Volumn 26, Issue 3, 2012, Pages 309-318

Automated approach for developing integrated model-based project histories to support estimation of activity production rates

Author keywords

Algorithms; Building information models; Cost estimating; Data storage; Decision support systems; Integrated product and process models; Model mappings

Indexed keywords

AUTOMATED APPROACH; AUTOMATED MAPPING; AUTOMATIC MAPPING; BUILDING INFORMATION MODEL - BIM; CONTEXTUAL INFORMATION; DATA ITEMS; DATA SOURCE; DATA STORAGE; HISTORICAL PRODUCTION; INTEGRATED FASHION; INTEGRATED MODELS; INTEGRATING INFORMATION; MODEL MAPPINGS; PROCESS MODEL; PRODUCTION RATES; PROJECT MODEL;

EID: 84861136495     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CP.1943-5487.0000139     Document Type: Article
Times cited : (11)

References (30)
  • 1
    • 16444384637 scopus 로고    scopus 로고
    • Construction zone generation mechanisms and applications
    • National Institute of Standards and Technology, Washington, DC
    • Akbas, R., and Fischer, M. (2002). Construction zone generation mechanisms and applications. 19th Int. Symp. on Automation and Robotics in Construction, National Institute of Standards and Technology, Washington, DC, 293-298.
    • (2002) 19th Int. Symp. on Automation and Robotics in Construction , pp. 293-298
    • Akbas, R.1    Fischer, M.2
  • 3
    • 60449086917 scopus 로고    scopus 로고
    • Unique requirements of building information modeling for cast-in-place reinforced concrete
    • JCCEE5 0887-3801. 10.1061/(ASCE)0887-3801(2009)23:2(64)
    • Barak, R., Jeong, Y., Sacks, R., and Eastman, C. (2009). Unique requirements of building information modeling for cast-in-place reinforced concrete. J. Comput. Civ. Eng. JCCEE5 0887-3801, 23 (2), 64-74. 10.1061/(ASCE)0887-3801(2009)23:2(64)
    • (2009) J. Comput. Civ. Eng. , vol.23 , Issue.2 , pp. 64-74
    • Barak, R.1    Jeong, Y.2    Sacks, R.3    Eastman, C.4
  • 4
    • 37349020861 scopus 로고    scopus 로고
    • What is Java reflection?
    • 1087-6944, (Jun. 3, 2007)
    • Barrera, J. (2001). What is Java reflection? Java Developers J. 1087-6944, 9 (6) http://jdj.sys-con.com/read/issue/31.htm (Jun. 3, 2007).
    • (2001) Java Developers J. , vol.9 , Issue.6
    • Barrera, J.1
  • 5
    • 0024626029 scopus 로고
    • Basic structure of a proposed building product model
    • 0010-4485. 10.1016/0010-4485(89)90141-3
    • Bjork, B. C. (1989). Basic structure of a proposed building product model. Comput. Aided Des. 0010-4485, 21 (2), 71-78. 10.1016/0010-4485(89)90141-3
    • (1989) Comput. Aided Des. , vol.21 , Issue.2 , pp. 71-78
    • Bjork, B.C.1
  • 6
    • 58149213711 scopus 로고    scopus 로고
    • Implementing metric operators of a spatial query language for 3D building models: Octree and b-rep approaches
    • JCCEE5 0887-3801. 10.1061/(ASCE)0887-3801(2009)23:1(34)
    • Borrmann, A., Schraufstetter, S., and Rank, E. (2009). Implementing metric operators of a spatial query language for 3D building models: Octree and b-rep approaches. J. Comput. Civ. Eng. JCCEE5 0887-3801, 23 (1), 34-46. 10.1061/(ASCE)0887-3801(2009)23:1(34)
    • (2009) J. Comput. Civ. Eng. , vol.23 , Issue.1 , pp. 34-46
    • Borrmann, A.1    Schraufstetter, S.2    Rank, E.3
  • 7
    • 84861138132 scopus 로고    scopus 로고
    • buildingSmart. (Mar. 3, 2008)
