Bridge construction schedule generation with pattern-based construction methods and constraint-based simulation
-
C. Wu, A. Borrmann, U. Beißert, M. König, E. Rank, Bridge construction schedule generation with pattern-based construction methods and constraint-based simulation, Advanced Engineering Informatics, 24(2010), 379-388.
-
(2010)
Advanced Engineering Informatics
, vol.24
, pp. 379-388
-
-
Wu, C.1
Borrmann, A.2
Beißert, U.3
König, M.4
Rank, E.5
-
3
-
-
80054792580
-
Application of 3D bridge information modeling to design and construction of bridges
-
C. S. Shim, N. R. Yun, H. H. Song, Application of 3D bridge information modeling to design and construction of bridges, Procedia Engineering, 14(2011), 95-99.
-
(2011)
Procedia Engineering
, vol.14
, pp. 95-99
-
-
Shim, C.S.1
Yun, N.R.2
Song, H.H.3
-
4
-
-
80054783632
-
Analysis and design of reinforced concrete bridge column based on BIM
-
H. M. Shin, H. M. Lee, J. Oh, J. H. Chen, Analysis and design of reinforced concrete bridge column based on BIM. Procedia Engineering, 14(2011), 2160-2163.
-
(2011)
Procedia Engineering
, vol.14
, pp. 2160-2163
-
-
Shin, H.M.1
Lee, H.M.2
Oh, J.3
Chen, J.H.4
-
5
-
-
78650330072
-
Applicability of 4D CAD in civil engineering construction: Case study of a cable-stayed bridge project
-
C. Kim, H. Kim, T. Park, M. K. Kim, Applicability of 4D CAD in civil engineering construction: case study of a cable-stayed bridge project, Journal of Computing in Civil Engineering, 25(2011), 98-107.
-
(2011)
Journal of Computing in Civil Engineering
, vol.25
, pp. 98-107
-
-
Kim, C.1
Kim, H.2
Park, T.3
Kim, M.K.4
-
6
-
-
84923317435
-
The application of 4D CAD in the large-scale bridge construction schedule management
-
W. B. Tang, Z. F. Song, The application of 4D CAD in the large-scale bridge construction schedule management, Technological Development of Enterprise, 28(2009), 127-128.
-
(2009)
Technological Development of Enterprise
, vol.28
, pp. 127-128
-
-
Tang, W.B.1
Song, Z.F.2
-
7
-
-
79955111842
-
System simulation for large scale bridge construction schedule based on 4D CAD
-
Z. F. Zhang, J. Q. Fu, K. X. Wu, F. Y. Zhang, System simulation for large scale bridge construction schedule based on 4D CAD, Engineering Science, 8(2006), 63-66.
-
(2006)
Engineering Science
, vol.8
, pp. 63-66
-
-
Zhang, Z.F.1
Fu, J.Q.2
Wu, K.X.3
Zhang, F.Y.4
-
8
-
-
77950800280
-
Highway bridge construction process simulation base on 4D visualization
-
C. H. Zhou, W. D. Wang, Highway bridge construction process simulation base on 4D visualization, GeoHunan International Conference, 2009, 138-145.
-
(2009)
GeoHunan International Conference
, pp. 138-145
-
-
Zhou, C.H.1
Wang, W.D.2
-
9
-
-
84859497886
-
Bridge information models for construction of a concrete box-girder bridge
-
K. M. Lee, Y. B. Lee, C. S. Shim, K. L. Park, Bridge information models for construction of a concrete box-girder bridge, Structure and Infrastructure Engineering, 8(2012), 687-703.
-
(2012)
Structure and Infrastructure Engineering
, vol.8
, pp. 687-703
-
-
Lee, K.M.1
Lee, Y.B.2
Shim, C.S.3
Park, K.L.4
-
10
-
-
84863746764
-
Simulation for steel bridge erection by using BIM tools
-
C. T. Chiu, T. H. Hsu, M. T. Wang, H. Y. Chiu, Simulation for steel bridge erection by using BIM tools, Proceedings of the 28th ISARC, 2011, 560-563.
