-
2
-
-
77952409036
-
Integration of knowledge-based and generative systems for building characterization and prediction
-
Aksamija A, Yu K, Kim H, Grobler F and Krishnamurti R (2010) Integration of knowledge-based and generative systems for building characterization and prediction. Artificial Intelligence for Engineering Design, Analysis and Manufacturing: AI EDAM 24(1): 3.
-
(2010)
Artificial Intelligence for Engineering Design Analysis and Manufacturing: AI EDAM
, vol.24
, Issue.1
, pp. 3
-
-
Aksamija, A.1
Yu, K.2
Kim, H.3
Grobler, F.4
Krishnamurti, R.5
-
4
-
-
84903166253
-
A BIM-based approach for communicating and implementing a construction site safety plan
-
California Polytechnic State University, San Luis Obispo, CA, USA
-
Azhar S and Behringer A (2013) A BIM-based approach for communicating and implementing a construction site safety plan. Proceedings of the 49th ASC Annual International Conference, California Polytechnic State University, San Luis Obispo, CA, USA.
-
(2013)
Proceedings of the 49th ASC Annual International Conference
-
-
Azhar, S.1
Behringer, A.2
-
5
-
-
84912539206
-
-
Autodesk (access 03/09/2014)
-
Autodesk (2014) http://www.autodesk.com/products/revitfamily/overview (access 03/09/2014).
-
(2014)
-
-
-
7
-
-
78049300426
-
Application of geographic information systems in construction safety planning
-
Bansal V (2011) Application of geographic information systems in construction safety planning. International Journal of Project Management 29(1): 66-77.
-
(2011)
International Journal of Project Management
, vol.29
, Issue.1
, pp. 66-77
-
-
Bansal, V.1
-
9
-
-
0033824074
-
Behavioural implications of alarm mistrust as a function of task workload
-
Bliss JP and Dunn MC (2000) Behavioural implications of alarm mistrust as a function of task workload. Ergonomics 43(9): 1283-1300.
-
(2000)
Ergonomics
, vol.43
, Issue.9
, pp. 1283-1300
-
-
Bliss, J.P.1
Dunn, M.C.2
-
10
-
-
33750525525
-
The role of alarm signal duration as a cue for alarm validity
-
Bliss JP, Fallon CK and Nica N (2007) The role of alarm signal duration as a cue for alarm validity. Applied Ergonomics 38(2): 191-199.
-
(2007)
Applied Ergonomics
, vol.38
, Issue.2
, pp. 191-199
-
-
Bliss, J.P.1
Fallon, C.K.2
Nica, N.3
-
11
-
-
79960637989
-
A proactive system for real-time safety management in construction sites
-
Carbonari A, Giretti A and Naticchia B (2011) A proactive system for real-time safety management in construction sites. Automation in Construction 20(6): 686-698.
-
(2011)
Automation in Construction
, vol.20
, Issue.6
, pp. 686-698
-
-
Carbonari, A.1
Giretti, A.2
Naticchia, B.3
-
14
-
-
84993047731
-
A learning culture for strategic partnering in construction
-
Cheng E, Li H, Love P and Zahir I (2004) A learning culture for strategic partnering in construction. Construction Innovation 4(1): 53-65.
-
(2004)
Construction Innovation
, vol.4
, Issue.1
, pp. 53-65
-
-
Cheng, E.1
Li, H.2
Love, P.3
Zahir, I.4
-
15
-
-
84898994203
-
Modeling tower crane operator visibility to minimize the risk of limited situational awareness
-
Cheng T and Teizer J (2012) Modeling tower crane operator visibility to minimize the risk of limited situational awareness. Journal of Computing in Civil Engineering 28(3): 401-404.
-
(2012)
Journal of Computing in Civil Engineering
, vol.28
, Issue.3
, pp. 401-404
-
-
Cheng, T.1
Teizer, J.2
-
16
-
-
84878579790
-
Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications
-
Cheng T and Teizer J (2013) Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications. Automation in Construction 34: 3-15.
