-
1
-
-
0031246943
-
The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories
-
Dec
-
S. H. Chung, M. H. Yang, and C. M. Cheng, "The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories," IEEE Trans. Compon. Packag. Technol. vol. 20, no. 4, pp. 278-287, Dec. 1997.
-
(1997)
IEEE Trans. Compon. Packag. Technol
, vol.20
, Issue.4
, pp. 278-287
-
-
Chung, S.H.1
Yang, M.H.2
Cheng, C.M.3
-
2
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
T. C. E. Cheng and M. Gupta, "Survey of scheduling research involving due date determination decisions," Eur. J. Oper. Res., vol. 38, pp. 156-164, 1989.
-
(1989)
Eur. J. Oper. Res
, vol.38
, pp. 156-164
-
-
Cheng, T.C.E.1
Gupta, M.2
-
3
-
-
0037118177
-
A survey of the state-of-the-art of common due date assignment and scheduling research
-
V. Gordon, J. M. Proth, and C. Chu. "A survey of the state-of-the-art of common due date assignment and scheduling research," Eur. J. Oper. Res., vol. 139, pp. 1-25, 2002a.
-
(2002)
Eur. J. Oper. Res
, vol.139
, pp. 1-25
-
-
Gordon, V.1
Proth, J.M.2
Chu, C.3
-
4
-
-
0036507457
-
Due date assignment and scheduling: SLK, TWK, and other due date assignment models
-
_, "Due date assignment and scheduling: SLK, TWK, and other due date assignment models," Prod. Plan. Contr., vol. 13, no. 2, pp. 117-132, 2002b.
-
(2002)
Prod. Plan. Contr
, vol.13
, Issue.2
, pp. 117-132
-
-
Gordon, V.1
Proth, J.M.2
Chu, C.3
-
5
-
-
0019560165
-
Due date assignment for production systems
-
A. Seidmann and M. L. Smith, "Due date assignment for production systems." Manage. Sci., vol. 27, no. 5, pp. 571-581, 1981.
-
(1981)
Manage. Sci
, vol.27
, Issue.5
, pp. 571-581
-
-
Seidmann, A.1
Smith, M.L.2
-
6
-
-
21344493885
-
Optimal due-date assignment in an assembly shop
-
T. C. E. Cheng, "Optimal due-date assignment in an assembly shop," Int. J. Oper. Prod., vol. 14, no. 2, pp. 31-42, 1994.
-
(1994)
Int. J. Oper. Prod
, vol.14
, Issue.2
, pp. 31-42
-
-
Cheng, T.C.E.1
-
7
-
-
0002992336
-
An economic approach to job shop performance analysis
-
S. T. Enns, "An economic approach to job shop performance analysis," Int. J. Prod. Econ., vol. 38, pp. 117-131, 1995.
-
(1995)
Int. J. Prod. Econ
, vol.38
, pp. 117-131
-
-
Enns, S.T.1
-
8
-
-
0032668257
-
Due-date determination with resequencing
-
C. L. Li and T. C. E. Cheng, "Due-date determination with resequencing," IIE Trans., vol. 31, pp. 183-188, 1999.
-
(1999)
IIE Trans
, vol.31
, pp. 183-188
-
-
Li, C.L.1
Cheng, T.C.E.2
-
9
-
-
0034275944
-
Quoting manufacturing due dates subject to a service level constraint
-
W. J. Hopp and M. L. Roofsturgis, "Quoting manufacturing due dates subject to a service level constraint," IIE Trans., vol. 32, pp. 771-784, 2000.
-
(2000)
IIE Trans
, vol.32
, pp. 771-784
-
-
Hopp, W.J.1
Roofsturgis, M.L.2
-
10
-
-
0035546127
-
Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions
-
H. P. G. Ooijen and J. W. M. Bertrand, "Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions," Int. J. Prod. Econ., vol. 74, pp. 261-268, 2001.
-
(2001)
Int. J. Prod. Econ
, vol.74
, pp. 261-268
-
-
Ooijen, H.P.G.1
Bertrand, J.W.M.2
-
11
-
-
0027850894
-
A probabilistic cost-based due date assignment model for job shops
-
A. C. Kaplan and A. T. Unal. "A probabilistic cost-based due date assignment model for job shops," Int. J. Prod. Res., vol. 31, no. 12, pp. 2817-2834, 1993.
