메뉴 건너뛰기




Volumn 34, Issue , 2013, Pages 45-55

Development of web-based system for safety risk early warning in urban metro construction

Author keywords

Data fusion; Early warning; Safety risk; Urban metro construction; Web based system

Indexed keywords

DEVELOPMENT AND APPLICATIONS; EARLY WARNING; INFRASTRUCTURE INVESTMENT; METRO CONSTRUCTION; MULTI-SOURCE INFORMATIONS; SAFETY RISK ASSESSMENTS; SAFETY RISKS; WEB-BASED SYSTEM;

EID: 84878586886     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2012.11.001     Document Type: Article
Times cited : (131)

References (31)
  • 1
    • 13944282970 scopus 로고    scopus 로고
    • Risk assessment methodology for underground construction projects
    • DOI 10.1061/(ASCE)0733-9364(2004)130:2(258)
    • H.H. Choi, H.N. Cho, and J.W. Seo Risk assessment methodology for underground construction projects Journal of Construction Engineering and Management-ASCE 130 2 2004 258 272 (Pubitemid 40265393)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.2 , pp. 258-272
    • Choi, H.-H.1    Cho, H.-N.2    Seo, J.W.3
  • 2
    • 0036605009 scopus 로고    scopus 로고
    • Computer-aided DSS for safety monitoring of geotechnical construction
    • DOI 10.1016/S0926-5805(01)00059-0, PII S0926580501000590
    • M.-Y. Cheng, C.-H. Ko, and C.-H. Chang Computer-aided DSS for safety monitoring of geotechnical construction Automation in Construction 11 4 2002 375 390 (Pubitemid 34435108)
    • (2002) Automation in Construction , vol.11 , Issue.4 , pp. 375-390
    • Cheng, M.-Y.1    Ko, C.-H.2    Chang, C.-H.3
  • 3
    • 20844433900 scopus 로고    scopus 로고
    • Structural health monitoring of underground facilities - Technological issues and challenges
    • DOI 10.1016/j.tust.2005.03.003, PII S0886779805000234
    • S. Bhalla, Y.W. Yang, J. Zhao, and C.K. Soh Structural health monitoring of underground facilities - technological issues and challenges Tunnelling and Underground Space Technology 20 5 2005 487 500 (Pubitemid 40864783)
    • (2005) Tunnelling and Underground Space Technology , vol.20 , Issue.5 , pp. 487-500
    • Bhalla, S.1    Yang, Y.W.2    Zhao, J.3    Soh, C.K.4
  • 5
    • 30044451095 scopus 로고    scopus 로고
    • IT-based tunnelling risk management system (IT-TURISK) - Development and implementation
    • DOI 10.1016/j.tust.2005.05.002, PII S0886779805000532
    • C. Yoo, Y.-W. Jeon, and B.-S. Choi IT-based tunnelling risk management system (IT-TURISK) - development and implementation Tunnelling and Underground Space Technology 21 2 2006 190 202 (Pubitemid 43045953)
    • (2006) Tunnelling and Underground Space Technology , vol.21 , Issue.2 , pp. 190-202
    • Yoo, C.1    Jeon, Y.-W.2    Choi, B.-S.3
  • 6
    • 30044445993 scopus 로고    scopus 로고
    • Artificial neural networks for predicting the maximum surface settlement caused by EPB shield tunneling
    • DOI 10.1016/j.tust.2005.06.007, PII S0886779805000568
    • S. Suwansawat, and H.H. Einstein Artificial neural networks for predicting the maximum surface settlement caused by EPB shield tunneling Tunnelling and Underground Space Technology 21 2 2006 133 150 (Pubitemid 43045947)
    • (2006) Tunnelling and Underground Space Technology , vol.21 , Issue.2 , pp. 133-150
    • Suwansawat, S.1    Einstein, H.H.2
  • 7
    • 78650017773 scopus 로고    scopus 로고
    • A dam assessment support system based on physical measurements, sensory evaluations and expert judgements
    • C. Curt, A. Talon, and G. Mauris A dam assessment support system based on physical measurements, sensory evaluations and expert judgements Measurement 44 1 2010 192 201
    • (2010) Measurement , vol.44 , Issue.1 , pp. 192-201
    • Curt, C.1    Talon, A.2    Mauris, G.3
  • 8
    • 37249022845 scopus 로고    scopus 로고
    • Risk-based safety impact assessment methodology for underground construction projects in Korea
    • DOI 10.1061/(ASCE)0733-9364(2008)134:1(72)
    • J.W. Seo, and H.H. Choi Risk-based safety impact assessment methodology for underground construction projects in Korea Journal of Construction Engineering and Management-Asce 134 1 2008 72 81 (Pubitemid 350265380)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.1 , pp. 72-81
