-
1
-
-
0034960598
-
Rough set theory a data mining tool for semiconductor manufacturing
-
10.1109/6104.924792
-
Kusiak A (2001) Rough set theory a data mining tool for semiconductor manufacturing. IEEE Trans Electron Packing Manuf 24(1):44-50
-
(2001)
IEEE Trans Electron Packing Manuf
, vol.24
, Issue.1
, pp. 44-50
-
-
Kusiak, A.1
-
2
-
-
33748005672
-
Decomposition in data mining an industrial case study
-
10.1109/6104.895081
-
Kusiak A (2000) Decomposition in data mining an industrial case study. IEEE Trans Electron packing Manuf 23(4):345-353
-
(2000)
IEEE Trans Electron Packing Manuf
, vol.23
, Issue.4
, pp. 345-353
-
-
Kusiak, A.1
-
3
-
-
0035401581
-
Feature transformation methods in data mining
-
10.1109/6104.956807
-
Kusiak A (2001) Feature transformation methods in data mining. IEEE Trans Electron Packing Manuf 24(4):214-221
-
(2001)
IEEE Trans Electron Packing Manuf
, vol.24
, Issue.4
, pp. 214-221
-
-
Kusiak, A.1
-
4
-
-
72449177821
-
A rough set approach to feature selection based on ant colony optimization
-
10.1016/j.patrec.2009.10.013
-
Chen YM, Miao DQ, Wang RZ (2010) A rough set approach to feature selection based on ant colony optimization. Pattern Recognit Lett 31(3):226-233
-
(2010)
Pattern Recognit Lett
, vol.31
, Issue.3
, pp. 226-233
-
-
Chen, Y.M.1
Miao, D.Q.2
Wang, R.Z.3
-
5
-
-
0036413432
-
Attribute selection for neural network based adaptive scheduling systems in flexible manufacturing systems
-
10.1007/s001700200187
-
Shine YR, Su CT (2002) Attribute selection for neural network based adaptive scheduling systems in flexible manufacturing systems. Int J Adv Manuf Technol 20(7):532-544
-
(2002)
Int J Adv Manuf Technol
, vol.20
, Issue.7
, pp. 532-544
-
-
Shine, Y.R.1
Su, C.T.2
-
6
-
-
33645574902
-
The optimization of attribute selection in decision tree-based production control systems
-
10.1007/s00170-004-2430-y
-
Shiue YR, Guh RS (2006) The optimization of attribute selection in decision tree-based production control systems. Int J Adv Manuf Technol 28(7-8):737-746
-
(2006)
Int J Adv Manuf Technol
, vol.28
, Issue.7-8
, pp. 737-746
-
-
Shiue, Y.R.1
Guh, R.S.2
-
7
-
-
32544433960
-
Learning based multi pass adaptive scheduling for a dynamic manufacturing cell environment
-
10.1016/j.rcim.2005.03.004
-
Shiue YR, Guh RS (2006) Learning based multi pass adaptive scheduling for a dynamic manufacturing cell environment. Rob Comput Integr Manuf 22(3):203-216
-
(2006)
Rob Comput Integr Manuf
, vol.22
, Issue.3
, pp. 203-216
-
-
Shiue, Y.R.1
Guh, R.S.2
-
8
-
-
63449134271
-
Development of two-level decision tree-based real-time scheduling system under product mix variety environment
-
10.1016/j.rcim.2008.06.002
-
Shiue YR (2009) Development of two-level decision tree-based real-time scheduling system under product mix variety environment. Robot Comput-Integr Manuf 25(4-5):709-720
-
(2009)
Robot Comput-Integr Manuf
, vol.25
, Issue.4-5
, pp. 709-720
-
-
Shiue, Y.R.1
-
9
-
-
67349136034
-
GA based learning bias selection mechanism for real time scheduling systems
-
10.1016/j.eswa.2009.03.019
-
Shiue YR, Guh RS, Tseng TY (2009) GA based learning bias selection mechanism for real time scheduling systems. Expert Syst Appl 36(9):11451-11460
-
(2009)
Expert Syst Appl
, vol.36
, Issue.9
, pp. 11451-11460
-
-
Shiue, Y.R.1
Guh, R.S.2
Tseng, T.Y.3
