메뉴 건너뛰기




Volumn 66, Issue 9-12, 2013, Pages 1891-1905

Data-based scheduling framework and adaptive dispatching rule of complex manufacturing systems

Author keywords

Complex manufacturing system; Data mining; Data based; Scheduling

Indexed keywords

BACKWARD PROPAGATION; BINARY REGRESSION MODEL; COMPLEX MANUFACTURING SYSTEMS; DATA-BASED; OPERATIONAL PERFORMANCE; PARTICLE SWARM OPTIMIZATION ALGORITHM; SCHEDULING FRAMEWORKS; SEMICONDUCTOR MANUFACTURING SYSTEMS;

EID: 84879070876     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-012-4468-6     Document Type: Article
Times cited : (33)

References (57)
  • 1
    • 0034960598 scopus 로고    scopus 로고
    • Rough set theory a data mining tool for semiconductor manufacturing
    • 10.1109/6104.924792
    • Kusiak A (2001) Rough set theory a data mining tool for semiconductor manufacturing. IEEE Trans Electron Packing Manuf 24(1):44-50
    • (2001) IEEE Trans Electron Packing Manuf , vol.24 , Issue.1 , pp. 44-50
    • Kusiak, A.1
  • 2
    • 33748005672 scopus 로고    scopus 로고
    • Decomposition in data mining an industrial case study
    • 10.1109/6104.895081
    • Kusiak A (2000) Decomposition in data mining an industrial case study. IEEE Trans Electron packing Manuf 23(4):345-353
    • (2000) IEEE Trans Electron Packing Manuf , vol.23 , Issue.4 , pp. 345-353
    • Kusiak, A.1
  • 3
    • 0035401581 scopus 로고    scopus 로고
    • Feature transformation methods in data mining
    • 10.1109/6104.956807
    • Kusiak A (2001) Feature transformation methods in data mining. IEEE Trans Electron Packing Manuf 24(4):214-221
    • (2001) IEEE Trans Electron Packing Manuf , vol.24 , Issue.4 , pp. 214-221
    • Kusiak, A.1
  • 4
    • 72449177821 scopus 로고    scopus 로고
    • A rough set approach to feature selection based on ant colony optimization
    • 10.1016/j.patrec.2009.10.013
    • Chen YM, Miao DQ, Wang RZ (2010) A rough set approach to feature selection based on ant colony optimization. Pattern Recognit Lett 31(3):226-233
    • (2010) Pattern Recognit Lett , vol.31 , Issue.3 , pp. 226-233
    • Chen, Y.M.1    Miao, D.Q.2    Wang, R.Z.3
  • 5
    • 0036413432 scopus 로고    scopus 로고
    • Attribute selection for neural network based adaptive scheduling systems in flexible manufacturing systems
    • 10.1007/s001700200187
    • Shine YR, Su CT (2002) Attribute selection for neural network based adaptive scheduling systems in flexible manufacturing systems. Int J Adv Manuf Technol 20(7):532-544
    • (2002) Int J Adv Manuf Technol , vol.20 , Issue.7 , pp. 532-544
    • Shine, Y.R.1    Su, C.T.2
  • 6
    • 33645574902 scopus 로고    scopus 로고
    • The optimization of attribute selection in decision tree-based production control systems
    • 10.1007/s00170-004-2430-y
    • Shiue YR, Guh RS (2006) The optimization of attribute selection in decision tree-based production control systems. Int J Adv Manuf Technol 28(7-8):737-746
    • (2006) Int J Adv Manuf Technol , vol.28 , Issue.7-8 , pp. 737-746
    • Shiue, Y.R.1    Guh, R.S.2
  • 7
    • 32544433960 scopus 로고    scopus 로고
    • Learning based multi pass adaptive scheduling for a dynamic manufacturing cell environment
    • 10.1016/j.rcim.2005.03.004
