Evolving CBR and data segmentation by SOM for flow time prediction in semiconductor manufacturing
-
Chang, P. C., Fan, C. Y., & Wang, Y. W. (2009). Evolving CBR and data segmentation by SOM for flow time prediction in semiconductor manufacturing. Journal of IntelligentManufacturing, 20(4), 421-429.
-
(2009)
Journal of IntelligentManufacturing
, vol.20
, Issue.4
, pp. 421-429
-
-
Chang, P.C.1
Fan, C.Y.2
Wang, Y.W.3
-
2
-
-
23044463387
-
Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory
-
DOI 10.1007/s10845-005-1663-4
-
Chang, P. C., Hsieh, J. C., & Liao, T. W. (2005). Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. Journal of Intelligent Manufacturing, 16, 549-557. (Pubitemid 41067724)
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, Issue.4-5
, pp. 549-557
-
-
Chang, P.-C.1
Hieh, J.-C.2
Liao, T.W.3
-
3
-
-
33746257095
-
A branch and bound procedure for the reentrant permutation flow-shop scheduling problem
-
DOI 10.1007/s00170-005-0017-x
-
Chen, J.-S. (2006). A branch and bound procedure for the reentrant permutation flow-shop scheduling problem. International Journal of Advanced Manufacturing Technology, 29(11-12), 1186-1193. (Pubitemid 44099797)
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.29
, Issue.11-12
, pp. 1186-1193
-
-
Chen, J.-S.1
-
4
-
-
15844419035
-
A fuzzy back propagation network for output time prediction in a wafer fab
-
DOI 10.1016/S1568-4946(02)00066-2, PII S1568494602000662
-
Chen, T. (2003a). A fuzzy back propagation network for output time prediction in a wafer fab. Applied Soft Computing, 2/3F, 211-222. (Pubitemid 40421588)
-
(2003)
Applied Soft Computing Journal
, vol.2
, Issue.3
, pp. 211-222
-
-
Chen, T.1
-
5
-
-
0042232468
-
A fuzzy mid-term single-fab production planning model
-
Chen, T. (2003b). A fuzzy mid-term single-fab production planning model. Journal of Intelligent Manufacturing, 14, 273-285.
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, pp. 273-285
-
-
Chen, T.1
-
6
-
-
42649085767
-
A SOM-FBPN-ensemble approach with error feedback to adjust classification for wafer-lot completion time prediction
-
DOI 10.1007/s00170-007-1007-y
-
Chen, T. (2008). A SOM-FBPN-ensemble approach with error feedback to adjust classification forwafer-lot completion time prediction. International Journal of Advanced Manufacturing Technology, 37(7-8), 782-792. (Pubitemid 351601465)
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.37
, Issue.7-8
, pp. 782-792
-
-
Chen, T.1
-
7
-
-
80052612097
-
Applying a fuzzy and neural approach for forecasting the foreign exchange rate
-
in press
-
Chen, T. (2010). Applying a fuzzy and neural approach for forecasting the foreign exchange rate. International Journal of Fuzzy System Applications, (in press).
-
(2010)
International Journal of Fuzzy System Applications
-
-
Chen, T.1
-
8
-
-
63449117415
-
A fuzzy-neural approach for output projection in a semiconductor fabrication factory
-
Chen, T., & Wu, H.-C. (2008). A fuzzy-neural approach for output projection in a semiconductor fabrication factory. Journal of Chinese Institute of Engineers, 32(2), 287-293.
-
(2008)
Journal of Chinese Institute of Engineers
, vol.32
, Issue.2
, pp. 287-293
-
-
Chen, T.1
Wu, H.-C.2
-
9
-
-
74849088960
-
Dynamic consistency of fuzzy conditional temporal problems
-
Falda, M., Rossi, F., & Venable, K. B. (2010). Dynamic consistency of fuzzy conditional temporal problems. Journal of Intelligent Manufacturing, 21, 75-88.
-
(2010)
Journal of Intelligent Manufacturing
, vol.21
, pp. 75-88
-
-
Falda, M.1
Rossi, F.2
Venable, K.B.3
-
10
-
-
31644451948
-
Job shop scheduling techniques in semiconductor manufacturing
-
DOI 10.1007/s00170-004-2296-z
-
Gupta, A. K., & Sivakumar, A. I. (2006). Job shop scheduling techniques in semiconductor manufacturing. International Journal of Advanced Manufacturing Technology, 27, 1163-1169. (Pubitemid 43170416)
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.27
, Issue.11-12
, pp. 1163-1169
-
-
Gupta, A.K.1
Sivakumar, A.I.2
-
11
-
-
0035485814
-
Scheduling semiconductor wafer fabrication by using ordinal optimization-based simulation
-
DOI 10.1109/70.964661, PII S1042296X01097476
-
Hsieh, B.-W., Chen, C.-H., & Chang, S.-C. (2001). Scheduling semiconductor wafer fabrication by using ordinal optimizationbased simulation. IEEE Transactions on Robotics and Automation, 17(5), 599-608. (Pubitemid 33137776)
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, Issue.5
, pp. 599-608
-
-
Hsieh, B.-W.1
Chen, C.-H.2
Chang, S.-C.3
-
12
-
-
0035485317
-
Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates
-
Kim, Y. D., Kim, J. G., & Kim, H. U. (2001). Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates. IEEE Transactions on Robotics and Automation, 17(5), 589-598.