-
11
-
-
34547094355
-
Predicting wafer-lot output time with a hybrid FCM-FBPN approach
-
10.1109/TSMCB.2007.895364
-
Chen T (2007) Predicting wafer-lot output time with a hybrid FCM-FBPN approach. IEEE Trans Dystem Man Cybern B Cybern 37(4):784-793
-
(2007)
IEEE Trans Dystem Man Cybern B Cybern
, vol.37
, Issue.4
, pp. 784-793
-
-
Chen, T.1
-
12
-
-
33846817362
-
An intelligent hybrid system for wafer lot output time prediction
-
10.1016/j.aei.2006.10.002
-
Chen T (2007) An intelligent hybrid system for wafer lot output time prediction. Adv Eng Inform 21(1):55-65
-
(2007)
Adv Eng Inform
, vol.21
, Issue.1
, pp. 55-65
-
-
Chen, T.1
-
13
-
-
0034294996
-
Using data mining to find patterns in genetic algorithm solutions to a job shop schedule
-
10.1016/S0360-8352(00)00050-4
-
Koonce DA, Tsai SC (2000) Using data mining to find patterns in genetic algorithm solutions to a job shop schedule. Comput Ind Eng 38(3):361-374
-
(2000)
Comput Ind Eng
, vol.38
, Issue.3
, pp. 361-374
-
-
Koonce, D.A.1
Tsai, S.C.2
-
16
-
-
34248551329
-
Automated Petri-net modeling based on production management data
-
2333506 1160.90394 10.1080/13873950600834082
-
Gradisar D, Music G (2007) Automated Petri-net modeling based on production management data. Math Comput Model DynSyst 13(3):267-290
-
(2007)
Math Comput Model DynSyst
, vol.13
, Issue.3
, pp. 267-290
-
-
Gradisar, D.1
Music, G.2
-
17
-
-
35448952063
-
Production-process modeling based on production-management data: A Petri-Net approach
-
10.1080/09511920601103064
-
Gradisar D, Music G (2007) Production-process modeling based on production-management data: a Petri-Net approach. Int J Comput Integr Manuf 20(8):794-810
-
(2007)
Int J Comput Integr Manuf
, vol.20
, Issue.8
, pp. 794-810
-
-
Gradisar, D.1
Music, G.2
-
19
-
-
76449115493
-
General structure of the semiconductor production scheduling model
-
10.4028/www.scientific.net/AMM.20-23.465
-
Ye K, Qiao F, Ma YM (2010) General structure of the semiconductor production scheduling model. Appl Mech Mater 20-23:465-469
-
(2010)
Appl Mech Mater
, vol.20-23
, pp. 465-469
-
-
Ye, K.1
Qiao, F.2
Ma, Y.M.3
-
20
-
-
77649118571
-
Data analytics and stochastic modeling in a semiconductor fab
-
2663060 1224.90065 10.1002/asmb.828
-
Bagchi S, Baseman RJ, Davenport A, Natarajan R, Slonim N, Weiss S (2010) Data analytics and stochastic modeling in a semiconductor fab. Appl Stoch Model Bus Ind 26(1):1-27
-
(2010)
Appl Stoch Model Bus Ind
, vol.26
, Issue.1
, pp. 1-27
-
-
Bagchi, S.1
Baseman, R.J.2
Davenport, A.3
Natarajan, R.4
Slonim, N.5
Weiss, S.6
-
21
-
-
50249174448
-
The methods of data collection and tool processing time estimation in lot processing
-
Santa Clara, Institute of Electrical and Electronics Engineers Inc., Piscataway
-
Hosoe H, Knanamori N, Yoshida K (2007) The methods of data collection and tool processing time estimation in lot processing. In: International Symposium on Semiconductor Manufacturing. Santa Clara, Institute of Electrical and Electronics Engineers Inc., Piscataway, pp 241-244
-
(2007)
International Symposium on Semiconductor Manufacturing
, pp. 241-244
-
-
Hosoe, H.1
Knanamori, N.2
Yoshida, K.3
-
22
-
-
15844419035
-
A fuzzy back propagation network for output time prediction in a wafer fab
-
10.1016/S1568-4946(02)00066-2
-
