메뉴 건너뛰기




Volumn 23, Issue 3, 2012, Pages 897-911

Intelligent scheduling approaches for a wafer fabrication factory

Author keywords

Fuzzy; Intelligent; Neural; Scheduling; Wafer fabrication

Indexed keywords

CYCLE TIME; FUZZY; INTELLIGENT; INTELLIGENT SCHEDULING; JOB SCHEDULING; NEURAL; PRODUCTION SIMULATION; PRODUCTION SYSTEM; WAFER FABRICATIONS;

EID: 84862291324     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-010-0445-9     Document Type: Article
Times cited : (13)

References (23)
  • 1
    • 67749106612 scopus 로고    scopus 로고
    • Evolving CBR and data segmentation by SOM for flow time prediction in semiconductor manufacturing
    • Chang, P. C., Fan, C. Y., & Wang, Y. W. (2009). Evolving CBR and data segmentation by SOM for flow time prediction in semiconductor manufacturing. Journal of IntelligentManufacturing, 20(4), 421-429.
    • (2009) Journal of IntelligentManufacturing , vol.20 , Issue.4 , pp. 421-429
    • Chang, P.C.1    Fan, C.Y.2    Wang, Y.W.3
  • 2
    • 23044463387 scopus 로고    scopus 로고
    • Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory
    • DOI 10.1007/s10845-005-1663-4
    • Chang, P. C., Hsieh, J. C., & Liao, T. W. (2005). Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. Journal of Intelligent Manufacturing, 16, 549-557. (Pubitemid 41067724)
    • (2005) Journal of Intelligent Manufacturing , vol.16 , Issue.4-5 , pp. 549-557
    • Chang, P.-C.1    Hieh, J.-C.2    Liao, T.W.3
  • 3
    • 33746257095 scopus 로고    scopus 로고
    • A branch and bound procedure for the reentrant permutation flow-shop scheduling problem
    • DOI 10.1007/s00170-005-0017-x
    • Chen, J.-S. (2006). A branch and bound procedure for the reentrant permutation flow-shop scheduling problem. International Journal of Advanced Manufacturing Technology, 29(11-12), 1186-1193. (Pubitemid 44099797)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , Issue.11-12 , pp. 1186-1193
    • Chen, J.-S.1
  • 4
    • 15844419035 scopus 로고    scopus 로고
    • A fuzzy back propagation network for output time prediction in a wafer fab
    • DOI 10.1016/S1568-4946(02)00066-2, PII S1568494602000662
    • Chen, T. (2003a). A fuzzy back propagation network for output time prediction in a wafer fab. Applied Soft Computing, 2/3F, 211-222. (Pubitemid 40421588)
    • (2003) Applied Soft Computing Journal , vol.2 , Issue.3 , pp. 211-222
    • Chen, T.1
  • 5
    • 0042232468 scopus 로고    scopus 로고
    • A fuzzy mid-term single-fab production planning model
    • Chen, T. (2003b). A fuzzy mid-term single-fab production planning model. Journal of Intelligent Manufacturing, 14, 273-285.
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 273-285
    • Chen, T.1
  • 6
    • 42649085767 scopus 로고    scopus 로고
    • A SOM-FBPN-ensemble approach with error feedback to adjust classification for wafer-lot completion time prediction
    • DOI 10.1007/s00170-007-1007-y
    • Chen, T. (2008). A SOM-FBPN-ensemble approach with error feedback to adjust classification forwafer-lot completion time prediction. International Journal of Advanced Manufacturing Technology, 37(7-8), 782-792. (Pubitemid 351601465)
    • (2008) International Journal of Advanced Manufacturing Technology , vol.37 , Issue.7-8 , pp. 782-792
    • Chen, T.1
  • 7
    • 80052612097 scopus 로고    scopus 로고
    • Applying a fuzzy and neural approach for forecasting the foreign exchange rate
    • in press
    • Chen, T. (2010). Applying a fuzzy and neural approach for forecasting the foreign exchange rate. International Journal of Fuzzy System Applications, (in press).
    • (2010) International Journal of Fuzzy System Applications
    • Chen, T.1
  • 8
    • 63449117415 scopus 로고    scopus 로고
    • A fuzzy-neural approach for output projection in a semiconductor fabrication factory
    • Chen, T., & Wu, H.-C. (2008). A fuzzy-neural approach for output projection in a semiconductor fabrication factory. Journal of Chinese Institute of Engineers, 32(2), 287-293.
    • (2008) Journal of Chinese Institute of Engineers , vol.32 , Issue.2 , pp. 287-293
    • Chen, T.1    Wu, H.-C.2
  • 10
    • 31644451948 scopus 로고    scopus 로고
    • Job shop scheduling techniques in semiconductor manufacturing
    • DOI 10.1007/s00170-004-2296-z