    • buildingSmart. (2008). Short introduction to IFC. www.buildingsmart.com/ bim (Mar. 3, 2008).
    • (2008) Short Introduction to IFC
  • 8
    • 0032667279 scopus 로고    scopus 로고
    • WorkPlan: Constraint-based database for work package scheduling
    • JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1999)125:3(151)
    • Choo, H. J., and Tommelein, I. D. (1999). WorkPlan: Constraint-based database for work package scheduling. J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (3), 151-160. 10.1061/(ASCE)0733-9364(1999)125:3(151)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 151-160
    • Choo, H.J.1    Tommelein, I.D.2
  • 9
    • 84861118023 scopus 로고    scopus 로고
    • CIS/2. (Mar. 16, 2008)
    • CIS/2. (2003). CIMSteel integration standards. http://www.cis2.org (Mar. 16, 2008).
    • (2003) CIMSteel Integration Standards
  • 10
    • 0030219240 scopus 로고    scopus 로고
    • Rapid conceptual design evaluation using a virtual product model
    • DOI 10.1016/0952-1976(96)00035-8, PII S0952197696000358
    • Clayton, M., Kunz, J., and Fischer, M. (1996). Rapid conceptual design evaluation using a virtual product model. Eng. Appl. Artif. Intell. EAAIE6 0952-1976, 9 (4), 439-451. 10.1016/0952-1976(96)00035-8 (Pubitemid 126358978)
    • (1996) Engineering Applications of Artificial Intelligence , vol.9 , Issue.4 , pp. 439-451
    • Clayton, M.J.1    Kunz, J.C.2    Fischer, M.A.3
  • 11
    • 84974449619 scopus 로고
    • OARPlan: Generating project plans by reasoning about objects, actions and resources
    • 10.1017/S0890060400000639
    • Darwiche, A., Levitt, R. E., and Hayes-Roth, B. (1988). OARPlan: Generating project plans by reasoning about objects, actions and resources. J. Artif. Intell. Eng. Des., Anal., Manuf., 2 (3), 169-181. 10.1017/ S0890060400000639
    • (1988) J. Artif. Intell. Eng. Des., Anal., Manuf. , vol.2 , Issue.3 , pp. 169-181
    • Darwiche, A.1    Levitt, R.E.2    Hayes-Roth, B.3
  • 12
    • 33750133837 scopus 로고    scopus 로고
    • Methodology for usability evaluation of corporate memory design reuse systems
    • DOI 10.1061/(ASCE)0887-3801(2006)20:6(377), 001606QCP
    • Demian, P., and Fruchter, R. (2006). Methodology for usability evaluation of corporate memory design reuse systems. J. Comput. Civ. Eng. JCCEE5 0887-3801, 20 (6), 377-388. 10.1061/(ASCE)0887-3801(2006)20:6(377) (Pubitemid 44592481)
    • (2006) Journal of Computing in Civil Engineering , vol.20 , Issue.6 , pp. 377-389
    • Demian, P.1    Fruchter, R.2
  • 13
    • 0000693991 scopus 로고    scopus 로고
    • Scheduling with computer-interpretable construction method models
    • Fischer, M. A., and Aalami, F. (1996). Scheduling with computer-interpretable construction method models. J. Constr. Eng. Manage. JCEMD4 0733-9364, 122 (4), 337-347. 10.1061/(ASCE)0733-9364(1996)122:4(337) (Pubitemid 126567114)
    • (1996) Journal of Construction Engineering and Management , vol.122 , Issue.4 , pp. 337-347
    • Fischer, M.A.1    Aalami, F.2
  • 14
    • 9344259769 scopus 로고    scopus 로고
    • Estimating the productivity of cyclic construction operations using case-based reasoning
    • 1474-0346. 10.1016/j.aei.2004.03.001
    • Graham, D., and Smith, S. (2004). Estimating the productivity of cyclic construction operations using case-based reasoning. Adv. Eng. Inform. 1474-0346, 18 (1), 17-28. 10.1016/j.aei.2004.03.001