Chen T (2003) A fuzzy back propagation network for output time prediction in a wafer fab. Appl Soft Comput 2(3):211-222
-
(2003)
Appl Soft Comput
, vol.2
, Issue.3
, pp. 211-222
-
-
Chen, T.1
-
23
-
-
84862291324
-
Intelligent scheduling approaches for a wafer fabrication factory
-
10.1007/s10845-010-0445-9
-
Chen T (2010) Intelligent scheduling approaches for a wafer fabrication factory. J Intell Manuf 23(3):897-911
-
(2010)
J Intell Manuf
, vol.23
, Issue.3
, pp. 897-911
-
-
Chen, T.1
-
24
-
-
70350537138
-
A nonlinear scheduling rule incorporating fuzzy-neural remaining cycle time estimator for scheduling a semiconductor manufacturing factory - A simulation study
-
10.1007/s00170-009-1941-y
-
Chen T, Wang YC (2009) A nonlinear scheduling rule incorporating fuzzy-neural remaining cycle time estimator for scheduling a semiconductor manufacturing factory - a simulation study. Int J Adv Manuf Technol 45(1-2):110-121
-
(2009)
Int J Adv Manuf Technol
, vol.45
, Issue.1-2
, pp. 110-121
-
-
Chen, T.1
Wang, Y.C.2
-
25
-
-
33751120379
-
Job releasing and throughput planning for wafer fabrication under demand fluctuating make-to stock environment
-
10.1007/s00170-005-0185-8
-
Chung SH, Lai CM (2006) Job releasing and throughput planning for wafer fabrication under demand fluctuating make-to stock environment. Int J Adv Manuf Technol 31(3-4):316-327
-
(2006)
Int J Adv Manuf Technol
, vol.31
, Issue.3-4
, pp. 316-327
-
-
Chung, S.H.1
Lai, C.M.2
-
26
-
-
34248190308
-
Due date assignment for wafer fabrication under demand variate environment
-
10.1109/TSM.2007.895215
-
Pearn WL, Chung SH, Lai CM (2007) Due date assignment for wafer fabrication under demand variate environment. IEEE Trans Semicond Manuf 20(2):165-175
-
(2007)
IEEE Trans Semicond Manuf
, vol.20
, Issue.2
, pp. 165-175
-
-
Pearn, W.L.1
Chung, S.H.2
Lai, C.M.3
-
27
-
-
33845269117
-
Combining SOM and GA-CBR for flow time prediction in semiconductor manufacturing factory
-
2309341 10.1007/11908029-79
-
Chang PC, Wang YW, Liu CH (2006) Combining SOM and GA-CBR for flow time prediction in semiconductor manufacturing factory. Lect Notes Comput Sci 4259:767-775
-
(2006)
Lect Notes Comput Sci
, vol.4259
, pp. 767-775
-
-
Chang, P.C.1
Wang, Y.W.2
Liu, C.H.3
-
28
-
-
33750566327
-
A hybrid SOM-BPN approach to lot output time prediction in a wafer fab
-
10.1007/s11063-006-9027-4
-
Chen T (2006) A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Process Lett 24(3):271-288
-
(2006)
Neural Process Lett
, vol.24
, Issue.3
, pp. 271-288
-
-
Chen, T.1
-
29
-
-
36049051023
-
A hybrid look-ahead SOM-FBPN and FIR system for wafer-lot-output time prediction and achievability evaluation
-
10.1007/s00170-006-0741-x
-
Chen T (2007) A hybrid look-ahead SOM-FBPN and FIR system for wafer-lot-output time prediction and achievability evaluation. Int J Adv Manuf Technol 35(5-6):575-586
-
(2007)
Int J Adv Manuf Technol
, vol.35
, Issue.5-6
, pp. 575-586
-
-
Chen, T.1
-
30
-
-
30344446393
-
Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory
-
10.1016/j.asoc.2004.12.004
-
Chang PC, Liao TW (2006) Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Appl Soft Comput 6(2):198-206
-
(2006)
Appl Soft Comput
, vol.6
, Issue.2
, pp. 198-206
-
-
Chang, P.C.1
Liao, T.W.2
-
31
-
-
44949138483
-
A neuro-fuzzy based forecasting approach for rush order control applications
