메뉴 건너뛰기




Volumn 34, Issue , 2013, Pages 16-24

VP-based safety management in large-scale construction projects: A conceptual framework

Author keywords

Large scale construction projects; Safety management; Safety performance; The construction industry; Virtual prototyping

Indexed keywords

CONCEPTUAL FRAMEWORKS; CONSTRUCTION PROJECTS; CONSTRUCTION SAFETY; MODELLING AND SIMULATIONS; SAFETY MANAGEMENT; SAFETY PERFORMANCE; THREE COMPONENT; VIRTUAL PROTOTYPING;

EID: 84878575659     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2012.10.013     Document Type: Article
Times cited : (98)

References (46)
  • 1
    • 68049108355 scopus 로고    scopus 로고
    • An intervention effectiveness study of hazard awareness training in the construction building trades
    • R.K. Sokas, E. Jorgensen, L. Nickels, W. Gao, and J.L. Gittleman An intervention effectiveness study of hazard awareness training in the construction building trades Public Health Reports 124 1 2009 161 168
    • (2009) Public Health Reports , vol.124 , Issue.1 , pp. 161-168
    • Sokas, R.K.1    Jorgensen, E.2    Nickels, L.3    Gao, W.4    Gittleman, J.L.5
  • 2
    • 2642578172 scopus 로고    scopus 로고
    • Analysis of fatal events in the construction industry, 1991-2001: What do OSHA data show?
    • National Institute for Occupational Health and Safety Pittsburgh, Pa
    • W.R. Schriver, and M. Schoenbaum Analysis of fatal events in the construction industry, 1991-2001: what do OSHA data show? Proceedings of National Occupational Injury Research Symposium 2003 National Institute for Occupational Health and Safety Pittsburgh, Pa
    • (2003) Proceedings of National Occupational Injury Research Symposium
    • Schriver, W.R.1    Schoenbaum, M.2
  • 3
    • 3342970967 scopus 로고    scopus 로고
    • Large construction projects in developing countries: A case study from Vietnam
    • DOI 10.1016/j.ijproman.2004.03.004, PII S0263786304000298
    • N.D. Long, S. Ogunlana, T. Quang, and K.C. Lam Large construction projects in developing countries: a case study from Vietnam International Journal of Project Management 22 7 2004 553 561 (Pubitemid 38994793)
    • (2004) International Journal of Project Management , vol.22 , Issue.7 , pp. 553-561
    • Long, N.D.1    Ogunlana, S.2    Quang, T.3    Lam, K.C.4
  • 4
    • 0036603981 scopus 로고    scopus 로고
    • The effect of attitudinal differences on interface conflicts in large scale construction projects: A case study
    • P. Awakul, and S.O. Ogunlana The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study Construction Management and Economics 20 4 2002 311 335
    • (2002) Construction Management and Economics , vol.20 , Issue.4 , pp. 311-335
    • Awakul, P.1    Ogunlana, S.O.2
  • 5
    • 44049107957 scopus 로고    scopus 로고
    • Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industry
    • DOI 10.1016/j.ijproman.2007.08.003, PII S0263786307001275
    • S.R. Toor, and S.O. Ogunlana Critical COMs of success in large-scale construction projects: evidence from Thailand construction industry International Journal of Project Management 26 4 2008 420 430 (Pubitemid 351709372)
    • (2008) International Journal of Project Management , vol.26 , Issue.4 , pp. 420-430
    • Toor, S.-u.-R.1    Ogunlana, S.O.2
  • 8
    • 73449091542 scopus 로고    scopus 로고
    • Life cycle management of construction projects based on Virtual Prototyping technology
    • H.L. Guo, H. Li, and M. Skitmore Life cycle management of construction projects based on Virtual Prototyping technology Journal of Management in Engineering 26 1 2010 41 47
    • (2010) Journal of Management in Engineering , vol.26 , Issue.1 , pp. 41-47
    • Guo, H.L.1    Li, H.2    Skitmore, M.3
  • 9
    • 58149216115 scopus 로고    scopus 로고
    • Identification and analysis of factors affecting safety on construction sites with tower cranes
