메뉴 건너뛰기




Volumn 167, Issue 5, 2014, Pages 242-252

Proactive construction safety systems and the human factor

Author keywords

Information technology; Safety hazards

Indexed keywords

BEHAVIORAL RESEARCH; HAZARDS; HUMAN ENGINEERING; INFORMATION TECHNOLOGY; REAL TIME SYSTEMS; SAFETY FACTOR; SECURITY SYSTEMS;

EID: 84912557577     PISSN: 17514304     EISSN: 17514312     Source Type: Journal    
DOI: 10.1680/mpal.13.00055     Document Type: Article
Times cited : (22)

References (61)
  • 4
    • 84903166253 scopus 로고    scopus 로고
    • A BIM-based approach for communicating and implementing a construction site safety plan
    • California Polytechnic State University, San Luis Obispo, CA, USA
    • Azhar S and Behringer A (2013) A BIM-based approach for communicating and implementing a construction site safety plan. Proceedings of the 49th ASC Annual International Conference, California Polytechnic State University, San Luis Obispo, CA, USA.
    • (2013) Proceedings of the 49th ASC Annual International Conference
    • Azhar, S.1    Behringer, A.2
  • 5
    • 84912539206 scopus 로고    scopus 로고
    • Autodesk (access 03/09/2014)
    • Autodesk (2014) http://www.autodesk.com/products/revitfamily/overview (access 03/09/2014).
    • (2014)
  • 7
    • 78049300426 scopus 로고    scopus 로고
    • Application of geographic information systems in construction safety planning
    • Bansal V (2011) Application of geographic information systems in construction safety planning. International Journal of Project Management 29(1): 66-77.
    • (2011) International Journal of Project Management , vol.29 , Issue.1 , pp. 66-77
    • Bansal, V.1
  • 9
    • 0033824074 scopus 로고    scopus 로고
    • Behavioural implications of alarm mistrust as a function of task workload
    • Bliss JP and Dunn MC (2000) Behavioural implications of alarm mistrust as a function of task workload. Ergonomics 43(9): 1283-1300.
    • (2000) Ergonomics , vol.43 , Issue.9 , pp. 1283-1300
    • Bliss, J.P.1    Dunn, M.C.2
  • 10
    • 33750525525 scopus 로고    scopus 로고
    • The role of alarm signal duration as a cue for alarm validity
    • Bliss JP, Fallon CK and Nica N (2007) The role of alarm signal duration as a cue for alarm validity. Applied Ergonomics 38(2): 191-199.
    • (2007) Applied Ergonomics , vol.38 , Issue.2 , pp. 191-199
    • Bliss, J.P.1    Fallon, C.K.2    Nica, N.3
  • 11
    • 79960637989 scopus 로고    scopus 로고
    • A proactive system for real-time safety management in construction sites
    • Carbonari A, Giretti A and Naticchia B (2011) A proactive system for real-time safety management in construction sites. Automation in Construction 20(6): 686-698.
    • (2011) Automation in Construction , vol.20 , Issue.6 , pp. 686-698
    • Carbonari, A.1    Giretti, A.2    Naticchia, B.3
  • 14
    • 84993047731 scopus 로고    scopus 로고
    • A learning culture for strategic partnering in construction
    • Cheng E, Li H, Love P and Zahir I (2004) A learning culture for strategic partnering in construction. Construction Innovation 4(1): 53-65.
    • (2004) Construction Innovation , vol.4 , Issue.1 , pp. 53-65
    • Cheng, E.1    Li, H.2    Love, P.3    Zahir, I.4
  • 15
    • 84898994203 scopus 로고    scopus 로고
    • Modeling tower crane operator visibility to minimize the risk of limited situational awareness
    • Cheng T and Teizer J (2012) Modeling tower crane operator visibility to minimize the risk of limited situational awareness. Journal of Computing in Civil Engineering 28(3): 401-404.
