-
1
-
-
84893633516
-
Comparative roles of major stakeholders for the implementation of BIM in various countries
-
New Roles; New Challenges Noordwijkaan Zee
-
Wong AKD, Wong F KW, Nadeem A. Comparative Roles of Major Stakeholders for the Implementation of BIM in Various Countries. Proc. of Changing Roles, New Roles; New Challenges, 2009. Noordwijkaan Zee, 1-10.
-
(2009)
Proc. of Changing Roles
, pp. 1-10
-
-
Wong, A.K.D.1
Wong, F.K.W.2
Nadeem, A.3
-
3
-
-
84863131346
-
Application of 3D Bridge Information Modeling to Design and Construction of Bridges
-
Shim CS, Yun NR, Song HH. Application of 3D Bridge Information Modeling to Design and Construction of Bridges. Proc. of EASEC 12, 2011, 114-115.
-
(2011)
Proc. of EASEC
, vol.12
, pp. 114-115
-
-
Shim, C.S.1
Yun, N.R.2
Song, H.H.3
-
4
-
-
80054781112
-
Collaborative design of high-speed railway lines using 3D information models
-
Buildings and Construction Practice
-
Shim CS, Lee KM, Son WS, Moon JW. Collaborative design of high-speed railway lines using 3D information models, Proc. of IABSE Conference on Information and Communication Technology for Bridges, Buildings and Construction Practice, 2008, C33.
-
(2008)
Proc. of IABSE Conference on Information and Communication Technology for Bridges
-
-
Shim, C.S.1
Lee, K.M.2
Son, W.S.3
Moon, J.W.4
-
5
-
-
84859497886
-
Bridge information models for construction of a concrete box-girder bridge
-
DOI: 10.1080/15732471003727977
-
Lee KM, Lee YB, Shim CS, Park KL. Bridge information models for construction of a concrete box-girder bridge. Struct. Infrastruct. Eng. DOI: 10.1080/15732471003727977.
-
Struct. Infrastruct. Eng.
-
-
Lee, K.M.1
Lee, Y.B.2
Shim, C.S.3
Park, K.L.4
-
6
-
-
84863150755
-
Development of BIM for a maintenance system of subway infrastructures
-
Shim CS, Kim SW, Song HH, Yun NR. Development of BIM for a maintenance system of subway infrastructures. J. Korean Inst. Build. Inform. Model. 2011; 3(1): 6-12.
-
(2011)
J. Korean Inst. Build. Inform. Model.
, vol.3
, Issue.1
, pp. 6-12
-
-
Shim, C.S.1
Kim, S.W.2
Song, H.H.3
Yun, N.R.4
-
7
-
-
78049472053
-
Improved link system between schedule data and 3D object in 4D CAD system by using WBS code
-
Kang LS, Moon HS , Park SY, Kim CH, Lee TS. Improved link system between schedule data and 3D object in 4D CAD system by using WBS code. KSCE J. Civil Eng. 2010; 14(6): 803-814.
-
(2010)
KSCE J. Civil Eng.
, vol.14
, Issue.6
, pp. 803-814
-
-
Kang, L.S.1
Moon, H.S.2
Park, S.Y.3
Kim, C.H.4
Lee, T.S.5
-
8
-
-
78149283314
-
Development of methodology and virtual system for optimised simulation of road design data
-
Kang LS, Moon HS, Dawood N, Kang MS. Development of methodology and virtual system for optimised simulation of road design data. Autom. Constr. 2010; 19(8): 1000-1015.
-
(2010)
Autom. Constr.
, vol.19
, Issue.8
, pp. 1000-1015
-
-
Kang, L.S.1
Moon, H.S.2
Dawood, N.3
Kang, M.S.4
-
9
-
-
80053145153
-
Development of 5D CAD System for Visualizing Risk Degree and Progress Schedule for Construction Project
-
Miami, USA
-
Kang LS, Moon HS, Kim HS, Choi GY, Kim CH. Development of 5D CAD System for Visualizing Risk Degree and Progress Schedule for Construction Project. Proceeding of 2011 ASCE International Workshop on Computing in Civil Engineering, Miami, USA, 2011.
-
(2011)
Proceeding of 2011 ASCE International Workshop on Computing in Civil Engineering
-
-
Kang, L.S.1
Moon, H.S.2
Kim, H.S.3
Choi, G.Y.4
Kim, C.H.5
-
11
-
-
84863153101
-
-
PLM08
-
Kim GY, Lee SS, Kim JH, Noh SD, Jung SH, Lee KM, C-PLM, New Paradigm of PLM for Construction Companies, PLM08, 2008.
-
(2008)
C-PLM, New Paradigm of PLM for Construction Companies
-
-
Kim, G.Y.1
Lee, S.S.2
Kim, J.H.3
Noh, S.D.4
Jung, S.H.5
Lee, K.M.6
|