    • A. Shapira, and B. Lyachin Identification and analysis of factors affecting safety on construction sites with tower cranes Journal of Construction Engineering and Management 135 1 2009 24 33
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.1 , pp. 24-33
    • Shapira, A.1    Lyachin, B.2
  • 11
    • 84861880361 scopus 로고    scopus 로고
    • Using game technologies to improve the safety of construction plant operations
    • H.L. Guo, H. Li, G. Chan, and M. Skitmore Using game technologies to improve the safety of construction plant operations Accident Analysis and Prevention 48 2012 204 213
    • (2012) Accident Analysis and Prevention , vol.48 , pp. 204-213
    • Guo, H.L.1    Li, H.2    Chan, G.3    Skitmore, M.4
  • 12
    • 78049432825 scopus 로고    scopus 로고
    • Tower crane safety in the construction industry: A Hong Kong study
    • V.W.Y. Tam, and I.W.H. Fung Tower crane safety in the construction industry: a Hong Kong study Safety Science 49 2 2011 208 215
    • (2011) Safety Science , vol.49 , Issue.2 , pp. 208-215
    • Tam, V.W.Y.1    Fung, I.W.H.2
  • 13
    • 7044286545 scopus 로고    scopus 로고
    • The effectiveness of the revised scaffold safety standard in the construction industry
    • DOI 10.1016/j.ssci.2004.05.001, PII S0925753504000451
    • A.S. Yassin, and J.F. Martonik The effectiveness of the revised scaffold safety standard in the construction industry Safety Science 42 10 2004 921 931 (Pubitemid 39421044)
    • (2004) Safety Science , vol.42 , Issue.10 , pp. 921-931
    • Yassin, A.S.1    Martonik, J.F.2
  • 14
    • 2642514012 scopus 로고    scopus 로고
    • An evaluation of scaffold safety at construction sites
    • K.M. Halperin, and M. McCann An evaluation of scaffold safety at construction sites Journal of Safety Research 35 2 2004 141 150
    • (2004) Journal of Safety Research , vol.35 , Issue.2 , pp. 141-150
    • Halperin, K.M.1    McCann, M.2
  • 15
    • 53349108776 scopus 로고    scopus 로고
    • Using the IKEA model and Virtual Prototyping technology to improve construction process management
    • H. Li, H.L. Guo, M.J. Skibniewski, and M. Skitmore Using the IKEA model and Virtual Prototyping technology to improve construction process management Construction Management and Economics 26 9 2008 991 1000
    • (2008) Construction Management and Economics , vol.26 , Issue.9 , pp. 991-1000
    • Li, H.1    Guo, H.L.2    Skibniewski, M.J.3    Skitmore, M.4
  • 20
    • 0002482599 scopus 로고
    • Attitudes to safety: Psychological factors and the accident plateau
    • I. Donald, and D. Canter Attitudes to safety: psychological factors and the accident plateau Health and Safety Information Bulletin 215 1993 5 8
    • (1993) Health and Safety Information Bulletin , vol.215 , pp. 5-8
    • Donald, I.1    Canter, D.2
  • 23
    • 79952377493 scopus 로고    scopus 로고
    • Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong
    • H. Li, H.L. Guo, M. Skitmore, T. Huang, N. Chan, and G. Chan Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong Construction Management and Economics 29 3 2011 233 245
    • (2011) Construction Management and Economics , vol.29 , Issue.3 , pp. 233-245
    • Li, H.1    Guo, H.L.2    Skitmore, M.3    Huang, T.4    Chan, N.5    Chan, G.6
  • 25
    • 16444376810 scopus 로고    scopus 로고
    • Automated path planning of cooperative crane lifts using heuristic search
    • DOI 10.1061/(ASCE)0887-3801(2003)17:3(197)
    • P.L. Sivakumar1, K. Varghese, and N.R. Babu Automated path planning of cooperative crane lifts using heuristic search Journal of Computing in Civil Engineering 17 3 2003 197 207 (Pubitemid 40475462)
    • (2003) Journal of Computing in Civil Engineering , vol.17 , Issue.3 , pp. 197-207
    • Sivakumar, P.L.1    Varghese, K.2    Ramesh Babu, N.3
  • 26
    • 18144425787 scopus 로고    scopus 로고
    • Collision free path planning of cooperative crane manipulators using genetic algorithm
    • DOI 10.1061/(ASCE)0887-3801(2005)19:2(182)