    • Shiue YR, Guh RS (2006) Learning based multi pass adaptive scheduling for a dynamic manufacturing cell environment. Rob Comput Integr Manuf 22(3):203-216
    • (2006) Rob Comput Integr Manuf , vol.22 , Issue.3 , pp. 203-216
    • Shiue, Y.R.1    Guh, R.S.2
  • 8
    • 63449134271 scopus 로고    scopus 로고
    • Development of two-level decision tree-based real-time scheduling system under product mix variety environment
    • 10.1016/j.rcim.2008.06.002
    • Shiue YR (2009) Development of two-level decision tree-based real-time scheduling system under product mix variety environment. Robot Comput-Integr Manuf 25(4-5):709-720
    • (2009) Robot Comput-Integr Manuf , vol.25 , Issue.4-5 , pp. 709-720
    • Shiue, Y.R.1
  • 9
    • 67349136034 scopus 로고    scopus 로고
    • GA based learning bias selection mechanism for real time scheduling systems
    • 10.1016/j.eswa.2009.03.019
    • Shiue YR, Guh RS, Tseng TY (2009) GA based learning bias selection mechanism for real time scheduling systems. Expert Syst Appl 36(9):11451-11460
    • (2009) Expert Syst Appl , vol.36 , Issue.9 , pp. 11451-11460
    • Shiue, Y.R.1    Guh, R.S.2    Tseng, T.Y.3
  • 11
    • 34547094355 scopus 로고    scopus 로고
    • Predicting wafer-lot output time with a hybrid FCM-FBPN approach
    • 10.1109/TSMCB.2007.895364
    • Chen T (2007) Predicting wafer-lot output time with a hybrid FCM-FBPN approach. IEEE Trans Dystem Man Cybern B Cybern 37(4):784-793
    • (2007) IEEE Trans Dystem Man Cybern B Cybern , vol.37 , Issue.4 , pp. 784-793
    • Chen, T.1
  • 12
    • 33846817362 scopus 로고    scopus 로고
    • An intelligent hybrid system for wafer lot output time prediction
    • 10.1016/j.aei.2006.10.002
    • Chen T (2007) An intelligent hybrid system for wafer lot output time prediction. Adv Eng Inform 21(1):55-65
    • (2007) Adv Eng Inform , vol.21 , Issue.1 , pp. 55-65
    • Chen, T.1
  • 13
    • 0034294996 scopus 로고    scopus 로고
    • Using data mining to find patterns in genetic algorithm solutions to a job shop schedule
    • 10.1016/S0360-8352(00)00050-4
    • Koonce DA, Tsai SC (2000) Using data mining to find patterns in genetic algorithm solutions to a job shop schedule. Comput Ind Eng 38(3):361-374
    • (2000) Comput Ind Eng , vol.38 , Issue.3 , pp. 361-374
    • Koonce, D.A.1    Tsai, S.C.2
  • 16
    • 34248551329 scopus 로고    scopus 로고
    • Automated Petri-net modeling based on production management data
    • 2333506 1160.90394 10.1080/13873950600834082
    • Gradisar D, Music G (2007) Automated Petri-net modeling based on production management data. Math Comput Model DynSyst 13(3):267-290
    • (2007) Math Comput Model DynSyst , vol.13 , Issue.3 , pp. 267-290
    • Gradisar, D.1    Music, G.2
  • 17
    • 35448952063 scopus 로고    scopus 로고
    • Production-process modeling based on production-management data: A Petri-Net approach
    • 10.1080/09511920601103064
    • Gradisar D, Music G (2007) Production-process modeling based on production-management data: a Petri-Net approach. Int J Comput Integr Manuf 20(8):794-810
    • (2007) Int J Comput Integr Manuf , vol.20 , Issue.8 , pp. 794-810
    • Gradisar, D.1    Music, G.2
  • 19
    • 76449115493 scopus 로고    scopus 로고