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, Issue.5
, pp. 589-598
-
-
Kim, Y.D.1
Kim, J.G.2
Kim, H.U.3
-
14
-
-
0034294996
-
Using data mining to find patterns in genetic algorithm solutions to a job shop schedule
-
DOI 10.1016/S0360-8352(00)00050-4
-
Koonce, D. A., & Tsai, S.-C. (2000). Using data mining to find patterns in genetic algorithm solutions to a job shop schedule. Computers and Industrial Engineering, 38(3), 361-374. (Pubitemid 32022410)
-
(2000)
Computers and Industrial Engineering
, vol.38
, Issue.3
, pp. 361-374
-
-
Koonce, D.A.1
Tsai, S.-C.2
-
16
-
-
0028481114
-
Efficient scheduling policies to reduce mean and variation of cycle time in semiconductor manufacturing plant
-
Lu, S. C. H., Ramaswamy, D., & Kumar, P. R. (1994). Efficient scheduling policies to reduce mean and variation of cycle time in semiconductor manufacturing plant. IEEE Transactions on Semiconductor Manufacturing, 7(3), 374-388.
-
(1994)
IEEE Transactions on Semiconductor Manufacturing
, vol.7
, Issue.3
, pp. 374-388
-
-
Lu, S.C.H.1
Ramaswamy, D.2
Kumar, P.R.3
-
17
-
-
10244226688
-
A comparative study of schedule-generation procedures for the reentrant shops scheduling problem
-
Pan, J. C.-H., & Chen, J.-S. (2004). A comparative study of schedule-generation procedures for the reentrant shops scheduling problem. International Journal of Industrial Engineering: Theory Applications and Practice, 11(4), 313-321.
-
(2004)
International Journal of Industrial Engineering: Theory Applications and Practice
, vol.11
, Issue.4
, pp. 313-321
-
-
Pan, J.C.-H.1
Chen, J.-S.2
-
18
-
-
0036413432
-
Attribute selection for neural network-based adaptive scheduling systems in flexible manufacturing systems
-
Shiue, Y. R., & Su, C. T. (2002). Attribute selection for neural network-based adaptive scheduling systems in flexible manufacturing systems. International Journal of Advanced Manufacturing Technology, 20(7), 532-544.
-
(2002)
International Journal of Advanced Manufacturing Technology
, vol.20
, Issue.7
, pp. 532-544
-
-
Shiue, Y.R.1
Su, C.T.2
-
19
-
-
69649098917
-
A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan minimization
-
Topaloglu, S., & Kilincli, G. (2009). A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan minimization. International Journal of Advanced Manufacturing Technology, 44(7-8), 781-794.
-
(2009)
International Journal of Advanced Manufacturing Technology
, vol.44
, Issue.7-8
, pp. 781-794
-
-
Topaloglu, S.1
Kilincli, G.2
-
21
-
-
38949143264
-
A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints
-
DOI 10.1109/TSM.2007.914388
-
Yoon, H. J., & Shen, W. (2008). A multiagent-based decisionmaking system for semiconductor wafer fabrication with hard temporal constraints. IEEE Transactions on Semiconductor Manufacturing, 21(1), 83-91. (Pubitemid 351229821)
-
(2008)
IEEE Transactions on Semiconductor Manufacturing
, vol.21
, Issue.1
, pp. 83-91
-
-
Yoon, H.J.1
Shen, W.2
-
22
-
-
0038407676
-
A genetic algorithm and data mining based meta-heuristic for job shop scheduling problem
-
Youssef, H., Brigitte, C.-M., Noureddine, Z. (2002). A genetic algorithm and data mining based meta-heuristic for job shop scheduling problem. In Proceedings of the IEEE international conference on systems, man and cybernetics (vol. 7, pp. 280-285).
-
(2002)
Proceedings of the IEEE International Conference on Systems, Man and Cybernetics
, vol.7
, pp. 280-285
-
-
Youssef, H.1
Brigitte, C.-M.2
Noureddine, Z.3
-
23
-
-
60949107906
-
Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology
-
Zhang, H., Jiang, Z., & Guo, C. (2007). Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology. International Journal of Advanced Manufacturing Technology, 41(1-2), 110-121.
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.41
, Issue.1-2
, pp. 110-121
-
-
Zhang, H.1
Jiang, Z.2
Guo, C.3
|