메뉴 건너뛰기




Volumn 25, Issue 4-5, 2009, Pages 709-720

Development of two-level decision tree-based real-time scheduling system under product mix variety environment

Author keywords

Decision tree learning; Machine learning; Product mix variety; Real time scheduling; Self organizing map

Indexed keywords

DECISION TREE LEARNING; MACHINE LEARNING; PRODUCT MIX VARIETY; REAL-TIME SCHEDULING; SELF-ORGANIZING MAP;

EID: 63449134271     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.rcim.2008.06.002     Document Type: Article
Times cited : (22)

References (37)
  • 2
    • 0027576654 scopus 로고
    • A robust adaptive scheduler for an intelligent workstation controller
    • Cho H., and Wysk R.A. A robust adaptive scheduler for an intelligent workstation controller. Int J Prod Res 31 4 (1993) 771-789
    • (1993) Int J Prod Res , vol.31 , Issue.4 , pp. 771-789
    • Cho, H.1    Wysk, R.A.2
  • 3
    • 0002622363 scopus 로고
    • Intelligent workstation controller for computer-integrated manufacturing: problems and models
    • Cho H., and Wysk R.A. Intelligent workstation controller for computer-integrated manufacturing: problems and models. J Manuf Syst 14 4 (1995) 252-263
    • (1995) J Manuf Syst , vol.14 , Issue.4 , pp. 252-263
    • Cho, H.1    Wysk, R.A.2
  • 4
    • 0242269909 scopus 로고    scopus 로고
    • Intelligent scheduling controller for shop floor control systems: a hybrid genetic algorithm/decision tree learning approach
    • Su C.T., and Shiue Y.R. Intelligent scheduling controller for shop floor control systems: a hybrid genetic algorithm/decision tree learning approach. Int J Prod Res 41 12 (2003) 2619-2641
    • (2003) Int J Prod Res , vol.41 , Issue.12 , pp. 2619-2641
    • Su, C.T.1    Shiue, Y.R.2
  • 5
    • 32544433960 scopus 로고    scopus 로고
    • Learning-based multi-pass adaptive scheduling for a dynamic manufacturing cell environment
    • Shiue Y.R., and Guh R.S. Learning-based multi-pass adaptive scheduling for a dynamic manufacturing cell environment. Robot Comput-Integrated Manuf 22 3 (2006) 203-216
    • (2006) Robot Comput-Integrated Manuf , vol.22 , Issue.3 , pp. 203-216
    • Shiue, Y.R.1    Guh, R.S.2
  • 6
    • 85077945234 scopus 로고    scopus 로고
    • The design of rapid production planning mechanism for the product mix changing in a wafer fabrication
    • Chung S.H., and Haung C.Y. The design of rapid production planning mechanism for the product mix changing in a wafer fabrication. J Chin Inst Ind Eng 20 2 (2003) 153-168
    • (2003) J Chin Inst Ind Eng , vol.20 , Issue.2 , pp. 153-168
    • Chung, S.H.1    Haung, C.Y.2
  • 7
    • 0034651059 scopus 로고    scopus 로고
    • Operating an FMC by a decision-tree-based adaptive production control system
    • Arzi Y., and Iaroslavitz L. Operating an FMC by a decision-tree-based adaptive production control system. Int J Prod Res 38 3 (2000) 675-697
    • (2000) Int J Prod Res , vol.38 , Issue.3 , pp. 675-697
    • Arzi, Y.1    Iaroslavitz, L.2
  • 8
    • 0035358169 scopus 로고    scopus 로고
    • A review of machine learning in dynamic scheduling of flexible manufacturing systems.
    • Priore P., De la Fuente D., Gomez A., and Puente J. A review of machine learning in dynamic scheduling of flexible manufacturing systems. Artif Intell Eng Des Anal Manuf 15 3 (2001) 251-263
    • (2001) Artif Intell Eng Des Anal Manuf , vol.15 , Issue.3 , pp. 251-263
    • Priore, P.1    De la Fuente, D.2    Gomez, A.3    Puente, J.4
  • 10
    • 0032661588 scopus 로고    scopus 로고
    • Neural network-based adaptive production control system for flexible manufacturing cell under a random environment
