-
3
-
-
42949097433
-
Editorial-Sensor in construction and infrastructure management
-
1874-4753
-
Akinci, B., and, Anumba, C. (2008). " Editorial-Sensor in construction and infrastructure management." ITcon, 13, 69-70. 1874-4753
-
(2008)
ITcon
, vol.13
, pp. 69-70
-
-
Akinci, B.1
Anumba, C.2
-
4
-
-
0041805006
-
Automated generation of work spaces required by construction activities
-
Akinci, B., Fischer, M., and, Kunz, J. (2002). " Automated generation of work spaces required by construction activities." J. Constr. Eng. Manage.
-
(2002)
J. Constr. Eng. Manage
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
-
5
-
-
41849128115
-
CAD and GIS interoperability through semantic web services
-
Akinci, B., Karimi, H., Pradhan, A., Wu, C.-C., and, Fichtl, G. (2008). " CAD and GIS interoperability through semantic web services." ITcon, 13, 39-55.
-
(2008)
ITcon
, vol.13
, pp. 39-55
-
-
Akinci, B.1
Karimi, H.2
Pradhan, A.3
Wu, C.-C.4
Fichtl, G.5
-
6
-
-
0035175291
-
Point set surfaces
-
Alexa, M., Behr, J., Cohen-Or, D., Fleishman, S., Levin, D., and, Silva, C. (2001). " Point set surfaces." Proc., IEEE Conf. on Visualization, New York, 21-28.
-
(2001)
Proc. IEEE Conf. on Visualization, New York
, pp. 21-28
-
-
Alexa, M.1
Behr, J.2
Cohen-Or, D.3
Fleishman, S.4
Levin, D.5
Silva, C.6
-
7
-
-
18744393158
-
Optimization algorithm for selection and on site location of mobile cranes
-
Al-Hussein, M., Alkass, S., and, Moselhi, O. (2005). " Optimization algorithm for selection and on site location of mobile cranes." J. Constr. Eng. Manage.
-
(2005)
J. Constr. Eng. Manage
-
-
Al-Hussein, M.1
Alkass, S.2
Moselhi, O.3
-
8
-
-
84898930874
-
Crane safety on construction sites: An introduction
-
ASCE Task Committee on Crane Safety on Construction Sites. Reston, VA
-
ASCE Task Committee on Crane Safety on Construction Sites. (1998). " Crane safety on construction sites: An introduction." ASCE Manuals and Reports on Engineering Practice No. 93, Reston, VA.
-
(1998)
ASCE Manuals and Reports on Engineering Practice No. 93
-
-
-
9
-
-
33747344709
-
Crane-related fatalities in the construction industry
-
Beavers, J. E., Moore, J. R., Rinehart, R., and, Schriver, W. R. (2006). " Crane-related fatalities in the construction industry." J. Constr. Eng. Manage.
-
(2006)
J. Constr. Eng. Manage
-
-
Beavers, J.E.1
Moore, J.R.2
Rinehart, R.3
Schriver, W.R.4
-
10
-
-
70350064472
-
Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control
-
Bosche, F., Haas, C. T., and, Akinci, B. (2009). " Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control." J. Comput. Civ. Eng.
-
(2009)
J. Comput. Civ. Eng
-
-
Bosche, F.1
Haas, C.T.2
Akinci, B.3
-
11
-
-
34547670382
-
Automated reasoning about construction specification to support inspection and quality control
-
AUCOES 0926-5805 10.1016/j.autcon.2007.03.002
-
Boukamp, F., and, Akinci, B. (2007). " Automated reasoning about construction specification to support inspection and quality control." Automat. Constr., 17 (1), 90-106. AUCOES 0926-5805 10.1016/j.autcon.2007.03.002
-
(2007)
Automat. Constr.
, vol.17
, Issue.1
, pp. 90-106
-
-
Boukamp, F.1
Akinci, B.2
-
12
-
-
84869662119
-
-
Bureau of Labor Statistics. (Jan. 19, 2014)
-
Bureau of Labor Statistics. (2008). " Crane-related occupational fatalities." http://www.bls.gov/iif/oshwc/osh/os/osh-crane-2006.pdf (Jan. 19, 2014).
