-
2
-
-
0035255381
-
An algorithm for the implementation of safety improvement programs
-
Cagno, E., Giulio, A. D., and Trucco, P. (2001). " An algorithm for the implementation of safety improvement programs.. " Safety Sci., 37, 59-75.
-
(2001)
Safety Sci.
, vol.37
, pp. 59-75
-
-
Cagno, E.1
Giulio, A.D.2
Trucco, P.3
-
3
-
-
0032593172
-
Addressing construction worker safety in the design phase-designing for construction worker safety
-
Gambatese, J., and Hinze, J. (1999). " Addressing construction worker safety in the design phase-designing for construction worker safety.. " Autom. Constr., 8, 643-649.
-
(1999)
Autom. Constr.
, vol.8
, pp. 643-649
-
-
Gambatese, J.1
Hinze, J.2
-
4
-
-
18844379643
-
The quality of accident and health data in the construction industry: Interviews with senior managers
-
Gyi, D. E., Gibb, A. G. F., and Haslam, R. A. (1999). " The quality of accident and health data in the construction industry: Interviews with senior managers.. " Constr. Manage. Econom., 17, 197-204.
-
(1999)
Constr. Manage. Econom.
, vol.17
, pp. 197-204
-
-
Gyi, D.E.1
Gibb, A.G.F.2
Haslam, R.A.3
-
5
-
-
0036680235
-
Integration of virtually reality construction models and design for a safety-process database
-
Hadikusumo, B. H. W., and Rowlinson, S. (2002). " Integration of virtually reality construction models and design for a safety-process database.. " Autom. Constr., 11, 501-509.
-
(2002)
Autom. Constr.
, vol.11
, pp. 501-509
-
-
Hadikusumo, B.H.W.1
Rowlinson, S.2
-
6
-
-
13944256610
-
Analysis of construction worker fall accidents
-
Huang, X., and Hinze, J. (2003). " Analysis of construction worker fall accidents.. " J. Constr. Eng. Manage., 129 (3), 262-271.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.3
, pp. 262-271
-
-
Huang, X.1
Hinze, J.2
-
7
-
-
0000575151
-
Integrating safety and health performance into construction
-
Kartam, N. A. (1997). " Integrating safety and health performance into construction.. " J. Constr. Eng. Manage., 123 (2), 121-126.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.2
, pp. 121-126
-
-
Kartam, N.A.1
-
8
-
-
0032199670
-
Fatalities and injuries in the Kuwaiti construction industry
-
Kartam, N. A., and Bouz, R. G. (1998). " Fatalities and injuries in the Kuwaiti construction industry.. " Accid. Anal Prev., 30 (6), 805-814.
-
(1998)
Accid. Anal Prev.
, vol.30
, Issue.6
, pp. 805-814
-
-
Kartam, N.A.1
Bouz, R.G.2
-
9
-
-
0034578989
-
Construction safety in Kuwait: Issues, procedures, problems, and recommendations
-
Kartam, N. A., Flood, I., and Koushki, P. (2000). " Construction safety in Kuwait: Issues, procedures, problems, and recommendations.. " Safety Sci., 36, 163-184.
-
(2000)
Safety Sci.
, vol.36
, pp. 163-184
-
-
Kartam, N.A.1
Flood, I.2
Koushki, P.3
-
10
-
-
33646735089
-
-
Korea Occupational Safety and Health Agency (KOSHA).
-
Korea Occupational Safety and Health Agency (KOSHA). (2003). " Industrial accident report.. " Rep. submitted to Ministry of Labour, 2001-2003, Korea.
-
(2003)
Industrial Accident Report
-
-
-
11
-
-
84993035258
-
Safety behaviour and safety management: Its influence on the attitudes of workers in the UK construction industry
-
Langford, D., Rowlinson, S., and Sawacha, E. (2000). " Safety behaviour and safety management: Its influence on the attitudes of workers in the UK construction industry.. " Eng., Constr., Archit. Manage., 7 (2), 133-140.
-
(2000)
Eng., Constr., Archit. Manage.
, vol.7
, Issue.2
, pp. 133-140
-
-
Langford, D.1
Rowlinson, S.2
Sawacha, E.3
-
12
-
-
0033237285
-
Empirical investigation of construction safety management activities and performance in Australia
-
Mohamed, S. (1999). " Empirical investigation of construction safety management activities and performance in Australia.. " Safety Sci., 33, 129-142.
-
(1999)
Safety Sci.
, vol.33
, pp. 129-142
-
-
Mohamed, S.1
-
14
-
-
0027866760
-
Scheduling of repetitive projects with cost optimization
-
Moselhi, O., and El-Rayes, K. (1993). " Scheduling of repetitive projects with cost optimization.. " J. Constr. Eng. Manage., 119 (4), 681-697.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.4
, pp. 681-697
-
-
Moselhi, O.1
El-Rayes, K.2
-
15
-
-
1842842991
-
Safety and production: An integrated planning and control model
-
Saurin, T. A., Formoso, C. T., and Guimaraes, L. B. M. (2004). " Safety and production: An integrated planning and control model.. " Constr. Manage. Econom., 22 (2), 159-169.
-
(2004)
Constr. Manage. Econom.
, vol.22
, Issue.2
, pp. 159-169
-
-
Saurin, T.A.1
Formoso, C.T.2
Guimaraes, L.B.M.3
-
16
-
-
0032649287
-
Factors affecting safety performance on construction sites
-
Sawacha, E., Naoum, S., and Fong, D. (1999). " Factors affecting safety performance on construction sites.. " Int. J. Proj. Manage., 17 (5), 309-315.
-
(1999)
Int. J. Proj. Manage.
, vol.17
, Issue.5
, pp. 309-315
-
-
Sawacha, E.1
Naoum, S.2
Fong, D.3
-
17
-
-
0035391255
-
Development of causal model of construction accident causation
-
Suraji, A., Duff, A. R., and Peckitt, S. J. (2001). " Development of causal model of construction accident causation.. " J. Constr. Eng. Manage., 127 (4), 337-344.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.4
, pp. 337-344
-
-
Suraji, A.1
Duff, A.R.2
Peckitt, S.J.3
-
18
-
-
0036568542
-
Non-structural fuzzy decision support systems for the evaluation of construction safety management systems
-
Tam, C. M., Tong, T. K. L., Chiu, G. C. W., and Fung, I. W. H. (2002). " Non-structural fuzzy decision support systems for the evaluation of construction safety management systems.. " Int. J. Proj. Manage., 20, 303-313.
-
(2002)
Int. J. Proj. Manage.
, vol.20
, pp. 303-313
-
-
Tam, C.M.1
Tong, T.K.L.2
Chiu, G.C.W.3
Fung, I.W.H.4
-
19
-
-
0006138041
-
Controlling activity interval times in LOB scheduling
-
Wang, C., and Huang, Y. (1998). " Controlling activity interval times in LOB scheduling.. " Constr. Manage. Econom., 16 (1), 5-16.
-
(1998)
Constr. Manage. Econom.
, vol.16
, Issue.1
, pp. 5-16
-
-
Wang, C.1
Huang, Y.2
|