-
(2011)
Proceedings of the 28th ISARC
, pp. 560-563
-
-
Chiu, C.T.1
Hsu, T.H.2
Wang, M.T.3
Chiu, H.Y.4
-
11
-
-
70350053404
-
Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction
-
T. Park, M. K. Kim, C. Kim, H. Kim, Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction, Journal of Construction Engineering and Management, 135(2009), 1261-1270.
-
(2009)
Journal of Construction Engineering and Management
, vol.135
, pp. 1261-1270
-
-
Park, T.1
Kim, M.K.2
Kim, C.3
Kim, H.4
-
12
-
-
84863652477
-
Virtual prototyping for planning bridge construction
-
H. Li, N. K. Y. Chan, T. Huang, M. Skitmore, J. Yang, Virtual prototyping for planning bridge construction, Automation in Construction, 27(2012), 1-10.
-
(2012)
Automation in Construction
, vol.27
, pp. 1-10
-
-
Li, H.1
Chan, N.K.Y.2
Huang, T.3
Skitmore, M.4
Yang, J.5
-
13
-
-
78651293796
-
BrIM for project delivery and the life-cycle: State of the art
-
A. M. Shirole, T. J. Riordan, S. S. Chen, Q. Gao, H. Hu, J. A. Puckett, BrIM for project delivery and the life-cycle: state of the art, Bridge Structures, 5(2009), 173-187.
-
(2009)
Bridge Structures
, vol.5
, pp. 173-187
-
-
Shirole, A.M.1
Riordan, T.J.2
Chen, S.S.3
Gao, Q.4
Hu, H.5
Puckett, J.A.6
-
14
-
-
79551684087
-
BIM and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
-
J. P. Zhang, Z. Z. Hu, BIM and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies, Automation in Construction, 20(2011), 155-166.
-
(2011)
Automation in Construction
, vol.20
, pp. 155-166
-
-
Zhang, J.P.1
Hu, Z.Z.2
-
15
-
-
79551684087
-
BIM and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials
-
Z. Z. Hu, J. P. Zhang, BIM and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials, Automation in Construction, 20(2011), 167-180.
-
(2011)
Automation in Construction
, vol.20
, pp. 167-180
-
-
Hu, Z.Z.1
Zhang, J.P.2
-
16
-
-
34248575853
-
Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling
-
J. H. Kang, S. D. Anderson, M. J. Clayton, Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling, Journal of Construction Engineering and Management, 133(2007), 447-461.
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, pp. 447-461
-
-
Kang, J.H.1
Anderson, S.D.2
Clayton, M.J.3
-
17
-
-
77956386598
-
BIM for integration of automated real-time project control systems
-
H. Seokyon, L. Y. Liu, BIM for integration of automated real-time project control systems, Construction Research Congress, 2010, 509-517.
-
(2010)
Construction Research Congress
, pp. 509-517
-
-
Seokyon, H.1
Liu, L.Y.2
-
18
-
-
84923317085
-
-
Taiwan, National Cheng Kung University
-
C. W. Feng, O. Mustaklem, Y. J. Chen, The BIM-based information integration sphere for construction projects, Taiwan, National Cheng Kung University, 2011, 1-6.
-
(2011)
The BIM-based Information Integration Sphere for Construction Projects
, pp. 1-6
-
-
Feng, C.W.1
Mustaklem, O.2
Chen, Y.J.3
-
19
-
-
51849088974
-
Areas of application for 3D and 4D models on construction projects
-
T. Hartmann, J. Gao, M. Fischer, Areas of application for 3D and 4D models on construction projects, Journal of Construction Engineering and Management, 134(2008), 776-785.
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, pp. 776-785
-
-
Hartmann, T.1
Gao, J.2
Fischer, M.3
-
20
-
-
21844461066
-
A 4D construction management system based on IFC standard and engineering information model
-
J. P. Zhang, M. Cao, Y. Zhang, A 4D construction management system based on IFC standard and engineering information model, Engineering Mechanics, 22(2005), 220-227.
-
(2005)
Engineering Mechanics
, vol.22
, pp. 220-227
-
-
Zhang, J.P.1
Cao, M.2
Zhang, Y.3
-
21
-
-
70350060197
-
Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
-
G. F. Mani, P. M. Feniosky, A. A. Carlos, S. H. Lee, Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs, Journal of Computing in Civil Engineering, 23(2009), 391-404.
