Volumn 31, Issue 3-4, 2006, Pages 316-327

Job releasing and throughput planning for wafer fabrication under demand fluctuating make-to-stock environment

Author keywords

Cycle time; Lot release scheduling; Product mix; Wafer fabrication

Indexed keywords

COMPUTER SIMULATION; INVENTORY CONTROL; PRODUCTION CONTROL; SCHEDULING; STRATEGIC PLANNING; THROUGHPUT; WSI CIRCUITS;

EID: 33751120379     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-005-0185-8     Document Type: Article
Times cited : (12)

References (19)
  • 1
    • 0034250153 scopus 로고    scopus 로고
    • A methodology for product mix planning in semiconductor foundry manufacturing
    • Chou YC, Hong IH (2000) A methodology for product mix planning in semiconductor foundry manufacturing. IEEE Trans Semicond Manuf 13(3):278-285
    • (2000) IEEE Trans Semicond Manuf , vol.13 , Issue.3 , pp. 278-285
    • Chou, Y.C.1    Hong, I.H.2
  • 2
    • 0034428151 scopus 로고    scopus 로고
    • Analysis of the instationary behavior of a wafer fab during product mix changes
    • Dümmler MA (2000) Analysis of the instationary behavior of a wafer fab during product mix changes. Proc 2000 Winter Simulation Conference, pp 1436-1442
    • (2000) Proc 2000 Winter Simulation Conference , pp. 1436-1442
    • Dümmler, M.A.1
  • 3
    • 0035334647 scopus 로고    scopus 로고
    • A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing
    • Sivakumar AI, Chong CS (2001) A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing. Comput Ind 45:59-78
    • (2001) Comput Ind , vol.45 , pp. 59-78
    • Sivakumar, A.I.1    Chong, C.S.2
  • 4
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
    • Lu SCH, Ramaswamy D, Kumar PR (1994) Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Trans Semicond Manuf 7(3):374-388
    • (1994) IEEE Trans Semicond Manuf , vol.7 , Issue.3 , pp. 374-388
    • Lu, S.C.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 5
    • 0029393210 scopus 로고
    • Estimating flow times and setting due-dates in complex production systems
    • Lawrence SR (1995) Estimating flow times and setting due-dates in complex production systems. IIE Trans 27(5):657-668
    • (1995) IIE Trans , vol.27 , Issue.5 , pp. 657-668
    • Lawrence, S.R.1
  • 9
    • 0033438122 scopus 로고    scopus 로고
    • The block-based cycle time estimation algorithm for wafer fabrication factories
    • Chung SH, Huang HW (1999) The block-based cycle time estimation algorithm for wafer fabrication factories. Int J Ind Eng 6(4):307-316
    • (1999) Int J Ind Eng , vol.6 , Issue.4 , pp. 307-316
    • Chung, S.H.1    Huang, H.W.2
  • 11
    • 0000204502 scopus 로고
    • A general framework for modeling production
    • Hackman ST, Leachman RC (1989) A general framework for modeling production. Manage Sci 35(4):478-495
    • (1989) Manage Sci , vol.35 , Issue.4 , pp. 478-495
    • Hackman, S.T.1    Leachman, R.C.2
  • 12
    • 0001554098 scopus 로고
    • A mathematical programming approach towards optimized master production scheduling
    • Chu SCK (1995) A mathematical programming approach towards optimized master production scheduling. Int J Prod Econ 38:269-270
    • (1995) Int J Prod Econ , vol.38 , pp. 269-270
    • Chu, S.C.K.1
  • 14
    • 0025493170 scopus 로고
    • An integrated approach for modeling uncertainty in aggregate production planning
    • Thompson SD, Davis WJ (1990) An integrated approach for modeling uncertainty in aggregate production planning. IEEE Trans Syst Man Cybern 20:1000-1012
    • (1990) IEEE Trans Syst Man Cybern , vol.20 , pp. 1000-1012
    • Thompson, S.D.1    Davis, W.J.2
  • 15
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on interactive simulation and linear programming calculations
    • Hung YF, Leachman RC (1996) A production planning methodology for semiconductor manufacturing based on interactive simulation and linear programming calculations. IEEE Trans Semicond Manuf 9(2):257-269
    • (1996) IEEE Trans Semicond Manuf , vol.9 , Issue.2 , pp. 257-269
    • Hung, Y.F.1    Leachman, R.C.2
  • 16
    • 0038630719 scopus 로고    scopus 로고
    • Capacity planning under demand uncertainty for semiconductor manufacturing
    • Hood SJ, Bermon S, Barahona F (2003) Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Trans Semicond Manuf 16(2):273-280
    • (2003) IEEE Trans Semicond Manuf , vol.16 , Issue.2 , pp. 273-280
    • Hood, S.J.1    Bermon, S.2    Barahona, F.3
  • 17
    • 0031246943 scopus 로고    scopus 로고
    • The design of due-date assignment model and the determination of flow time control parameter for the wafer fabrication factories
    • Chung SH, Yang MH, Cheng CM (1997) The design of due-date assignment model and the determination of flow time control parameter for the wafer fabrication factories. IEEE Trans Compon, Packag, Manuf Technol 20:278-287
    • (1997) IEEE Trans Compon, Packag, Manuf Technol , vol.20 , pp. 278-287
    • Chung, S.H.1    Yang, M.H.2    Cheng, C.M.3
  • 18
    • 0000861722 scopus 로고
    • A proof for the queueing formula L=L=λW
    • Little JDC (1961) A proof for the queueing formula L=L=λW. Oper Res 9:383-387
    • (1961) Oper Res , vol.9 , pp. 383-387
    • Little, J.D.C.1
  • 19
    • 33751072478 scopus 로고    scopus 로고
    • Tecnomatix Software Company, Germany
    • Tecnomatix Technologies Ltd. (2000) eM-plant pbjects manual. Tecnomatix Software Company, Germany