-
(2008)
Crane-related Occupational Fatalities
-
-
-
13
-
-
75649091237
-
-
Center to Protect Workers' Rights. "." http://www.cpwr.com/ research-cranereport.html (Jan. 19, 2014)
-
Center to Protect Workers' Rights. (2009). " Crane-related deaths in construction and recommendations for their prevention." http://www.cpwr.com/research-cranereport.html (Jan. 19, 2014).
-
(2009)
Crane-related Deaths in Construction and Recommendations for Their Prevention
-
-
-
14
-
-
0028532881
-
Recognition of parameterized objects from 3D data: A parallel implementation
-
0262-8856 10.1016/0262-8856(94)90011-6
-
Chenavier, F., Reid, I., and, Brady, M. (1994). " Recognition of parameterized objects from 3D data: A parallel implementation." Image Visual. Comput., 12 (9), 573-582. 0262-8856 10.1016/0262-8856(94)90011-6
-
(1994)
Image Visual. Comput.
, vol.12
, Issue.9
, pp. 573-582
-
-
Chenavier, F.1
Reid, I.2
Brady, M.3
-
15
-
-
80053648019
-
Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments
-
AUCOES 0926-5805 10.1016/j.autcon.2011.05.001
-
Cheng, T., Venugopal, M., Teizer, J., and, Vela, P. A. (2011). " Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments." Automat. Constr., 20 (8), 1173-1184. AUCOES 0926-5805 10.1016/j.autcon.2011.05.001
-
(2011)
Automat. Constr.
, vol.20
, Issue.8
, pp. 1173-1184
-
-
Cheng, T.1
Venugopal, M.2
Teizer, J.3
Vela, P.A.4
-
16
-
-
84866254083
-
Comparison of image-based and time-of-flight-based technologies for 3D reconstruction of infrastructure
-
Dai, F., Rashidi, A., Brilakis, I., and, Vela, P. A. (2012). " Comparison of image-based and time-of-flight-based technologies for 3D reconstruction of infrastructure." Proc., Construction Research Congress, ASCE, Reston, VA, 929-939.
-
(2012)
Proc. Construction Research Congress, ASCE, Reston, VA
, pp. 929-939
-
-
Dai, F.1
Rashidi, A.2
Brilakis, I.3
Vela, P.A.4
-
17
-
-
34147149759
-
3D laser scanning and GPS technology for landslide earthwork volume estimation
-
AUCOES 0926-5805 10.1016/j.autcon.2006.11.002
-
Du, J. C., and, Teng, H. C. (2007). " 3D laser scanning and GPS technology for landslide earthwork volume estimation." Automat. Constr., 16 (5), 657-663. AUCOES 0926-5805 10.1016/j.autcon.2006.11.002
-
(2007)
Automat. Constr.
, vol.16
, Issue.5
, pp. 657-663
-
-
Du, J.C.1
Teng, H.C.2
-
18
-
-
79960638196
-
Integrating automated data acquisition technologies for progress reporting of construction project
-
AUCOES 0926-5805 10.1016/j.autcon.2010.12.001
-
El-Omari, S., and, Moselhi, O. (2011). " Integrating automated data acquisition technologies for progress reporting of construction project." Automat. Constr., 20 (6), 699-705. AUCOES 0926-5805 10.1016/j.autcon.2010.12.001
-
(2011)
Automat. Constr.
, vol.20
, Issue.6
, pp. 699-705
-
-
El-Omari, S.1
Moselhi, O.2
-
19
-
-
85170282443
-
A density-based algorithm for discovering clusters in large spatial databases with noise
-
Palo Alto, CA
-
Ester, M., Kriegel, H. P., Sander, J., and, Xu, X. (1996). " A density-based algorithm for discovering clusters in large spatial databases with noise." Proc., Int. Conf. on Knowledge Discovery and Data Mining, Association for the Advancement of Artificial Intelligence, Palo Alto, CA, 226-231.
-
(1996)
Proc. Int. Conf. on Knowledge Discovery and Data Mining, Association for the Advancement of Artificial Intelligence
, pp. 226-231
-
-
Ester, M.1
Kriegel, H.P.2
Sander, J.3
Xu, X.4
-
20
-
-
0027556933
-
CRANIUM: Device for improving crane productivity and safety
-
Everett, J. G., and, Slocum, A. H. (1993). " CRANIUM: Device for improving crane productivity and safety." J. Constr. Eng. Manage.