-
(2013)
Automation in Construction
, vol.34
, pp. 3-15
-
-
Cheng, T.1
Teizer, J.2
-
17
-
-
18844391780
-
Accident patterns and prevention measures for fatal occupational falls in the construction industry
-
Chi C-F, Chang T-C and Ting H-I (2005) Accident patterns and prevention measures for fatal occupational falls in the construction industry. Applied Ergonomics 36(4): 391-400.
-
(2005)
Applied Ergonomics
, vol.36
, Issue.4
, pp. 391-400
-
-
Chi, C.-F.1
Chang, T.-C.2
Ting, H.-I.3
-
18
-
-
42949099928
-
Why operatives engage in unsafe work behavior: Investigating factors on construction sites
-
Choudhry RM and Fang D (2008) Why operatives engage in unsafe work behavior: Investigating factors on construction sites. Safety Science 46(4): 566-584.
-
(2008)
Safety Science
, vol.46
, Issue.4
, pp. 566-584
-
-
Choudhry, R.M.1
Fang, D.2
-
20
-
-
57149087208
-
-
Commission of the European Communities, Commission of the European Communities, Brussels, Belgium. See (accessed 14/11/2013).
-
Commission of the European Communities (2007 Improving Quality and Productivity at Work: Community Strategy 2007-2012 on Health and Safety at Work. Commission of the European Communities, Brussels, Belgium. See http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri5COM:2007: 0062: FIN: EN: PDF (accessed 14/11/2013).
-
(2007)
Improving Quality and Productivity at Work: Community Strategy 2007-2012 on Health and Safety at Work
-
-
-
21
-
-
84912539205
-
-
CVPL (Construction Virtual Prototyping Laboratory) Construction Virtual Prototyping Laboratory Hong Kong Polythechnic Hong Kong. See (accessed 27/06/2013).
-
CVPL (Construction Virtual Prototyping Laboratory) (2012) Proactive Construction Management System. Construction Virtual Prototyping Laboratory Hong Kong Polythechnic, Hong Kong. See http://www.youtube.com/watch?v5OMEgn0amzM0 (accessed 27/06/2013).
-
(2012)
Proactive Construction Management System
-
-
-
22
-
-
84878586886
-
Development of web-based system for safety risk early warning in urban metro construction
-
Ding L and Zhou C (2013) Development of web-based system for safety risk early warning in urban metro construction. Automation in Construction 34: 45-55.
-
(2013)
Automation in Construction
, vol.34
, pp. 45-55
-
-
Ding, L.1
Zhou, C.2
-
23
-
-
38649094993
-
-
Wiley, Hoboken, NJ, USA
-
Eastman C, Teicholz P, Sacks R and Liston K (2011) BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. Wiley, Hoboken, NJ, USA.
-
(2011)
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors
-
-
Eastman, C.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
24
-
-
0003975349
-
-
EC (European Community) Council Directive 92/57/EEC of 24 June 1992 on the implementation of minimum safety and health requirements at temporary or mobile construction sites (eighth individual Directive within the meaning of Article 16 (1) of Directive 89/391/EEC)
-
EC (European Community) Council Directive 92/57/EEC of 24 June 1992 on the implementation of minimum safety and health requirements at temporary or mobile construction sites (eighth individual Directive within the meaning of Article 16 (1) of Directive 89/391/EEC). Official Journal of the European Communities L245/6.
-
Official Journal of the European Communities L245/6
-
-
-
25
-
-
84882241101
-
-
Eurostat European Commission, Brussels, Belgium. See(accessed 15/11/2013).
-
Eurostat (2012) The Statistical Office of the European Communities. European Commission, Brussels, Belgium. See http://epp.eurostat.ec.europa.eu/(accessed 15/11/2013).
-
(2012)
The Statistical Office of the European Communities
-
-
-
27
-
-
42949103619
-
Design's role in construction accident causality and prevention: Perspectives from an expert panel
-
Gambatese JA, Behm M and Rajendran S (2008) Design's role in construction accident causality and prevention: Perspectives from an expert panel. Safety Science 46(4): 675-691.
