메뉴 건너뛰기




Volumn 31, Issue 6, 2013, Pages 596-605

Integrating real time positioning systems to improve blind lifting and loading crane operations

Author keywords

Blind lifting; crane safety; positioning system

Indexed keywords

BLIND LIFTING; CONSTRUCTION PLANTS; CRANE OPERATIONS; POSITIONING DATA; POSITIONING SYSTEM; REAL TIME POSITIONING; REAL-TIME MONITORING SYSTEMS; SAFETY MANAGEMENT;

EID: 84884289383     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446193.2012.756144     Document Type: Article
Times cited : (53)

References (43)
  • 1
    • 18144425787 scopus 로고    scopus 로고
    • Collision free path planning of cooperative crane manipulators using genetic algorithm
    • Ali, A.D.M.S., Babu, N. and Varghese, K. 2005. Collision free path planning of cooperative crane manipulators using genetic algorithm. Journal of Computing in Civil Engineering, 19 (2): 182 - 193.
    • (2005) Journal of Computing in Civil Engineering , vol.19 , Issue.2 , pp. 182-193
    • Ali, A.D.M.S.1    Babu, N.2    Varghese, K.3
  • 4
    • 69949173934 scopus 로고    scopus 로고
    • Paper presented at the IEEE 19th International Symposium on Personal, Indoor and Mobile Radio Communications, September 15-18, Paris
    • Bouet, M. and Pujolle, G. (2008) A range-free 3-D localization method for RFID tags based on virtual landmarks. Paper presented at the IEEE 19th International Symposium on Personal, Indoor and Mobile Radio Communications, September 15-18, Paris.
    • (2008) A range-free 3-D localization method for RFID tags based on virtual landmarks
    • Bouet, M.1    Pujolle, G.2
  • 5
    • 33745325795 scopus 로고    scopus 로고
    • Using global positioning system to improve materials-locating processes in industrial projects
    • Caldas, C.H., Torrent, D.G. and Haas, C.T. 2006. Using global positioning system to improve materials-locating processes in industrial projects. Journal of Construction Engineering and Management, 132 (7): 741 - 749.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.7 , pp. 741-749
    • Caldas, C.H.1    Torrent, D.G.2    Haas, C.T.3
  • 6
    • 84863765082 scopus 로고    scopus 로고
    • Paper presented at the 28th International Symposium on Automation and Robotics in Construction, Seoul, Korea, 29 June-2 July
    • Cheng, T. and Teizer, J. (2011) Crane operator visibility of ground operations. Paper presented at the 28th International Symposium on Automation and Robotics in Construction, Seoul, Korea, 29 June-2 July.
    • (2011) Crane operator visibility of ground operations
    • Cheng, T.1    Teizer, J.2
  • 7
    • 80053648019 scopus 로고    scopus 로고
    • Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments
    • Cheng, T., Venugopal, M., Teizer, J. and Vela, P.A. 2011. Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments. Automation in Construction, 20 (8): 1173 - 1184.
    • (2011) Automation in Construction , vol.20 , Issue.8 , pp. 1173-1184
    • Cheng, T.1    Venugopal, M.2    Teizer, J.3    Vela, P.A.4
  • 11
    • 73349089019 scopus 로고    scopus 로고
    • Design and first development of an automated real-time safety management system for construction site
    • Giretti, A., Carbonari, A., Naticchia, B. and De Grassi, M. 2009. Design and first development of an automated real-time safety management system for construction site. Journal of Civil Engineering and Management, 15 (4): 325 - 36.
    • (2009) Journal of Civil Engineering and Management , vol.15 , Issue.4 , pp. 325-336
    • Giretti, A.1    Carbonari, A.2    Naticchia, B.3    De Grassi, M.4
  • 12
    • 40649110285 scopus 로고    scopus 로고
    • Data processing for real-time construction site spatial modeling
    • Gong, J. and Caldas, C.H. 2008. Data processing for real-time construction site spatial modeling. Automation in Construction, 17 (5): 526 - 535.
    • (2008) Automation in Construction , vol.17 , Issue.5 , pp. 526-535
    • Gong, J.1    Caldas, C.H.2
  • 13
    • 79952186241 scopus 로고    scopus 로고
    • Visibility-related fatalities related to construction equipment