-
(1993)
J. Constr. Eng. Manage
-
-
Everett, J.G.1
Slocum, A.H.2
-
21
-
-
80053650754
-
Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques
-
AUCOES 0926-5805 10.1016/j.autcon.2011.04.016
-
Golparvar-Fard, M., Bohn, J., Teizer, J., Savarese, S., and, Peña-Mora, F. (2011). " Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques." Automat. Constr., 20 (8), 1143-1155. AUCOES 0926-5805 10.1016/j.autcon.2011.04.016
-
(2011)
Automat. Constr.
, vol.20
, Issue.8
, pp. 1143-1155
-
-
Golparvar-Fard, M.1
Bohn, J.2
Teizer, J.3
Savarese, S.4
Peña-Mora, F.5
-
22
-
-
40649110285
-
Data processing for real-time construction site spatial modeling
-
AUCOES 0926-5805 10.1016/j.autcon.2007.09.002
-
Gong, J., and, Caldas, C. H. (2008). " Data processing for real-time construction site spatial modeling." Automat. Constr., 17 (5), 526-535. AUCOES 0926-5805 10.1016/j.autcon.2007.09.002
-
(2008)
Automat. Constr.
, vol.17
, Issue.5
, pp. 526-535
-
-
Gong, J.1
Caldas, C.H.2
-
23
-
-
0027626212
-
Crane accidents and their prevention revisited
-
SSCIEO 0925-7535 10.1016/0925-7535(93)90049-J
-
Häkkinen, K. (1993). " Crane accidents and their prevention revisited." Safety Sci., 16 (3-4), 267-277. SSCIEO 0925-7535 10.1016/0925-7535(93)90049-J
-
(1993)
Safety Sci.
, vol.16
, Issue.34
, pp. 267-277
-
-
Häkkinen, K.1
-
24
-
-
84899001900
-
Why every pick needs a plan
-
ENREAU 0013-807X
-
Hampton, T. V. (2012). " Why every pick needs a plan." Eng. News-Rec., 269 (4), 8-9. ENREAU 0013-807X
-
(2012)
Eng. News-Rec.
, vol.269
, Issue.4
, pp. 8-9
-
-
Hampton, T.V.1
-
26
-
-
79957509563
-
Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming
-
AUCOES 0926-5805 10.1016/j.autcon.2010.11.023
-
Huang, C., Wang, C. K., and, Tam, C. M. (2011). " Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming." Automat. Constr., 20 (5), 571-580. AUCOES 0926-5805 10.1016/j.autcon.2010.11.023
-
(2011)
Automat. Constr.
, vol.20
, Issue.5
, pp. 571-580
-
-
Huang, C.1
Wang, C.K.2
Tam, C.M.3
-
27
-
-
84857373763
-
Ultra-wide band technology experiments for real-time prevention of tower crane collision
-
AUCOES 0926-5805 10.1016/j.autcon.2011.11.015
-
Hwang, S. (2012). " Ultra-wide band technology experiments for real-time prevention of tower crane collision." Automat. Constr., 22 (1), 545-553. AUCOES 0926-5805 10.1016/j.autcon.2011.11.015
-
(2012)
Automat. Constr.
, vol.22
, Issue.1
, pp. 545-553
-
-
Hwang, S.1
-
28
-
-
84898961561
-
Earth-moving machinery-Operator's field of view-Test method and performance criteria
-
ISO. Geneva
-
ISO. (2006). " Earth-moving machinery-Operator's field of view-Test method and performance criteria." ISO 5006, Geneva.
-
(2006)
ISO 5006
-
-
-
29
-
-
0032685832
-
Using spin images for efficient object recognition in clustered 3D scenes
-
ITPIDJ 0162-8828 10.1109/34.765655
-
Johnson, A. E., and, Hebert, M. (1999). " Using spin images for efficient object recognition in clustered 3D scenes." IEEE Trans. Pattern Anal. Mach. Intell., 21 (5), 433-449. ITPIDJ 0162-8828 10.1109/34.765655
-
(1999)
IEEE Trans. Pattern Anal. Mach. Intell.