-
(2008)
Safety Science
, vol.46
, Issue.4
, pp. 675-691
-
-
Gambatese, J.A.1
Behm, M.2
Rajendran, S.3
-
28
-
-
84878575659
-
VP-based safety management in large-scale construction projects: A conceptual framework
-
Guo H, Li H and Li V (2013) VP-based safety management in large-scale construction projects: A conceptual framework. Automation in Construction 34: 16-24.
-
(2013)
Automation in Construction
, vol.34
, pp. 16-24
-
-
Guo, H.1
Li, H.2
Li, V.3
-
29
-
-
0036680235
-
Integration of virtually real construction model and design-for-safetyprocess database
-
Hadikusumo B and Rowlinson S (2002) Integration of virtually real construction model and design-for-safetyprocess database. Automation in Construction 11(5): 501-509.
-
(2002)
Automation in Construction
, vol.11
, Issue.5
, pp. 501-509
-
-
Hadikusumo, B.1
Rowlinson, S.2
-
33
-
-
84905091473
-
-
Health and Safety Executive, Health and Safety Executive, London, UK. See (accessed 15/11/2013).
-
Health and Safety Executive (2013) Health and Safety in Construction in Great Britain, 2013. Health and Safety Executive, London, UK. See http://www.hse.gov.uk/statistics/industry/construction/construction.pdf (accessed 15/11/2013).
-
(2013)
Health and Safety in Construction in Great Britain, 2013
-
-
-
34
-
-
84913579881
-
-
HMG (Her Majesty's Government) The Stationery Office, London, UK, Statutory Instrument 2007 No. 320
-
HMG (Her Majesty's Government) (2007) Health and Safety. The Construction (Design and Management) Regulations 2007. The Stationery Office, London, UK, Statutory Instrument 2007 No. 320.
-
(2007)
Health and Safety. The Construction (Design and Management) Regulations 2007
-
-
-
35
-
-
79551684087
-
BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2 Development and site trials
-
Hu Z and Zhang J (2011) BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials. Automation in Construction 20(2): 167-180.
-
(2011)
Automation in Construction
, vol.20
, Issue.2
, pp. 167-180
-
-
Hu, Z.1
Zhang, J.2
-
36
-
-
85017731119
-
-
ILO (International Labour Organization), International Labour Organization, Geneva, Switzerland
-
ILO (International Labour Organization) (2005) Fact Sheet on Safety at Work. International Labour Organization, Geneva, Switzerland.
-
(2005)
Fact Sheet on Safety at Work
-
-
-
37
-
-
1942471116
-
Rapid human-assisted, obstacle avoidance system using sparse range point clouds
-
(Malla RB and Maji A (eds)). American Society of Civil Engineers, New York, NY, USA
-
Kim C, Haas CT, Liapi KA et al. (2005) Rapid human-assisted, obstacle avoidance system using sparse range point clouds. In Engineering, Construction and Operations in Challenging Environments: Earth and Space (Malla RB and Maji A (eds)). American Society of Civil Engineers, New York, NY, USA, pp. 115-122.
-
(2005)
Engineering, Construction and Operations in Challenging Environments: Earth and Space
, pp. 115-122
-
-
Kim, C.1
Haas, C.T.2
Liapi, K.A.3
-
38
-
-
84912573144
-
-
LABORSTA. ILO Department of Statistic, Geneva, Switzerland. See(accessed 15/11/2013)
-
LABORSTA (2012) LABORSTA: An International Labour Office Database on Labour Statistics. ILO Department of Statistic, Geneva, Switzerland. See http://laborsta.ilo.org/(accessed 15/11/2013).
-
(2012)
LABORSTA: An International Labour Office Database on Labour Statistics
-
-
-
39
-
-
33744917534
-
Safety communications: Warnings
-
Laughery KR (2006) Safety communications: Warnings. Applied Ergonomics 37(4): 467-478.