-
(1993)
Int. J. Prod. Res
, vol.31
, Issue.12
, pp. 2817-2834
-
-
Kaplan, A.C.1
Unal, A.T.2
-
12
-
-
0029393210
-
Estimating flowtimes and setting due-dates in complex production systems
-
S. R. Lawrence. "Estimating flowtimes and setting due-dates in complex production systems," IIE Trans., vol. 27, pp. 657-668, 1995.
-
(1995)
IIE Trans
, vol.27
, pp. 657-668
-
-
Lawrence, S.R.1
-
13
-
-
0000728790
-
Lead time selection and the behavior of work flow in job shops
-
S. T. Enns, "Lead time selection and the behavior of work flow in job shops," Eur. J. Oper. Res., vol. 109. pp. 122-136, 1998.
-
(1998)
Eur. J. Oper. Res
, vol.109
, pp. 122-136
-
-
Enns, S.T.1
-
14
-
-
0017478424
-
A methodology for assigning minimum cost due-dates
-
J. K. Weeks and J. S. Fryer, "A methodology for assigning minimum cost due-dates," Manage. Sci., vol. 23, no. 8, pp. 872-881, 1977.
-
(1977)
Manage. Sci
, vol.23
, Issue.8
, pp. 872-881
-
-
Weeks, J.K.1
Fryer, J.S.2
-
15
-
-
84985810576
-
Due date assignment, job order release, and sequencing interaction in job shop scheduling
-
I. Ahmed and W. W. Fisher, "Due date assignment, job order release, and sequencing interaction in job shop scheduling," Decis. Sci., vol. 23, no. 3, pp. 633-647, 1992.
-
(1992)
Decis. Sci
, vol.23
, Issue.3
, pp. 633-647
-
-
Ahmed, I.1
Fisher, W.W.2
-
16
-
-
0028730645
-
A study of factors affecting due-date predictability in a simulated dynamic job shop
-
F. C. R. Chang, "A study of factors affecting due-date predictability in a simulated dynamic job shop," J. Manuf. Syst., vol. 13, no. 6, pp. 393-400, 1994.
-
(1994)
J. Manuf. Syst
, vol.13
, Issue.6
, pp. 393-400
-
-
Chang, F.C.R.1
-
17
-
-
0018454859
-
A simulation study of predictable due-dates
-
J. K. Weeks, "A simulation study of predictable due-dates," Manage. Sci., vol. 25, no. 4, pp. 363-373, 1979.
-
(1979)
Manage. Sci
, vol.25
, Issue.4
, pp. 363-373
-
-
Weeks, J.K.1
-
18
-
-
0026186620
-
Dynamic rules for due-date assignment
-
M. M. Vig and K. J. Dooley, "Dynamic rules for due-date assignment," Int. J. Prod. Res., vol. 29, no. 7, pp. 1361-1377, 1991.
-
(1991)
Int. J. Prod. Res
, vol.29
, Issue.7
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
19
-
-
0027565391
-
Mixing static and dynamic flowtime estimates for due-date assignment
-
_, "Mixing static and dynamic flowtime estimates for due-date assignment," J. Oper. Manage., vol. 11, pp. 67-79, 1993.
-
(1993)
J. Oper. Manage
, vol.11
, pp. 67-79
-
-
Vig, M.M.1
Dooley, K.J.2
-
20
-
-
0000482128
-
Due-date setting methodologies based on simulated annealing - An experimental study in a real-life job shop
-
T. S. Raghu and C. Rajendran, "Due-date setting methodologies based on simulated annealing - An experimental study in a real-life job shop," Int. J. Prod. Res., vol. 33, no. 9, pp. 2535-2554, 1995.
-
(1995)
Int. J. Prod. Res
, vol.33
, Issue.9
, pp. 2535-2554
-
-
Raghu, T.S.1
Rajendran, C.2
-
21
-
-
0030172572
-
Dynamic assignment of due-dates in an assembly shop based in simulation
-
D. B. Roman and A. G. del Valle, "Dynamic assignment of due-dates in an assembly shop based in simulation," Int. J. Prod. Res., vol. 34, no. 6, pp. 1539-1554, 1996.