    • Arzi Y., and Iaroslavitz L. Neural network-based adaptive production control system for flexible manufacturing cell under a random environment. IIE Trans 31 3 (1999) 217-230
    • (1999) IIE Trans , vol.31 , Issue.3 , pp. 217-230
    • Arzi, Y.1    Iaroslavitz, L.2
  • 11
    • 31744447388 scopus 로고    scopus 로고
    • A comparison of machine-learning algorithms for dynamic scheduling of flexible manufacturing systems
    • Priore P., De La Fuente D., Puente J., and Parreño J. A comparison of machine-learning algorithms for dynamic scheduling of flexible manufacturing systems. Eng Appl Artif Intell 19 3 (2006) 247-255
    • (2006) Eng Appl Artif Intell , vol.19 , Issue.3 , pp. 247-255
    • Priore, P.1    De La Fuente, D.2    Puente, J.3    Parreño, J.4
  • 12
    • 0031198746 scopus 로고    scopus 로고
    • Adaptive scheduling in dynamic flexible manufacturing systems: a dynamic rule selection approach
    • Park S.C., Raman N., and Shaw M.J. Adaptive scheduling in dynamic flexible manufacturing systems: a dynamic rule selection approach. IEEE Trans Robot Automat 13 4 (1997) 486-502
    • (1997) IEEE Trans Robot Automat , vol.13 , Issue.4 , pp. 486-502
    • Park, S.C.1    Raman, N.2    Shaw, M.J.3
  • 13
    • 33744584654 scopus 로고
    • Induction of decision trees
    • Quinlan J.R. Induction of decision trees. Mach Learn 1 1 (1986) 81-106
    • (1986) Mach Learn , vol.1 , Issue.1 , pp. 81-106
    • Quinlan, J.R.1
  • 14
    • 0023417432 scopus 로고
    • Simplifying decision trees
    • Quinlan J.R. Simplifying decision trees. Int J Man-Mach Studies 27 3 (1987) 221-234
    • (1987) Int J Man-Mach Studies , vol.27 , Issue.3 , pp. 221-234
    • Quinlan, J.R.1
  • 17
    • 0029404744 scopus 로고
    • A learning-based methodology for dynamic scheduling in distributed manufacturing systems
    • Chiu C., and Yih Y. A learning-based methodology for dynamic scheduling in distributed manufacturing systems. Int J Prod Res 33 11 (1995) 3217-3232
    • (1995) Int J Prod Res , vol.33 , Issue.11 , pp. 3217-3232
    • Chiu, C.1    Yih, Y.2
  • 18
    • 0032163501 scopus 로고    scopus 로고
    • Integration of inductive learning and neural networks for multi-objective FMS scheduling
    • Kim C.O., Min H.S., and Yih Y. Integration of inductive learning and neural networks for multi-objective FMS scheduling. Int J Prod Res 36 9 (1998) 2497-2509
    • (1998) Int J Prod Res , vol.36 , Issue.9 , pp. 2497-2509
    • Kim, C.O.1    Min, H.S.2    Yih, Y.3
  • 19
    • 0032635912 scopus 로고    scopus 로고
    • Auto-bias selection for learning-based scheduling systems
    • Chen C.C., Yih Y., and Wu Y.C. Auto-bias selection for learning-based scheduling systems. Int J Prod Res 37 9 (1999) 1987-2002
    • (1999) Int J Prod Res , vol.37 , Issue.9 , pp. 1987-2002
    • Chen, C.C.1    Yih, Y.2    Wu, Y.C.3
  • 20
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • Baker K.R. Sequencing rules and due-date assignments in a job shop. Manage Sci 30 9 (1984) 1093-1104
    • (1984) Manage Sci , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 21
    • 0025416939 scopus 로고
    • Analysis of scheduling rules for an FMS
    • Montazeri M., and Van Wassenhove L.N. Analysis of scheduling rules for an FMS. Int J Prod Res 28 4 (1990) 785-802
    • (1990) Int J Prod Res , vol.28 , Issue.4 , pp. 785-802
    • Montazeri, M.1    Van Wassenhove, L.N.2
  • 22
    • 3242671403 scopus 로고    scopus 로고
    • Analysis of dynamic control strategies of an FMS under different scenarios
    • Chan F.T.S., and Chan T.S. Analysis of dynamic control strategies of an FMS under different scenarios. Robot Comput-Integrated Manuf 20 5 (2004) 423-437
    • (2004) Robot Comput-Integrated Manuf , vol.20 , Issue.5 , pp. 423-437
    • Chan, F.T.S.1    Chan, T.S.2