    • General structure of the semiconductor production scheduling model
    • 10.4028/www.scientific.net/AMM.20-23.465
    • Ye K, Qiao F, Ma YM (2010) General structure of the semiconductor production scheduling model. Appl Mech Mater 20-23:465-469
    • (2010) Appl Mech Mater , vol.20-23 , pp. 465-469
    • Ye, K.1    Qiao, F.2    Ma, Y.M.3
  • 21
    • 50249174448 scopus 로고    scopus 로고
    • The methods of data collection and tool processing time estimation in lot processing
    • Santa Clara, Institute of Electrical and Electronics Engineers Inc., Piscataway
    • Hosoe H, Knanamori N, Yoshida K (2007) The methods of data collection and tool processing time estimation in lot processing. In: International Symposium on Semiconductor Manufacturing. Santa Clara, Institute of Electrical and Electronics Engineers Inc., Piscataway, pp 241-244
    • (2007) International Symposium on Semiconductor Manufacturing , pp. 241-244
    • Hosoe, H.1    Knanamori, N.2    Yoshida, K.3
  • 22
    • 15844419035 scopus 로고    scopus 로고
    • A fuzzy back propagation network for output time prediction in a wafer fab
    • 10.1016/S1568-4946(02)00066-2
    • Chen T (2003) A fuzzy back propagation network for output time prediction in a wafer fab. Appl Soft Comput 2(3):211-222
    • (2003) Appl Soft Comput , vol.2 , Issue.3 , pp. 211-222
    • Chen, T.1
  • 23
    • 84862291324 scopus 로고    scopus 로고
    • Intelligent scheduling approaches for a wafer fabrication factory
    • 10.1007/s10845-010-0445-9
    • Chen T (2010) Intelligent scheduling approaches for a wafer fabrication factory. J Intell Manuf 23(3):897-911
    • (2010) J Intell Manuf , vol.23 , Issue.3 , pp. 897-911
    • Chen, T.1
  • 24
    • 70350537138 scopus 로고    scopus 로고
    • A nonlinear scheduling rule incorporating fuzzy-neural remaining cycle time estimator for scheduling a semiconductor manufacturing factory - A simulation study
    • 10.1007/s00170-009-1941-y
    • Chen T, Wang YC (2009) A nonlinear scheduling rule incorporating fuzzy-neural remaining cycle time estimator for scheduling a semiconductor manufacturing factory - a simulation study. Int J Adv Manuf Technol 45(1-2):110-121
    • (2009) Int J Adv Manuf Technol , vol.45 , Issue.1-2 , pp. 110-121
    • Chen, T.1    Wang, Y.C.2
  • 25
    • 33751120379 scopus 로고    scopus 로고
    • Job releasing and throughput planning for wafer fabrication under demand fluctuating make-to stock environment
    • 10.1007/s00170-005-0185-8
    • Chung SH, Lai CM (2006) Job releasing and throughput planning for wafer fabrication under demand fluctuating make-to stock environment. Int J Adv Manuf Technol 31(3-4):316-327
    • (2006) Int J Adv Manuf Technol , vol.31 , Issue.3-4 , pp. 316-327
    • Chung, S.H.1    Lai, C.M.2
  • 26
    • 34248190308 scopus 로고    scopus 로고
    • Due date assignment for wafer fabrication under demand variate environment
    • 10.1109/TSM.2007.895215
    • Pearn WL, Chung SH, Lai CM (2007) Due date assignment for wafer fabrication under demand variate environment. IEEE Trans Semicond Manuf 20(2):165-175
    • (2007) IEEE Trans Semicond Manuf , vol.20 , Issue.2 , pp. 165-175
    • Pearn, W.L.1    Chung, S.H.2    Lai, C.M.3
  • 27
    • 33845269117 scopus 로고    scopus 로고