    • (2012) Journal of Computing in Civil Engineering , vol.28 , Issue.3 , pp. 401-404
    • Cheng, T.1    Teizer, J.2
  • 16
    • 84878579790 scopus 로고    scopus 로고
    • Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications
    • Cheng T and Teizer J (2013) Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications. Automation in Construction 34: 3-15.
    • (2013) Automation in Construction , vol.34 , pp. 3-15
    • Cheng, T.1    Teizer, J.2
  • 17
    • 18844391780 scopus 로고    scopus 로고
    • Accident patterns and prevention measures for fatal occupational falls in the construction industry
    • Chi C-F, Chang T-C and Ting H-I (2005) Accident patterns and prevention measures for fatal occupational falls in the construction industry. Applied Ergonomics 36(4): 391-400.
    • (2005) Applied Ergonomics , vol.36 , Issue.4 , pp. 391-400
    • Chi, C.-F.1    Chang, T.-C.2    Ting, H.-I.3
  • 18
    • 42949099928 scopus 로고    scopus 로고
    • Why operatives engage in unsafe work behavior: Investigating factors on construction sites
    • Choudhry RM and Fang D (2008) Why operatives engage in unsafe work behavior: Investigating factors on construction sites. Safety Science 46(4): 566-584.
    • (2008) Safety Science , vol.46 , Issue.4 , pp. 566-584
    • Choudhry, R.M.1    Fang, D.2
  • 20
    • 57149087208 scopus 로고    scopus 로고
    • Commission of the European Communities, Commission of the European Communities, Brussels, Belgium. See (accessed 14/11/2013).
    • Commission of the European Communities (2007 Improving Quality and Productivity at Work: Community Strategy 2007-2012 on Health and Safety at Work. Commission of the European Communities, Brussels, Belgium. See http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri5COM:2007: 0062: FIN: EN: PDF (accessed 14/11/2013).
    • (2007) Improving Quality and Productivity at Work: Community Strategy 2007-2012 on Health and Safety at Work
  • 21
    • 84912539205 scopus 로고    scopus 로고
    • CVPL (Construction Virtual Prototyping Laboratory) Construction Virtual Prototyping Laboratory Hong Kong Polythechnic Hong Kong. See (accessed 27/06/2013).
    • CVPL (Construction Virtual Prototyping Laboratory) (2012) Proactive Construction Management System. Construction Virtual Prototyping Laboratory Hong Kong Polythechnic, Hong Kong. See http://www.youtube.com/watch?v5OMEgn0amzM0 (accessed 27/06/2013).
    • (2012) Proactive Construction Management System
  • 22
    • 84878586886 scopus 로고    scopus 로고
    • Development of web-based system for safety risk early warning in urban metro construction
    • Ding L and Zhou C (2013) Development of web-based system for safety risk early warning in urban metro construction. Automation in Construction 34: 45-55.
    • (2013) Automation in Construction , vol.34 , pp. 45-55
    • Ding, L.1    Zhou, C.2
  • 24
    • 0003975349 scopus 로고    scopus 로고
    • EC (European Community) Council Directive 92/57/EEC of 24 June 1992 on the implementation of minimum safety and health requirements at temporary or mobile construction sites (eighth individual Directive within the meaning of Article 16 (1) of Directive 89/391/EEC)
    • EC (European Community) Council Directive 92/57/EEC of 24 June 1992 on the implementation of minimum safety and health requirements at temporary or mobile construction sites (eighth individual Directive within the meaning of Article 16 (1) of Directive 89/391/EEC). Official Journal of the European Communities L245/6.
    • Official Journal of the European Communities L245/6
  • 25
    • 84882241101 scopus 로고    scopus 로고
    • Eurostat European Commission, Brussels, Belgium. See(accessed 15/11/2013).
    • Eurostat (2012) The Statistical Office of the European Communities. European Commission, Brussels, Belgium. See http://epp.eurostat.ec.europa.eu/(accessed 15/11/2013).
