메뉴 건너뛰기




Volumn 58, Issue 1, 2010, Pages 70-83

Learning and adaptation of a policy for dynamic order acceptance in make-to-order manufacturing

Author keywords

Demand management; Make to order manufacturing; Order acceptance; Order similarity; Reinforcement learning; Revenue management

Indexed keywords

ARRIVAL RATES; CUSTOMER RELATIONSHIP MANAGEMENT; DECISION-MAKING PROBLEM; DEMAND MANAGEMENT; DIFFERENT ORDER; DUE DATES; DYNAMIC ORDER; GAIN VALUES; INSTALLED CAPACITY; LEARNING AND ADAPTATION; LOCALLY WEIGHTED REGRESSION; MAKE TO ORDER; MANUFACTURING SYSTEM; ON-LINE ADAPTATION; ORDER ACCEPTANCE; PER UNIT; PRODUCT MIX; PRODUCTION PLANNING; REVENUE MANAGEMENT; SHOP FLOOR; SIMULATION-BASED;

EID: 72049095063     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2009.08.005     Document Type: Article
Times cited : (48)

References (37)
  • 2
    • 0346910187 scopus 로고    scopus 로고
    • Design and evaluation of a dynamic capacity apportionment procedure
    • Barut M., and Sridharan V. Design and evaluation of a dynamic capacity apportionment procedure. European Journal of Operational Research 155 (2004) 112-133
    • (2004) European Journal of Operational Research , vol.155 , pp. 112-133
    • Barut, M.1    Sridharan, V.2
  • 3
    • 27844457069 scopus 로고    scopus 로고
    • Revenue management in order-driven production systems
    • Barut M., and Sridharan V. Revenue management in order-driven production systems. Decision Sciences 36 (2005) 287-316
    • (2005) Decision Sciences , vol.36 , pp. 287-316
    • Barut, M.1    Sridharan, V.2
  • 5
    • 3242717874 scopus 로고    scopus 로고
    • Negotiation support for make-to-order operations in business-to-business electronic commerce
    • Calosso T., Cantamessa M., and Gualano M. Negotiation support for make-to-order operations in business-to-business electronic commerce. Robotics and Computer-Integrated Manufacturing 20 (2004) 405-416
    • (2004) Robotics and Computer-Integrated Manufacturing , vol.20 , pp. 405-416
    • Calosso, T.1    Cantamessa, M.2    Gualano, M.3
  • 6
    • 0032643313 scopus 로고    scopus 로고
    • Solving semi-markov decision problems using average reward reinforcement learning
    • Das T., Gosavi A., Mahavedan S., and Marchalleck N. Solving semi-markov decision problems using average reward reinforcement learning. Management Science 45 4 (1999) 560-574
    • (1999) Management Science , vol.45 , Issue.4 , pp. 560-574
    • Das, T.1    Gosavi, A.2    Mahavedan, S.3    Marchalleck, N.4
  • 7
    • 33750326269 scopus 로고    scopus 로고
    • Revenue management for a make-to-order company with limited inventory capacity
    • Defregger F., and Kuhn H. Revenue management for a make-to-order company with limited inventory capacity. OR Spectrum 29 (2007) 137-156
    • (2007) OR Spectrum , vol.29 , pp. 137-156
    • Defregger, F.1    Kuhn, H.2
  • 8
    • 15244355696 scopus 로고    scopus 로고
    • Workload based order acceptance in job-shop environments
    • Ebben M., Hans E., and Olde Weghuis F. Workload based order acceptance in job-shop environments. OR Spectrum 27 (2005) 107-122
    • (2005) OR Spectrum , vol.27 , pp. 107-122
    • Ebben, M.1    Hans, E.2    Olde Weghuis, F.3
  • 9
    • 0033888502 scopus 로고    scopus 로고
    • Evaluating shop-floor input control using rapid modelling
    • Enns T. Evaluating shop-floor input control using rapid modelling. International Journal of Production Economics 63 3 (2000) 229-241
    • (2000) International Journal of Production Economics , vol.63 , Issue.3 , pp. 229-241
    • Enns, T.1
  • 10
    • 0036820210 scopus 로고    scopus 로고