    • Combining SOM and GA-CBR for flow time prediction in semiconductor manufacturing factory
    • 2309341 10.1007/11908029-79
    • Chang PC, Wang YW, Liu CH (2006) Combining SOM and GA-CBR for flow time prediction in semiconductor manufacturing factory. Lect Notes Comput Sci 4259:767-775
    • (2006) Lect Notes Comput Sci , vol.4259 , pp. 767-775
    • Chang, P.C.1    Wang, Y.W.2    Liu, C.H.3
  • 28
    • 33750566327 scopus 로고    scopus 로고
    • A hybrid SOM-BPN approach to lot output time prediction in a wafer fab
    • 10.1007/s11063-006-9027-4
    • Chen T (2006) A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Process Lett 24(3):271-288
    • (2006) Neural Process Lett , vol.24 , Issue.3 , pp. 271-288
    • Chen, T.1
  • 29
    • 36049051023 scopus 로고    scopus 로고
    • A hybrid look-ahead SOM-FBPN and FIR system for wafer-lot-output time prediction and achievability evaluation
    • 10.1007/s00170-006-0741-x
    • Chen T (2007) A hybrid look-ahead SOM-FBPN and FIR system for wafer-lot-output time prediction and achievability evaluation. Int J Adv Manuf Technol 35(5-6):575-586
    • (2007) Int J Adv Manuf Technol , vol.35 , Issue.5-6 , pp. 575-586
    • Chen, T.1
  • 30
    • 30344446393 scopus 로고    scopus 로고
    • Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory
    • 10.1016/j.asoc.2004.12.004
    • Chang PC, Liao TW (2006) Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Appl Soft Comput 6(2):198-206
    • (2006) Appl Soft Comput , vol.6 , Issue.2 , pp. 198-206
    • Chang, P.C.1    Liao, T.W.2
  • 31
    • 44949138483 scopus 로고    scopus 로고
    • A neuro-fuzzy based forecasting approach for rush order control applications
    • 10.1016/j.eswa.2007.06.038
    • Wang WP, Ze C (2008) A neuro-fuzzy based forecasting approach for rush order control applications. Expert Syst Appl 35(1-2):223-234
    • (2008) Expert Syst Appl , vol.35 , Issue.1-2 , pp. 223-234
    • Wang, W.P.1    Ze, C.2
  • 32
    • 72049095063 scopus 로고    scopus 로고
    • Learning and adaptation of a policy for dynamic order acceptance in make-to-order manufacturing
    • 10.1016/j.cie.2009.08.005
    • Arredondo F, Martinez E (2010) Learning and adaptation of a policy for dynamic order acceptance in make-to-order manufacturing. Comput Ind Eng 58(1):70-83
    • (2010) Comput Ind Eng , vol.58 , Issue.1 , pp. 70-83
    • Arredondo, F.1    Martinez, E.2
  • 33
    • 46749150544 scopus 로고    scopus 로고
    • Bidding-based multi-agent system for integrated process planning and scheduling a data-mining and hybrid tabu-SA algorithm-oriented approach
    • 10.1007/s00170-007-1087-8
    • Shukla KS, Tiwari MK, Son YJ (2008) Bidding-based multi-agent system for integrated process planning and scheduling a data-mining and hybrid tabu-SA algorithm-oriented approach. Int J Adv Manuf Technol 38(1-2):163-175
    • (2008) Int J Adv Manuf Technol , vol.38 , Issue.1-2 , pp. 163-175
    • Shukla, K.S.1    Tiwari, M.K.2    Son, Y.J.3
  • 34
    • 33646421404 scopus 로고    scopus 로고
    • Data mining using genetic programming for construction of a semiconductor manufacturing yield rate prediction system
    • 10.1007/s10845-005-0008-7