-
(2006)
Applied Ergonomics
, vol.37
, Issue.4
, pp. 467-478
-
-
Laughery, K.R.1
-
40
-
-
58949083695
-
Development of a mobile safety monitoring system for construction sites
-
Lee U-K, Kim J-H, Cho H and Kang K-I (2009) Development of a mobile safety monitoring system for construction sites. Automation in Construction 18(3): 258-264.
-
(2009)
Automation in Construction
, vol.18
, Issue.3
, pp. 258-264
-
-
Lee, U.-K.1
Kim, J.-H.2
Cho, H.3
Kang, K.-I.4
-
41
-
-
84884289383
-
Integrating real time positioning systems to improve blind lifting and loading crane operations
-
Li H, Chan G and Skitmore M (2013) Integrating real time positioning systems to improve blind lifting and loading crane operations. Construction Management and Economics 31(6): 596-605.
-
(2013)
Construction Management and Economics
, vol.31
, Issue.6
, pp. 596-605
-
-
Li, H.1
Chan, G.2
Skitmore, M.3
-
42
-
-
45949103855
-
Integrating design and construction through virtual prototyping
-
Li H, Huang T, Kong C et al. (2008) Integrating design and construction through virtual prototyping. Automation in Construction 17(8): 915-922.
-
(2008)
Automation in Construction
, vol.17
, Issue.8
, pp. 915-922
-
-
Li, H.1
Huang, T.2
Kong, C.3
-
43
-
-
0000611441
-
Behaviour-based safety management in Hong Kong's construction industry
-
Lingard H and Rowlinson S (1997) Behaviour-based safety management in Hong Kong's construction industry. Journal of Safety Research 28(4): 243-256.
-
(1997)
Journal of Safety Research
, vol.28
, Issue.4
, pp. 243-256
-
-
Lingard, H.1
Rowlinson, S.2
-
45
-
-
70450222914
-
Prevention through design: The effect of European directives on construction workplace accidents
-
Martínez Aires MD, Rubio Gámez MC and Gibb A (2010) Prevention through design: The effect of European directives on construction workplace accidents. Safety Science 48(2): 248-258.
-
(2010)
Safety Science
, vol.48
, Issue.2
, pp. 248-258
-
-
Martínez Aires, M.D.1
Rubio Gámez, M.C.2
Gibb, A.3
-
46
-
-
76749155340
-
Computer image generation for job simulation: An effective approach to occupational risk analysis
-
Patrucco M, Bersano D, Cigna C and Fissore F (2010) Computer image generation for job simulation: An effective approach to occupational risk analysis. Safety Science 48(4): 508-516.
-
(2010)
Safety Science
, vol.48
, Issue.4
, pp. 508-516
-
-
Patrucco, M.1
Bersano, D.2
Cigna, C.3
Fissore, F.4
-
47
-
-
33748342338
-
SightSafety: A hybrid information and communication technology system for reducing vehicle/pedestrian collisions
-
Riaz Z, Edwards D and Thorpe A (2006) SightSafety: A hybrid information and communication technology system for reducing vehicle/pedestrian collisions. Automation in Construction 15(6): 719-728.
-
(2006)
Automation in Construction
, vol.15
, Issue.6
, pp. 719-728
-
-
Riaz, Z.1
Edwards, D.2
Thorpe, A.3
-
49
-
-
84912559222
-
-
Safe Work Australia Safe Work Australia Canberra Australia
-
Safe Work Australia (2013) Construction Fact Sheet. Safe Work Australia, Canberra, Australia.
-
(2013)
Construction Fact Sheet
-
-
-
51
-
-
22944483650
-
Construction project safety planning
-
Szymberski R (1997) Construction project safety planning. Tappi Journal 80(11): 69-74.
-
(1997)
Tappi Journal
, vol.80
, Issue.11
, pp. 69-74
-
-
Szymberski, R.1
-
52
-
-
55849113413
-
Real-time 3D modeling for accelerated and safer construction using emerging technology
-
Seoul, Korea
-
Teizer J, Kim C, Bosche F, Caldas C and Haas C (2005) Real-time 3D modeling for accelerated and safer construction using emerging technology. Proceedings of the 1st International Conference on Construction Engineering and Management, Seoul, Korea, pp. 539-543.