-
(2009)
Journal of Computing in Civil Engineering
, vol.23
, pp. 391-404
-
-
Mani, G.F.1
Feniosky, P.M.2
Carlos, A.A.3
Lee, S.H.4
-
22
-
-
35948950045
-
The application and development of 4D technology in project management
-
W. P. Ding, J. G. Chen, The application and development of 4D technology in project management, Optimization of Capital Construction, 25(2004), 1-12.
-
(2004)
Optimization of Capital Construction
, vol.25
, pp. 1-12
-
-
Ding, W.P.1
Chen, J.G.2
-
23
-
-
80053541507
-
Research on the application architecture of BIM in building projects
-
H. Li, H. L. Guo, T. Huang, N. Chan, G. Chan, Research on the application architecture of BIM in building projects, Journal of Engineering Management, 5(2010), 525-529.
-
(2010)
Journal of Engineering Management
, vol.5
, pp. 525-529
-
-
Li, H.1
Guo, H.L.2
Huang, T.3
Chan, N.4
Chan, G.5
-
24
-
-
34147115212
-
A virtual prototyping system for simulating construction processes
-
T. Huang, C. W. Kong, H. L. Guo, A. Baldwin, H. Li, A virtual prototyping system for simulating construction processes, Automation in Construction, 16(2007), 576-585.
-
(2007)
Automation in Construction
, vol.16
, pp. 576-585
-
-
Huang, T.1
Kong, C.W.2
Guo, H.L.3
Baldwin, A.4
Li, H.5
-
25
-
-
45949103855
-
Integrating design and construction through virtual prototyping
-
H. Li, T. Huang, C. W. Kong, H. L. Guo, A. Baldwin, N. Chan, J. Wong, Integrating design and construction through virtual prototyping, Automation in Construction, 17(2008), 915-922.
-
(2008)
Automation in Construction
, vol.17
, pp. 915-922
-
-
Li, H.1
Huang, T.2
Kong, C.W.3
Guo, H.L.4
Baldwin, A.5
Chan, N.6
Wong, J.7
-
26
-
-
53349108776
-
Using the IKEA model and virtual prototyping technology to improve construction process management
-
H. Li, H. L. Guo, M. J. Skibniewski, M. Skitmore, Using the IKEA model and Virtual Prototyping technology to improve construction process management, Construction Management and Economics, 26(2008), 991-1000.
-
(2008)
Construction Management and Economics
, vol.26
, pp. 991-1000
-
-
Li, H.1
Guo, H.L.2
Skibniewski, M.J.3
Skitmore, M.4
-
27
-
-
79952377493
-
Rethinking prefabricated construction management using the VP-based IKEA model in hong Kong
-
H. Li, H. L. Guo, M. Skitmore, T. Huang, N. Chan, G. Chan, Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong, Construction Management and Economics, 29(2011), 233-245.
-
(2011)
Construction Management and Economics
, vol.29
, pp. 233-245
-
-
Li, H.1
Guo, H.L.2
Skitmore, M.3
Huang, T.4
Chan, N.5
Chan, G.6
-
28
-
-
84861880361
-
Using game technologies to improve the safety of construction plant operations
-
H. L. Guo, H. Li, G. Chan, M. Skitmore, Using game technologies to improve the safety of construction plant operations, Accident Analysis and Prevention, 48(2012), 204-213.
-
(2012)
Accident Analysis and Prevention
, vol.48
, pp. 204-213
-
-
Guo, H.L.1
Li, H.2
Chan, G.3
Skitmore, M.4
-
29
-
-
73449091542
-
Life cycle management of construction projects based on virtual prototyping technology
-
H. L. Guo, H. Li, M. Skitmore, Life cycle management of construction projects based on Virtual Prototyping technology, Journal of Management in Engineering, ASCE, 26(2010), 41-47.
-
(2010)
Journal of Management in Engineering, ASCE
, vol.26
, pp. 41-47
-
-
Guo, H.L.1
Li, H.2
Skitmore, M.3
|