    • (2004) Adv. Eng. Inform. , vol.18 , Issue.1 , pp. 17-28
    • Graham, D.1    Smith, S.2
  • 16
    • 0023440167 scopus 로고
    • Expert system for construction planning
    • JCCEE5 0887-3801. 10.1061/(ASCE)0887-3801(1987)1:4(253)
    • Hendrickson, C., Zozaya-Gorostiza, C., Rehak, D. R., Baracco-Miller, E., and Lim, P. (1987). Expert system for construction planning. J. Comput. Civ. Eng. JCCEE5 0887-3801, 1 (4), 253-269. 10.1061/(ASCE)0887-3801(1987)1:4(253)
    • (1987) J. Comput. Civ. Eng. , vol.1 , Issue.4 , pp. 253-269
    • Hendrickson, C.1    Zozaya-Gorostiza, C.2    Rehak, D.R.3    Baracco-Miller, E.4    Lim, P.5
  • 17
    • 0029747295 scopus 로고    scopus 로고
    • Making effective use of construction lessons learned in project life cycle
    • JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1996)122:1(14)
    • Kartam, N. (1996). Making effective use of construction lessons learned in project life cycle. J. Constr. Eng. Manage. JCEMD4 0733-9364, 122 (1), 14-20. 10.1061/(ASCE)0733-9364(1996)122:1(14)
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.1 , pp. 14-20
    • Kartam, N.1
  • 19
    • 69149083688 scopus 로고    scopus 로고
    • Contextual information requirements of cost estimators from past construction projects
    • JCEMD4 0733-9364. 10.1061/(ASCE)CO.1943-7862.0000053
    • Kiziltas, S., and Akinci, B. (2009). Contextual information requirements of cost estimators from past construction projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (9), 841-852. 10.1061/(ASCE)CO.1943-7862.0000053
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.9 , pp. 841-852
    • Kiziltas, S.1    Akinci, B.2
  • 20
    • 77149158804 scopus 로고    scopus 로고
    • Automated generation of customized field data collection templates to support information needs of cost estimators
    • JCCEE5 0887-3801. 10.1061/(ASCE)CP.1943-5487.0000017
    • Kiziltas, S., and Akinci, B. (2010). Automated generation of customized field data collection templates to support information needs of cost estimators. J. Comput. Civ. Eng. JCCEE5 0887-3801, 24 (2), 129-139. 10.1061/(ASCE)CP.1943- 5487.0000017
    • (2010) J. Comput. Civ. Eng. , vol.24 , Issue.2 , pp. 129-139
    • Kiziltas, S.1    Akinci, B.2
  • 21
    • 77649147786 scopus 로고    scopus 로고
    • Comparison of experienced and novice cost estimator behaviors in information pull and push methods
    • CJCEB8 0315-1468. 10.1139/L09-152
    • Kiziltas, S., Akinci, B., and Gonzalez, C. (2010). Comparison of experienced and novice cost estimator behaviors in information pull and push methods. Can. J. Civ. Eng. CJCEB8 0315-1468, 37 (2), 290-301. 10.1139/L09-152
    • (2010) Can. J. Civ. Eng. , vol.37 , Issue.2 , pp. 290-301
    • Kiziltas, S.1    Akinci, B.2    Gonzalez, C.3
  • 22
    • 0012072562 scopus 로고
    • An information reference model for architecture, engineering, and construction
    • M. Betts, and K. Tham, eds., World Scientific & Global Publication Services, Singapore
    • Luiten, G., (1993). An information reference model for architecture, engineering, and construction. Management of information technology for construction, M. Betts, and, K. Tham, eds., World Scientific & Global Publication Services, Singapore, 391-406.
    • (1993) Management of Information Technology for Construction , pp. 391-406
    • Luiten, G.1
  • 23