    • Li TS, Huang CL, Wu ZY (2006) Data mining using genetic programming for construction of a semiconductor manufacturing yield rate prediction system. J Intell Manuf 17(3):355-361
    • (2006) J Intell Manuf , vol.17 , Issue.3 , pp. 355-361
    • Li, T.S.1    Huang, C.L.2    Wu, Z.Y.3
  • 35
    • 33846922481 scopus 로고    scopus 로고
    • Hybrid data mining approach for pattern extraction from wafer bin map to improve yield in semiconductor manufacturing
    • 10.1016/j.ijpe.2006.05.015
    • Hsu SC, Chien CF (2007) Hybrid data mining approach for pattern extraction from wafer bin map to improve yield in semiconductor manufacturing. Int J Prod Econ 107:88-103
    • (2007) Int J Prod Econ , vol.107 , pp. 88-103
    • Hsu, S.C.1    Chien, C.F.2
  • 36
    • 33646433948 scopus 로고    scopus 로고
    • Data mining for improving the quality of manufacturing: A feature decomposition approach
    • 10.1007/s10845-005-0005-x
    • Rokach L, Maimon O (2006) Data mining for improving the quality of manufacturing: a feature decomposition approach. J Intell Manuf 17(3):285-299
    • (2006) J Intell Manuf , vol.17 , Issue.3 , pp. 285-299
    • Rokach, L.1    Maimon, O.2
  • 37
    • 0000936343 scopus 로고
    • Intelligent scheduling with machine learning capabilities the induction of scheduling knowledge
    • 10.1080/07408179208964213
    • Shaw MJ, Park S, Raman N (1992) Intelligent scheduling with machine learning capabilities the induction of scheduling knowledge. IIE Trans 24(2):156-168
    • (1992) IIE Trans , vol.24 , Issue.2 , pp. 156-168
    • Shaw, M.J.1    Park, S.2    Raman, N.3
  • 38
    • 0031198746 scopus 로고    scopus 로고
    • Adaptive scheduling in dynamic flexible manufacturing systems
    • 10.1109/70.611301
    • Park SC, Raman N, Shaw MJ (1997) Adaptive scheduling in dynamic flexible manufacturing systems. IEEE Trans Robot Autom 13(4):486-502
    • (1997) IEEE Trans Robot Autom , vol.13 , Issue.4 , pp. 486-502
    • Park, S.C.1    Raman, N.2    Shaw, M.J.3
  • 39
    • 0033724249 scopus 로고    scopus 로고
    • A neural-net approach to real time flow-shop sequencing
    • 10.1016/S0360-8352(00)00034-6
    • Lee I, Shaw MJ (2000) A neural-net approach to real time flow-shop sequencing. Comput Ind Eng 38(1):125-147
    • (2000) Comput Ind Eng , vol.38 , Issue.1 , pp. 125-147
    • Lee, I.1    Shaw, M.J.2
  • 40
    • 50149101510 scopus 로고    scopus 로고
    • Fuzzy rule generation for adaptive scheduling in a dynamic manufacturing
    • 10.1016/j.asoc.2007.11.005
    • Lee KK (2008) Fuzzy rule generation for adaptive scheduling in a dynamic manufacturing. Appl Soft Comput 8(4):1295-1304
    • (2008) Appl Soft Comput , vol.8 , Issue.4 , pp. 1295-1304
    • Lee, K.K.1
  • 41
    • 0242322798 scopus 로고    scopus 로고
    • Learning-based scheduling of flexible manufacturing systems using case-based reasoning
    • 10.1080/088395101753242697
    • Priore P, Fuente D, Pino R (2001) Learning-based scheduling of flexible manufacturing systems using case-based reasoning. Appl Artif Intell 15(10):949-963
    • (2001) Appl Artif Intell , vol.15 , Issue.10 , pp. 949-963
    • Priore, P.1    Fuente, D.2    Pino, R.3
  • 42
    • 31744447388 scopus 로고    scopus 로고
    • A comparison of machine-learning algorithms for dynamic scheduling of flexible manufacturing systems