    • Seo, J.W.1    Choi, H.H.2
  • 9
    • 37249022830 scopus 로고    scopus 로고
    • Safety risk identification and assessment for Beijing olympic Venues construction
    • DOI 10.1061/(ASCE)0742-597X(2008)24:1(40)
    • Y. Sun, D.P. Fang, S.Q. Wang, M.D. Dai, and X.Q. Lv Safety risk identification and assessment for Beijing Olympic venues construction Journal of Management in Engineering 24 1 2008 40 47 (Pubitemid 350274459)
    • (2008) Journal of Management in Engineering , vol.24 , Issue.1 , pp. 40-47
    • Sun, Y.1    Fang, D.2    Wang, S.3    Dai, M.4    Lv, X.5
  • 10
    • 61449227351 scopus 로고    scopus 로고
    • Quantitative risk evaluation based on event tree analysis technique: Application to the design of shield TBM
    • E.-S. Hong, I.-M. Lee, H.-S. Shin, S.-W. Nam, and J.-S. Kong Quantitative risk evaluation based on event tree analysis technique: application to the design of shield TBM Tunnelling and Underground Space Technology 24 3 2009 269 277
    • (2009) Tunnelling and Underground Space Technology , vol.24 , Issue.3 , pp. 269-277
    • Hong, E.-S.1    Lee, I.-M.2    Shin, H.-S.3    Nam, S.-W.4    Kong, J.-S.5
  • 12
    • 33644667825 scopus 로고    scopus 로고
    • Simulation-based safety evaluation model integrated with network schedule
    • DOI 10.1016/j.autcon.2005.06.015, PII S0926580505000804
    • W.-C. Wang, J.-J. Liu, and S.-C. Chou Simulation-based safety evaluation model integrated with network schedule Automation in Construction 15 3 2006 341 354 (Pubitemid 43332717)
    • (2006) Automation in Construction , vol.15 , Issue.3 , pp. 341-354
    • Wang, W.-C.1    Liu, J.-J.2    Chou, S.-C.3
  • 13
    • 78650351818 scopus 로고    scopus 로고
    • New method for measuring the safety risk of construction activities: Task demand assessment
    • M. Panagiotis, and N. Manoj New Method for Measuring the Safety Risk of Construction Activities: Task Demand Assessment Journal of Construction Engineering and Management 137 1 2011 30 38
    • (2011) Journal of Construction Engineering and Management , vol.137 , Issue.1 , pp. 30-38
    • Panagiotis, M.1    Manoj, N.2
  • 14
    • 81355149858 scopus 로고    scopus 로고
    • Using nD technology to develop an integrated construction management system for city rail transit construction
    • L.Y. Ding, Y. Zhou, H.B. Luo, and X.G. Wu Using nD technology to develop an integrated construction management system for city rail transit construction Automation in Construction 21 2012 64 73
    • (2012) Automation in Construction , vol.21 , pp. 64-73
    • Ding, L.Y.1    Zhou, Y.2    Luo, H.B.3    Wu, X.G.4
  • 15
    • 53449102190 scopus 로고    scopus 로고
    • A blueprint for higher-level fusion systems
    • D.A. Lambert A blueprint for higher-level fusion systems Information Fusion 10 1 2009 6 24
    • (2009) Information Fusion , vol.10 , Issue.1 , pp. 6-24
    • Lambert, D.A.1
  • 16
    • 77950922575 scopus 로고    scopus 로고
    • Development of an optimized condition-based maintenance system by data fusion and reliability-centered maintenance
    • G. Niu, B.-S. Yang, and M. Pecht Development of an optimized condition-based maintenance system by data fusion and reliability-centered maintenance Reliability Engineering & System Safety 95 7 2010 786 796
    • (2010) Reliability Engineering & System Safety , vol.95 , Issue.7 , pp. 786-796
    • Niu, G.1    Yang, B.-S.2    Pecht, M.3
  • 17
    • 84878553700 scopus 로고    scopus 로고
    • A reliability based hybrid data fusion method for adaptive location estimation in construction
    • N.R. Saiedeh, and T.H. Carl A Reliability Based Hybrid Data Fusion Method for Adaptive Location Estimation in Construction Journal of Computing in Civil Engineering 1 1 2011 69
    • (2011) Journal of Computing in Civil Engineering , vol.1 , Issue.1 , pp. 69
    • Saiedeh, N.R.1    Carl, T.H.2
  • 20
    • 54249153792 scopus 로고    scopus 로고
    • Construction project risk assessment using existing database and project-specific information
    • C. Hyun-Ho, and M. Sankaran Construction project risk assessment using existing database and project-specific information Journal of Construction Engineering and Management 134 11 2008 894 903
