메뉴 건너뛰기




Volumn 18, Issue , 2013, Pages 40-63

Reviewing the evidence: USE of digital collaboration technologies in major building and infrastructure projects

Author keywords

BIM; Collaboration; Coordination; Digital technologies; Integration; Major projects; Practices

Indexed keywords

BIM; COLLABORATION; COORDINATION; DIGITAL TECHNOLOGIES; MAJOR PROJECT; PRACTICES;

EID: 84876909628     PISSN: 14036835     EISSN: 14006529     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (53)

References (104)
  • 1
    • 25844464325 scopus 로고    scopus 로고
    • Use of information and communication technologies by small and medium-sized enterprises (SMEs) in building construction
    • DOI 10.1080/01446190500127112
    • Acar E., Koçak I., Sey Y. and Arditi D. (2005). Use of information and communication technologies by small and medium-sized enterprises (smes) in building construction. Construction Management & Economics, 23(7), 713-722. (Pubitemid 41388510)
    • (2005) Construction Management and Economics , vol.23 , Issue.7 , pp. 713-722
    • Acar, E.1    Kocak, I.2    Sey, Y.3    Arditi, D.4
  • 3
    • 0000735812 scopus 로고
    • Information technology (it) and integration in the construction industry
    • Ahmad I. U., Russell J. S. and Abou-Zeid A. (1995). Information technology (it) and integration in the construction industry. Construction Management & Economics, 13(2), 163.
    • (1995) Construction Management & Economics , vol.13 , Issue.2 , pp. 163
    • Ahmad, I.U.1    Russell, J.S.2    Abou-Zeid, A.3
  • 4
    • 56749092458 scopus 로고    scopus 로고
    • AIA. California Council: The American Institute of Architects
    • AIA. (2007). Integrated project delivery: A guide. California Council: The American Institute of Architects.
    • (2007) Integrated Project Delivery: A Guide
  • 7
    • 84862026653 scopus 로고    scopus 로고
    • Building information modelling (bim) implementation and remote construction projects: Issues, challenges and critiques
    • (Special Issue Management of remote construction sites and the role of IT Systems)
    • Arayici Y., Egbu C. and Coates P. (2012). Building information modelling (bim) implementation and remote construction projects: Issues, challenges and critiques. ITcon, 17(Special Issue: Management of remote construction sites and the role of IT Systems), 75-92.
    • (2012) ITcon , vol.17 , pp. 75-92
    • Arayici, Y.1    Egbu, C.2    Coates, P.3
  • 8
    • 79960269657 scopus 로고    scopus 로고
    • Building information modeling (bim): Trends, benefits, risks, and challenges for the aec industry
    • Azhar S. (2011). Building information modeling (bim): Trends, benefits, risks, and challenges for the aec industry. Leadership and Management in Engineering, 11(3), 241-252.
    • (2011) Leadership and Management in Engineering , vol.11 , Issue.3 , pp. 241-252
    • Azhar, S.1
  • 9
    • 77955710066 scopus 로고    scopus 로고
    • Integrating resource production and construction using bim
    • Babic N. C., Podbreznik P. and Rebolj D. (2010). Integrating resource production and construction using bim. Automation in Construction, 19(5), 539-543.
    • (2010) Automation in Construction , vol.19 , Issue.5 , pp. 539-543
    • Babic, N.C.1    Podbreznik, P.2    Rebolj, D.3
  • 10
    • 34147185296 scopus 로고    scopus 로고
    • Towards distributed product data sharing environments - Progress so far and future challenges
    • DOI 10.1016/j.autcon.2006.10.002, PII S092658050600104X
    • Bakis N., Aouad G. and Kagioglou M. (2007). Towards distributed product data sharing environments-progress so far and future challenges. Automation in Construction, 16(5), 586-595. (Pubitemid 46575188)
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 586-595
    • Bakis, N.1    Aouad, G.2    Kagioglou, M.3
  • 11
    • 77955340995 scopus 로고    scopus 로고
    • Discussion of "areas of application for 3d and 4d models on construction projects" by timo hartmann, ju gao, and martin fischer
    • Bansal V. K. (2010). Discussion of "areas of application for 3d and 4d models on construction projects" by timo hartmann, ju gao, and martin fischer. Journal of Construction Engineering & Management, 136(8), 931-932.
    • (2010) Journal of Construction Engineering & Management , vol.136 , Issue.8 , pp. 931-932
    • Bansal, V.K.1
  • 12
    • 84860281943 scopus 로고    scopus 로고
    • How to measure the benefits of bim-A case study approach
    • Barlish K. and Sullivan K. (2012). How to measure the benefits of bim-a case study approach. Automation in Construction, 24(0), 149-159.