    • 10.1016/j.engappai.2005.09.009
    • Priore P, Fuente D, Puente J, Parreno J (2006) A comparison of machine-learning algorithms for dynamic scheduling of flexible manufacturing systems. Eng Appl Artif Intel 19(3):247-255
    • (2006) Eng Appl Artif Intel , vol.19 , Issue.3 , pp. 247-255
    • Priore, P.1    Fuente, D.2    Puente, J.3    Parreno, J.4
  • 43
    • 0035358169 scopus 로고    scopus 로고
    • A review of machine learning in dynamic scheduling of flexible manufacturing systems
    • 0972.68544
    • Priore P, Fuente D, Gomez A, Puente J (2001) A review of machine learning in dynamic scheduling of flexible manufacturing systems. Artif Intell Eng Design Anal Manuf 15(3):251-263
    • (2001) Artif Intell Eng Design Anal Manuf , vol.15 , Issue.3 , pp. 251-263
    • Priore, P.1    Fuente, D.2    Gomez, A.3    Puente, J.4
  • 44
    • 27944469012 scopus 로고    scopus 로고
    • Using data-fuzzification technology in small data set learning to improve FMS
    • 10.1007/s00170-003-2184-y
    • Li DC, Wu CH, Chang FM (2005) Using data-fuzzification technology in small data set learning to improve FMS. Int J Adv Manuf Technol 27(3-4):321-328
    • (2005) Int J Adv Manuf Technol , vol.27 , Issue.3-4 , pp. 321-328
    • Li, D.C.1    Wu, C.H.2    Chang, F.M.3
  • 45
    • 0242485227 scopus 로고    scopus 로고
    • Using functional virtual population as assistance to learn scheduling knowledge in dynamic manufacturing environments
    • 10.1080/0020754031000149211
    • Li DC, Chen LS, Lin YS (2003) Using functional virtual population as assistance to learn scheduling knowledge in dynamic manufacturing environments. Int J Prod Res 41(17):4011-4024
    • (2003) Int J Prod Res , vol.41 , Issue.17 , pp. 4011-4024
    • Li, D.C.1    Chen, L.S.2    Lin, Y.S.3
  • 46
    • 27344432371 scopus 로고    scopus 로고
    • Using mega-fuzzification and data trend estimation in small data set learning for early FMS scheduling knowledge
    • 1091.90021 10.1016/j.cor.2004.11.022
    • Li DC, Wu CH, Tsa TI, Fengming MC (2006) Using mega-fuzzification and data trend estimation in small data set learning for early FMS scheduling knowledge. Comput Oper Res 33(6):1857-1869
    • (2006) Comput Oper Res , vol.33 , Issue.6 , pp. 1857-1869
    • Li, D.C.1    Wu, C.H.2    Tsa, T.I.3    Fengming, M.C.4
  • 47
    • 0034325416 scopus 로고    scopus 로고
    • Dynamic job-shop scheduling using reinforcement learning agents
    • 10.1016/S0921-8890(00)00087-7
    • Aydin ME, Öztemel E (2000) Dynamic job-shop scheduling using reinforcement learning agents. Robot Auton Syst 33(2-3):169-178
    • (2000) Robot Auton Syst , vol.33 , Issue.2-3 , pp. 169-178
    • Aydin, M.E.1    Öztemel, E.2
  • 48
    • 67650227926 scopus 로고    scopus 로고
    • An adaptive approach to dynamic scheduling in knowledgeable manufacturing cell
    • 10.1007/s00170-008-1588-0
    • Yang HB, Yan HS (2009) An adaptive approach to dynamic scheduling in knowledgeable manufacturing cell. Int J Adv Manuf Technol 42(3-4):312-320
    • (2009) Int J Adv Manuf Technol , vol.42 , Issue.3-4 , pp. 312-320
    • Yang, H.B.1    Yan, H.S.2
  • 49
    • 30044437249 scopus 로고    scopus 로고
