메뉴 건너뛰기




Volumn 37, Issue 4, 2007, Pages 784-793

Predicting wafer-lot output time with a hybrid FCM-FBPN approach

Author keywords

Fuzzy backpropagation network (FBPN); Fuzzy c means (FCM); Output time prediction; Wafer fab

Indexed keywords

COMPUTER SIMULATION; FORECASTING; FUZZY NEURAL NETWORKS; TOPOLOGY;

EID: 34547094355     PISSN: 10834419     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSMCB.2007.895364     Document Type: Article
Times cited : (24)

References (24)
  • 1
    • 0032074551 scopus 로고    scopus 로고
    • The impact of priority rule combinations on lateness and tardiness
    • May
    • S. Barman, "The impact of priority rule combinations on lateness and tardiness," IIE Trans., vol. 30, no. 5, pp. 495-504, May 1998.
    • (1998) IIE Trans , vol.30 , Issue.5 , pp. 495-504
    • Barman, S.1
  • 2
    • 0037546939 scopus 로고    scopus 로고
    • A neural networks approach for due-date assignment in a wafer fabrication factory
    • P.-C. Chang and J.-C. Hsieh, "A neural networks approach for due-date assignment in a wafer fabrication factory," Int. J. Ind. Eng., vol. 10, no. 1, pp. 55-61, 2003.
    • (2003) Int. J. Ind. Eng , vol.10 , Issue.1 , pp. 55-61
    • Chang, P.-C.1    Hsieh, J.-C.2
  • 3
    • 67749133834 scopus 로고    scopus 로고
    • A case-based reasoning approach for due date assignment in a wafer fabrication factory
    • Vancouver, BC, Canada
    • P.-C. Chang, J.-C. Hsieh, and T. W. Liao, "A case-based reasoning approach for due date assignment in a wafer fabrication factory," in Proc. ICCBR, Vancouver, BC, Canada, 2001, pp. 648-659.
    • (2001) Proc. ICCBR , pp. 648-659
    • Chang, P.-C.1    Hsieh, J.-C.2    Liao, T.W.3
  • 4
    • 23044463387 scopus 로고    scopus 로고
    • Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory
    • Oct
    • P.-C. Chang, J.-C. Hsieh, and T. W. Liao, "Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory," J. Intell. Manuf., vol. 16, no. 4/5, pp. 549-557, Oct. 2005.
    • (2005) J. Intell. Manuf , vol.16 , Issue.4-5 , pp. 549-557
    • Chang, P.-C.1    Hsieh, J.-C.2    Liao, T.W.3
  • 5
    • 16244381765 scopus 로고    scopus 로고
    • A hybrid system combining self-organizing maps with case-based reasoning in wholesaler's new-release book forecasting
    • P.-C. Chang and C. Y. Lai, "A hybrid system combining self-organizing maps with case-based reasoning in wholesaler's new-release book forecasting," Expert Syst. Appl., vol. 29, no. 1, pp. 183-192, 2005.
    • (2005) Expert Syst. Appl , vol.29 , Issue.1 , pp. 183-192
    • Chang, P.-C.1    Lai, C.Y.2
  • 6
    • 33750462377 scopus 로고    scopus 로고
    • A hybrid model by clustering and evolving fuzzy rules for sale forecasting in printed circuit board industry
    • P.-C. Chang, C. H. Liu, and Y. W. Wang, "A hybrid model by clustering and evolving fuzzy rules for sale forecasting in printed circuit board industry," Decis. Support Syst., vol. 42, no. 3, pp. 1254-1269, 2006.
    • (2006) Decis. Support Syst , vol.42 , Issue.3 , pp. 1254-1269
    • Chang, P.-C.1    Liu, C.H.2    Wang, Y.W.3
  • 7
    • 15844419035 scopus 로고    scopus 로고
