-
1
-
-
0034250153
-
A methodology for product mix planning in semiconductor foundry manufacturing
-
Chou YC, Hong IH (2000) A methodology for product mix planning in semiconductor foundry manufacturing. IEEE Trans Semicond Manuf 13(3):278-285
-
(2000)
IEEE Trans Semicond Manuf
, vol.13
, Issue.3
, pp. 278-285
-
-
Chou, Y.C.1
Hong, I.H.2
-
2
-
-
0034428151
-
Analysis of the instationary behavior of a wafer fab during product mix changes
-
Dümmler MA (2000) Analysis of the instationary behavior of a wafer fab during product mix changes. Proc 2000 Winter Simulation Conference, pp 1436-1442
-
(2000)
Proc 2000 Winter Simulation Conference
, pp. 1436-1442
-
-
Dümmler, M.A.1
-
3
-
-
0035334647
-
A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing
-
Sivakumar AI, Chong CS (2001) A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing. Comput Ind 45:59-78
-
(2001)
Comput Ind
, vol.45
, pp. 59-78
-
-
Sivakumar, A.I.1
Chong, C.S.2
-
4
-
-
0028481114
-
Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
-
Lu SCH, Ramaswamy D, Kumar PR (1994) Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Trans Semicond Manuf 7(3):374-388
-
(1994)
IEEE Trans Semicond Manuf
, vol.7
, Issue.3
, pp. 374-388
-
-
Lu, S.C.H.1
Ramaswamy, D.2
Kumar, P.R.3
-
5
-
-
0029393210
-
Estimating flow times and setting due-dates in complex production systems
-
Lawrence SR (1995) Estimating flow times and setting due-dates in complex production systems. IIE Trans 27(5):657-668
-
(1995)
IIE Trans
, vol.27
, Issue.5
, pp. 657-668
-
-
Lawrence, S.R.1
-
9
-
-
0033438122
-
The block-based cycle time estimation algorithm for wafer fabrication factories
-
Chung SH, Huang HW (1999) The block-based cycle time estimation algorithm for wafer fabrication factories. Int J Ind Eng 6(4):307-316
-
(1999)
Int J Ind Eng
, vol.6
, Issue.4
, pp. 307-316
-
-
Chung, S.H.1
Huang, H.W.2
-
11
-
-
0000204502
-
A general framework for modeling production
-
Hackman ST, Leachman RC (1989) A general framework for modeling production. Manage Sci 35(4):478-495
-
(1989)
Manage Sci
, vol.35
, Issue.4
, pp. 478-495
-
-
Hackman, S.T.1
Leachman, R.C.2
-
12
-
-
0001554098
-
A mathematical programming approach towards optimized master production scheduling
-
Chu SCK (1995) A mathematical programming approach towards optimized master production scheduling. Int J Prod Econ 38:269-270
-
(1995)
Int J Prod Econ
, vol.38
, pp. 269-270
-
-
Chu, S.C.K.1
-
13
-
-
0022748217
-
Performance analysis techniques for IC manufacturing lines
-
Burman DY, Gurrola-Gal F, Nozari JA, Sathaye S, Sitarik JP (1986) Performance analysis techniques for IC manufacturing lines. AT&T Technical J, pp 46-56
-
(1986)
AT&T Technical J
, pp. 46-56
-
-
Burman, D.Y.1
Gurrola-Gal, F.2
Nozari, J.A.3
Sathaye, S.4
Sitarik, J.P.5
-
14
-
-
0025493170
-
An integrated approach for modeling uncertainty in aggregate production planning
-
Thompson SD, Davis WJ (1990) An integrated approach for modeling uncertainty in aggregate production planning. IEEE Trans Syst Man Cybern 20:1000-1012
-
(1990)
IEEE Trans Syst Man Cybern
, vol.20
, pp. 1000-1012
-
-
Thompson, S.D.1
Davis, W.J.2
-
15
-
-
0030150549
-
A production planning methodology for semiconductor manufacturing based on interactive simulation and linear programming calculations
-
Hung YF, Leachman RC (1996) A production planning methodology for semiconductor manufacturing based on interactive simulation and linear programming calculations. IEEE Trans Semicond Manuf 9(2):257-269
-
(1996)
IEEE Trans Semicond Manuf
, vol.9
, Issue.2
, pp. 257-269
-
-
Hung, Y.F.1
Leachman, R.C.2
-
16
-
-
0038630719
-
Capacity planning under demand uncertainty for semiconductor manufacturing
-
Hood SJ, Bermon S, Barahona F (2003) Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Trans Semicond Manuf 16(2):273-280
-
(2003)
IEEE Trans Semicond Manuf
, vol.16
, Issue.2
, pp. 273-280
-
-
Hood, S.J.1
Bermon, S.2
Barahona, F.3
-
17
-
-
0031246943
-
The design of due-date assignment model and the determination of flow time control parameter for the wafer fabrication factories
-
Chung SH, Yang MH, Cheng CM (1997) The design of due-date assignment model and the determination of flow time control parameter for the wafer fabrication factories. IEEE Trans Compon, Packag, Manuf Technol 20:278-287
-
(1997)
IEEE Trans Compon, Packag, Manuf Technol
, vol.20
, pp. 278-287
-
-
Chung, S.H.1
Yang, M.H.2
Cheng, C.M.3
-
18
-
-
0000861722
-
A proof for the queueing formula L=L=λW
-
Little JDC (1961) A proof for the queueing formula L=L=λW. Oper Res 9:383-387
-
(1961)
Oper Res
, vol.9
, pp. 383-387
-
-
Little, J.D.C.1
-
19
-
-
33751072478
-
-
Tecnomatix Software Company, Germany
-
Tecnomatix Technologies Ltd. (2000) eM-plant pbjects manual. Tecnomatix Software Company, Germany
-
(2000)
EM-plant Pbjects Manual
-
-
|