    • (2012) Automation in Construction , vol.24 , Issue.0 , pp. 149-159
    • Barlish, K.1    Sullivan, K.2
  • 13
    • 78049271775 scopus 로고    scopus 로고
    • The process of embedding new information technology artifacts into innovative design practices
    • Baxter R. J. and Berente N. (2010). The process of embedding new information technology artifacts into innovative design practices. Information and Organization, 20(3-4), 133-155.
    • (2010) Information and Organization , vol.20 , Issue.3-4 , pp. 133-155
    • Baxter, R.J.1    Berente, N.2
  • 14
    • 84861063825 scopus 로고    scopus 로고
    • Design communication: Issues confronting both co-located and virtual teams
    • F. Khosrowshahi (Ed.), SOAS University of London: Association of Researchers in Construction Management
    • Bellamy T., Williams A., Sher W., Sherratt S. and Gameson R. (2005). Design communication: Issues confronting both co-located and virtual teams. In F. Khosrowshahi (Ed.), 21st annual arcom conference, 7-9 september 2005 (Vol. 1, pp. 353-361). SOAS, University of London: Association of Researchers in Construction Management.
    • (2005) 21st Annual Arcom Conference, 7-9 September 2005 , vol.1 , pp. 353-361
    • Bellamy, T.1    Williams, A.2    Sher, W.3    Sherratt, S.4    Gameson, R.5
  • 15
    • 33751506669 scopus 로고    scopus 로고
    • Negotiating visualizations in briefing and design
    • DOI 10.1080/09613210600950401, PII X3J4L11H251K95NJ
    • Bendixen M. and Koch C. (2007). Negotiating visualizations in briefing and design. Building Research & Information, 35(1), 42-53. (Pubitemid 44838088)
    • (2007) Building Research and Information , vol.35 , Issue.1 , pp. 42-53
    • Bendixen, M.1    Koch, C.2
  • 17
    • 84876924012 scopus 로고    scopus 로고
    • Building information modeling for sustainable design
    • Bernstein P. (2007). Building information modeling for sustainable design. Sustainable Facility, 32(11), 26-27.
    • (2007) Sustainable Facility , vol.32 , Issue.11 , pp. 26-27
    • Bernstein, P.1
  • 18
    • 30644476972 scopus 로고    scopus 로고
    • The impact of a design management training initiative on project performance
    • DOI 10.1108/09699980610646476
    • Bibby L., Austin S. and Bouchlaghem D. (2006). The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(1), 7-26. (Pubitemid 43089133)
    • (2006) Engineering, Construction and Architectural Management , vol.13 , Issue.1 , pp. 7-26
    • Bibby, L.1    Austin, S.2    Bouchlaghem, D.3
  • 19
    • 84861841999 scopus 로고    scopus 로고
    • BIS. Retrieved 30/05/2011
    • BIS. (2011a). Government construction strategy. Retrieved 30/05/2011. from http://www.cabinetoffice.gov.uk/sites/default/files/resources/Government- Construction-Strategy.pdf.
    • (2011) Government Construction Strategy
  • 21
    • 0002577475 scopus 로고
    • Impacts of information technology on the structure of construction
    • Bröchner J. (1990). Impacts of information technology on the structure of construction. Construction Management & Economics, 8(2), 205.
    • (1990) Construction Management & Economics , vol.8 , Issue.2 , pp. 205
    • Bröchner, J.1
  • 22
    • 79954424532 scopus 로고    scopus 로고
    • A review and outlook for a 'building information model' (bim): A multi-standpoint framework for technological development
    • Cerovsek T. (2011). A review and outlook for a 'building information model' (bim): A multi-standpoint framework for technological development. Advanced Engineering Informatics, 25(2), 224-244.
    • (2011) Advanced Engineering Informatics , vol.25 , Issue.2 , pp. 224-244
    • Cerovsek, T.1
  • 23
    • 72649097737 scopus 로고    scopus 로고
    • Producing a systematic review
    • D. A. Buchanan & A. Bryman (Eds.). Los Angeles: SAGE
    • Denyer D. and Tranfield D. (2009). Producing a systematic review. In D. A. Buchanan & A. Bryman (Eds.), The sage handbook of organizational research methods (pp. 671-689). Los Angeles: SAGE.
    • (2009) The Sage Handbook of Organizational Research Methods , pp. 671-689
    • Denyer, D.1    Tranfield, D.2
  • 24
    • 84872547845 scopus 로고    scopus 로고
    • Benchmarking a new design management system using process simulation approach
    • Doloi H. (2010). Benchmarking a new design management system using process simulation approach. Construction Innovation: Information, Process, Management, 10(1), 42-59.