-
10.1016/j.eswa.2007.06.038
-
Wang WP, Ze C (2008) A neuro-fuzzy based forecasting approach for rush order control applications. Expert Syst Appl 35(1-2):223-234
-
(2008)
Expert Syst Appl
, vol.35
, Issue.1-2
, pp. 223-234
-
-
Wang, W.P.1
Ze, C.2
-
32
-
-
72049095063
-
Learning and adaptation of a policy for dynamic order acceptance in make-to-order manufacturing
-
10.1016/j.cie.2009.08.005
-
Arredondo F, Martinez E (2010) Learning and adaptation of a policy for dynamic order acceptance in make-to-order manufacturing. Comput Ind Eng 58(1):70-83
-
(2010)
Comput Ind Eng
, vol.58
, Issue.1
, pp. 70-83
-
-
Arredondo, F.1
Martinez, E.2
-
33
-
-
46749150544
-
Bidding-based multi-agent system for integrated process planning and scheduling a data-mining and hybrid tabu-SA algorithm-oriented approach
-
10.1007/s00170-007-1087-8
-
Shukla KS, Tiwari MK, Son YJ (2008) Bidding-based multi-agent system for integrated process planning and scheduling a data-mining and hybrid tabu-SA algorithm-oriented approach. Int J Adv Manuf Technol 38(1-2):163-175
-
(2008)
Int J Adv Manuf Technol
, vol.38
, Issue.1-2
, pp. 163-175
-
-
Shukla, K.S.1
Tiwari, M.K.2
Son, Y.J.3
-
34
-
-
33646421404
-
Data mining using genetic programming for construction of a semiconductor manufacturing yield rate prediction system
-
10.1007/s10845-005-0008-7
-
Li TS, Huang CL, Wu ZY (2006) Data mining using genetic programming for construction of a semiconductor manufacturing yield rate prediction system. J Intell Manuf 17(3):355-361
-
(2006)
J Intell Manuf
, vol.17
, Issue.3
, pp. 355-361
-
-
Li, T.S.1
Huang, C.L.2
Wu, Z.Y.3
-
35
-
-
33846922481
-
Hybrid data mining approach for pattern extraction from wafer bin map to improve yield in semiconductor manufacturing
-
10.1016/j.ijpe.2006.05.015
-
Hsu SC, Chien CF (2007) Hybrid data mining approach for pattern extraction from wafer bin map to improve yield in semiconductor manufacturing. Int J Prod Econ 107:88-103
-
(2007)
Int J Prod Econ
, vol.107
, pp. 88-103
-
-
Hsu, S.C.1
Chien, C.F.2
-
36
-
-
33646433948
-
Data mining for improving the quality of manufacturing: A feature decomposition approach
-
10.1007/s10845-005-0005-x
-
Rokach L, Maimon O (2006) Data mining for improving the quality of manufacturing: a feature decomposition approach. J Intell Manuf 17(3):285-299
-
(2006)
J Intell Manuf
, vol.17
, Issue.3
, pp. 285-299
-
-
Rokach, L.1
Maimon, O.2
-
37
-
-
0000936343
-
Intelligent scheduling with machine learning capabilities the induction of scheduling knowledge
-
10.1080/07408179208964213
-
Shaw MJ, Park S, Raman N (1992) Intelligent scheduling with machine learning capabilities the induction of scheduling knowledge. IIE Trans 24(2):156-168
-
(1992)
IIE Trans
, vol.24
, Issue.2
, pp. 156-168
-
-
Shaw, M.J.1
Park, S.2
Raman, N.3
-
38
-
-
0031198746
-
Adaptive scheduling in dynamic flexible manufacturing systems
-
10.1109/70.611301
-
Park SC, Raman N, Shaw MJ (1997) Adaptive scheduling in dynamic flexible manufacturing systems. IEEE Trans Robot Autom 13(4):486-502
-
(1997)
IEEE Trans Robot Autom
, vol.13
, Issue.4
, pp. 486-502
-
-
Park, S.C.1
Raman, N.2
Shaw, M.J.3
-
39
-
-
0033724249
-
A neural-net approach to real time flow-shop sequencing
-
10.1016/S0360-8352(00)00034-6
-
Lee I, Shaw MJ (2000) A neural-net approach to real time flow-shop sequencing. Comput Ind Eng 38(1):125-147