    • 84861174651 scopus 로고    scopus 로고
    • Electr. Constr. Maint. Mag., (Dec. 5, 2010)
    • Moore, H. M., and Nimmo, P. E. (2008). Improving estimation accuracy. Electr. Constr. Maint. Mag., http://www.ecmweb.com/ops-maintenance/electric- improving-estimation-accuracy/index.html (Dec. 5, 2010).
    • (2008) Improving Estimation Accuracy
    • Moore, H.M.1    Nimmo, P.E.2
  • 25
    • 33748128388 scopus 로고    scopus 로고
    • A project-oriented data warehouse for construction
    • DOI 10.1016/j.autcon.2005.11.001, PII S0926580505001597, Knowledge Enabled Information System Applications in Construction
    • Rujirayanyong, T., and Shi, J. J. (2006). A project-oriented data warehouse for construction. Autom. Constr. AUCOES 0926-5805, 15 (6), 800-807. 10.1016/j.autcon.2005.11.001 (Pubitemid 44311012)
    • (2006) Automation in Construction , vol.15 , Issue.6 , pp. 800-807
    • Rujirayanyong, T.1    Shi, J.J.2
  • 26
    • 0001582375 scopus 로고
    • Knowledge-based system for construction planning of high-rise buildings
    • JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1995)121:2(172)
    • Shaked, O., and Warszawski, A. (1995). Knowledge-based system for construction planning of high-rise buildings. J. Constr. Eng. Manage. JCEMD4 0733-9364, 121 (2), 172-182. 10.1061/(ASCE)0733-9364(1995)121:2(172)
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.2 , pp. 172-182
    • Shaked, O.1    Warszawski, A.2
  • 27
    • 0042889331 scopus 로고    scopus 로고
    • A generic feature-driven activity-based cost estimation process
    • 1474-0346. 10.1016/S1474-0346(03)00017-X
    • Staub-French, S., Fisher, M., Kunz, J., and Paulson, B. (2003). A generic feature-driven activity-based cost estimation process. Adv. Eng. Inform. 1474-0346, 17 (1), 23-39. 10.1016/S1474-0346(03)00017-X
    • (2003) Adv. Eng. Inform. , vol.17 , Issue.1 , pp. 23-39
    • Staub-French, S.1    Fisher, M.2    Kunz, J.3    Paulson, B.4
  • 28
    • 0028396033 scopus 로고
    • Forecasting labor productivity using the factor model
    • JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1994)120:1(228)
    • Thomas, H. R., and Sakarcan, A. (1994). Forecasting labor productivity using the factor model. J. Constr. Eng. Manage. JCEMD4 0733-9364, 120 (1), 228-239. 10.1061/(ASCE)0733-9364(1994)120:1(228)
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.1 , pp. 228-239
    • Thomas, H.R.1    Sakarcan, A.2
  • 29
    • 84055212436 scopus 로고    scopus 로고
    • Ontology-based representation and reasoning framework for supporting job hazard analysis
    • JCCEE5 0887-3801. 10.1061/(ASCE)CP.1943-5487.0000125
    • Wang, H. H., and Boukamp, F. (2011). Ontology-based representation and reasoning framework for supporting job hazard analysis. J. Comput. Civ. Eng. JCCEE5 0887-3801, 25 (6), 442-456. 10.1061/(ASCE)CP.1943-5487.0000125
    • (2011) J. Comput. Civ. Eng. , vol.25 , Issue.6 , pp. 442-456
    • Wang, H.H.1    Boukamp, F.2
  • 30
    • 0003866904 scopus 로고
    • To product models and beyond
    • P. Brandon and M. Betts, eds., E&F Spon, London
    • Watson, A. (1995). To product models and beyond. Integrated construction information, P. Brandon, and, M. Betts, eds., E&F Spon, London, 159-172.
    • (1995) Integrated Construction Information , pp. 159-172
    • Watson, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.