    • Hinze, J.W. and Teizer, J. 2011. Visibility-related fatalities related to construction equipment. Safety Science, 49 (5): 709 - 718.
    • (2011) Safety Science , vol.49 , Issue.5 , pp. 709-718
    • Hinze, J.W.1    Teizer, J.2
  • 14
    • 33744547057 scopus 로고    scopus 로고
    • Planning and visualization for automated robotic crane erection processes in construction
    • Kang, S. and Miranda, E. 2006. Planning and visualization for automated robotic crane erection processes in construction. Automation in Construction, 15 (4): 398 - 414.
    • (2006) Automation in Construction , vol.15 , Issue.4 , pp. 398-414
    • Kang, S.1    Miranda, E.2
  • 16
    • 33646168031 scopus 로고    scopus 로고
    • Human-assisted obstacle avoidance system using 3D workspace modeling for construction equipment operation
    • Kim, C.W., Haas, C.T., Liapi, K.A. and Caldas, C.H. 2006. Human-assisted obstacle avoidance system using 3D workspace modeling for construction equipment operation. Journal of Computing in Civil Engineering, 20 (3): 177 - 186.
    • (2006) Journal of Computing in Civil Engineering , vol.20 , Issue.3 , pp. 177-186
    • Kim, C.W.1    Haas, C.T.2    Liapi, K.A.3    Caldas, C.H.4
  • 17
    • 0347411213 scopus 로고    scopus 로고
    • Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds
    • Kwon, S.W., Bosche, F., Kim, C.W., Haas, C.T. and Liapi, K.A. 2004. Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds. Automation in Construction, 13 (1): 67 - 81.
    • (2004) Automation in Construction , vol.13 , Issue.1 , pp. 67-81
    • Kwon, S.W.1    Bosche, F.2    Kim, C.W.3    Haas, C.T.4    Liapi, K.A.5
  • 19
    • 67949119492 scopus 로고    scopus 로고
    • A study on the work efficiency improvement of tower crane operation using GPS and machine vision
    • Lee, J.H., Park, S.J., Oh, S.W. and Kim, Y.S. 2002. A study on the work efficiency improvement of tower crane operation using GPS and machine vision. Journal of Architectural Institute of Korea, 18 (11): 133 - 140.
    • (2002) Journal of Architectural Institute of Korea , vol.18 , Issue.11 , pp. 133-140
    • Lee, J.H.1    Park, S.J.2    Oh, S.W.3    Kim, Y.S.4
  • 23
    • 0018533130 scopus 로고
    • An algorithm for planning collision-free paths among polyhedral obstacles
    • Lozano-Perez, T. and Wesley, M.A. 1979. An algorithm for planning collision-free paths among polyhedral obstacles. Communications of the ACM, 22 (10): 560 - 570.
    • (1979) Communications of the ACM , vol.22 , Issue.10 , pp. 560-570
    • Lozano-Perez, T.1    Wesley, M.A.2
  • 24
    • 84855790305 scopus 로고    scopus 로고
    • A case study on the feasibility and performance of an UWB-AoA real time location system for resources management of civil construction projects
    • Mok, E., Xia, L., Retscher, G. and Tian, H. 2010. A case study on the feasibility and performance of an UWB-AoA real time location system for resources management of civil construction projects. Journal of Applied Geodesy, 4: 23 - 32.
    • (2010) Journal of Applied Geodesy , vol.4 , pp. 23-32
    • Mok, E.1    Xia, L.2    Retscher, G.3    Tian, H.4
  • 26
    • 0032070691 scopus 로고    scopus 로고
    • Automation of existing tower cranes: economic and technological feasibility
    • Rosenfeld, Y. and Shapira, A. 1998. Automation of existing tower cranes: economic and technological feasibility. Automation in Construction, 7 (4): 285 - 298.
    • (1998) Automation in Construction , vol.7 , Issue.4 , pp. 285-298
    • Rosenfeld, Y.1    Shapira, A.2
  • 27
    • 70349850503 scopus 로고    scopus 로고
    • An investigation of lifting operations on UK construction sites
    • Sertyesilisik, B., Tunstall, A. and McLouglin, J. 2010. An investigation of lifting operations on UK construction sites. Safety Science, 48 (1): 72 - 79.
    • (2010) Safety Science , vol.48 , Issue.1 , pp. 72-79
    • Sertyesilisik, B.1    Tunstall, A.2    McLouglin, J.3
  • 29
    • 58149216115 scopus 로고    scopus 로고
    • Identification and analysis of factors affecting safety on construction sites with tower cranes