    • M.S.A.D. Ali, N.R. Babu, and K. Varghese Collision free path planning of cooperative crane manipulators using Genetic Algorithm Journal of Computing in Civil Engineering 19 2 2005 182 193 (Pubitemid 40609905)
    • (2005) Journal of Computing in Civil Engineering , vol.19 , Issue.2 , pp. 182-193
    • Deen Ali, M.S.A.1    Babu, N.R.2    Varghese, K.3
  • 28
    • 18844391780 scopus 로고    scopus 로고
    • Accident patterns and prevention measures for fatal occupational falls in the construction industry
    • C.F. Chi, T.C. Chang, and H.I. Ting Accident patterns and prevention measures for fatal occupational falls in the construction industry Applied Ergonomics 36 4 2005 391 400
    • (2005) Applied Ergonomics , vol.36 , Issue.4 , pp. 391-400
    • Chi, C.F.1    Chang, T.C.2    Ting, H.I.3
  • 29
    • 84874768908 scopus 로고    scopus 로고
    • Study on underestimating risks of scaffolders to unsafe behaviors
    • M.C. Zhang, D.P. Fang, and R.P. Tong Study on underestimating risks of scaffolders to unsafe behaviors China Safety Science Journal 21 8 2011 145 150
    • (2011) China Safety Science Journal , vol.21 , Issue.8 , pp. 145-150
    • Zhang, M.C.1    Fang, D.P.2    Tong, R.P.3
  • 30
    • 54949091185 scopus 로고    scopus 로고
    • A method to identify strategies for the improvement of human safety behavior by considering safety climate and personal experience
    • Q. Zhou, D. Fang, and X. Wang A method to identify strategies for the improvement of human safety behavior by considering safety climate and personal experience Safety Science 46 10 2008 1406 1419
    • (2008) Safety Science , vol.46 , Issue.10 , pp. 1406-1419
    • Zhou, Q.1    Fang, D.2    Wang, X.3
  • 32
    • 79551684087 scopus 로고    scopus 로고
    • BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1 Principles and methodologies
    • J.P. Zhang, and Z.Z. Hu BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1 Principles and methodologies Automation in Construction 20 2 2011 155 166
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 155-166
    • Zhang, J.P.1    Hu, Z.Z.2
  • 33
    • 79551684087 scopus 로고    scopus 로고
    • BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2 Development and site trials
    • Z.Z. Hu, and J.P. Zhang BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2 Development and site trials Automation in Construction 20 2 2011 167 180
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 167-180
    • Hu, Z.Z.1    Zhang, J.P.2
  • 34
    • 75149127614 scopus 로고    scopus 로고
    • An integrated safety management with construction management using 4D CAD model
    • V. Benjaoran, and S. Bhokha An integrated safety management with construction management using 4D CAD model Safety Science 48 3 2010 395 403
    • (2010) Safety Science , vol.48 , Issue.3 , pp. 395-403
    • Benjaoran, V.1    Bhokha, S.2
  • 35
    • 78049300426 scopus 로고    scopus 로고
    • Application of geographic information systems in construction safety planning
    • V.K. Bansal Application of geographic information systems in construction safety planning International Journal of Project Management 29 1 2011 66 77
    • (2011) International Journal of Project Management , vol.29 , Issue.1 , pp. 66-77
    • Bansal, V.K.1
  • 36
    • 77950535248 scopus 로고    scopus 로고
    • A new-generation safety contest in the construction industry - A long-term evaluation of a real-life intervention
    • H. Laitinen, and K. Paivarinta A new-generation safety contest in the construction industry - a long-term evaluation of a real-life intervention Safety Science 48 5 2010 680 686
    • (2010) Safety Science , vol.48 , Issue.5 , pp. 680-686
    • Laitinen, H.1    Paivarinta, K.2
  • 37
    • 77953127878 scopus 로고    scopus 로고
    • Construction safety training via e-Learning: Learning effectiveness and user satisfaction
    • C.L. Ho, and R.J. Dzeng Construction safety training via e-Learning: learning effectiveness and user satisfaction Computers in Education 55 2 2010 858 867
