메뉴 건너뛰기




Volumn , Issue , 2013, Pages 849-859

Current status of BIM benefits, challenges, and the future potential for the structural discipline

Author keywords

Building Information Modeling; Computational Modeling; Structural Engineering; Structural Systems

Indexed keywords

CONSTRUCTION INDUSTRY; INFORMATION THEORY; STRUCTURAL DESIGN;

EID: 84885416092     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/9780784412848.075     Document Type: Conference Paper
Times cited : (10)

References (18)
  • 1
    • 84885407826 scopus 로고    scopus 로고
    • accessed: October 19, 2011
    • American Institute of Steel Construction (AISC) (2011). ""AISC Basic Technology Survey Results", http://www.aisc.org/WorkArea/showcontent. aspx?id=28374, accessed: October 19, 2011.
    • (2011) AISC Basic Technology Survey Results
  • 2
    • 84885416256 scopus 로고    scopus 로고
    • Managing the risk of BIM
    • April 2010, 25, 27
    • Ales, J.M. (2010) "Managing the Risk of BIM", Structure Magazine, April 2010, pages: 23, 25, 27.
    • (2010) Structure Magazine , pp. 23
    • Ales, J.M.1
  • 3
    • 84883334464 scopus 로고    scopus 로고
    • BIM interoperability, the promise and the reality
    • December 2009
    • Burt, B. A. (2009) "BIM interoperability, the promise and the reality", Structure Magazine, December 2009, pages: 19-21
    • (2009) Structure Magazine , pp. 19-21
    • Burt, B.A.1
  • 4
    • 20444471167 scopus 로고    scopus 로고
    • Deployment of an AEC industry sector product model
    • Eastman, C, Wang. F., You, S.-J., and Yang, D. (2005) "Deployment of an AEC industry sector product model." Computer-Aided Design, 37(11), 1214-1228
    • (2005) Computer-Aided Design , vol.37 , Issue.11 , pp. 1214-1228
    • Eastman Wang, C.F.1    You, S.-J.2    Yang, D.3
  • 6
    • 84885406614 scopus 로고    scopus 로고
    • Integrated project delivery using BIM
    • April 2009, 22, and 24
    • Griem, P. (2009). "Integrated project Delivery Using BIM", Structure Engineering and Design, April 2009, pages 21, 22, and 24
    • (2009) Structure Engineering and Design , pp. 21
    • Griem, P.1
  • 7
    • 84885396203 scopus 로고    scopus 로고
    • The importance of BIM in structural engineering
    • October 2008
    • Ikerd, W. F. (2008b). "The importance of BIM in Structural engineering", Structure Magazine, October 2008, 37-39
    • (2008) Structure Magazine , pp. 37-39
    • Ikerd, W.F.1
  • 8
    • 84883379539 scopus 로고    scopus 로고
    • Transforming the delivery process using building information modeling
    • April 2007
    • Jacobi, J. (2007). "Transforming the delivery Process Using Building Information Modeling", Structure Engineering and Design, April 2007, pages 19-21
    • (2007) Structure Engineering and Design , pp. 19-21
    • Jacobi, J.1
  • 10
    • 84885416604 scopus 로고    scopus 로고
    • BIM: Leveraging integration, modeling a confederated BIM at LAX's new tom Bradley international terminal
    • October 2011
    • Klorman, W.M. (2011). "BIM: leveraging Integration, Modeling a confederated BIM at LAX's new tom Bradley international Terminal", Structure Magazine, October 2011, pages 22-24
    • (2011) Structure Magazine , pp. 22-24
    • Klorman, W.M.1
  • 12
    • 84885415464 scopus 로고    scopus 로고
    • The dots are connected in today's digital BIM workflow
    • September 2010
    • Middlebrooks, R. and Hammond, S. (2010). "The Dots are connected in Today's Digital BIM Workflow", Structure Engineering and Design, September 2010, page 49
    • (2010) Structure Engineering and Design , pp. 49
    • Middlebrooks, R.1    Hammond, S.2
  • 14
    • 13944284538 scopus 로고    scopus 로고
    • Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry
    • ASCE
    • Sacks, R., Eastman, C.M., and Lee, G. (2004) "Process Model Perspectives on Management and Engineering Procedures in the Precast/Prestressed Concrete Industry", Journal of Construction Engineering and Management, 130(2), 206-215, ASCE
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.2 , pp. 206-215
    • Sacks, R.1    Eastman, C.M.2    Lee, G.3
  • 16
    • 84885394631 scopus 로고    scopus 로고
    • Integrating BIM
    • November 2011
    • Sandoval, A. (2011). "Integrating BIM", Structure Magazine, November 2011, pages: 20-22.
    • (2011) Structure Magazine , pp. 20-22
    • Sandoval, A.1
  • 17
    • 84885413502 scopus 로고    scopus 로고
    • BIM and the structural engineering community
    • December 2008
    • Schinler, D. and Nelson, E. (2008). "BIM and the structural engineering community", Structure Magazine, December 2008, pages: 10-12
    • (2008) Structure Magazine , pp. 10-12
    • Schinler, D.1    Nelson, E.2
  • 18
    • 84885412558 scopus 로고    scopus 로고
    • Process modeling for BIM technologies focusing on interdisciplinary design relating to structural design and construction
    • Submitted
    • Solnosky, R. (2013) "Process modeling for BIM technologies focusing on interdisciplinary design relating to structural design and construction." 2013 Architectural Engineering Institute Conference (Submitted)
    • (2013) 2013 Architectural Engineering Institute Conference
    • Solnosky, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.