-
(2000)
Comput Ind Eng
, vol.38
, Issue.1
, pp. 125-147
-
-
Lee, I.1
Shaw, M.J.2
-
40
-
-
50149101510
-
Fuzzy rule generation for adaptive scheduling in a dynamic manufacturing
-
10.1016/j.asoc.2007.11.005
-
Lee KK (2008) Fuzzy rule generation for adaptive scheduling in a dynamic manufacturing. Appl Soft Comput 8(4):1295-1304
-
(2008)
Appl Soft Comput
, vol.8
, Issue.4
, pp. 1295-1304
-
-
Lee, K.K.1
-
41
-
-
0242322798
-
Learning-based scheduling of flexible manufacturing systems using case-based reasoning
-
10.1080/088395101753242697
-
Priore P, Fuente D, Pino R (2001) Learning-based scheduling of flexible manufacturing systems using case-based reasoning. Appl Artif Intell 15(10):949-963
-
(2001)
Appl Artif Intell
, vol.15
, Issue.10
, pp. 949-963
-
-
Priore, P.1
Fuente, D.2
Pino, R.3
-
42
-
-
31744447388
-
A comparison of machine-learning algorithms for dynamic scheduling of flexible manufacturing systems
-
10.1016/j.engappai.2005.09.009
-
Priore P, Fuente D, Puente J, Parreno J (2006) A comparison of machine-learning algorithms for dynamic scheduling of flexible manufacturing systems. Eng Appl Artif Intel 19(3):247-255
-
(2006)
Eng Appl Artif Intel
, vol.19
, Issue.3
, pp. 247-255
-
-
Priore, P.1
Fuente, D.2
Puente, J.3
Parreno, J.4
-
43
-
-
0035358169
-
A review of machine learning in dynamic scheduling of flexible manufacturing systems
-
0972.68544
-
Priore P, Fuente D, Gomez A, Puente J (2001) A review of machine learning in dynamic scheduling of flexible manufacturing systems. Artif Intell Eng Design Anal Manuf 15(3):251-263
-
(2001)
Artif Intell Eng Design Anal Manuf
, vol.15
, Issue.3
, pp. 251-263
-
-
Priore, P.1
Fuente, D.2
Gomez, A.3
Puente, J.4
-
44
-
-
27944469012
-
Using data-fuzzification technology in small data set learning to improve FMS
-
10.1007/s00170-003-2184-y
-
Li DC, Wu CH, Chang FM (2005) Using data-fuzzification technology in small data set learning to improve FMS. Int J Adv Manuf Technol 27(3-4):321-328
-
(2005)
Int J Adv Manuf Technol
, vol.27
, Issue.3-4
, pp. 321-328
-
-
Li, D.C.1
Wu, C.H.2
Chang, F.M.3
-
45
-
-
0242485227
-
Using functional virtual population as assistance to learn scheduling knowledge in dynamic manufacturing environments
-
10.1080/0020754031000149211
-
Li DC, Chen LS, Lin YS (2003) Using functional virtual population as assistance to learn scheduling knowledge in dynamic manufacturing environments. Int J Prod Res 41(17):4011-4024
-
(2003)
Int J Prod Res
, vol.41
, Issue.17
, pp. 4011-4024
-
-
Li, D.C.1
Chen, L.S.2
Lin, Y.S.3
-
46
-
-
27344432371
-
Using mega-fuzzification and data trend estimation in small data set learning for early FMS scheduling knowledge
-
1091.90021 10.1016/j.cor.2004.11.022
-
Li DC, Wu CH, Tsa TI, Fengming MC (2006) Using mega-fuzzification and data trend estimation in small data set learning for early FMS scheduling knowledge. Comput Oper Res 33(6):1857-1869
-
(2006)
Comput Oper Res
, vol.33
, Issue.6
, pp. 1857-1869
-
-
Li, D.C.1
Wu, C.H.2
Tsa, T.I.3
Fengming, M.C.4
-
47
-
-
0034325416
-
Dynamic job-shop scheduling using reinforcement learning agents
-
10.1016/S0921-8890(00)00087-7
-
Aydin ME, Öztemel E (2000) Dynamic job-shop scheduling using reinforcement learning agents. Robot Auton Syst 33(2-3):169-178
-
(2000)
Robot Auton Syst
, vol.33