    • (2012) The Statistical Office of the European Communities
  • 27
    • 42949103619 scopus 로고    scopus 로고
    • Design's role in construction accident causality and prevention: Perspectives from an expert panel
    • Gambatese JA, Behm M and Rajendran S (2008) Design's role in construction accident causality and prevention: Perspectives from an expert panel. Safety Science 46(4): 675-691.
    • (2008) Safety Science , vol.46 , Issue.4 , pp. 675-691
    • Gambatese, J.A.1    Behm, M.2    Rajendran, S.3
  • 28
    • 84878575659 scopus 로고    scopus 로고
    • VP-based safety management in large-scale construction projects: A conceptual framework
    • Guo H, Li H and Li V (2013) VP-based safety management in large-scale construction projects: A conceptual framework. Automation in Construction 34: 16-24.
    • (2013) Automation in Construction , vol.34 , pp. 16-24
    • Guo, H.1    Li, H.2    Li, V.3
  • 29
    • 0036680235 scopus 로고    scopus 로고
    • Integration of virtually real construction model and design-for-safetyprocess database
    • Hadikusumo B and Rowlinson S (2002) Integration of virtually real construction model and design-for-safetyprocess database. Automation in Construction 11(5): 501-509.
    • (2002) Automation in Construction , vol.11 , Issue.5 , pp. 501-509
    • Hadikusumo, B.1    Rowlinson, S.2
  • 33
    • 84905091473 scopus 로고    scopus 로고
    • Health and Safety Executive, Health and Safety Executive, London, UK. See (accessed 15/11/2013).
    • Health and Safety Executive (2013) Health and Safety in Construction in Great Britain, 2013. Health and Safety Executive, London, UK. See http://www.hse.gov.uk/statistics/industry/construction/construction.pdf (accessed 15/11/2013).
    • (2013) Health and Safety in Construction in Great Britain, 2013
  • 34
  • 35
    • 79551684087 scopus 로고    scopus 로고
    • BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2 Development and site trials
    • Hu Z and Zhang J (2011) BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials. Automation in Construction 20(2): 167-180.
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 167-180
    • Hu, Z.1    Zhang, J.2
  • 36
    • 85017731119 scopus 로고    scopus 로고
    • ILO (International Labour Organization), International Labour Organization, Geneva, Switzerland
    • ILO (International Labour Organization) (2005) Fact Sheet on Safety at Work. International Labour Organization, Geneva, Switzerland.
    • (2005) Fact Sheet on Safety at Work
  • 37
    • 1942471116 scopus 로고    scopus 로고
    • Rapid human-assisted, obstacle avoidance system using sparse range point clouds
    • (Malla RB and Maji A (eds)). American Society of Civil Engineers, New York, NY, USA
    • Kim C, Haas CT, Liapi KA et al. (2005) Rapid human-assisted, obstacle avoidance system using sparse range point clouds. In Engineering, Construction and Operations in Challenging Environments: Earth and Space (Malla RB and Maji A (eds)). American Society of Civil Engineers, New York, NY, USA, pp. 115-122.
    • (2005) Engineering, Construction and Operations in Challenging Environments: Earth and Space , pp. 115-122
    • Kim, C.1    Haas, C.T.2    Liapi, K.A.3
  • 38
    • 84912573144 scopus 로고    scopus 로고
    • LABORSTA. ILO Department of Statistic, Geneva, Switzerland. See(accessed 15/11/2013)
    • LABORSTA (2012) LABORSTA: An International Labour Office Database on Labour Statistics. ILO Department of Statistic, Geneva, Switzerland. See http://laborsta.ilo.org/(accessed 15/11/2013).
    • (2012) LABORSTA: An International Labour Office Database on Labour Statistics
  • 39
    • 33744917534 scopus 로고    scopus 로고
    • Safety communications: Warnings
    • Laughery KR (2006) Safety communications: Warnings. Applied Ergonomics 37(4): 467-478.