-
(1996)
Int. J. Prod. Res
, vol.34
, Issue.6
, pp. 1539-1554
-
-
Roman, D.B.1
del Valle, A.G.2
-
22
-
-
0031098116
-
Heuristics for dynamic job shop scheduling with realtime updated queueing time estimates
-
F. C. R. Chang, "Heuristics for dynamic job shop scheduling with realtime updated queueing time estimates," Int. J. Prod. Res., vol. 35, no. 3, pp. 651-665, 1997.
-
(1997)
Int. J. Prod. Res
, vol.35
, Issue.3
, pp. 651-665
-
-
Chang, F.C.R.1
-
23
-
-
21144471984
-
Transient flows in queueing systems via closure approximations
-
C. R. Glassey and S. Seshadri, "Transient flows in queueing systems via closure approximations," Queueing Syst., vol. 14, pp. 177-201, 1993.
-
(1993)
Queueing Syst
, vol.14
, pp. 177-201
-
-
Glassey, C.R.1
Seshadri, S.2
-
24
-
-
1642436935
-
Bench-marking of a stochastic production planning model in a simulation testbed
-
S. Chick, P. J. Sanchez, D. Ferrin, and D. J. Morrice, Eds
-
G. Riano, S. H. Ng, R. Serfozo, S. Hackman, and L. P. Chan, "Bench-marking of a stochastic production planning model in a simulation testbed," in Proc. Winter Simulation Conf., S. Chick, P. J. Sanchez, D. Ferrin, and D. J. Morrice, Eds., 2003, pp. 1183-1191.
-
(2003)
Proc. Winter Simulation Conf
, pp. 1183-1191
-
-
Riano, G.1
Ng, S.H.2
Serfozo, R.3
Hackman, S.4
Chan, L.P.5
-
25
-
-
0033438122
-
The block-based cycle time estimation algorithm for wafer fabrication factories
-
S. H. Chung and H. W. Huang, "The block-based cycle time estimation algorithm for wafer fabrication factories," Int. J. Indust. Eng., vol. 6, no. 4, pp. 307-316, 1999.
-
(1999)
Int. J. Indust. Eng
, vol.6
, Issue.4
, pp. 307-316
-
-
Chung, S.H.1
Huang, H.W.2
-
26
-
-
0034250153
-
A methodology for product mix planning in semiconductor foundry manufacturing
-
Aug
-
Y. C. Chou and I. H. Hong, "A methodology for product mix planning in semiconductor foundry manufacturing," IEEE Trans. Semicond. Manuf., vol. 13, no. 3, pp. 278-285, Aug. 2000.
-
(2000)
IEEE Trans. Semicond. Manuf
, vol.13
, Issue.3
, pp. 278-285
-
-
Chou, Y.C.1
Hong, I.H.2
-
27
-
-
0034428151
-
Analysis of the instationary behavior of a wafer fab during product mix changes
-
M. A. Dümmler, "Analysis of the instationary behavior of a wafer fab during product mix changes," in Proc. Winter Simulation Conf., 2000, pp. 1436-1442.
-
(2000)
Proc. Winter Simulation Conf
, pp. 1436-1442
-
-
Dümmler, M.A.1
-
28
-
-
0038630719
-
Capacity planning under demand uncertainty of semiconductor manufacturing
-
May
-
S. J. Hood, S. Bermon, and F. Barahona, "Capacity planning under demand uncertainty of semiconductor manufacturing," IEEE Trans. Semicond. Manuf., vol. 16, no. 2, pp. 273-280, May 2003.
-
(2003)
IEEE Trans. Semicond. Manuf
, vol.16
, Issue.2
, pp. 273-280
-
-
Hood, S.J.1
Bermon, S.2
Barahona, F.3
-
29
-
-
0025430443
-
CONWIP: A pull alternative to Kanban
-
M. L. Spearman, D. L. Woodruff, and W. J. Hopp, "CONWIP: A pull alternative to Kanban," Int. J. Prod. Res., vol. 28, pp. 879-894, 1990.
-
(1990)
Int. J. Prod. Res
, vol.28
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
31
-
-
0000861722
-
A proof for the queueing formula L = λW
-
J. D. C. Little, "A proof for the queueing formula L = λW," Oper. Res., vol. 9, pp. 383-387, 1961.
-
(1961)
Oper. Res
, vol.9
, pp. 383-387
-
-
Little, J.D.C.1
|