, vol.21
, Issue.5
, pp. 433-449
-
-
Johnson, A.E.1
Hebert, M.2
-
30
-
-
70350060196
-
Three-dimensional simulation and visualization of crane assisted construction erection processes
-
Kang, S. C., Chi, H. L., and, Miranda, E. (2009). " Three-dimensional simulation and visualization of crane assisted construction erection processes." J. Comput. Civ. Eng.
-
(2009)
J. Comput. Civ. Eng
-
-
Kang, S.C.1
Chi, H.L.2
Miranda, E.3
-
31
-
-
33748310378
-
Ultrahigh-precision GPS positioning and navigation gantry crane auto-steering
-
Kim, D. H., and, Langley, R. B. (2003). " Ultrahigh-precision GPS positioning and navigation gantry crane auto-steering." GIM Int., 17 (10), 48-51.
-
(2003)
GIM Int.
, vol.17
, Issue.10
, pp. 48-51
-
-
Kim, D.H.1
Langley, R.B.2
-
32
-
-
16444382403
-
Automated quality assessment of stone aggregate based on laser imaging and a neural network
-
Kim, H., Rauch, A. F., and, Haas, C. T. (2004). " Automated quality assessment of stone aggregate based on laser imaging and a neural network." J. Comput. Civ. Eng.
-
(2004)
J. Comput. Civ. Eng
-
-
Kim, H.1
Rauch, A.F.2
Haas, C.T.3
-
33
-
-
42949120546
-
Technological assessment and process implications of field data capture technologies for construction and facility infrastructure management
-
1874-4753
-
Kiziltas, S., Akinci, B., Ergen, E., Tang, P., and, Gordon, C. (2008). " Technological assessment and process implications of field data capture technologies for construction and facility infrastructure management." ITcon, Special Issue Sensors in Constr. Infrastruc. Manage., 13, 134-154. 1874-4753
-
(2008)
ITcon, Special Issue Sensors in Constr. Infrastruc. Manage.
, vol.13
, pp. 134-154
-
-
Kiziltas, S.1
Akinci, B.2
Ergen, E.3
Tang, P.4
Gordon, C.5
-
34
-
-
84862125657
-
A BIM- and sensor-based tower crane navigation system for blind lifts
-
AUCOES 0926-5805 10.1016/j.autcon.2012.05.002
-
Lee, G., and et al. (2012). " A BIM- and sensor-based tower crane navigation system for blind lifts." Automat. Constr., 26 (1), 1-10. AUCOES 0926-5805 10.1016/j.autcon.2012.05.002
-
(2012)
Automat. Constr.
, vol.26
, Issue.1
, pp. 1-10
-
-
Lee, G.1
-
35
-
-
33748300746
-
Improving tower crane productivity using wireless technology
-
CCIEFR 1093-9687 10.1111/mice.2006.21.issue-8
-
Lee, U. K., Kang, K. I., Kim, G. H., and, Cho, H. H., (2006). " Improving tower crane productivity using wireless technology." Comput. Aided Civ. Infrastruct. Eng., 21 (8), 594-604. CCIEFR 1093-9687 10.1111/mice.2006.21.issue-8
-
(2006)
Comput. Aided Civ. Infrastruct. Eng.
, vol.21
, Issue.8
, pp. 594-604
-
-
Lee, U.K.1
Kang, K.I.2
Kim, G.H.3
Cho, H.H.4
-
36
-
-
84878350089
-
Multiuser virtual safety training system for tower crane dismantlement
-
10.1061/(ASCE)CP.1943-5487.0000170, 0887-3801
-
Li, H., Chan, G., and, Skitmore, M. (2012). " Multiuser virtual safety training system for tower crane dismantlement." J. Comput. Civ. Eng., 10.1061/(ASCE)CP.1943-5487.0000170, 638-647. 0887-3801
-
(2012)
J. Comput. Civ. Eng.
, pp. 638-647
-
-
Li, H.1
Chan, G.2
Skitmore, M.3
-
37
-
-
84863714851
-
Integrating field data and 3D simulation for tower crane activity monitoring and alarming
-
AUCOES 0926-5805 10.1016/j.autcon.2012.05.003
-
Li, Y., and, Liu, C. (2012). " Integrating field data and 3D simulation for tower crane activity monitoring and alarming." Automat. Constr., 27 (1), 111-119. AUCOES 0926-5805 10.1016/j.autcon.2012.05.003
-
(2012)
Automat. Constr.