-
(2005)
Proceedings of the 1st International Conference on Construction Engineering and Management
, pp. 539-543
-
-
Teizer, J.1
Kim, C.2
Bosche, F.3
Caldas, C.4
Haas, C.5
-
53
-
-
77955716869
-
Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system
-
Teizer J, Allread BS, Fullerton CE and Hinze J (2010) Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Automation in Construction 19(5): 630-640.
-
(2010)
Automation in Construction
, vol.19
, Issue.5
, pp. 630-640
-
-
Teizer, J.1
Allread, B.S.2
Fullerton, C.E.3
Hinze, J.4
-
54
-
-
84884502878
-
Location tracking and data visualization technology to advance construction ironworkers' education and training in safety and productivity
-
Teizer J, Cheng T and Fang Y (2013) Location tracking and data visualization technology to advance construction ironworkers' education and training in safety and productivity. Automation in Construction 35: 53-68.
-
(2013)
Automation in Construction
, vol.35
, pp. 53-68
-
-
Teizer, J.1
Cheng, T.2
Fang, Y.3
-
55
-
-
84912539204
-
-
International Labour Organization, Geneva, Switzerland. See (accessed 13/01/2014)
-
Teoh K (2011) WSH Approach on the Construction Sector in Singapore. International Labour Organization, Geneva, Switzerland. See http://www.ilo.org/wcmsp5/groups/public/-ed-protect/-protrav/-safework/documents/presentation/wcms-169573.pdf (accessed 13/01/2014).
-
(2011)
WSH Approach on the Construction Sector in Singapore
-
-
Teoh, K.1
-
56
-
-
84880309449
-
Identifying critical incidents in naturalistic driving data: Experiences from a promoting real life observation for gaining understanding of road user behaviour in Europe smallscale field trial
-
Tontsch A, Valero-Mora PM and Pareja I (2013) Identifying critical incidents in naturalistic driving data: Experiences from a promoting real life observation for gaining understanding of road user behaviour in Europe smallscale field trial. IET Intelligent Transport Systems 7(2): 198-202.
-
(2013)
IET Intelligent Transport Systems
, vol.7
, Issue.2
, pp. 198-202
-
-
Tontsch, A.1
Valero-Mora, P.M.2
Pareja, I.3
-
57
-
-
84878705494
-
Attention allocation patterns in naturalistic driving
-
Wong J-T and Huang S-H (2013) Attention allocation patterns in naturalistic driving. Accident Analysis and Prevention 58(C): 140-147.
-
(2013)
Accident Analysis and Prevention
, vol.58
, Issue.100
, pp. 140-147
-
-
Wong, J.-T.1
Huang, S.-H.2
-
58
-
-
84866168938
-
A location based service approach for collision warning systems in concrete dam construction
-
Wu H, Tao J, Li X et al. (2013a) A location based service approach for collision warning systems in concrete dam construction. Safety Science 51(1): 338-346.
-
(2013)
Safety Science
, vol.51
, Issue.1
, pp. 338-346
-
-
Wu, H.1
Tao, J.2
Li, X.3
-
59
-
-
84878619070
-
An integrated information management model for proactive prevention of struck-by-falling-object accidents on construction sites
-
Wu W, Yang H, Li Q and Chew D (2013b) An integrated information management model for proactive prevention of struck-by-falling-object accidents on construction sites. Automation in Construction 34: 67-74.
-
(2013)
Automation in Construction
, vol.34
, pp. 67-74
-
-
Wu, W.1
Yang, H.2
Li, Q.3
Chew, D.4
-
60
-
-
79551684087
-
BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
-
Zhang J and Hu Z (2011) BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies. Automation in Construction 20(2): 155-166.
-
(2011)
Automation in Construction
, vol.20
, Issue.2
, pp. 155-166
-
-
Zhang, J.1
Hu, Z.2
|