  • 23
    • 0024731596 scopus 로고
    • An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
    • Wu S.D., and Wysk R.A. An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing. Int J Prod Res 27 9 (1989) 1603-1623
    • (1989) Int J Prod Res , vol.27 , Issue.9 , pp. 1603-1623
    • Wu, S.D.1    Wysk, R.A.2
  • 24
    • 12344273544 scopus 로고    scopus 로고
    • Object detection using feature subset selection
    • Sun Z., Bebis G., and Miller R. Object detection using feature subset selection. Pattern Recognition 37 11 (2004) 2165-2176
    • (2004) Pattern Recognition , vol.37 , Issue.11 , pp. 2165-2176
    • Sun, Z.1    Bebis, G.2    Miller, R.3
  • 25
    • 30844449000 scopus 로고    scopus 로고
    • Application of genetic algorithms with dominant genes in a distributed scheduling problem in flexible manufacturing systems
    • Chan F.T.S., Chung S.H., and Chan P.L.Y. Application of genetic algorithms with dominant genes in a distributed scheduling problem in flexible manufacturing systems. Int J Prod Res 44 3 (2006) 523-543
    • (2006) Int J Prod Res , vol.44 , Issue.3 , pp. 523-543
    • Chan, F.T.S.1    Chung, S.H.2    Chan, P.L.Y.3
  • 26
    • 33746855485 scopus 로고    scopus 로고
    • Solving distributed FMS scheduling problems subject to maintenance: genetic algorithms approach
    • Chan F.T.S., Chung S.H., Chan P.L.Y., Finke G., and Tiwari M.K. Solving distributed FMS scheduling problems subject to maintenance: genetic algorithms approach. Robot Comput-Integrated Manuf 22 5-6 (2006) 493-504
    • (2006) Robot Comput-Integrated Manuf , vol.22 , Issue.5-6 , pp. 493-504
    • Chan, F.T.S.1    Chung, S.H.2    Chan, P.L.Y.3    Finke, G.4    Tiwari, M.K.5
  • 27
    • 70449670631 scopus 로고    scopus 로고
    • Data mining-based dynamic dispatching rule selection mechanism for shop floor control systems using a support vector machine approach
    • 10.1080/00207540701846236
    • Shiue Y.R. Data mining-based dynamic dispatching rule selection mechanism for shop floor control systems using a support vector machine approach. Int J Prod Res (2008) 10.1080/00207540701846236
    • (2008) Int J Prod Res
    • Shiue, Y.R.1
  • 29
    • 0034187784 scopus 로고    scopus 로고
    • Clustering of the self-organizing map
    • Vesanto J., and Alhoniemi E. Clustering of the self-organizing map. IEEE Trans Neural Networks 11 3 (2000) 586-600
    • (2000) IEEE Trans Neural Networks , vol.11 , Issue.3 , pp. 586-600
    • Vesanto, J.1    Alhoniemi, E.2
  • 32
    • 63449089761 scopus 로고    scopus 로고
    • See5. See5: An informal tutorial, 〈http://www.rulequest.com/see5-win.html〉.
    • See5. See5: An informal tutorial, 〈http://www.rulequest.com/see5-win.html〉.
  • 34
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • Baker K.R. Sequencing rules and due-date assignments in a job shop. Manage Sci 30 9 (1984) 1093-1104
    • (1984) Manage Sci , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 35
    • 0028127531 scopus 로고
    • A mixed dispatching rule approach in FMS scheduling
    • Ishii N., and Talavage J.J. A mixed dispatching rule approach in FMS scheduling. Int J Flexible Manuf Syst 6 1 (1994) 69-87
    • (1994) Int J Flexible Manuf Syst , vol.6 , Issue.1 , pp. 69-87
    • Ishii, N.1    Talavage, J.J.2
  • 36
    • 0242269876 scopus 로고    scopus 로고
    • Development of a real-time multi-objective scheduler for a semiconductor fabrication system
    • Min H.S., and Yih Y. Development of a real-time multi-objective scheduler for a semiconductor fabrication system. Int J Prod Res 41 10 (2003) 2345-2364
    • (2003) Int J Prod Res , vol.41 , Issue.10 , pp. 2345-2364
    • Min, H.S.1    Yih, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.