    • A fuzzy backpropagation network for output time prediction in a wafer fab
    • T. Chen, "A fuzzy backpropagation network for output time prediction in a wafer fab," Appl. Soft Comput., vol. 2, no. 3, pp. 211-222, 2003.
    • (2003) Appl. Soft Comput , vol.2 , Issue.3 , pp. 211-222
    • Chen, T.1
  • 8
    • 33750566327 scopus 로고    scopus 로고
    • A hybrid SOM-BPN approach to lot output time prediction in a wafer fab
    • Dec, DOI 10.1007/s11063-006-9027-4
    • T. Chen, "A hybrid SOM-BPN approach to lot output time prediction in a wafer fab," Neural Process. Lett., vol. 24, no. 3, pp. 271-288, Dec. 2006. DOI 10.1007/s11063-006-9027-4.
    • (2006) Neural Process. Lett , vol.24 , Issue.3 , pp. 271-288
    • Chen, T.1
  • 9
    • 30344446393 scopus 로고    scopus 로고
    • Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory
    • Jan
    • P.-C. Chang and T. W. Liao, "Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory," Appl. Soft Comput., vol. 6, no. 2, pp. 198-206, Jan. 2006.
    • (2006) Appl. Soft Comput , vol.6 , Issue.2 , pp. 198-206
    • Chang, P.-C.1    Liao, T.W.2
  • 10
    • 0031246943 scopus 로고    scopus 로고
    • The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories
    • Oct
    • S.-H. Chung, M.-H. Yang, and C.-M. Cheng, "The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories," IEEE Trans. Compon., Packag., Manuf. Technol. C, vol. 20, no. 4, pp. 278-287, Oct. 1997.
    • (1997) IEEE Trans. Compon., Packag., Manuf. Technol. C , vol.20 , Issue.4 , pp. 278-287
    • Chung, S.-H.1    Yang, M.-H.2    Cheng, C.-M.3
  • 11
    • 0026851662 scopus 로고
    • Neural network forecasting of short, noisy time series
    • W. R. Foster, F. Gollopy, and L. H. Ungar, "Neural network forecasting of short, noisy time series," Comput. Chem. Eng., vol. 16, no. 4, pp. 293-297, 1992.
    • (1992) Comput. Chem. Eng , vol.16 , Issue.4 , pp. 293-297
    • Foster, W.R.1    Gollopy, F.2    Ungar, L.H.3
  • 13
    • 24644518477 scopus 로고    scopus 로고
    • Dispatching rules using flow time predictions for semiconductor wafer fabrications
    • Y.-F. Hung and C.-B. Chang, "Dispatching rules using flow time predictions for semiconductor wafer fabrications," J. Chinese Inst. Ind. Eng., vol. 19, no. 1, pp. 67-74, 2002.
    • (2002) J. Chinese Inst. Ind. Eng , vol.19 , Issue.1 , pp. 67-74
    • Hung, Y.-F.1    Chang, C.-B.2
  • 14
    • 0027595614 scopus 로고
    • Neural networks that learn from fuzzy If-Then rules
    • May
    • H. Ishibuchi, R. Fujioka, and H. Tanaka, "Neural networks that learn from fuzzy If-Then rules," IEEE Trans. Fuzzy Syst., vol. 1, no. 2, pp. 85-97, May 1993.
    • (1993) IEEE Trans. Fuzzy Syst , vol.1 , Issue.2 , pp. 85-97
    • Ishibuchi, H.1    Fujioka, R.2    Tanaka, H.3
  • 15
    • 10844279814 scopus 로고    scopus 로고
    • SOM ensemble-based image segmentation
    • Nov
    • Y. Jiang and Z. H. Zhou, "SOM ensemble-based image segmentation," Neural Process. Lett., vol. 20, no. 3, pp. 171-178, Nov. 2004.
    • (2004) Neural Process. Lett , vol.20 , Issue.3 , pp. 171-178
    • Jiang, Y.1    Zhou, Z.H.2
  • 16
    • 0000888528 scopus 로고
    • A neural fuzzy system with linguistic teaching signals
