메뉴 건너뛰기




Volumn 13, Issue , 2008, Pages 324-342

Benefits and lessons learned of implementing Building Virtual Design and Construction (VDC) technologies for coordination of Mechanical, Electrical, and Plumbing (MEP) systems on a large Healthcare project

Author keywords

3D CAD; 4D CAD; Building Information Modeling (BIM); Change Orders; Design Coordination; Electrical; Mechanical; MEP Coordination; Plumbing Systems (MEP Systems); Prefabrication; Productivity; RFI; Virtual Design and Construction (VDC)

Indexed keywords

(E ,3E) PROCESS; ADVANCED TECHNOLOGIES; BUILDING INFORMATION MODELING (BIM); CALIFORNIA , USA; CASE STUDIES; LABOR SAVINGS; LESSONS LEARNED (LL); MEP COORDINATION; PROJECT SCHEDULING; PROJECT TEAMING; REQUESTS FOR INFORMATION; TEAM MEMBERS; TECHNICAL PROJECTS; VIRTUAL DESIGN AND CONSTRUCTION;

EID: 46349088624     PISSN: 14036835     EISSN: 14006529     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (230)

References (28)
  • 1
    • 2342436357 scopus 로고    scopus 로고
    • Assessment of the capabilities of a commercial 4D CAD system to visualize equipment space requirements on construction sites
    • Honolulu, HI
    • Akinci B. Tantisevi K., Ergen E. (2003) Assessment of the capabilities of a commercial 4D CAD system to visualize equipment space requirements on construction sites. Construction Research Congress, Honolulu, HI, 989-995.
    • (2003) Construction Research Congress , pp. 989-995
    • Akinci, B.1    Tantisevi, K.2    Ergen, E.3
  • 4
    • 46349084878 scopus 로고    scopus 로고
    • Eastman C., Sacks R., Lee, G. (2002). Strategies for realizing the benefits of 3D integrated modeling of buildings in the AEC industry. IS ARC 2002. 19th International Symposium on Automation and Robotics in Construction, SP 989, (Washington DC). 2002. 9-14.
    • Eastman C., Sacks R., Lee, G. (2002). Strategies for realizing the benefits of 3D integrated modeling of buildings in the AEC industry. IS ARC 2002. 19th International Symposium on Automation and Robotics in Construction, SP 989, (Washington DC). 2002. 9-14.
  • 10
    • 1842832075 scopus 로고    scopus 로고
    • Trends of 4D CAD applications for construction planning
    • Heesom D., Mahdjoubi L. (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), 171-182
    • (2004) Construction Management and Economics , vol.22 , Issue.2 , pp. 171-182
    • Heesom, D.1    Mahdjoubi, L.2
  • 12
    • 84866126106 scopus 로고    scopus 로고
    • Case Study of The Implementation of The Lean Project Delivery System (LPDS) using Virtual Building Technologies on a Large Healthcare Project
    • Sydney, Australia
    • Khanzode A., Fischer M., Reed D. (2005). Case Study of The Implementation of The Lean Project Delivery System (LPDS) using Virtual Building Technologies on a Large Healthcare Project, Proceedings of IGLC-13, Sydney, Australia, 153-160.
    • (2005) Proceedings of IGLC-13 , pp. 153-160
    • Khanzode, A.1    Fischer, M.2    Reed, D.3
  • 13
    • 46349097455 scopus 로고    scopus 로고
    • Challenges and benefits of implementing virtual design and construction technologies for coordination of mechanical, electrical, and plumbing systems on a large healthcare project
    • Danijel Reolj ed
    • Khanzode A., Fischer M., Reed D. (2007). Challenges and benefits of implementing virtual design and construction technologies for coordination of mechanical, electrical, and plumbing systems on a large healthcare project. CIB 24th W78 Conference Maribor 2007, Bringing ITC knowledge to work, Danijel Reolj (ed.), 205-212.
    • (2007) CIB 24th W78 Conference Maribor 2007, Bringing ITC knowledge to work , pp. 205-212
    • Khanzode, A.1    Fischer, M.2    Reed, D.3
  • 15
    • 9344245058 scopus 로고    scopus 로고
    • Development of a knowledge-based system to improve mechanical, electrical, and plumbing coordination
    • Technical Report 129, CIFE, Stanford University, CA
    • Korman T.M., Tatum C.B. (2001). Development of a knowledge-based system to improve mechanical, electrical, and plumbing coordination. Technical Report 129, CIFE, Stanford University, CA.
