor construction safety management in China. Saf. Sci. 42 (2004), 569–586.
-
(2004)
Saf. Sci.
, vol.42
, pp. 569-586
-
-
Tam, C.M.1
Zeng, S.X.2
Deng, Z.M.3
-
93
-
-
80053148707
-
Efficient and effective quality assessment of as-is building information models and 3D laser-scanned data
-
In: Computing in Civil Engineering, pp.
-
Tang, P., Anil, E., Akinci, B., Huber, D., 2011. Efficient and effective quality assessment of as-is building information models and 3D laser-scanned data. In: Proceedings of the ASCE International Workshop on Computing in Civil Engineering, 19–22 June 2011, Miami, Florida, United States. Computing in Civil Engineering, pp. 486–493.
-
(2011)
Proceedings of the ASCE International Workshop on Computing in Civil Engineering, 19–22 June 2011, Miami, Florida, United States
, pp. 486-493
-
-
Tang, P.1
Anil, E.2
Akinci, B.3
Huber, D.4
-
94
-
-
42949096914
-
3D range imaging camera sensing for active safety in construction
-
Teizer, J., 3D range imaging camera sensing for active safety in construction. ITcon 13 (2008), 103–117.
-
(2008)
ITcon
, vol.13
, pp. 103-117
-
-
Teizer, J.1
-
95
-
-
77955716869
-
Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system
-
Teizer, J., Allread, B.S., Fullerton, C.E., Hinze, J., Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Autom. Constr. 19 (2010), 630–640.
-
(2010)
Autom. Constr.
, vol.19
, pp. 630-640
-
-
Teizer, J.1
Allread, B.S.2
Fullerton, C.E.3
Hinze, J.4
-
96
-
-
35348874797
-
Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
-
Teizer, J., Caldas, C.H., Haas, C.T., Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources. J. Constr. Eng. Manage. 133 (2007), 880–888.
-
(2007)
J. Constr. Eng. Manage.
, vol.133
, pp. 880-888
-
-
Teizer, J.1
Caldas, C.H.2
Haas, C.T.3
-
97
-
-
84884502878
-
Location tracking and data visualization technology to advance construction ironworkers’ education and training in safety and productivity
-
Teizer, J., Cheng, T., Fang, Y., Location tracking and data visualization technology to advance construction ironworkers’ education and training in safety and productivity. Autom. Constr. 35 (2013), 53–68.
-
(2013)
Autom. Constr.
, vol.35
, pp. 53-68
-
-
Teizer, J.1
Cheng, T.2
Fang, Y.3
-
98
-
-
84949128098
-
The impact of BIM on risk management as an argument for its implementation in a construction company
-
Tomek, A., Matějka, P., The impact of BIM on risk management as an argument for its implementation in a construction company. Proc. Eng. 85 (2014), 501–509.
-
(2014)
Proc. Eng.
, vol.85
, pp. 501-509
-
-
Tomek, A.1
Matějka, P.2
-
99
-
-
84890525940
-
Building Information Modeling (BIM) for existing buildings—literature review and future needs
-
Volk, R., Stengel, J., Schultmann, F., Building Information Modeling (BIM) for existing buildings—literature review and future needs. Autom. Constr. 38 (2014), 109–127.
-
(2014)
Autom. Constr.
, vol.38
, pp. 109-127
-
-
Volk, R.1
Stengel, J.2
Schultmann, F.3
-
100
-
-
36148974120
-
Risk assessment and risk communication in civil engineering
-
CIB Report Publication Malta
-
Vrouwenvelder, A., Holicky, B., Tanner, C., Lovegrove, D., Canisius, E., Risk assessment and risk communication in civil engineering. Safety, Risk, Reliability – Trends in Engineering, 2001, CIB Report Publication, Malta, 885–890.
-
(2001)
Safety, Risk, Reliability – Trends in Engineering
, pp. 885-890
-
-
Vrouwenvelder, A.1
Holicky, B.2
Tanner, C.3
Lovegrove, D.4
Canisius, E.5
-
101
-
-
84907247097
-
BIM based virtual environment for fire emergency evacuation
-
Wang, B., Li, H., Rezgui, Y., Bradley, A., Ong, H.N., BIM based virtual environment for fire emergency evacuation. Sci. World J., 2014, 2014, 589016.
-
(2014)
Sci. World J.
, vol.2014
, pp. 589016
-
-
Wang, B.1
Li, H.2
Rezgui, Y.3
Bradley, A.4
Ong, H.N.5
-
102
-
-
4544303735
-
Analysis of recent bridge failures in the United States
-
Wardhana, K., Hadipriono, F.C., Analysis of recent bridge failures in the United States. J. Perform. Constr. Facil. 17 (2003), 144–150.
-
(2003)
J. Perform. Constr. Facil.
, vol.17
, pp. 144-150
-
-
Wardhana, K.1
Hadipriono, F.C.2
-
103
-
-
0141937396
-
Virtual Reality and the Built Environment
-
Architectural Press Oxford, UK
-
Whyte, J., Virtual Reality and the Built Environment. 2002, Architectural Press, Oxford, UK.
