메뉴 건너뛰기




Volumn 44, Issue 3, 2002, Pages 13-26

Project risk management: A combined analytic hierarchy process and decision tree approach

Author keywords

Analytic hierarchy process; Cross country petroleum pipeline; Decision tree analysis; Risk management; Time cost control; Work break down structure

Indexed keywords


EID: 0242662989     PISSN: 02749696     EISSN: None     Source Type: Trade Journal    
DOI: None     Document Type: Article
Times cited : (99)

References (20)
  • 5
    • 0001848701 scopus 로고
    • Tabucanon and S. O. Ogunlana. Planning for project control through risk analysis; A case of petroleum pipeline laying project
    • Dey, P. K. M. T. Tabucanon and S. O. Ogunlana. Planning for Project Control through Risk Analysis; A Case of Petroleum Pipeline Laying Project. International Journal of Project Management 12, no. 1, (1994) 23-33.
    • (1994) International Journal of Project Management , vol.12 , Issue.1 , pp. 23-33
    • Dey, P.K.M.T.1
  • 7
    • 0033150275 scopus 로고    scopus 로고
    • Process re-engineering for effective implementation of projects
    • Dey, P. K. Process Re-engineering for Effective Implementation of Projects. International Journal of Project Management, 17, no. 3(1999) 147-159.
    • (1999) International Journal of Project Management , vol.17 , Issue.3 , pp. 147-159
    • Dey, P.K.1
  • 10
    • 0023314577 scopus 로고
    • Some results concerning the estimation of beta distribution parameters in pert
    • Farnum N. R., and L. W. Stanton. Some Results Concerning the Estimation of Beta Distribution Parameters in PERT. Journal of the Operational Research Society 38 no. 3(1987) : 287-290.
    • (1987) Journal of the Operational Research Society , vol.38 , Issue.3 , pp. 287-290
    • Farnum, N.R.1    Stanton, L.W.2
  • 13
    • 34250836481 scopus 로고
    • Construction risk assessment by linguistics
    • Kangari, R. and L. S. Riggs. Construction Risk Assessment by Linguistics. IEEE Trans. Eng. Manag. 36 no. 2(1989) : 126-131.
    • (1989) IEEE Trans. Eng. Manag. , vol.36 , Issue.2 , pp. 126-131
    • Kangari, R.1    Riggs, L.S.2
  • 14
    • 0026106979 scopus 로고
    • Project risk assessment using the analytic hierarchy process
    • Mustafa, M. A. and J. F. Al-Bahar. Project Risk Assessment Using the Analytic Hierarchy Process. IEEE Trans. Eng. Manag. 38 no. 1(1991) : 46-52.
    • (1991) IEEE Trans. Eng. Manag. , vol.38 , Issue.1 , pp. 46-52
    • Mustafa, M.A.1    Al-Bahar, J.F.2
  • 17
    • 0033177429 scopus 로고    scopus 로고
    • Applying a risk management process (RMP) to manage cost risk for an EHV transmission line project
    • Tummala V. M. Rao and Y. H. Leung. Applying a Risk Management Process (RMP) to Manage Cost Risk for an EHV Transmission Line Project. International Journal of Project Management, 17, no. 4(1999) : 223-235.
    • (1999) International Journal of Project Management , vol.17 , Issue.4 , pp. 223-235
    • Rao, T.V.M.1    Leung, Y.H.2
  • 19
    • 0029357179 scopus 로고
    • A classified bibliography of recent research relating to project risk management
    • Williams, T. M. A Classified Bibliography of Recent Research relating to Project Risk Management. European Journal of Operational Research, 85, no. 1(1995) : 18-38.
    • (1995) European Journal of Operational Research , vol.85 , Issue.1 , pp. 18-38
    • Williams, T.M.1
  • 20
    • 0025503588 scopus 로고
    • Classification of estimates and contingency
    • Yeo, K. T. Risks, Classification of Estimates and Contingency. Journal of Manage. Eng. 6, no. 4(1990) : 458-470.
    • (1990) Journal of Manage. Eng. , vol.6 , Issue.4 , pp. 458-470
    • Yeo, K.T.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.