    • May
    • C.-T. Lin and Y.-C. Lu, "A neural fuzzy system with linguistic teaching signals," IEEE Trans. Fuzzy Syst., vol. 3, no. 2, pp. 169-189, May 1995.
    • (1995) IEEE Trans. Fuzzy Syst , vol.3 , Issue.2 , pp. 169-189
    • Lin, C.-T.1    Lu, Y.-C.2
  • 17
    • 34547107747 scopus 로고    scopus 로고
    • C.-Y. Lin, Shop floor scheduling of semiconductor wafer fabrication using real-time feedback control and prediction, Ph.D. dissertation, Eng.-Ind. Eng. and Oper. Res., Univ. California at Berkeley, Berkeley, CA, 1996.
    • C.-Y. Lin, "Shop floor scheduling of semiconductor wafer fabrication using real-time feedback control and prediction," Ph.D. dissertation, Eng.-Ind. Eng. and Oper. Res., Univ. California at Berkeley, Berkeley, CA, 1996.
  • 18
    • 0000861722 scopus 로고
    • A proof of the queueing formula L = λ W
    • J. D. C. Little, "A proof of the queueing formula L = λ W," Oper. Res., vol. 9, no. 3, pp. 383-387, 1961.
    • (1961) Oper. Res , vol.9 , Issue.3 , pp. 383-387
    • Little, J.D.C.1
  • 19
    • 0032749972 scopus 로고    scopus 로고
    • Theory and methodology - Financial credit-risk evaluation with neural and neuralfuzzy systems
    • S. Piramuthu, "Theory and methodology - Financial credit-risk evaluation with neural and neuralfuzzy systems," Eur. J. Oper. Res. vol. 112, no. 2, pp. 310-321, 1999.
    • (1999) Eur. J. Oper. Res , vol.112 , Issue.2 , pp. 310-321
    • Piramuthu, S.1
  • 20
    • 0001870328 scopus 로고
    • A simulation analysis of due date assignment
    • G. L. Ragatz and V. A. Mabert, "A simulation analysis of due date assignment," J. Oper. Manage., vol. 5, no. 1, pp. 27-39, 1984.
    • (1984) J. Oper. Manage , vol.5 , Issue.1 , pp. 27-39
    • Ragatz, G.L.1    Mabert, V.A.2
  • 21
    • 0026186620 scopus 로고
    • Dynamic rules for due-date assignment
    • M. M. Vig and K. J. Dooley, "Dynamic rules for due-date assignment," Int. J. Prod. Res., vol. 29, no. 7, pp. 1361-1377, 1991.
    • (1991) Int. J. Prod. Res , vol.29 , Issue.7 , pp. 1361-1377
    • Vig, M.M.1    Dooley, K.J.2
  • 22
    • 0026943536 scopus 로고
    • Generating fuzzy rules by learning from examples
    • Nov./Dec
    • L.-X. Wang and J. M. Mendel, "Generating fuzzy rules by learning from examples," IEEE Trans. Syst., Man, Cybern., vol. 22, no. 6, pp. 1414-1427, Nov./Dec. 1992.
    • (1992) IEEE Trans. Syst., Man, Cybern , vol.22 , Issue.6 , pp. 1414-1427
    • Wang, L.-X.1    Mendel, J.M.2
  • 23
    • 0018454859 scopus 로고
    • A simulation study of predictable due-dates
    • Apr
    • J. K.Weeks, "A simulation study of predictable due-dates," Manage. Sci., vol. 25, no. 4, pp. 363-373, Apr. 1979.
    • (1979) Manage. Sci , vol.25 , Issue.4 , pp. 363-373
    • Weeks, J.K.1
  • 24
    • 0026204245 scopus 로고
    • A validity measure for fuzzy clustering
    • Aug
    • X. L. Xie and G. Beni, "A validity measure for fuzzy clustering," IEEE Trans. Pattern Anal. Mach. Intell., vol. 13, no. 8, pp. 841-847, Aug. 1991.
    • (1991) IEEE Trans. Pattern Anal. Mach. Intell , vol.13 , Issue.8 , pp. 841-847
    • Xie, X.L.1    Beni, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.