    • Applying inductive logic programming for knowledge discovery in genetic algorithms solutions to a job shop schedule
    • Houston
    • Koonce DA, Gandhi SA (2004) Applying inductive logic programming for knowledge discovery in genetic algorithms solutions to a job shop schedule. Proceedings of the IIE 2004 Annual Conference, Houston
    • (2004) Proceedings of the IIE 2004 Annual Conference
    • Koonce, D.A.1    Gandhi, S.A.2
  • 50
    • 40849126576 scopus 로고    scopus 로고
    • A neural network job-shop scheduler
    • 10.1007/s10845-008-0073-9
    • Weckman GR, Ganduri CV, Koonce DA (2008) A neural network job-shop scheduler. J Intell Manuf 19(2):191-201
    • (2008) J Intell Manuf , vol.19 , Issue.2 , pp. 191-201
    • Weckman, G.R.1    Ganduri, C.V.2    Koonce, D.A.3
  • 52
    • 79961026512 scopus 로고    scopus 로고
    • Job scheduling problem using rough fuzzy multilayer perception neural networks
    • Chaudhuri A, De K (2010) Job scheduling problem using rough fuzzy multilayer perception neural networks. J Artif Intell Theory Appl 1(1):4-19
    • (2010) J Artif Intell Theory Appl , vol.1 , Issue.1 , pp. 4-19
    • Chaudhuri, A.1    De, K.2
  • 53
    • 69249208646 scopus 로고    scopus 로고
    • Application of ant colony, genetic algorithm and data mining-based techniques for scheduling
    • 10.1016/j.rcim.2009.04.015
    • Kumar S, Rao CSP (2009) Application of ant colony, genetic algorithm and data mining-based techniques for scheduling. Robot Comput-Integr Manuf 25(6):901-908
    • (2009) Robot Comput-Integr Manuf , vol.25 , Issue.6 , pp. 901-908
    • Kumar, S.1    Rao, C.S.P.2
  • 54
    • 26644461462 scopus 로고    scopus 로고
    • Discovering dispatching rules using data mining
    • 2179408 1123.90031 10.1007/s10951-005-4781-0
    • Li XN, Olafsson S (2005) Discovering dispatching rules using data mining. J Sched 8(6):515-527
    • (2005) J Sched , vol.8 , Issue.6 , pp. 515-527
    • Li, X.N.1    Olafsson, S.2
  • 55
    • 77957790861 scopus 로고    scopus 로고
    • Learning effective new single machine dispatching rules from optimal scheduling data
    • 10.1016/j.ijpe.2010.06.004
    • Olafsson S, Li XN (2010) Learning effective new single machine dispatching rules from optimal scheduling data. Int J Prod Econ 128:118-126
    • (2010) Int J Prod Econ , vol.128 , pp. 118-126
    • Olafsson, S.1    Li, X.N.2
  • 56
    • 78650684480 scopus 로고    scopus 로고
    • Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line
    • 2760229 10.1016/j.eswa.2010.08.139
    • Choi HS, Kim JS, Lee DH (2011) Real-time scheduling for reentrant hybrid flow shops: a decision tree based mechanism and its application to a TFT-LCD line. Expert Syst Appl 38(4):3514-3521
    • (2011) Expert Syst Appl , vol.38 , Issue.4 , pp. 3514-3521
    • Choi, H.S.1    Kim, J.S.2    Lee, D.H.3
  • 57
    • 1542376003 scopus 로고    scopus 로고
    • Data-mining approach to production control in the computer-integrated testing cell
    • 10.1109/TRA.2003.819595
    • Kwak C, Yih Y (2004) Data-mining approach to production control in the computer-integrated testing cell. IEEE Trans Robot Autom 20(1):107-116
    • (2004) IEEE Trans Robot Autom , vol.20 , Issue.1 , pp. 107-116
    • Kwak, C.1    Yih, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.