-
(2002)
-
-
Whyte, J.1
-
104
-
-
0030167974
-
The two-dimensionality of project risk
-
Williams, T.M., The two-dimensionality of project risk. Int. J. Project Manage. 14 (1996), 185–186.
-
(1996)
Int. J. Project Manage.
, vol.14
, pp. 185-186
-
-
Williams, T.M.1
-
105
-
-
84866168938
-
A location based service approach for collision warning systems in concrete dam construction
-
Wu, H., Tao, J., Li, X., Chi, X., Li, H., Hua, X., Yang, R., Wang, S., Chen, N., A location based service approach for collision warning systems in concrete dam construction. Saf. Sci. 51 (2013), 338–346.
-
(2013)
Saf. Sci.
, vol.51
, pp. 338-346
-
-
Wu, H.1
Tao, J.2
Li, X.3
Chi, X.4
Li, H.5
Hua, X.6
Yang, R.7
Wang, S.8
Chen, N.9
-
106
-
-
1642327044
-
Design knowledge modeling and software implementation for building code compliance checking
-
Yang, Q., Xu, X., Design knowledge modeling and software implementation for building code compliance checking. Build. Environ. 39 (2004), 689–698.
-
(2004)
Build. Environ.
, vol.39
, pp. 689-698
-
-
Yang, Q.1
Xu, X.2
-
107
-
-
33646753383
-
Scheduling-based risk estimation and safety planning for construction projects
-
Yi, K.-J., Langford, D., Scheduling-based risk estimation and safety planning for construction projects. J. Constr. Eng. Manage. 132 (2006), 626–635.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, pp. 626-635
-
-
Yi, K.-J.1
Langford, D.2
-
108
-
-
84857360690
-
A Knowledge Based System for Construction Health and Safety Competence Assessment
-
PhD Thesis, University of Wolverhampton.
-
Yu, H., 2009. A Knowledge Based System for Construction Health and Safety Competence Assessment. PhD Thesis, University of Wolverhampton.
-
(2009)
-
-
Yu, H.1
-
109
-
-
79551684087
-
BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
-
Zhang, J.P., Hu, Z.Z., BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies. Autom. Constr. 20 (2011), 155–166.
-
(2011)
Autom. Constr.
, vol.20
, pp. 155-166
-
-
Zhang, J.P.1
Hu, Z.Z.2
-
110
-
-
84903946197
-
Bayesian-network-based safety risk analysis in construction projects
-
Zhang, L., Wu, X., Skibniewski, M.J., Zhong, J., Lu, Y., Bayesian-network-based safety risk analysis in construction projects. Rel. Eng. Syst. Saf. 131 (2014), 29–39.
-
(2014)
Rel. Eng. Syst. Saf.
, vol.131
, pp. 29-39
-
-
Zhang, L.1
Wu, X.2
Skibniewski, M.J.3
Zhong, J.4
Lu, Y.5
-
111
-
-
84869092675
-
Building information modeling (BIM) and safety: automatic safety checking of construction models and schedules
-
Zhang, S.J., Teizer, J., Lee, J.K., Eastman, C.M., Venugopal, M., Building information modeling (BIM) and safety: automatic safety checking of construction models and schedules. Autom. Constr. 29 (2013), 183–195.
-
(2013)
Autom. Constr.
, vol.29
, pp. 183-195
-
-
Zhang, S.J.1
Teizer, J.2
Lee, J.K.3
Eastman, C.M.4
Venugopal, M.5
-
112
-
-
70349785210
-
An interactive approach to collaborative 4D construction planning
-
Zhou, W., Heesom, D., Georgakis, P., Nwagboso, C., Feng, A., An interactive approach to collaborative 4D construction planning. Electron. J. Inform. Technol. Constr. 14 (2009), 30–47.
-
(2009)
Electron. J. Inform. Technol. Constr.
, vol.14
, pp. 30-47
-
-
Zhou, W.1
Heesom, D.2
Georgakis, P.3
Nwagboso, C.4
Feng, A.5
-
113
-
-
84857357863
-
Construction safety and digital design: a review
-
Zhou, W., Whyte, J., Sacks, R., Construction safety and digital design: a review. Autom. Constr. 22 (2012), 102–111.
-
(2012)
Autom. Constr.
, vol.22
, pp. 102-111
-
-
Zhou, W.1
Whyte, J.2
Sacks, R.3
-
114
-
-
34447566136
-
Understanding the key risks in construction projects in China
-
Zou, P.X.W., Zhang, G., Wang, J., Understanding the key risks in construction projects in China. Int. J. Project Manage. 25 (2007), 601–614.
-
(2007)
Int. J. Project Manage.
, vol.25
, pp. 601-614
-
-
Zou, P.X.W.1
Zhang, G.2
Wang, J.3
|