, vol.27
, Issue.1
, pp. 111-119
-
-
Li, Y.1
Liu, C.2
-
38
-
-
84863750303
-
Simulation of construction processes considering spatial constraints of crane operations
-
W. Tizani, ed. Nottingham University Press, Nottingham, U.K
-
Marx, A., Erlemann, K., and, Koonig, M. (2010). " Simulation of construction processes considering spatial constraints of crane operations." Proc., Int. Conf. on Computing in Civil and Building Engineering, W. Tizani., ed., Nottingham University Press, Nottingham, U.K., 1-6.
-
(2010)
Proc. Int. Conf. on Computing in Civil and Building Engineering
, pp. 1-6
-
-
Marx, A.1
Erlemann, K.2
Koonig, M.3
-
39
-
-
84899022832
-
-
Nationwide Crane Training. (Jan. 19, 2014)
-
Nationwide Crane Training. (2009). " Qualifying rigger/signal person training." http://www.nationwidecranetraining.com/post/qualifying-rigger- signalperson-training (Jan. 19, 2014).
-
(2009)
Qualifying Rigger/signal Person Training
-
-
-
40
-
-
0035672055
-
A review of crane safety in the construction industry
-
1047-322X 10.1080/10473220127411
-
Neitzel, R. L., Seixas, N. S., and, Ren, K. K. (2001). " A review of crane safety in the construction industry." J. Appl. Occup. Environ. Hyg., 16 (12), 1106-1117. 1047-322X 10.1080/10473220127411
-
(2001)
J. Appl. Occup. Environ. Hyg.
, vol.16
, Issue.12
, pp. 1106-1117
-
-
Neitzel, R.L.1
Seixas, N.S.2
Ren, K.K.3
-
41
-
-
70350053404
-
Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction
-
10.1061/(ASCE)CO.1943-7862.0000101
-
Park, T., Kim, M. K., Kim, C., and, Kim, H. (2009). " Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction." J. Constr. Eng. Manage, 10.1061/(ASCE)CO.1943-7862.0000101, 1261-1270.
-
(2009)
J. Constr. Eng. Manage
, pp. 1261-1270
-
-
Park, T.1
Kim, M.K.2
Kim, C.3
Kim, H.4
-
42
-
-
0004176045
-
-
McGraw-Hill, New York
-
Peurifoy, R. L., and, Schexnayder, C. J. (2002). Construction planning, equipment, and methods, McGraw-Hill, New York.
-
(2002)
Construction Planning, Equipment, and Methods
-
-
Peurifoy, R.L.1
Schexnayder, C.J.2
-
43
-
-
83555173546
-
Coarse head pose estimation of construction equipment operators to formulate dynamic blind spots
-
1474-0346 10.1016/j.aei.2011.09.005
-
Ray, J. S., and, Teizer, J. (2012). " Coarse head pose estimation of construction equipment operators to formulate dynamic blind spots." Adv. Eng. Inform., 26 (1), 117-130. 1474-0346 10.1016/j.aei.2011.09.005
-
(2012)
Adv. Eng. Inform.
, vol.26
, Issue.1
, pp. 117-130
-
-
Ray, J.S.1
Teizer, J.2
-
45
-
-
0029323168
-
Automation of existing cranes: From concept to prototype
-
AUCOES 0926-5805 10.1016/0926-5805(94)00040-T
-
Rosenfeld, Y. (1995). " Automation of existing cranes: From concept to prototype." Automat. Constr., 4 (2), 125-138. AUCOES 0926-5805 10.1016/0926-5805(94)00040-T
-
(1995)
Automat. Constr.
, vol.4
, Issue.2
, pp. 125-138
-
-
Rosenfeld, Y.1
-
46
-
-
0032070691
-
Automation of existing tower cranes: Economic and technological feasibility
-
AUCOES 0926-5805 10.1016/S0926-5805(98)00049-1
-
Rosenfeld, Y., and, Shapira, A. (1998). " Automation of existing tower cranes: Economic and technological feasibility." Automat. Constr., 7 (4), 285-298. AUCOES 0926-5805 10.1016/S0926-5805(98)00049-1
-
(1998)
Automat. Constr.