    • (2010) Construction Innovation: Information, Process, Management , vol.10 , Issue.1 , pp. 42-59
    • Doloi, H.1
  • 25
    • 77949691000 scopus 로고    scopus 로고
    • Organizational divisions in bim-enabled commercial construction
    • Dossick C. S. and Neff G. (2010). Organizational divisions in bim-enabled commercial construction. Journal of Construction Engineering & Management, 136(4), 459-467.
    • (2010) Journal of Construction Engineering & Management , vol.136 , Issue.4 , pp. 459-467
    • Dossick, C.S.1    Neff, G.2
  • 26
    • 84862309292 scopus 로고    scopus 로고
    • Messy talk and clean technology: Communication, problem-solving and collaboration using building information modelling
    • Dossick C. S. and Neff G. (2011). Messy talk and clean technology: Communication, problem-solving and collaboration using building information modelling. Engineering Project Organization Journal, 1(2), 83-93.
    • (2011) Engineering Project Organization Journal , vol.1 , Issue.2 , pp. 83-93
    • Dossick, C.S.1    Neff, G.2
  • 29
    • 34248570113 scopus 로고    scopus 로고
    • Using digital socialization to support geographically dispersed AEC project teams
    • DOI 10.1061/(ASCE)0733-9364(2007)133:6(462)
    • El-Tayeh A. and Gil N. (2007). Using digital socialization to support geographically dispersed aec project teams. Journal of Construction Engineering & Management, 133(6), 462-473. (Pubitemid 46753485)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.6 , pp. 462-473
    • El-Tayeh, A.1    Gil, N.2
  • 30
    • 33751531640 scopus 로고    scopus 로고
    • Visual representations as 'artefacts of knowing'
    • Ewenstein B. and Whyte J. K. (2007). Visual representations as 'artefacts of knowing'. Building Research & Information, 35(1), 81-89.
    • (2007) Building Research & Information , vol.35 , Issue.1 , pp. 81-89
    • Ewenstein, B.1    Whyte, J.K.2
  • 31
    • 33747347230 scopus 로고    scopus 로고
    • The benefits of virtual building tools
    • Fischer M. (2003). The benefits of virtual building tools. Civil Engineering-ASCE, 73(8), 60-67.
    • (2003) Civil Engineering-ASCE , vol.73 , Issue.8 , pp. 60-67
    • Fischer, M.1
  • 33
    • 33751384135 scopus 로고    scopus 로고
    • Challenges and benefits of 4d modeling on the walt disney concert hall project
    • Center for Integrated Facilities Engineering (CIFE), Stanford University, Stanford CA
    • Fischer M. and Haymaker J. (2001). Challenges and benefits of 4d modeling on the walt disney concert hall project Working Paper 64: Center for Integrated Facilities Engineering (CIFE), Stanford University, Stanford CA.
    • (2001) Working Paper 64
    • Fischer, M.1    Haymaker, J.2
  • 34
    • 26644446807 scopus 로고    scopus 로고
    • Benefits of 3d and 4d models for facility managers and aec service providers
    • R. R. A. Issa, I. Flood & W. J. O'Brien (Eds.). Lisse, Abingdon: A.A. Balkema Publishers
    • Fischer M., Haymaker J. and Liston K. (2003). Benefits of 3d and 4d models for facility managers and aec service providers. In R. R. A. Issa, I. Flood & W. J. O'Brien (Eds.), 4d cad and visualization in construction. Lisse, Abingdon: A.A. Balkema Publishers.
    • (2003) 4d Cad and Visualization in Construction
    • Fischer, M.1    Haymaker, J.2    Liston, K.3
  • 35
    • 34047115894 scopus 로고    scopus 로고
    • Interorganizational use of building information models: Potential for automational, informational and transformational effects
    • DOI 10.1080/01446190600892995, PII 775675982
    • Fox S. and Hietanen J. (2007). Interorganizational use of building information models: Potential for automational, informational and transformational effects. Construction Management & Economics, 25(3), 289-296. (Pubitemid 46510937)
    • (2007) Construction Management and Economics , vol.25 , Issue.3 , pp. 289-296
    • Fox, S.1    Hietanen, J.2
  • 36
    • 77955716145 scopus 로고    scopus 로고
    • The impact of emerging information technology on project management for construction
    • Fröese T. M. (2010). The impact of emerging information technology on project management for construction. Automation in Construction, 19(5), 531-538.
    • (2010) Automation in Construction , vol.19 , Issue.5 , pp. 531-538
    • Fröese, T.M.1
  • 37
    • 48849101685 scopus 로고    scopus 로고
    • The dynamics of it boundary objects, information infrastructures, and organisational identities: The introduction of 3d modelling technologies into the architecture, engineering, and construction industry
    • Gal U., Lyytinen K. and Yoo Y. J. (2008). The dynamics of it boundary objects, information infrastructures, and organisational identities: The introduction of 3d modelling technologies into the architecture, engineering, and construction industry. European Journal of Information Systems, 17(3), 290-304.