    • Gupta, A. K., & Sivakumar, A. I. (2006). Job shop scheduling techniques in semiconductor manufacturing. International Journal of Advanced Manufacturing Technology, 27, 1163-1169. (Pubitemid 43170416)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.27 , Issue.11-12 , pp. 1163-1169
    • Gupta, A.K.1    Sivakumar, A.I.2
  • 11
    • 0035485814 scopus 로고    scopus 로고
    • Scheduling semiconductor wafer fabrication by using ordinal optimization-based simulation
    • DOI 10.1109/70.964661, PII S1042296X01097476
    • Hsieh, B.-W., Chen, C.-H., & Chang, S.-C. (2001). Scheduling semiconductor wafer fabrication by using ordinal optimizationbased simulation. IEEE Transactions on Robotics and Automation, 17(5), 599-608. (Pubitemid 33137776)
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , Issue.5 , pp. 599-608
    • Hsieh, B.-W.1    Chen, C.-H.2    Chang, S.-C.3
  • 12
    • 0035485317 scopus 로고    scopus 로고
    • Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates
    • Kim, Y. D., Kim, J. G., & Kim, H. U. (2001). Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates. IEEE Transactions on Robotics and Automation, 17(5), 589-598.
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , Issue.5 , pp. 589-598
    • Kim, Y.D.1    Kim, J.G.2    Kim, H.U.3
  • 14
    • 0034294996 scopus 로고    scopus 로고
    • Using data mining to find patterns in genetic algorithm solutions to a job shop schedule
    • DOI 10.1016/S0360-8352(00)00050-4
    • Koonce, D. A., & Tsai, S.-C. (2000). Using data mining to find patterns in genetic algorithm solutions to a job shop schedule. Computers and Industrial Engineering, 38(3), 361-374. (Pubitemid 32022410)
    • (2000) Computers and Industrial Engineering , vol.38 , Issue.3 , pp. 361-374
    • Koonce, D.A.1    Tsai, S.-C.2
  • 16
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variation of cycle time in semiconductor manufacturing plant
    • Lu, S. C. H., Ramaswamy, D., & Kumar, P. R. (1994). Efficient scheduling policies to reduce mean and variation of cycle time in semiconductor manufacturing plant. IEEE Transactions on Semiconductor Manufacturing, 7(3), 374-388.
    • (1994) IEEE Transactions on Semiconductor Manufacturing , vol.7 , Issue.3 , pp. 374-388
    • Lu, S.C.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 18
    • 0036413432 scopus 로고    scopus 로고
    • Attribute selection for neural network-based adaptive scheduling systems in flexible manufacturing systems
    • Shiue, Y. R., & Su, C. T. (2002). Attribute selection for neural network-based adaptive scheduling systems in flexible manufacturing systems. International Journal of Advanced Manufacturing Technology, 20(7), 532-544.
    • (2002) International Journal of Advanced Manufacturing Technology , vol.20 , Issue.7 , pp. 532-544
    • Shiue, Y.R.1    Su, C.T.2
  • 19
    • 69649098917 scopus 로고    scopus 로고
    • A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan minimization
    • Topaloglu, S., & Kilincli, G. (2009). A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan minimization. International Journal of Advanced Manufacturing Technology, 44(7-8), 781-794.
    • (2009) International Journal of Advanced Manufacturing Technology , vol.44 , Issue.7-8 , pp. 781-794
    • Topaloglu, S.1    Kilincli, G.2
  • 21
    • 38949143264 scopus 로고    scopus 로고
    • A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints
    • DOI 10.1109/TSM.2007.914388
    • Yoon, H. J., & Shen, W. (2008). A multiagent-based decisionmaking system for semiconductor wafer fabrication with hard temporal constraints. IEEE Transactions on Semiconductor Manufacturing, 21(1), 83-91. (Pubitemid 351229821)
    • (2008) IEEE Transactions on Semiconductor Manufacturing , vol.21 , Issue.1 , pp. 83-91
    • Yoon, H.J.1    Shen, W.2
  • 23
    • 60949107906 scopus 로고    scopus 로고
    • Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology
    • Zhang, H., Jiang, Z., & Guo, C. (2007). Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology. International Journal of Advanced Manufacturing Technology, 41(1-2), 110-121.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.41 , Issue.1-2 , pp. 110-121
    • Zhang, H.1    Jiang, Z.2    Guo, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.