, Issue.2-3
, pp. 169-178
-
-
Aydin, M.E.1
Öztemel, E.2
-
48
-
-
67650227926
-
An adaptive approach to dynamic scheduling in knowledgeable manufacturing cell
-
10.1007/s00170-008-1588-0
-
Yang HB, Yan HS (2009) An adaptive approach to dynamic scheduling in knowledgeable manufacturing cell. Int J Adv Manuf Technol 42(3-4):312-320
-
(2009)
Int J Adv Manuf Technol
, vol.42
, Issue.3-4
, pp. 312-320
-
-
Yang, H.B.1
Yan, H.S.2
-
49
-
-
30044437249
-
Applying inductive logic programming for knowledge discovery in genetic algorithms solutions to a job shop schedule
-
Houston
-
Koonce DA, Gandhi SA (2004) Applying inductive logic programming for knowledge discovery in genetic algorithms solutions to a job shop schedule. Proceedings of the IIE 2004 Annual Conference, Houston
-
(2004)
Proceedings of the IIE 2004 Annual Conference
-
-
Koonce, D.A.1
Gandhi, S.A.2
-
50
-
-
40849126576
-
A neural network job-shop scheduler
-
10.1007/s10845-008-0073-9
-
Weckman GR, Ganduri CV, Koonce DA (2008) A neural network job-shop scheduler. J Intell Manuf 19(2):191-201
-
(2008)
J Intell Manuf
, vol.19
, Issue.2
, pp. 191-201
-
-
Weckman, G.R.1
Ganduri, C.V.2
Koonce, D.A.3
-
52
-
-
79961026512
-
Job scheduling problem using rough fuzzy multilayer perception neural networks
-
Chaudhuri A, De K (2010) Job scheduling problem using rough fuzzy multilayer perception neural networks. J Artif Intell Theory Appl 1(1):4-19
-
(2010)
J Artif Intell Theory Appl
, vol.1
, Issue.1
, pp. 4-19
-
-
Chaudhuri, A.1
De, K.2
-
53
-
-
69249208646
-
Application of ant colony, genetic algorithm and data mining-based techniques for scheduling
-
10.1016/j.rcim.2009.04.015
-
Kumar S, Rao CSP (2009) Application of ant colony, genetic algorithm and data mining-based techniques for scheduling. Robot Comput-Integr Manuf 25(6):901-908
-
(2009)
Robot Comput-Integr Manuf
, vol.25
, Issue.6
, pp. 901-908
-
-
Kumar, S.1
Rao, C.S.P.2
-
54
-
-
26644461462
-
Discovering dispatching rules using data mining
-
2179408 1123.90031 10.1007/s10951-005-4781-0
-
Li XN, Olafsson S (2005) Discovering dispatching rules using data mining. J Sched 8(6):515-527
-
(2005)
J Sched
, vol.8
, Issue.6
, pp. 515-527
-
-
Li, X.N.1
Olafsson, S.2
-
55
-
-
77957790861
-
Learning effective new single machine dispatching rules from optimal scheduling data
-
10.1016/j.ijpe.2010.06.004
-
Olafsson S, Li XN (2010) Learning effective new single machine dispatching rules from optimal scheduling data. Int J Prod Econ 128:118-126
-
(2010)
Int J Prod Econ
, vol.128
, pp. 118-126
-
-
Olafsson, S.1
Li, X.N.2
-
56
-
-
78650684480
-
Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line
-
2760229 10.1016/j.eswa.2010.08.139
-
Choi HS, Kim JS, Lee DH (2011) Real-time scheduling for reentrant hybrid flow shops: a decision tree based mechanism and its application to a TFT-LCD line. Expert Syst Appl 38(4):3514-3521
-
(2011)
Expert Syst Appl
, vol.38
, Issue.4
, pp. 3514-3521
-
-
Choi, H.S.1
Kim, J.S.2
Lee, D.H.3
-
57
-
-
1542376003
-
Data-mining approach to production control in the computer-integrated testing cell
-
10.1109/TRA.2003.819595
-
Kwak C, Yih Y (2004) Data-mining approach to production control in the computer-integrated testing cell. IEEE Trans Robot Autom 20(1):107-116
-
(2004)
IEEE Trans Robot Autom
, vol.20
, Issue.1
, pp. 107-116
-
-
Kwak, C.1
Yih, Y.2
|