    • (2001)
    • Korman, T.M.1    Tatum, C.B.2
  • 17
    • 9944247432 scopus 로고    scopus 로고
    • Design your project organizations as engineers design bridges
    • Stanford University, August
    • Levitt R. Kunz J. (2002) "Design your project organizations as engineers design bridges," CIFE Working Paper 73, CIFE, Stanford University, August.
    • (2002) CIFE Working Paper 73, CIFE
    • Levitt, R.1    Kunz, J.2
  • 18
    • 46349098624 scopus 로고    scopus 로고
    • Virtual Facility Prototyping for Sustainable
    • Project Delivery
    • Messner, J.I., Riley, D.R., Moeck, M. (2006). Virtual Facility Prototyping for Sustainable Project Delivery.
    • (2006)
    • Messner, J.I.1    Riley, D.R.2    Moeck, M.3
  • 19
    • 46349095517 scopus 로고    scopus 로고
    • Feasibility study of field force automation in the Swedish construction sector
    • Olofsson T., Emborg M. (2004). Feasibility study of field force automation in the Swedish construction sector. ITCon, Vol. 9, 2004, 285-295.
    • (2004) ITCon , vol.9 , pp. 285-295
    • Olofsson, T.1    Emborg, M.2
  • 20
    • 24944465750 scopus 로고    scopus 로고
    • Effect of delivery system on change order size and frequency in Mechanical construction
    • September
    • Riley D., Diller B., Kerr D. (2005). Effect of delivery system on change order size and frequency in Mechanical construction. Journal of Construction Engineering and Management, ASCE, Vol. 131, September 2005. 953-962.
    • (2005) Journal of Construction Engineering and Management, ASCE , vol.131 , pp. 953-962
    • Riley, D.1    Diller, B.2    Kerr, D.3
  • 22
    • 0042861949 scopus 로고    scopus 로고
    • Industrial Case Study of Electronic Design, Cost, and Schedule Integration
    • Technical Report 122, CIFE, Stanford University, CA
    • Staub-French S., Fischer M. (2001). Industrial Case Study of Electronic Design, Cost, and Schedule Integration. Technical Report 122, CIFE, Stanford University, CA.
    • (2001)
    • Staub-French, S.1    Fischer, M.2
  • 23
    • 34547532859 scopus 로고    scopus 로고
    • 3D and 4D modeling for design and construction coordination: Issues and lessons learned
    • Staub-French S., Khanzode A. (2007). 3D and 4D modeling for design and construction coordination: issues and lessons learned. ITCon, Vol 12, 2007. 381-407.
    • (2007) ITCon , vol.12 , pp. 381-407
    • Staub-French, S.1    Khanzode, A.2
  • 25
    • 0034545205 scopus 로고    scopus 로고
    • Coordinating building systems: Process and knowledge
    • Tatum C.B., Korman T.M. (2000). Coordinating building systems: process and knowledge. Journal of Architectural Engineering, 6(4), 116-121.
    • (2000) Journal of Architectural Engineering , vol.6 , Issue.4 , pp. 116-121
    • Tatum, C.B.1    Korman, T.M.2
  • 27
    • 46349083731 scopus 로고    scopus 로고
    • Thompson J.D., (2003). Organizations in Action: Social Science Bases of Administrative Theory, Transaction Publishers, republished version of the original 1967 book with preface by Mayer N. Zald and a new introduction by W. Richard Scott published by Transaction Publishers, January 2003.
    • Thompson J.D., (2003). "Organizations in Action: Social Science Bases of Administrative Theory", Transaction Publishers, republished version of the original 1967 book with preface by Mayer N. Zald and a new introduction by W. Richard Scott published by Transaction Publishers, January 2003.
  • 28
    • 0034325024 scopus 로고    scopus 로고
    • From CAD to virtual reality: Modelling approaches, data exchange and interactive 3D building design tools
    • Whyte J., Bouchlaghem N. Thorpe A., McCaffer R. (2000). From CAD to virtual reality: modelling approaches, data exchange and interactive 3D building design tools. Automation in Construction, Vol. 10, 43-55.
    • (2000) Automation in Construction , vol.10 , pp. 43-55
    • Whyte, J.1    Bouchlaghem, N.2    Thorpe, A.3    McCaffer, R.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.