, vol.7
, Issue.4
, pp. 285-298
-
-
Rosenfeld, Y.1
Shapira, A.2
-
47
-
-
70349850503
-
An investigation of lifting operations on UK construction sites
-
SSCIEO 0925-7535 10.1016/j.ssci.2009.06.001
-
Sertyesilisik, B., Tunstall, A., and, McLouglin, J. (2010). " An investigation of lifting operations on UK construction sites." Safety Sci., 48 (1), 72-79. SSCIEO 0925-7535 10.1016/j.ssci.2009.06.001
-
(2010)
Safety Sci.
, vol.48
, Issue.1
, pp. 72-79
-
-
Sertyesilisik, B.1
Tunstall, A.2
McLouglin, J.3
-
49
-
-
62549085613
-
AHP-based weighting of factors affecting safety on construction sites with tower cranes
-
(a). "."
-
Shapira, A., and, Simcha, M. (2009 a). " AHP-based weighting of factors affecting safety on construction sites with tower cranes." J. Constr. Eng. Manage.
-
(2009)
J. Constr. Eng. Manage
-
-
Shapira, A.1
Simcha, M.2
-
50
-
-
70349324677
-
Measurement and risk scales of crane-related safety factors on construction sites
-
(b). "."
-
Shapira, A., and, Simcha, M. (2009 b). " Measurement and risk scales of crane-related safety factors on construction sites." J. Constr. Eng. Manage.
-
(2009)
J. Constr. Eng. Manage
-
-
Shapira, A.1
Simcha, M.2
-
51
-
-
0039699670
-
-
3rd Ed. McGraw-Hill, New York
-
Shapiro, H. I., Shapiro, J. P., and, Shapiro, L. K. (2000). Cranes and derricks, 3rd Ed., McGraw-Hill, New York.
-
(2000)
Cranes and Derricks
-
-
Shapiro, H.I.1
Shapiro, J.P.2
Shapiro, L.K.3
-
52
-
-
78049432825
-
Tower crane safety in the construction industry: A Hong Kong study
-
SSCIEO 0925-7535 10.1016/j.ssci.2010.08.001
-
Tam, V. W. Y., and, Fung, I. W. H. (2011). " Tower crane safety in the construction industry: A Hong Kong study." Safety Sci., 49 (2), 208-215. SSCIEO 0925-7535 10.1016/j.ssci.2010.08.001
-
(2011)
Safety Sci.
, vol.49
, Issue.2
, pp. 208-215
-
-
Tam, V.W.Y.1
Fung, I.W.H.2
-
53
-
-
25144439604
-
-
1st Ed. Pearson Addison Wesley, Boston
-
Tan, P.-N., Steinbach, M., and, Kumar, V. (2005). Introduction to data mining, 1st Ed., Pearson Addison Wesley, Boston.
-
(2005)
Introduction to Data Mining
-
-
Tan, P.-N.1
Steinbach, M.2
Kumar, V.3
-
54
-
-
70349433529
-
Quantification of edge loss of laser scanned data at spatial discontinuities
-
AUCOES 0926-5805 10.1016/j.autcon.2009.07.001
-
Tang, P., Akinci, B., and, Huber, D. (2009). " Quantification of edge loss of laser scanned data at spatial discontinuities." Automat. Constr., 18 (8), 1070-1083. AUCOES 0926-5805 10.1016/j.autcon.2009.07.001
-
(2009)
Automat. Constr.
, vol.18
, Issue.8
, pp. 1070-1083
-
-
Tang, P.1
Akinci, B.2
Huber, D.3
-
55
-
-
77950867082
-
Automating the blind spot measurement of construction equipment
-
AUCOES 0926-5805 10.1016/j.autcon.2009.12.012
-
Teizer, J., Allread, B. S., and, Mantripragada, U. (2010). " Automating the blind spot measurement of construction equipment." Automat. Constr., 19 (4), 491-501. AUCOES 0926-5805 10.1016/j.autcon.2009.12.012
-
(2010)
Automat. Constr.