    • (2006) Applied Ergonomics , vol.37 , Issue.4 , pp. 467-478
    • Laughery, K.R.1
  • 40
    • 58949083695 scopus 로고    scopus 로고
    • Development of a mobile safety monitoring system for construction sites
    • Lee U-K, Kim J-H, Cho H and Kang K-I (2009) Development of a mobile safety monitoring system for construction sites. Automation in Construction 18(3): 258-264.
    • (2009) Automation in Construction , vol.18 , Issue.3 , pp. 258-264
    • Lee, U.-K.1    Kim, J.-H.2    Cho, H.3    Kang, K.-I.4
  • 41
    • 84884289383 scopus 로고    scopus 로고
    • Integrating real time positioning systems to improve blind lifting and loading crane operations
    • Li H, Chan G and Skitmore M (2013) Integrating real time positioning systems to improve blind lifting and loading crane operations. Construction Management and Economics 31(6): 596-605.
    • (2013) Construction Management and Economics , vol.31 , Issue.6 , pp. 596-605
    • Li, H.1    Chan, G.2    Skitmore, M.3
  • 42
    • 45949103855 scopus 로고    scopus 로고
    • Integrating design and construction through virtual prototyping
    • Li H, Huang T, Kong C et al. (2008) Integrating design and construction through virtual prototyping. Automation in Construction 17(8): 915-922.
    • (2008) Automation in Construction , vol.17 , Issue.8 , pp. 915-922
    • Li, H.1    Huang, T.2    Kong, C.3
  • 43
    • 0000611441 scopus 로고    scopus 로고
    • Behaviour-based safety management in Hong Kong's construction industry
    • Lingard H and Rowlinson S (1997) Behaviour-based safety management in Hong Kong's construction industry. Journal of Safety Research 28(4): 243-256.
    • (1997) Journal of Safety Research , vol.28 , Issue.4 , pp. 243-256
    • Lingard, H.1    Rowlinson, S.2
  • 45
    • 70450222914 scopus 로고    scopus 로고
    • Prevention through design: The effect of European directives on construction workplace accidents
    • Martínez Aires MD, Rubio Gámez MC and Gibb A (2010) Prevention through design: The effect of European directives on construction workplace accidents. Safety Science 48(2): 248-258.
    • (2010) Safety Science , vol.48 , Issue.2 , pp. 248-258
    • Martínez Aires, M.D.1    Rubio Gámez, M.C.2    Gibb, A.3
  • 46
    • 76749155340 scopus 로고    scopus 로고
    • Computer image generation for job simulation: An effective approach to occupational risk analysis
    • Patrucco M, Bersano D, Cigna C and Fissore F (2010) Computer image generation for job simulation: An effective approach to occupational risk analysis. Safety Science 48(4): 508-516.
    • (2010) Safety Science , vol.48 , Issue.4 , pp. 508-516
    • Patrucco, M.1    Bersano, D.2    Cigna, C.3    Fissore, F.4
  • 47
    • 33748342338 scopus 로고    scopus 로고
    • SightSafety: A hybrid information and communication technology system for reducing vehicle/pedestrian collisions
    • Riaz Z, Edwards D and Thorpe A (2006) SightSafety: A hybrid information and communication technology system for reducing vehicle/pedestrian collisions. Automation in Construction 15(6): 719-728.
    • (2006) Automation in Construction , vol.15 , Issue.6 , pp. 719-728
    • Riaz, Z.1    Edwards, D.2    Thorpe, A.3
  • 49
    • 84912559222 scopus 로고    scopus 로고
    • Safe Work Australia Safe Work Australia Canberra Australia
    • Safe Work Australia (2013) Construction Fact Sheet. Safe Work Australia, Canberra, Australia.
    • (2013) Construction Fact Sheet
  • 51
    • 22944483650 scopus 로고    scopus 로고
    • Construction project safety planning
    • Szymberski R (1997) Construction project safety planning. Tappi Journal 80(11): 69-74.
    • (1997) Tappi Journal , vol.80 , Issue.11 , pp. 69-74
    • Szymberski, R.1
  • 53
    • 77955716869 scopus 로고    scopus 로고
    • Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system
    • Teizer J, Allread BS, Fullerton CE and Hinze J (2010) Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Automation in Construction 19(5): 630-640.