    • (2008) European Journal of Information Systems , vol.17 , Issue.3 , pp. 290-304
    • Gal, U.1    Lyytinen, K.2    Yoo, Y.J.3
  • 38
    • 45749088540 scopus 로고    scopus 로고
    • Integrating construction process documentation into building information modeling
    • Goedert J. D. and Meadati P. (2008). Integrating construction process documentation into building information modeling. Journal of Construction Engineering & Management, 134(7), 509-516.
    • (2008) Journal of Construction Engineering & Management , vol.134 , Issue.7 , pp. 509-516
    • Goedert, J.D.1    Meadati, P.2
  • 39
    • 77955711321 scopus 로고    scopus 로고
    • Value proposition on interoperability of bim and collaborative working environments
    • Grilo A. and Jardim-Goncalves R. (2010). Value proposition on interoperability of bim and collaborative working environments. Automation in Construction, 19(5), 522-530.
    • (2010) Automation in Construction , vol.19 , Issue.5 , pp. 522-530
    • Grilo, A.1    Jardim-Goncalves, R.2
  • 40
    • 79551684312 scopus 로고    scopus 로고
    • Challenging electronic procurement in the aec sector: A bim-based integrated perspective
    • Grilo A. and Jardim-Goncalves R. (2011). Challenging electronic procurement in the aec sector: A bim-based integrated perspective. Automation in Construction, 20(2), 107-114.
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 107-114
    • Grilo, A.1    Jardim-Goncalves, R.2
  • 41
    • 78149283543 scopus 로고    scopus 로고
    • Understanding and facilitating bim adoption in the aec industry
    • Gu N. and London K. (2010). Understanding and facilitating bim adoption in the aec industry. Automation in Construction, 19(8), 988-999.
    • (2010) Automation in Construction , vol.19 , Issue.8 , pp. 988-999
    • Gu, N.1    London, K.2
  • 42
    • 33751501800 scopus 로고    scopus 로고
    • Supporting the constructability review with 3D/4D models
    • DOI 10.1080/09613210600942218, PII NU6071P73H7T2004
    • Hartmann T. and Fischer M. (2007). Supporting the constructability review with 3d/4d models. Building Research & Information, 35(1), 70-80. (Pubitemid 44838090)
    • (2007) Building Research and Information , vol.35 , Issue.1 , pp. 70-80
    • Hartmann, T.1    Fischer, M.2
  • 44
    • 77955316630 scopus 로고    scopus 로고
    • Closure to "areas of application for 3d and 4d models on construction projects" by timo hartmann, ju gao, and martin fischer
    • Hartmann T., Gao J. and Fischer M. (2010). Closure to "areas of application for 3d and 4d models on construction projects" by timo hartmann, ju gao, and martin fischer. Journal of Construction Engineering & Management, 136(8), 932-934.
    • (2010) Journal of Construction Engineering & Management , vol.136 , Issue.8 , pp. 932-934
    • Hartmann, T.1    Gao, J.2    Fischer, M.3
  • 45
    • 84857357646 scopus 로고    scopus 로고
    • Aligning building information model tools and construction management methods
    • Hartmann T., van Meerveld H., Vossebeld N. and Adriaanse A. (2012). Aligning building information model tools and construction management methods. Automation in Construction, 22(0), 605-613.
    • (2012) Automation in Construction , vol.22 , Issue.0 , pp. 605-613
    • Hartmann, T.1    Van Meerveld, H.2    Vossebeld, N.3    Adriaanse, A.4
  • 46
    • 77949737409 scopus 로고    scopus 로고
    • Implementing innovation: Designers, users and actor-networks
    • Harty C. (2010). Implementing innovation: Designers, users and actor-networks. Technology Analysis & Strategic Management, 22(3), 297-315.
    • (2010) Technology Analysis & Strategic Management , vol.22 , Issue.3 , pp. 297-315
    • Harty, C.1
  • 48
    • 84965431678 scopus 로고
    • Flexible sketches and inflexible data-bases-visual communication, conscription devices, and boundary objects in design engineering
    • Henderson K. (1991). Flexible sketches and inflexible data-bases-visual communication, conscription devices, and boundary objects in design engineering. Science Technology & Human Values, 16(4), 448-473.
    • (1991) Science Technology & Human Values , vol.16 , Issue.4 , pp. 448-473
    • Henderson, K.1
  • 49
    • 40849134303 scopus 로고    scopus 로고
    • Building information modelling - Experts' views on standardisation and industry deployment
    • DOI 10.1016/j.aei.2007.03.001, PII S1474034607000201
    • Howard R. and Björk B.-C. (2008). Building information modelling-experts' views on standardisation and industry deployment. Advanced Engineering Informatics, 22(2), 271-280. (Pubitemid 351391925)
    • (2008) Advanced Engineering Informatics , vol.22 , Issue.2 , pp. 271-280
    • Howard, R.1    Bjork, B.-C.2
  • 50
    • 79551684087 scopus 로고    scopus 로고
    • Bim- and 4d-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials
    • Hu Z. and Zhang J. (2011). Bim- and 4d-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials. Automation in Construction, 20(2), 167-180.