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.11 , pp. 894-903
    • Hyun-Ho, C.1    Sankaran, M.2
  • 21
    • 39549099299 scopus 로고    scopus 로고
    • Sense of sensing: From data to informed decisions for the built environment
    • D.G. Steven, and T. Anne Sense of sensing: from data to informed decisions for the built environment Journal of Infrastructure Systems 14 1 2008 4 14
    • (2008) Journal of Infrastructure Systems , vol.14 , Issue.1 , pp. 4-14
    • Steven, D.G.1    Anne, T.2
  • 22
    • 78149285142 scopus 로고    scopus 로고
    • Multisensor data fusion for on-site materials tracking in construction
    • S.N. Razavi, and C.T. Haas Multisensor data fusion for on-site materials tracking in construction Automation in Construction 19 8 2010 1037 1046
    • (2010) Automation in Construction , vol.19 , Issue.8 , pp. 1037-1046
    • Razavi, S.N.1    Haas, C.T.2
  • 24
    • 77950866186 scopus 로고    scopus 로고
    • A web-based system for sharing and disseminating research results: The underground construction case study
    • N. Forcada, M. Casals, A. Fuertes, M. Gangolells, and X. Roca A web-based system for sharing and disseminating research results: The underground construction case study Automation in Construction 19 4 2010 458 474
    • (2010) Automation in Construction , vol.19 , Issue.4 , pp. 458-474
    • Forcada, N.1    Casals, M.2    Fuertes, A.3    Gangolells, M.4    Roca, X.5
  • 25
    • 2642531957 scopus 로고    scopus 로고
    • CSHM: Web-based safety and health monitoring system for construction management
    • S.O. Cheung, K.K.W. Cheung, and H.C.H. Suen CSHM: web-based safety and health monitoring system for construction management Journal of Safety Research 35 2 2004 159 170
    • (2004) Journal of Safety Research , vol.35 , Issue.2 , pp. 159-170
    • Cheung, S.O.1    Cheung, K.K.W.2    Suen, H.C.H.3
  • 26
    • 79955776768 scopus 로고    scopus 로고
    • Wavelet Analysis for tunneling-induced ground settlement based on a stochastic model
    • L. Ding, L. Ma, H. Luo, M. Yu, and X. Wu Wavelet Analysis for tunneling-induced ground settlement based on a stochastic model Tunnelling and Underground Space Technology 26 5 2011 619 628
    • (2011) Tunnelling and Underground Space Technology , vol.26 , Issue.5 , pp. 619-628
    • Ding, L.1    Ma, L.2    Luo, H.3    Yu, M.4    Wu, X.5
  • 27
    • 0031108444 scopus 로고    scopus 로고
    • Face recognition using hybrid classifiers
    • PII S0031320396001112
    • S. Gutta, and H. Wechsler Face recognition using hybrid classifiers Pattern Recognition 30 4 1997 539 553 (Pubitemid 127419703)
    • (1997) Pattern Recognition , vol.30 , Issue.4 , pp. 539-553
    • Gutta, S.1    Wechsler, H.2
  • 28
    • 0032961082 scopus 로고    scopus 로고
    • A global learning algorithm for a RBF network
    • DOI 10.1016/S0893-6080(98)00146-4, PII S0893608098001464
    • Q. Zhu, Y. Cai, and L. Liu A global learning algorithm for a RBF network Neural Networks 12 3 1999 527 540 (Pubitemid 29236379)
    • (1999) Neural Networks , vol.12 , Issue.3 , pp. 527-540
    • Zhu, Q.1    Cai, Y.2    Liu, L.3
  • 29
    • 70449528756 scopus 로고    scopus 로고
    • Time series prediction using RBF neural networks with a nonlinear time-varying evolution PSO algorithm
    • C.-M. Lee, and C.-N. Ko Time series prediction using RBF neural networks with a nonlinear time-varying evolution PSO algorithm Neurocomputing 73 1-3 2009 449 460
    • (2009) Neurocomputing , vol.73 , Issue.13 , pp. 449-460
    • Lee, C.-M.1    Ko, C.-N.2
  • 30
    • 44549083163 scopus 로고    scopus 로고
    • Structural damage identification based on integration of information fusion and shannon entropy
    • H. Li, Y. Bao, and J. Ou Structural damage identification based on integration of information fusion and shannon entropy Mechanical Systems and Signal Processing 22 6 2008 1427 1440
    • (2008) Mechanical Systems and Signal Processing , vol.22 , Issue.6 , pp. 1427-1440
    • Li, H.1    Bao, Y.2    Ou, J.3
  • 31


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.