메뉴 건너뛰기




Volumn 18, Issue , 2013, Pages 214-239

Prospective validation of virtual design and construction methods

Author keywords

4D; Implementation guidelines; Prototype; Renovation; Validation

Indexed keywords

4D; IMPLEMENTATION GUIDELINES; PROTOTYPE; RENOVATION; VALIDATION;

EID: 84878742679     PISSN: 14036835     EISSN: 14006529     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (7)

References (45)
  • 1
    • 75649102859 scopus 로고    scopus 로고
    • Mixed Method Research: Fundamental issues of design, validity and reliability in construction research
    • Abowitz, D., and Toole, M. (2010). "Mixed Method Research: Fundamental issues of design, validity and reliability in construction research." Journal of Construction Engineering and Management, 136, 108-116.
    • (2010) Journal of Construction Engineering and Management , vol.136 , pp. 108-116
    • Abowitz, D.1    Toole, M.2
  • 2
    • 0041805006 scopus 로고    scopus 로고
    • Automated generation of work spaces required by construction activities
    • DOI 10.1061/(ASCE)0733-9364(2002)128:4(306)
    • Akinci, B., Fischer, M., and Kunz, J. (2002). "Automated Generation of Work Spaces Required by Construction Activities." Journal of Construction Engineering and Management, 128(4), 306-315. (Pubitemid 40265535)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.4 , pp. 306-315
    • Akinci, B.1    Fischer, M.2    Kunz, J.3
  • 3
    • 84878696413 scopus 로고    scopus 로고
    • Formalization and automation of time-space conflict analysis
    • Center for Integrated Facility Engineering, Stanford University
    • Akinci, B., Fischer, M., Kunz, J., and Levitt, R. (2000). "Formalization and Automation of Time-Space Conflict Analysis." Working Paper #059, Center for Integrated Facility Engineering, Stanford University.
    • (2000) Working Paper #059
    • Akinci, B.1    Fischer, M.2    Kunz, J.3    Levitt, R.4
  • 5
    • 0008548790 scopus 로고
    • Computational and mathematical organization theory: Perspective and directions
    • Carley, K. (1995). "Computational and Mathematical Organization Theory: Perspective and Directions." Computational and Mathematical Organization Theory, 1(1), 39-56.
    • (1995) Computational and Mathematical Organization Theory , vol.1 , Issue.1 , pp. 39-56
    • Carley, K.1
  • 7
    • 0029719190 scopus 로고    scopus 로고
    • Visual based scheduling: 4D modelling on the san mateo county health centre
    • Anaheim, CA
    • Collier, E., and Fischer, M. "Visual based scheduling: 4D modelling on the San Mateo County Health Centre." 3rd ASCE Congress on Computing in Civil Engineering, Anaheim, CA, 800-805.
    • 3rd ASCE Congress on Computing in Civil Engineering , pp. 800-805
    • Collier, E.1    Fischer, M.2
  • 9
    • 58149196347 scopus 로고    scopus 로고
    • Measuring the effectiveness of 4D planning as a valuable communcation tool
    • Dawood, N., and Sikka, S. (2008). "Measuring the effectiveness of 4D planning as a valuable communcation tool." ItCon, 13, 620-636.
    • (2008) ItCon , vol.13 , pp. 620-636
    • Dawood, N.1    Sikka, S.2
  • 11
    • 14544284514 scopus 로고    scopus 로고
    • Lessons learned in designing research methodology in field-based construction research
    • DOI 10.1061/(ASCE)1052-3928(2004)130:2(109)
    • El-Diraby, T., and O'Connor, J. (2004). "Lessons learned in designing research methodology in field-based construction research." Journal of Construction Engineering and Management, 130(2), 109-114. (Pubitemid 40302677)
    • (2004) Journal of Professional Issues in Engineering Education and Practice , vol.130 , Issue.2 , pp. 109-114
    • El-Diraby, T.E.1    O'Connor, J.T.2
  • 16
    • 1642413835 scopus 로고    scopus 로고
    • Computer models and methods for disabled access analysis design environment
    • Stanford University, Stanford