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 167-180
    • Hu, Z.1    Zhang, J.2
  • 53
    • 77955715185 scopus 로고    scopus 로고
    • Two design patterns for facilitating building information model-based synchronous collaboration
    • Isikdag U. and Underwood J. (2010). Two design patterns for facilitating building information model-based synchronous collaboration. Automation in Construction, 19(5), 544-553.
    • (2010) Automation in Construction , vol.19 , Issue.5 , pp. 544-553
    • Isikdag, U.1    Underwood, J.2
  • 54
    • 77950930031 scopus 로고    scopus 로고
    • The influence of contextual elements, actors' frames of reference, and technology on the adoption and use of ict in construction projects: A swedish case study
    • Jacobsson M. and Linderoth H. C. J. (2010). The influence of contextual elements, actors' frames of reference, and technology on the adoption and use of ict in construction projects: A swedish case study. Construction Management & Economics, 28(1), 13-23.
    • (2010) Construction Management & Economics , vol.28 , Issue.1 , pp. 13-23
    • Jacobsson, M.1    Linderoth, H.C.J.2
  • 55
    • 21844518621 scopus 로고
    • Ecologically Sustainable Organizations: an Institutional Approach
    • Jennings P. D. and Zandbergen P. A. (1995). Ecologically sustainable organizations: An institutional approach. Academy of Management Review, 20(4), 1015-1052. (Pubitemid 126003242)
    • (1995) Academy of Management Review , vol.20 , Issue.4 , pp. 1015-1052
    • Devereaux Jennings, P.1    Zandbergen, P.A.2
  • 56
    • 84919501437 scopus 로고    scopus 로고
    • Introduction to concurrent engineering in construction
    • C. J. Anumba, J. M. Kamara & A.-F. Cutting-Decelle (Eds.). London, New York: Taylor Francis
    • Kamara J. M., Anumba C. J. and Cutting-Decelle A.-F. (2007). Introduction to concurrent engineering in construction. In C. J. Anumba, J. M. Kamara & A.-F. Cutting-Decelle (Eds.), Concurrent engineering in construction projects (pp. 1-11). London, New York: Taylor Francis.
    • (2007) Concurrent Engineering in Construction Projects , pp. 1-11
    • Kamara, J.M.1    Anumba, C.J.2    Cutting-Decelle, A.-F.3
  • 57
    • 40849097919 scopus 로고    scopus 로고
    • Best practices for integrating the concurrent engineering environment into multipartner project management
    • DOI 10.1061/(ASCE)0733-9364(2008)134:4(289)
    • Karlsson M., Lakka A., Sulankivi K., Hanna A. S. and Thompson B. P. (2008). Best practices for integrating the concurrent engineering environment into multipartner project management. Journal of construction engineering and management, 134(4), 289-299. (Pubitemid 351399366)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.4 , pp. 289-299
    • Karlsson, M.1    Lakka, A.2    Sulankivi, K.3    Hanna, A.S.4    Thompson, B.P.5
  • 60
    • 0033684936 scopus 로고    scopus 로고
    • Innovation versus standardization
    • Kondo Y. (2000). Innovation versus standardization. The TQM Magazine, 12(1), 6-10.
    • (2000) The TQM Magazine , vol.12 , Issue.1 , pp. 6-10
    • Kondo, Y.1
  • 64
    • 84857371393 scopus 로고    scopus 로고
    • D3 city project-economic impact of bim-assisted design validation
    • Lee G., Park H. K. and Won J. (2012). D3 city project-economic impact of bim-assisted design validation. Automation in Construction, 22(0), 577-586.
    • (2012) Automation in Construction , vol.22 , Issue.0 , pp. 577-586
    • Lee, G.1    Park, H.K.2    Won, J.3
  • 65
    • 44349122295 scopus 로고    scopus 로고
    • Materiality and change: Challenges to building better theory about technology and organizing
    • Leonardi P. M. and Barley S. R. (2008). Materiality and change: Challenges to building better theory about technology and organizing. Information and Organization, 18(3), 159-176.
    • (2008) Information and Organization , vol.18 , Issue.3 , pp. 159-176
    • Leonardi, P.M.1    Barley, S.R.2
  • 66
    • 79952377493 scopus 로고    scopus 로고
    • Rethinking prefabricated construction management using the vp-based ikea model in hong kong
    • Li H., Guo H. L., Skitmore M., Ting H., Chan K. Y. N. and Chan G. (2011a). Rethinking prefabricated construction management using the vp-based ikea model in hong kong. Construction Management & Economics, 29(3), 233-245.