    • The effectiveness of input control based on aggregate versus bottleneck work loads
    • Enns S., and Costa M. The effectiveness of input control based on aggregate versus bottleneck work loads. Production Planning and Control 13 (2002) 614-624
    • (2002) Production Planning and Control , vol.13 , pp. 614-624
    • Enns, S.1    Costa, M.2
  • 11
    • 36549033388 scopus 로고    scopus 로고
    • Dynamic order acceptance and capacity planning on a single bottleneck resource
    • Herbots J., Herroelen W., and Leus R. Dynamic order acceptance and capacity planning on a single bottleneck resource. Naval Research Logistics 54 8 (2007) 874-889
    • (2007) Naval Research Logistics , vol.54 , Issue.8 , pp. 874-889
    • Herbots, J.1    Herroelen, W.2    Leus, R.3
  • 12
    • 0442264229 scopus 로고    scopus 로고
    • Makespan estimation and order acceptance in batch process industries when processing times are uncertain
    • Ivanescu C., Fransoo J., and Bertrand J. Makespan estimation and order acceptance in batch process industries when processing times are uncertain. OR Spectrum 24 (2002) 467-495
    • (2002) OR Spectrum , vol.24 , pp. 467-495
    • Ivanescu, C.1    Fransoo, J.2    Bertrand, J.3
  • 16
    • 15244357336 scopus 로고    scopus 로고
    • Order acceptance with reinforcement learning
    • Technical Report 66. University of Twente, Netherlands
    • Mainegra Hing, M., van Harten, A., & Schuur, P. (2001). Order acceptance with reinforcement learning. Technical Report 66. University of Twente, Netherlands.
    • (2001)
    • Mainegra Hing, M.1    van Harten, A.2    Schuur, P.3
  • 18
    • 33847617835 scopus 로고    scopus 로고
    • Reinforcement learning versus heuristics for order acceptance on a single resource
    • Mainegra Hing M., van Harten A., and Schuur P. Reinforcement learning versus heuristics for order acceptance on a single resource. Journal of Heuristics 13 (2007) 167-187
    • (2007) Journal of Heuristics , vol.13 , pp. 167-187
    • Mainegra Hing, M.1    van Harten, A.2    Schuur, P.3
  • 19
    • 72049131372 scopus 로고    scopus 로고
    • PhD dissertation, Faculty of Economics, University of Porto, Portugal
    • Moreira, M. (2005). Planning and controlling job-shop operations. PhD dissertation, Faculty of Economics, University of Porto, Portugal.
    • (2005) Planning and controlling job-shop operations
    • Moreira, M.1
  • 20
    • 1642559579 scopus 로고    scopus 로고
    • Behavior of an order release mechanism in a make-to-order manufacturing system with selected order acceptance
    • Nandi, A., & Rogers, P. (2003). Behavior of an order release mechanism in a make-to-order manufacturing system with selected order acceptance. In Proceedings of the 2003 winter simulation conference (pp. 1251-1259).
    • (2003) Proceedings of the 2003 winter simulation conference , pp. 1251-1259
    • Nandi, A.1    Rogers, P.2
  • 21
    • 4344708206 scopus 로고    scopus 로고
    • Using simulation to make-to-order acceptance/rejection decision
    • Nandi A., and Rogers P. Using simulation to make-to-order acceptance/rejection decision. Simulation 80 3 (2004) 131-142
    • (2004) Simulation , vol.80 , Issue.3 , pp. 131-142
    • Nandi, A.1    Rogers, P.2
  • 22
    • 0022060567 scopus 로고
    • The optimal look-ahead policy for admission to a single server system
    • Nawijn W. The optimal look-ahead policy for admission to a single server system. Operations Research 33 3 (1985) 625-643
    • (1985) Operations Research , vol.33 , Issue.3 , pp. 625-643
    • Nawijn, W.1
  • 23
    • 0026953379 scopus 로고
    • Capacity-based order review/release strategies to improve manufacturing performance