    • Han, C. S., Law, K., and Kunz, J. (2000). "Computer Models and Methods for Disabled Access Analysis Design Environment." Technical Report #123, Stanford University, Stanford.
    • (2000) Technical Report #123
    • Han, C.S.1    Law, K.2    Kunz, J.3
  • 18
    • 84878719477 scopus 로고    scopus 로고
    • Measuring and improving rationale clarity in a unicersity office building design process
    • Stanford University, Stanford
    • Haymaker, J., Chachere, J., and Senescu, R. (2008). "Measuring and improving rationale clarity in a unicersity office building design process." Techincal Report #TR178, Stanford University, Stanford.
    • (2008) Techincal Report #TR178
    • Haymaker, J.1    Chachere, J.2    Senescu, R.3
  • 19
    • 33751384135 scopus 로고    scopus 로고
    • Challenges and benefits of 4D modeling on the walt disney concert hall project
    • Center for Integrated Facility Engineering, Stanford University, Stanford
    • Haymaker, J., and Fischer, M. (2001). "Challenges and benefits of 4D modeling on the Walt Disney Concert Hall project." CIFE Working Paper 64, Center for Integrated Facility Engineering, Stanford University, Stanford.
    • (2001) CIFE Working Paper 64
    • Haymaker, J.1    Fischer, M.2
  • 20
    • 84874602095 scopus 로고    scopus 로고
    • PERSPECTORS: Automating the construction and coordination of multidisciplinary 3D design representations
    • Center for Integrated Facility Engineering, Stanford University
    • Haymaker, J., Suter, B., Kunz, J., and Fischer, M. (2003). "PERSPECTORS: Automating the Construction and Coordination of Multidisciplinary 3D Design Representations." Technical Report #145, Center for Integrated Facility Engineering, Stanford University.
    • (2003) Technical Report #145
    • Haymaker, J.1    Suter, B.2    Kunz, J.3    Fischer, M.4
  • 21
    • 84878685831 scopus 로고    scopus 로고
    • An examination of current practices in identifying occupant interactions in renovation projects
    • Stanford University, Stanford
    • Ho, P., and Fischer, M. (2009). "An examination of current practices in identifying occupant interactions in renovation projects." CIFE Working Paper #121, Stanford University, Stanford.
    • (2009) CIFE Working Paper #121
    • Ho, P.1    Fischer, M.2
  • 22
    • 84878735489 scopus 로고    scopus 로고
    • Automated identification of occupant interactions in renovations of occupied buildings
    • Stanford University, Stanford
    • Ho, P., Fischer, M., and Haymaker, J. (2009). "Automated Identification of Occupant Interactions in Renovations of Occupied Buildings." CIFE Working Paper #122, Stanford University, Stanford.
    • (2009) CIFE Working Paper #122
    • Ho, P.1    Fischer, M.2    Haymaker, J.3
  • 23
    • 41749088228 scopus 로고    scopus 로고
    • Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models
    • Jongeling, R., Kim, J., Fischer, M., Mourgues, C., and Olofsson, T. (2008). "Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models." Automation in Construction, 17(6), 780-791.
    • (2008) Automation in Construction , vol.17 , Issue.6 , pp. 780-791
    • Jongeling, R.1    Kim, J.2    Fischer, M.3    Mourgues, C.4    Olofsson, T.5
  • 25
    • 46349088624 scopus 로고    scopus 로고
    • Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project
    • Special Issue: Case studies of BIM use
    • Khanzode, A., Fischer, M., and Reed, D. (2008). "Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project." ITcon, 13(Special Issue: Case studies of BIM use), 324-342.
    • (2008) ITcon , vol.13 , pp. 324-342
    • Khanzode, A.1    Fischer, M.2    Reed, D.3
  • 26
    • 0033962874 scopus 로고    scopus 로고
    • Identifying stroke in the field: Prospective validation of the Los Angeles Prehospital Stroke Screen (LAPSS)