    • (2010) Automation in Construction , vol.19 , Issue.5 , pp. 630-640
    • Teizer, J.1    Allread, B.S.2    Fullerton, C.E.3    Hinze, J.4
  • 54
    • 84884502878 scopus 로고    scopus 로고
    • Location tracking and data visualization technology to advance construction ironworkers' education and training in safety and productivity
    • Teizer J, Cheng T and Fang Y (2013) Location tracking and data visualization technology to advance construction ironworkers' education and training in safety and productivity. Automation in Construction 35: 53-68.
    • (2013) Automation in Construction , vol.35 , pp. 53-68
    • Teizer, J.1    Cheng, T.2    Fang, Y.3
  • 55
    • 84912539204 scopus 로고    scopus 로고
    • International Labour Organization, Geneva, Switzerland. See (accessed 13/01/2014)
    • Teoh K (2011) WSH Approach on the Construction Sector in Singapore. International Labour Organization, Geneva, Switzerland. See http://www.ilo.org/wcmsp5/groups/public/-ed-protect/-protrav/-safework/documents/presentation/wcms-169573.pdf (accessed 13/01/2014).
    • (2011) WSH Approach on the Construction Sector in Singapore
    • Teoh, K.1
  • 56
    • 84880309449 scopus 로고    scopus 로고
    • Identifying critical incidents in naturalistic driving data: Experiences from a promoting real life observation for gaining understanding of road user behaviour in Europe smallscale field trial
    • Tontsch A, Valero-Mora PM and Pareja I (2013) Identifying critical incidents in naturalistic driving data: Experiences from a promoting real life observation for gaining understanding of road user behaviour in Europe smallscale field trial. IET Intelligent Transport Systems 7(2): 198-202.
    • (2013) IET Intelligent Transport Systems , vol.7 , Issue.2 , pp. 198-202
    • Tontsch, A.1    Valero-Mora, P.M.2    Pareja, I.3
  • 57
    • 84878705494 scopus 로고    scopus 로고
    • Attention allocation patterns in naturalistic driving
    • Wong J-T and Huang S-H (2013) Attention allocation patterns in naturalistic driving. Accident Analysis and Prevention 58(C): 140-147.
    • (2013) Accident Analysis and Prevention , vol.58 , Issue.100 , pp. 140-147
    • Wong, J.-T.1    Huang, S.-H.2
  • 58
    • 84866168938 scopus 로고    scopus 로고
    • A location based service approach for collision warning systems in concrete dam construction
    • Wu H, Tao J, Li X et al. (2013a) A location based service approach for collision warning systems in concrete dam construction. Safety Science 51(1): 338-346.
    • (2013) Safety Science , vol.51 , Issue.1 , pp. 338-346
    • Wu, H.1    Tao, J.2    Li, X.3
  • 59
    • 84878619070 scopus 로고    scopus 로고
    • An integrated information management model for proactive prevention of struck-by-falling-object accidents on construction sites
    • Wu W, Yang H, Li Q and Chew D (2013b) An integrated information management model for proactive prevention of struck-by-falling-object accidents on construction sites. Automation in Construction 34: 67-74.
    • (2013) Automation in Construction , vol.34 , pp. 67-74
    • Wu, W.1    Yang, H.2    Li, Q.3    Chew, D.4
  • 60
    • 79551684087 scopus 로고    scopus 로고
    • BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
    • Zhang J and Hu Z (2011) BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies. Automation in Construction 20(2): 155-166.
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 155-166
    • Zhang, J.1    Hu, Z.2
  • 61
    • 84857357863 scopus 로고    scopus 로고
    • Construction safety and digital design: A review
    • Zhou W, Whyte J and Sacks R (2012) Construction safety and digital design: A review. Automation in Construction 22: 102-111.
    • (2012) Automation in Construction , vol.22 , pp. 102-111
    • Zhou, W.1    Whyte, J.2    Sacks, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.