    • (2010) Computers in Education , vol.55 , Issue.2 , pp. 858-867
    • Ho, C.L.1    Dzeng, R.J.2
  • 38
    • 33845331789 scopus 로고    scopus 로고
    • Computer-based training for safety: Comparing methods with older and younger workers
    • DOI 10.1016/j.jsr.2006.08.003, PII S0022437506001009
    • E.S. Wallen, and K.B. Mulloy Computer-based training for safety: comparing methods with older and younger workers Journal of Safety Research 37 5 2006 461 467 (Pubitemid 44869026)
    • (2006) Journal of Safety Research , vol.37 , Issue.5 , pp. 461-467
    • Wallen, E.S.1    Mulloy, K.B.2
  • 39
    • 2642531957 scopus 로고    scopus 로고
    • CSHM: Web-based safety and health monitoring system for construction management
    • S.O. Cheung, K.K.W. Cheung, and H.C.H. Suen CSHM: Web-based safety and health monitoring system for construction management Journal of Safety Research 35 2 2004 159 170
    • (2004) Journal of Safety Research , vol.35 , Issue.2 , pp. 159-170
    • Cheung, S.O.1    Cheung, K.K.W.2    Suen, H.C.H.3
  • 40
    • 23944437350 scopus 로고    scopus 로고
    • A cooperative virtual prototyping system for mechatronic solution elements based assembly
    • DOI 10.1016/j.aei.2005.05.011, PII S1474034605000418, Collaorative Environment for Design and Manufacturing
    • Q. Shen, J. Gausemeier, J. Bauch, and R. Radkowski A cooperative virtual prototyping system for mechatronic solution elements based assembly Advanced Engineering Informatics 19 2005 169 177 (Pubitemid 41203518)
    • (2005) Advanced Engineering Informatics , vol.19 , Issue.2 , pp. 169-177
    • Shen, Q.1    Gausemeier, J.2    Bauch, J.3    Radkowski, R.4
  • 41
    • 2642586428 scopus 로고    scopus 로고
    • Agent-based composable simulation for virtual prototyping of fluid power system
    • W. Xiang, S.C. Fok, and G. Thimm Agent-based composable simulation for virtual prototyping of fluid power system Computers in Industry 54 2004 237 251
    • (2004) Computers in Industry , vol.54 , pp. 237-251
    • Xiang, W.1    Fok, S.C.2    Thimm, G.3
  • 42
    • 1442334770 scopus 로고    scopus 로고
    • A virtual prototyping system for rapid product development
    • S.H. Choi, and A.M.M. Chan A virtual prototyping system for rapid product development Computer-Aided Design 36 2004 401 412
    • (2004) Computer-Aided Design , vol.36 , pp. 401-412
    • Choi, S.H.1    Chan, A.M.M.2
  • 43
    • 0031145409 scopus 로고    scopus 로고
    • Simulation of structural steel erection to assess innovations
    • PII S0018939197033801
    • E.S. Slaughter, and M. Eraso Simulation of structural steel erection to assess innovations IEEE Transactions on Engineering Management 44 2 1997 196 207 (Pubitemid 127826366)
    • (1997) IEEE Transactions on Engineering Management , vol.44 , Issue.2 , pp. 196-207
    • Sarah Slaughter, E.1    Eraso, M.2
  • 44
    • 34147115212 scopus 로고    scopus 로고
    • A virtual prototyping system for simulating construction processes
    • DOI 10.1016/j.autcon.2006.09.007, PII S0926580506001002
    • T. Huang, C.W. Kong, H.L. Guo, A. Baldwin, and H. Li A virtual prototyping system for simulating construction processes Automation in Construction 16 5 2007 576 585 (Pubitemid 46575187)
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 576-585
    • Huang, T.1    Kong, C.W.2    Guo, H.L.3    Baldwin, A.4    Li, H.5
  • 46
    • 84908940507 scopus 로고    scopus 로고
    • One Island East, Hong Kong: A case study in construction virtual prototyping
    • P. Brandon, T. Kocatürk, Blackwell Publishing Ltd. Oxford
    • M. Riese One Island East, Hong Kong: a case study in construction virtual prototyping P. Brandon, T. Kocatürk, Virtual Futures for Design, Construction & Procurement 2006 Blackwell Publishing Ltd. Oxford
    • (2006) Virtual Futures for Design, Construction & Procurement
    • Riese, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.