    • Philipoom P., and Fry T. Capacity-based order review/release strategies to improve manufacturing performance. International Journal of Production Research 30 11 (1992) 2559-2572
    • (1992) International Journal of Production Research , vol.30 , Issue.11 , pp. 2559-2572
    • Philipoom, P.1    Fry, T.2
  • 24
    • 55349098825 scopus 로고    scopus 로고
    • Revenue management and demand fulfilment: Matching applications, models, and software
    • in press, doi: 10.1007/s00291-008-0125-8
    • Quante, R., Meyer, H., & Fleischmann, M. (in press). Revenue management and demand fulfilment: Matching applications, models, and software. OR Spectrum. doi: 10.1007/s00291-008-0125-8.
    • OR Spectrum
    • Quante, R.1    Meyer, H.2    Fleischmann, M.3
  • 26
    • 0342845324 scopus 로고    scopus 로고
    • The performance of workload rules for order acceptance in batch chemical manufacturing
    • Raaymakers W., Bertrand J., and Fransoo J. The performance of workload rules for order acceptance in batch chemical manufacturing. Journal of Intelligent Manufacturing 11 (2000) 217-228
    • (2000) Journal of Intelligent Manufacturing , vol.11 , pp. 217-228
    • Raaymakers, W.1    Bertrand, J.2    Fransoo, J.3
  • 27
    • 0034288047 scopus 로고    scopus 로고
    • Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing
    • Raaymakers W., Bertrand J., and Fransoo J.F. Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing. IIE Transactions 32 (2000) 989-998
    • (2000) IIE Transactions , vol.32 , pp. 989-998
    • Raaymakers, W.1    Bertrand, J.2    Fransoo, J.F.3
  • 33
    • 38149144595 scopus 로고
    • Multicriteria order acceptance decision support in over demanded job-shops: A neural network approach
    • Wang J., Yang J., and Lee H. Multicriteria order acceptance decision support in over demanded job-shops: A neural network approach. Mathematical and Computer Modelling 19 5 (1994) 1-19
    • (1994) Mathematical and Computer Modelling , vol.19 , Issue.5 , pp. 1-19
    • Wang, J.1    Yang, J.2    Lee, H.3
  • 34
    • 0026880663 scopus 로고
    • Order acceptance strategies in a production-to-order environment with setup times and due-dates
    • Wester F., Wijngaard J., and Zijm W. Order acceptance strategies in a production-to-order environment with setup times and due-dates. International Journal of Production Research 30 6 (1992) 1313-1326
    • (1992) International Journal of Production Research , vol.30 , Issue.6 , pp. 1313-1326
    • Wester, F.1    Wijngaard, J.2    Zijm, W.3
  • 35
    • 0002274219 scopus 로고
    • Input/output control: A real handle on lead time
    • Wight O. Input/output control: A real handle on lead time. Production and Inventory Management Journal 11 3 (1970) 9-30
    • (1970) Production and Inventory Management Journal , vol.11 , Issue.3 , pp. 9-30
    • Wight, O.1
  • 36
    • 0030834962 scopus 로고    scopus 로고
    • Relevant cost information for order acceptance decisions
    • Wouters M. Relevant cost information for order acceptance decisions. Production Planning and Control 8 1 (1997) 2-9
    • (1997) Production Planning and Control , vol.8 , Issue.1 , pp. 2-9
    • Wouters, M.1
  • 37
    • 39649122099 scopus 로고    scopus 로고
    • Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis
    • Zorzini M., Corti D., and Pozzetti A. Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis. International Journal of Production Economics 112 2 (2008) 919-933
    • (2008) International Journal of Production Economics , vol.112 , Issue.2 , pp. 919-933
    • Zorzini, M.1    Corti, D.2    Pozzetti, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.