    • (2011) Construction Management & Economics , vol.29 , Issue.3 , pp. 233-245
    • Li, H.1    Guo, H.L.2    Skitmore, M.3    Ting, H.4    Chan, K.Y.N.5    Chan, G.6
  • 67
    • 67650337837 scopus 로고    scopus 로고
    • Rethinking project management and exploring virtual design and construction as a potential solution
    • Li H., Lu W. and Huang T. (2009). Rethinking project management and exploring virtual design and construction as a potential solution. Construction Management & Economics, 27(4), 363-371.
    • (2009) Construction Management & Economics , vol.27 , Issue.4 , pp. 363-371
    • Li, H.1    Lu, W.2    Huang, T.3
  • 68
    • 84876947902 scopus 로고    scopus 로고
    • Critical project management factors of architectural, engineering, and construction (aec) firms for delivering green building projects in singapore
    • Li Y. Y., Chen P.-H., Chew D. A. S., Teo C. C. and Ding R. G. (2011b). Critical project management factors of architectural, engineering, and construction (aec) firms for delivering green building projects in singapore. Journal of construction engineering and management, 1(1), 262.
    • (2011) Journal of Construction Engineering and Management , vol.1 , Issue.1 , pp. 262
    • Li, Y.Y.1    Chen, P.-H.2    Chew, D.A.S.3    Teo, C.C.4    Ding, R.G.5
  • 70
    • 0028128360 scopus 로고
    • Systematic reviews: Rationale for systematic reviews
    • Mulrow C. D. (1994). Systematic reviews: Rationale for systematic reviews. British Medical Journal, 309(6954), 597-599.
    • (1994) British Medical Journal , vol.309 , Issue.6954 , pp. 597-599
    • Mulrow, C.D.1
  • 71
    • 0031048850 scopus 로고    scopus 로고
    • Systematic reviews: Critical links in the great chain of evidence
    • Mulrow C. D., Cook D. J. and Davidoff F. (1997). Systematic reviews: Critical links in the great chain of evidence. Annals of Internal Medicine, 126, 389-391.
    • (1997) Annals of Internal Medicine , vol.126 , pp. 389-391
    • Mulrow, C.D.1    Cook, D.J.2    Davidoff, F.3
  • 72
    • 31944445471 scopus 로고    scopus 로고
    • Collaboration work for nuclear power building using 3D CAD information
    • DOI 10.1016/j.nucengdes.2005.09.004, PII S0029549305003560
    • Nakamura N., Tanaka K., Tokuhira H. and Miura J. (2006). Collaboration work for nuclear power building using 3d cad information. Nuclear Engineering and Design, 236(4), 368-374. (Pubitemid 43190307)
    • (2006) Nuclear Engineering and Design , vol.236 , Issue.4 , pp. 368-374
    • Nakamura, N.1    Tanaka, K.2    Tokuhira, H.3    Miura, J.4
  • 74
    • 33645127693 scopus 로고    scopus 로고
    • Innovation diffusion at the implementation stage of a construction project: A case study of information communication technology
    • Peansupap V. and Walker D. H. T. (2006). Innovation diffusion at the implementation stage of a construction project: A case study of information communication technology. Construction Management & Economics, 24(3), 321-332.
    • (2006) Construction Management & Economics , vol.24 , Issue.3 , pp. 321-332
    • Peansupap, V.1    Walker, D.H.T.2
  • 77
    • 57549112323 scopus 로고    scopus 로고
    • Constructors grapple with resistance to change in field
    • Post N. M. (2008). Constructors grapple with resistance to change in field. ENR: Engineering News-Record, 261(17), 34-35.
    • (2008) ENR: Engineering News-Record , vol.261 , Issue.17 , pp. 34-35
    • Post, N.M.1
  • 78
    • 84876923222 scopus 로고    scopus 로고
    • Ontologies and standards-based approaches to interoperability for concurrent engineering
    • C. J. Anumba, J. M. Kamara & A.-F. Cutting-Decelle (Eds.). London, New York: Taylor Francis
    • Pouchard L. C. and Cutting-Decelle A.-F. (2007). Ontologies and standards-based approaches to interoperability for concurrent engineering. In C. J. Anumba, J. M. Kamara & A.-F. Cutting-Decelle (Eds.), Concurrent engineering in construction projects (pp. 118-160). London, New York: Taylor Francis.
