Time-space conflict analysis based on 4D production models
-
K. C. P. Wang et al., eds., ASCE, Reston, Va.
-
Akinci, B., and Fischer, M. (1998). "Time-space conflict analysis based on 4D production models." J. Comput. Civ. Eng., K. C. P. Wang et al., eds., ASCE, Reston, Va., 342-353.
-
(1998)
J. Comput. Civ. Eng.
, pp. 342-353
-
-
Akinci, B.1
Fischer, M.2
-
3
-
-
0034588228
-
Four-dimensional Workplanner - A prototype system for automated generation of construction spaces and analysis of time-space conflicts
-
R. Fruchter et al., eds., ASCE, Reston, Va.
-
Akinci, B., and Fischer, M. (2000). "Four-dimensional Workplanner - A prototype system for automated generation of construction spaces and analysis of time-space conflicts." Computing in civil and building engineering, R. Fruchter et al., eds., ASCE, Reston, Va., 740-747.
-
(2000)
Computing in Civil and Building Engineering
, pp. 740-747
-
-
Akinci, B.1
Fischer, M.2
-
4
-
-
16444378302
-
Automated generation of work spaces required by construction activities
-
Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
-
Akinci, B., Fischer, M., and Kunz, J. (2000a). "Automated generation of work spaces required by construction activities." Working Paper No. 58, Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
-
(2000)
Working Paper No. 58
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
-
5
-
-
16444379088
-
Representing work Spaces generically within construction method models
-
Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
-
Akinci, B., Fischer, M., Kunz, J., and Levitt, R. (2000b). "Representing work Spaces generically within construction method models." Working Paper No. 57, Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
-
(2000)
Working Paper No. 57
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
Levitt, R.4
-
6
-
-
16444369261
-
Heuristic classification
-
Dept. of Computer Science, Stanford Univ., Stanford, Calif.
-
Clancey, W. (1985). "Heuristic classification." Report No. STAN-CS-85-1066, Dept. of Computer Science, Stanford Univ., Stanford, Calif.
-
(1985)
Report No. STAN-CS-85-1066
-
-
Clancey, W.1
-
8
-
-
1642304896
-
Factors affecting project success in the piping function.Lean construction
-
Balkema, Rotterdam, The Netherlands
-
Howell, G., and Ballard, G. (1997). "Factors affecting project success in the piping function." Lean construction, Luis Alarcon, ed., Balkema, Rotterdam, The Netherlands, 161-185.
-
(1997)
Luis Alarcon, Ed.
, pp. 161-185
-
-
Howell, G.1
Ballard, G.2
-
9
-
-
84860093721
-
-
Intergraph (February, 2000)
-
Intergraph. (1999). "Plant Design System (PDS)." Intergraph, (http://www.intergraph.com/pds/pdsover.asp) (February, 2000).
-
(1999)
Plant Design System (PDS)
-
-
-
10
-
-
80053403927
-
PlantSpace Navigator
-
February, 2000
-
Japobus. (1997). "PlantSpace Navigator." Jacobus Technologies, (http://www.bentley.com/products/peproducts/) (February, 2000).
-
(1997)
Jacobus Technologies
-
-
-
11
-
-
84860092984
-
-
Engineer thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
Katz, A. (1998). "Assessing plan reliability with 4D production models." Engineer thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
(1998)
"Assessing Plan Reliability with 4D Production Models
-
-
Katz, A.1
-
14
-
-
0025722997
-
Construction site utilization: Impact of material movement and storage on productivity and cost
-
Mutehlhausen, F. (1991). "Construction site utilization: Impact of material movement and storage on productivity and cost." AACE Transactions, 35, L.2.1-L.2.9.
-
(1991)
AACE Transactions
, vol.35
-
-
Mutehlhausen, F.1
-
15
-
-
0003892654
-
-
PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
O'Brien, W. (1998). "Capacity costing approaches for construction supply-chain management." PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
(1998)
Capacity Costing Approaches for Construction Supply-chain Management
-
-
O'Brien, W.1
-
16
-
-
0004158431
-
-
McGraw-Hill, New York
-
Oglesby, C. H., Parker, H. W., and Howell, G. A. (1989). Productivity improvement in construction, McGraw-Hill, New York.
-
(1989)
Productivity Improvement in Construction
-
-
Oglesby, C.H.1
Parker, H.W.2
Howell, G.A.3
-
18
-
-
0005390052
-
-
PhD thesis, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
-
Riley, D. (1994). "Modeling the space behavior of construction activities." PhD thesis, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
-
(1994)
Modeling the Space Behavior of Construction Activities
-
-
Riley, D.1
-
19
-
-
0031362303
-
Space planning for mechanical, electrical, plumbing and fire protection trades in multi-story building construction
-
ASCE, Reston, Va.
-
Riley, D., and Sanvido, V. (1997). "Space planning for mechanical, electrical, plumbing and fire protection trades in multi-story building construction." 5th ASCE Construction Congress, ASCE, Reston, Va., 102-109.
-
(1997)
5th ASCE Construction Congress
, pp. 102-109
-
-
Riley, D.1
Sanvido, V.2
-
20
-
-
13944266807
-
An analysis of factors affecting labor productivity in masonry construction
-
Pennsylvania State Univ., University Park, Pa.
-
Sanders, S. R., Thomas, H. R., and Smith, G. R. (1989). "An analysis of factors affecting labor productivity in masonry construction." PTI# 9003, Pennsylvania State Univ., University Park, Pa.
-
(1989)
PTI# 9003
-
-
Sanders, S.R.1
Thomas, H.R.2
Smith, G.R.3
-
21
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
Thabet, W., and Beliveau, Y. (1994). "Modeling work space to schedule repetitive floors in multistory buildings." J. Constr. Eng. Manage., 120(1), 96-116.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.1
Beliveau, Y.2
-
22
-
-
0027208427
-
Exchanging layout and schedule data in a real-time distributed environment
-
ASCE, New York
-
Tommelein, I., Dzeng, R., and Zouein, P. (1993). "Exchanging layout and schedule data in a real-time distributed environment." 5th Int. Conf. on Computing in Civil and Building Engineering, ASCE, New York, 947-954.
-
(1993)
5th Int. Conf. on Computing in Civil and Building Engineering
, pp. 947-954
-
-
Tommelein, I.1
Dzeng, R.2
Zouein, P.3
-
23
-
-
0028044305
-
Time-space tradeoff strategies for space-schedule construction
-
ASCE, New York
-
Zouein, P., and Tommelein, I. (1994). "Time-space tradeoff strategies for space-schedule construction." J. Comput. Civ. Eng., ASCE, New York, 1180-1187.
-
(1994)
J. Comput. Civ. Eng.
, pp. 1180-1187
-
-
Zouein, P.1
Tommelein, I.2
|