    • Kidwell, C., Starkman, S., Eckstein, M., Weems, K., and Saver, J. (2000). "Prospective Validation of the Los Angeles Prehospital Stroke Screen (LAPSS)." Stroke, 31(1), 71-76. (Pubitemid 30035755)
    • (2000) Stroke , vol.31 , Issue.1 , pp. 71-76
    • Kidwell, C.S.1    Starkman, S.2    Eckstein, M.3    Weems, K.4    Saver, J.L.5
  • 28
    • 84878702747 scopus 로고    scopus 로고
    • CEE 320 Presentation, 17 October 2008, Stanford University, Stanford
    • Kunz, J., and Fischer, M. (2008). "CIFE Research Questions and Methods." CEE 320 Presentation, 17 October 2008, Stanford University, Stanford.
    • (2008) CIFE Research Questions and Methods.
    • Kunz, J.1    Fischer, M.2
  • 29
    • 67650333268 scopus 로고    scopus 로고
    • Virtual design and construction: Themes, case studies and implementation suggestions
    • Stanford University, Stanford
    • Kunz, J., and Fischer, M. (2009). "Virtual Design and Construction: Themes, Case Studies and Implementation Suggestions." CIFE Working Paper #097, Stanford University, Stanford.
    • (2009) CIFE Working Paper #097
    • Kunz, J.1    Fischer, M.2
  • 31
    • 0001096636 scopus 로고
    • On the external validity of experiments in consumer research
    • Lynch, J. (1982). "On the external validity of experiments in consumer research." Journal of Consumer Research, 9(3), 225-239.
    • (1982) Journal of Consumer Research , vol.9 , Issue.3 , pp. 225-239
    • Lynch, J.1
  • 32
    • 58149505414 scopus 로고    scopus 로고
    • Building energy performance simulation tools - A life-cycle and interoperable perspective
    • Stanford University, Stanford
    • Maile, T., Fischer, M., and Bazjanac, V. (2007). "Building Energy Performance Simulation Tools - a Life-Cycle and Interoperable Perspective." CIFE Working Paper #WP107, Stanford University, Stanford.
    • (2007) CIFE Working Paper #WP107
    • Maile, T.1    Fischer, M.2    Bazjanac, V.3
  • 33
    • 46349103565 scopus 로고    scopus 로고
    • Case Studies in BIM implementation for programming of healthcare facilities
    • Special Issue: Case Studies of BIM Use
    • Manning, R., and Messner, J. (2008). "Case Studies in BIM implementation for programming of healthcare facilities." ITcon, 13(Special Issue: Case Studies of BIM Use), 246-257.
    • (2008) ITcon , vol.13 , pp. 246-257
    • Manning, R.1    Messner, J.2
  • 34
    • 74349122568 scopus 로고    scopus 로고
    • Microsoft. Microsoft Office, Redmond
    • Microsoft. (2007). "Microsoft Office Access 2007." Microsoft Office, Redmond.
    • (2007) Microsoft Office Access 2007.
  • 39
    • 54549089987 scopus 로고    scopus 로고
    • Automatic generation of progress profiles for earthwork operations using 4d visualisation model
    • Shah, R. K., Dawood, N., and Castro, S. (2008). "Automatic Generation of Progress Profiles for Earthwork Operations Using 4D Visualisation Model." ITcon, 13, 491-506.
    • (2008) ITcon , vol.13 , pp. 491-506
    • Shah, R.K.1    Dawood, N.2    Castro, S.3
  • 42
    • 58149259941 scopus 로고    scopus 로고
    • Methodology for automating the identification and localization of construction components on industrial projects
    • Torrent, D. G., and Caldas, C. (2009). "Methodology for automating the identification and localization of construction components on industrial projects." Journal of Construction Engineering and Management, 23(1), 3-13.
    • (2009) Journal of Construction Engineering and Management , vol.23 , Issue.1 , pp. 3-13
    • Torrent, D.G.1    Caldas, C.2
  • 44
    • 84878687801 scopus 로고    scopus 로고
    • U.S. General Services Administration. Internal Website, Accessed 15 September, Washington DC
    • U.S. General Services Administration. (2009). "GSA Project Information Portal." Internal Website, Accessed 15 September, Washington DC.
    • (2009) GSA Project Information Portal.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.