    • (2007) Concurrent Engineering in Construction Projects , pp. 118-160
    • Pouchard, L.C.1    Cutting-Decelle, A.-F.2
  • 79
    • 37249086234 scopus 로고    scopus 로고
    • Structural bim: Discussion, case studies and latest developments
    • DOI 10.1002/tal.417
    • Robinson C. (2007). Structural bim: Discussion, case studies and latest developments. Structural Design of Tall and Special Buildings, 16(4), 519-533. (Pubitemid 350271864)
    • (2007) Structural Design of Tall and Special Buildings , vol.16 , Issue.4 , pp. 519-533
    • Robinson, C.1
  • 80
    • 58449125596 scopus 로고    scopus 로고
    • Chapter 11: Evidence in management and organizational science: Assembling the field's full weight of scientific knowledge through syntheses
    • Rousseau D. M., Manning J. and Denyer D. (2008). Chapter 11: Evidence in management and organizational science: Assembling the field's full weight of scientific knowledge through syntheses. The Academy of Management Annals, 2, 475-515.
    • (2008) The Academy of Management Annals , vol.2 , pp. 475-515
    • Rousseau, D.M.1    Manning, J.2    Denyer, D.3
  • 82
    • 39449119503 scopus 로고    scopus 로고
    • The IT-Barometer - Adecade's development of it use in the Swedish construction sector
    • Samuelson O. (2008). The it-barometer - a decade's development of it use in the swedish construction sector. Journal of Information Technology in Construction, 13, 1-19. (Pubitemid 351270263)
    • (2008) Electronic Journal of Information Technology in Construction , vol.13 , pp. 1-19
    • Samuelson, O.1
  • 83
    • 36148981506 scopus 로고    scopus 로고
    • Global design practice: IT-based collaboration in AEC-projects
    • DOI 10.2495/DARC060081, Digital Architecture and Construction
    • Schroepfer T. (2006). Global design practice: It-based collaboration in aec-projects. In A. Ali & C. A. Brebbia (Eds.), Digital architecture and construction (Vol. 90, pp. 69-76). Southampton; Boston: WITPress. (Pubitemid 350108011)
    • (2006) WIT Transactions on the Built Environment , vol.90 , pp. 69-76
    • Schroepfer, T.1
  • 84
    • 79952411009 scopus 로고    scopus 로고
    • Changing roles of the clients, architects and contractors through bim
    • Sebastian R. (2011). Changing roles of the clients, architects and contractors through bim. Engineering Construction & Architectural Management, 18(2), 176-187.
    • (2011) Engineering Construction & Architectural Management , vol.18 , Issue.2 , pp. 176-187
    • Sebastian, R.1
  • 85
    • 77949492632 scopus 로고    scopus 로고
    • Systems integration and collaboration in architecture, engineering, construction, and facilities management: A review
    • Shen W. M., Hao Q., Mak H., Neelamkavil J., Xie H., Dickinson J., et al. (2010). Systems integration and collaboration in architecture, engineering, construction, and facilities management: A review. Advanced Engineering Informatics, 24(2), 196-207.
    • (2010) Advanced Engineering Informatics , vol.24 , Issue.2 , pp. 196-207
    • Shen, W.M.1    Hao, Q.2    Mak, H.3    Neelamkavil, J.4    Xie, H.5    Dickinson, J.6
  • 86
    • 79551689722 scopus 로고    scopus 로고
    • A theoretical framework of a bim-based multi-disciplinary collaboration platform
    • Singh V., Gu N. and Wang X. Y. (2011). A theoretical framework of a bim-based multi-disciplinary collaboration platform. Automation in Construction, 20(2), 134-144.
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 134-144
    • Singh, V.1    Gu, N.2    Wang, X.Y.3
  • 87
    • 84859831909 scopus 로고    scopus 로고
    • Expanding uses of building information modeling in life-cycle construction projects
    • Soares M. M., Jacobs K., Hannele K., Reijo M., Tarja M., Sami P., et al. (2012). Expanding uses of building information modeling in life-cycle construction projects. Work, 41, 114-119.
    • (2012) Work , vol.41 , pp. 114-119
    • Soares, M.M.1    Jacobs, K.2    Hannele, K.3    Reijo, M.4    Tarja, M.5    Sami, P.6
  • 88
    • 84970642045 scopus 로고
    • Institutional ecology, 'translations' and boundary objects: Amateurs and professionals in berkeley's museum of vertebrate zoology, 1907-39
    • Star S. L. and Griesemer J. R. (1989). Institutional ecology, 'translations' and boundary objects: Amateurs and professionals in berkeley's museum of vertebrate zoology, 1907-39. Social Studies of Science, 19(3), 387-420.
    • (1989) Social Studies of Science , vol.19 , Issue.3 , pp. 387-420
    • Star, S.L.1    Griesemer, J.R.2
  • 89
    • 84919508718 scopus 로고    scopus 로고
    • Enabling concurrent engineering through 4d cad
    • C. J. Anumba, J. M. Kamara & A.-F. Cutting-Decelle (Eds.). London, New York: Taylor Francis
    • Staub-French S. and Fischer M. (2007). Enabling concurrent engineering through 4d cad. In C. J. Anumba, J. M. Kamara & A.-F. Cutting-Decelle (Eds.), Concurrent engineering in construction projects (pp. 201-217). London, New York: Taylor Francis.