, vol.19
, Issue.4
, pp. 491-501
-
-
Teizer, J.1
Allread, B.S.2
Mantripragada, U.3
-
56
-
-
35348874797
-
Real-time three-dimensional occupancy grid modeling for the detecting and tracking of construction resources
-
Teizer, J., Caldas, C. H., and, Hass, C. T. (2007). " Real-time three-dimensional occupancy grid modeling for the detecting and tracking of construction resources." J. Constr. Eng. Manage.
-
(2007)
J. Constr. Eng. Manage
-
-
Teizer, J.1
Caldas, C.H.2
Hass, C.T.3
-
57
-
-
35448929100
-
Applications for real-time 3D modeling in transportation construction
-
ASCE, Reston, VA
-
Teizer, J., Haas, C. T., Caldas, C. H., and, Bosche, F. (2006). " Applications for real-time 3D modeling in transportation construction." Proc., Int. Conf. on Applications of Advanced Technology in Transportation, ASCE, Reston, VA, 123-128.
-
(2006)
Proc. Int. Conf. on Applications of Advanced Technology in Transportation
, pp. 123-128
-
-
Teizer, J.1
Haas, C.T.2
Caldas, C.H.3
Bosche, F.4
-
58
-
-
61349190359
-
-
Transportation Research Record 2081, Transportation Research Board, Washington, DC
-
Teizer, J., Venugopal, M., and, Walia, A. (2008). " Ultra wideband for automated real-time three-dimensional location sensing for workforce, equipment, and material positioning and tracking." Transportation Research Record 2081, Transportation Research Board, Washington, DC, 56-64.
-
(2008)
Ultra Wideband for Automated Real-time Three-dimensional Location Sensing for Workforce, Equipment, and Material Positioning and Tracking
, pp. 56-64
-
-
Teizer, J.1
Venugopal, M.2
Walia, A.3
-
59
-
-
85114491332
-
Post-processing of scanned 3D surface data
-
New York
-
Weyrich, T., Pauly, M., Keiser, R., Hinzle, S., Scandella, S., and, Gross, M. (2004). " Post-processing of scanned 3D surface data." Proc., IEEE Eurographics Symp. on Point-Based Graphics, New York, 85-94.
-
(2004)
Proc. IEEE Eurographics Symp. on Point-Based Graphics
, pp. 85-94
-
-
Weyrich, T.1
Pauly, M.2
Keiser, R.3
Hinzle, S.4
Scandella, S.5
Gross, M.6
-
60
-
-
0033101167
-
Location optimization for a group of tower cranes
-
Zhang, P., Harris, F. C., Olomolaiye, P. O., and, Holt, G. D. (1999). " Location optimization for a group of tower cranes." J. Constr. Eng. Manage.
-
(1999)
J. Constr. Eng. Manage
-
-
Zhang, P.1
Harris, F.C.2
Olomolaiye, P.O.3
Holt, G.D.4
-
61
-
-
84869092675
-
Building information modeling (BIM) and safety: Automatic safety checking of construction models and schedules
-
AUCOES 0926-5805
-
Zhang, S., Teizer, J., Lee, J.-K., Eastman, C. M., and, Venugopal, M. (2013). " Building information modeling (BIM) and safety: Automatic safety checking of construction models and schedules." Automat. Constr., 29 (1), 183-195. AUCOES 0926-5805
-
(2013)
Automat. Constr.
, vol.29
, Issue.1
, pp. 183-195
-
-
Zhang, S.1
Teizer, J.2
Lee, J.-K.3
Eastman, C.M.4
Venugopal, M.5
-
62
-
-
77953842350
-
Pointshop 3D: An interactive system for point-based surface editing
-
ATGRDF 0730-0301 10.1145/566654.566584
-
Zwicker, M., Pauly, M., and, Gross, M. (2002). " Pointshop 3D: An interactive system for point-based surface editing." ACM Trans. Graphics, 21 (3), 322-329. ATGRDF 0730-0301 10.1145/566654.566584
-
(2002)
ACM Trans. Graphics
, vol.21
, Issue.3
, pp. 322-329
-
-
Zwicker, M.1
Pauly, M.2
Gross, M.3
|