-
1
-
-
84885407826
-
-
accessed: October 19, 2011
-
American Institute of Steel Construction (AISC) (2011). ""AISC Basic Technology Survey Results", http://www.aisc.org/WorkArea/showcontent. aspx?id=28374, accessed: October 19, 2011.
-
(2011)
AISC Basic Technology Survey Results
-
-
-
2
-
-
84885416256
-
Managing the risk of BIM
-
April 2010, 25, 27
-
Ales, J.M. (2010) "Managing the Risk of BIM", Structure Magazine, April 2010, pages: 23, 25, 27.
-
(2010)
Structure Magazine
, pp. 23
-
-
Ales, J.M.1
-
3
-
-
84883334464
-
BIM interoperability, the promise and the reality
-
December 2009
-
Burt, B. A. (2009) "BIM interoperability, the promise and the reality", Structure Magazine, December 2009, pages: 19-21
-
(2009)
Structure Magazine
, pp. 19-21
-
-
Burt, B.A.1
-
4
-
-
20444471167
-
Deployment of an AEC industry sector product model
-
Eastman, C, Wang. F., You, S.-J., and Yang, D. (2005) "Deployment of an AEC industry sector product model." Computer-Aided Design, 37(11), 1214-1228
-
(2005)
Computer-Aided Design
, vol.37
, Issue.11
, pp. 1214-1228
-
-
Eastman Wang, C.F.1
You, S.-J.2
Yang, D.3
-
5
-
-
38649094993
-
-
2nd Edition, John Wiley & Sons., Hoboken, N.J
-
Eastman, C., Teicholz, P., Sacks, R., and Liston, K. (2011). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors 2nd Edition, John Wiley & Sons., Hoboken, N.J.
-
(2011)
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors
-
-
Eastman, C.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
6
-
-
84885406614
-
Integrated project delivery using BIM
-
April 2009, 22, and 24
-
Griem, P. (2009). "Integrated project Delivery Using BIM", Structure Engineering and Design, April 2009, pages 21, 22, and 24
-
(2009)
Structure Engineering and Design
, pp. 21
-
-
Griem, P.1
-
7
-
-
84885396203
-
The importance of BIM in structural engineering
-
October 2008
-
Ikerd, W. F. (2008b). "The importance of BIM in Structural engineering", Structure Magazine, October 2008, 37-39
-
(2008)
Structure Magazine
, pp. 37-39
-
-
Ikerd, W.F.1
-
8
-
-
84883379539
-
Transforming the delivery process using building information modeling
-
April 2007
-
Jacobi, J. (2007). "Transforming the delivery Process Using Building Information Modeling", Structure Engineering and Design, April 2007, pages 19-21
-
(2007)
Structure Engineering and Design
, pp. 19-21
-
-
Jacobi, J.1
-
9
-
-
0031987262
-
Process model of design and construction activities of a building
-
Wiley Interscience
-
Kaneta, T., Furusaka, S., Nagaoka, H., Kimoto, K., and Okamoto, H. (1999). "Process Model of Design and Construction Activities of a Building", Computer-Aided Civil and Infrastructure Engineering, Vol 14, 45-54, Wiley Interscience
-
(1999)
Computer-Aided Civil and Infrastructure Engineering
, vol.14
, pp. 45-54
-
-
Kaneta, T.1
Furusaka, S.2
Nagaoka, H.3
Kimoto, K.4
Okamoto, H.5
-
10
-
-
84885416604
-
BIM: Leveraging integration, modeling a confederated BIM at LAX's new tom Bradley international terminal
-
October 2011
-
Klorman, W.M. (2011). "BIM: leveraging Integration, Modeling a confederated BIM at LAX's new tom Bradley international Terminal", Structure Magazine, October 2011, pages 22-24
-
(2011)
Structure Magazine
, pp. 22-24
-
-
Klorman, W.M.1
-
12
-
-
84885415464
-
The dots are connected in today's digital BIM workflow
-
September 2010
-
Middlebrooks, R. and Hammond, S. (2010). "The Dots are connected in Today's Digital BIM Workflow", Structure Engineering and Design, September 2010, page 49
-
(2010)
Structure Engineering and Design
, pp. 49
-
-
Middlebrooks, R.1
Hammond, S.2
-
14
-
-
13944284538
-
Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry
-
ASCE
-
Sacks, R., Eastman, C.M., and Lee, G. (2004) "Process Model Perspectives on Management and Engineering Procedures in the Precast/Prestressed Concrete Industry", Journal of Construction Engineering and Management, 130(2), 206-215, ASCE
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.2
, pp. 206-215
-
-
Sacks, R.1
Eastman, C.M.2
Lee, G.3
-
15
-
-
77955883757
-
Interaction of lean and building information modeling in construction
-
Sacks, R., Koskela, L., Dave, B., and Owen, R. (2010). "Interaction of lean and building information modeling in construction." Journal of Construction Engineering and Management, 136 (9), 968-980
-
(2010)
Journal of Construction Engineering and Management
, vol.136
, Issue.9
, pp. 968-980
-
-
Sacks, R.1
Koskela, L.2
Dave, B.3
Owen, R.4
-
16
-
-
84885394631
-
Integrating BIM
-
November 2011
-
Sandoval, A. (2011). "Integrating BIM", Structure Magazine, November 2011, pages: 20-22.
-
(2011)
Structure Magazine
, pp. 20-22
-
-
Sandoval, A.1
-
17
-
-
84885413502
-
BIM and the structural engineering community
-
December 2008
-
Schinler, D. and Nelson, E. (2008). "BIM and the structural engineering community", Structure Magazine, December 2008, pages: 10-12
-
(2008)
Structure Magazine
, pp. 10-12
-
-
Schinler, D.1
Nelson, E.2
-
18
-
-
84885412558
-
Process modeling for BIM technologies focusing on interdisciplinary design relating to structural design and construction
-
Submitted
-
Solnosky, R. (2013) "Process modeling for BIM technologies focusing on interdisciplinary design relating to structural design and construction." 2013 Architectural Engineering Institute Conference (Submitted)
-
(2013)
2013 Architectural Engineering Institute Conference
-
-
Solnosky, R.1
|