    • (2007) Concurrent Engineering in Construction Projects , pp. 201-217
    • Staub-French, S.1    Fischer, M.2
  • 91
    • 74349102919 scopus 로고    scopus 로고
    • Evaluating industry perceptions of building information modeling (bim) impact on construction
    • Suermann P. C. and Issa R. R. A. (2009). Evaluating industry perceptions of building information modeling (bim) impact on construction. Journal of Information Technology in Construction, 14, 574-594.
    • (2009) Journal of Information Technology in Construction , vol.14 , pp. 574-594
    • Suermann, P.C.1    Issa, R.R.A.2
  • 92
    • 62549091452 scopus 로고    scopus 로고
    • Paradigm trajectories of building information modeling practice in project networks
    • Taylor J. E. and Bernstein P. G. (2009). Paradigm trajectories of building information modeling practice in project networks. Journal of Management in Engineering, 25(2), 69-76.
    • (2009) Journal of Management in Engineering , vol.25 , Issue.2 , pp. 69-76
    • Taylor, J.E.1    Bernstein, P.G.2
  • 93
    • 0141888108 scopus 로고    scopus 로고
    • Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review
    • Tranfield D., Denyer D. and Smart P. (2003). Towards a methodology for developing evidence-informed management knowledge by means of systematic review. British Journal of Management, 14(3), 207-222. (Pubitemid 37256361)
    • (2003) British Journal of Management , vol.14 , Issue.3 , pp. 207-222
    • Tranfield, D.1    Denyer, D.2    Smart, P.3
  • 94
    • 80053601079 scopus 로고    scopus 로고
    • Digital buildings - Challenges and opportunities
    • Watson A. (2011). Digital buildings - challenges and opportunities. Advanced Engineering Informatics, 25(4), 573-581.
    • (2011) Advanced Engineering Informatics , vol.25 , Issue.4 , pp. 573-581
    • Watson, A.1
  • 96
    • 77955868768 scopus 로고    scopus 로고
    • Coordination and control in project-based work: Digital objects and infrastructures for delivery
    • Whyte J. and Lobo S. (2010). Coordination and control in project-based work: Digital objects and infrastructures for delivery. Construction Management and Economics, 28(6), 557-567.
    • (2010) Construction Management and Economics , vol.28 , Issue.6 , pp. 557-567
    • Whyte, J.1    Lobo, S.2
  • 97
    • 33751549355 scopus 로고    scopus 로고
    • Visual practices and the objects used in design
    • DOI 10.1080/09613210601036697, PII H764458NU4M40041
    • Whyte J. K., Ewenstein B., Hales M. and Tidd J. (2007). Visual practices and the objects used in design. Building Research & Information, 35(1), 18-27. (Pubitemid 44838086)
    • (2007) Building Research and Information , vol.35 , Issue.1 , pp. 18-27
    • Whyte, J.K.1    Ewenstein, B.2    Hales, M.3    Tidd, J.4
  • 98
    • 33645572577 scopus 로고    scopus 로고
    • From organization design to organization designing
    • DOI 10.1287/orsc.1050.0168
    • Yoo Y., Boland Jr R. J. and Lyytinen K. (2006). From organization design to organization designing. Organization Science, 17(2), 215-229. (Pubitemid 43515284)
    • (2006) Organization Science , vol.17 , Issue.2 , pp. 215-229
    • Yoo, Y.1    Boland Jr., R.J.2    Lyytinen, K.3
  • 102
    • 84876899244 scopus 로고    scopus 로고
    • Paper presented at the Criocm2009: International Symposium on Advancement of Construction Management and Real Estate, from :// 000281119901124
    • Zhou M., Bo W. B. and Qian L. W. (2009). Study on the application of bim technology in green projects. Paper presented at the Criocm2009: International Symposium on Advancement of Construction Management and Real Estate, Vols 1-6. from ://000281119901124.
    • (2009) Study on the Application of Bim Technology in Green Projects , vol.1-6
    • Zhou, M.1    Bo, W.B.2    Qian, L.W.3
  • 104
    • 84876926046 scopus 로고    scopus 로고
    • Paper presented at the Ebm 2010: International Conference on Engineering and Business Management, from ://000276079500409
    • Zhu S. T. (2010). Sustainable building design based on bim. Paper presented at the Ebm 2010: International Conference on Engineering and Business Management, Vols 1-8. from ://000276079500409.
    • (2010) Sustainable Building Design Based on Bim , vol.1-8
    • Zhu, S.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.