    • Shapira, A. and Lyachin, B. 2009. Identification and analysis of factors affecting safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 135 (1): 24 - 33.
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.1 , pp. 24-33
    • Shapira, A.1    Lyachin, B.2
  • 30
    • 62549085613 scopus 로고    scopus 로고
    • AHP-based weighting of factors affecting safety on construction sites with tower cranes
    • Shapira, A. and Simcha, M. 2009. AHP-based weighting of factors affecting safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 135 (4): 307 - 318.
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.4 , pp. 307-318
    • Shapira, A.1    Simcha, M.2
  • 34
    • 16444376810 scopus 로고    scopus 로고
    • Automated path planning of cooperative crane lifts using heuristic search
    • Sivakumar, P.L., Varghese, K. and Babu, N.R. 2003. Automated path planning of cooperative crane lifts using heuristic search. Journal of Computing in Civil Engineering, 17 (3): 197 - 207.
    • (2003) Journal of Computing in Civil Engineering , vol.17 , Issue.3 , pp. 197-207
    • Sivakumar, P.L.1    Varghese, K.2    Babu, N.R.3
  • 35
    • 0035178320 scopus 로고    scopus 로고
    • Ultra-wide band radio: the emergence of an important new technology
    • IEEE VTS 53rd, Rhodes, Greece, 6-9 May
    • Siwiak, K., Withington, P. and Phelan, S. (2001) Ultra-wide band radio: the emergence of an important new technology, in Vehicular Technology Conference(VTC 2001-Spring), IEEE VTS 53rd, Rhodes, Greece, 6-9 May, pp. 1169-72.
    • (2001) Vehicular Technology Conference(VTC 2001-Spring) , pp. 1169-1172
    • Siwiak, K.1    Withington, P.2    Phelan, S.3
  • 37
    • 78049432825 scopus 로고    scopus 로고
    • Tower crane safety in the construction industry: a Hong Kong study
    • Tam, V.W.Y. and Fung, I.W.H. 2011. Tower crane safety in the construction industry: a Hong Kong study. Safety Science, 49 (2): 208 - 215.
    • (2011) Safety Science , vol.49 , Issue.2 , pp. 208-215
    • Tam, V.W.Y.1    Fung, I.W.H.2
  • 38
    • 35348874797 scopus 로고    scopus 로고
    • Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
    • Teizer, J., Caldas, C.H. and Haas, C.T. 2007. Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources. Journal of Construction Engineering and Management, 133 (11): 880 - 888.
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.11 , pp. 880-888
    • Teizer, J.1    Caldas, C.H.2    Haas, C.T.3
  • 39
    • 77955716869 scopus 로고    scopus 로고
    • Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system
    • Teizer, J., Allread, B.S., Fullerton, C.E. and Hinze, J. 2010. Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Automation in Construction, 19 (5): 630 - 640.
    • (2010) Automation in Construction , vol.19 , Issue.5 , pp. 630-640
    • Teizer, J.1    Allread, B.S.2    Fullerton, C.E.3    Hinze, J.4
  • 42
    • 78649301915 scopus 로고    scopus 로고
    • Application of WiFi-based indoor positioning system for labor tracking at construction sites: a case study in Guangzhou MTR
    • Woo, S., Jeong, S., Mok, E., Xia, L., Choi, C., Pyeon, M. and Heo, J. 2011. Application of WiFi-based indoor positioning system for labor tracking at construction sites: a case study in Guangzhou MTR. Automation in Construction, 20 (1): 3 - 13.
    • (2011) Automation in Construction , vol.20 , Issue.1 , pp. 3-13
    • Woo, S.1    Jeong, S.2    Mok, E.3    Xia, L.4    Choi, C.5    Pyeon, M.6    Heo, J.7
  • 43
    • 67949093477 scopus 로고    scopus 로고
    • Development of the semi-automation system for tower crane using position measuring device and carriage control algorithm
    • Yu, S.N., Kim, B.H. and Han, C.S. 2005. Development of the semi-automation system for tower crane using position measuring device and carriage control algorithm. Journal of Architectural Institute of Korea, 21 (12): 157 - 166.
    • (2005) Journal of Architectural Institute of Korea , vol.21 , Issue.12 , pp. 157-166
    • Yu, S.N.1    Kim, B.H.2    Han, C.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.