메뉴 건너뛰기




Volumn 56, Issue 19, 2018, Pages 6391-6411

Flexible job shop scheduling with lot streaming and sublot size optimisation

Author keywords

constraint programming; flexible job shop; lot sizing; lot streaming; mixed integer linear programming; tabu search

Indexed keywords

COMPUTER PROGRAMMING; CONSTRAINT THEORY; GRAPHIC METHODS; INTEGER PROGRAMMING; SCHEDULING; STREAM FLOW; TABU SEARCH;

EID: 85023179297     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2017.1346322     Document Type: Article
Times cited : (77)

References (39)
  • 1
    • 84985818856 scopus 로고
    • Solution Procedures for the Lot-streaming Problem
    • Baker, K. R., 1990. “Solution Procedures for the Lot-streaming Problem.” Decision Science 21 (3): 475–491
    • (1990) Decision Science , vol.21 , Issue.3 , pp. 475-491
    • Baker, K.R.1
  • 3
    • 33644634541 scopus 로고    scopus 로고
    • Lot Streaming with Variable Sublots: An Integer Programming Formulation
    • Biskup, D., and M., Feldmann. 2006. “Lot Streaming with Variable Sublots: An Integer Programming Formulation.” Journal of the Operational Research Society 57 (3): 296–303
    • (2006) Journal of the Operational Research Society , vol.57 , Issue.3 , pp. 296-303
    • Biskup, D.1    Feldmann, M.2
  • 6
    • 84965081697 scopus 로고    scopus 로고
    • Off-line and Dynamic Production Scheduling -- A Comparative Case Study
    • Bożek, A., and M., Wysocki. 2016. “Off-line and Dynamic Production Scheduling -- A Comparative Case Study.” Management and Production Engineering Review 7 (1): 21–32
    • (2016) Management and Production Engineering Review , vol.7 , Issue.1 , pp. 21-32
    • Bożek, A.1    Wysocki, M.2
  • 7
    • 1642461394 scopus 로고    scopus 로고
    • Multi-objective Lot Splitting for a Single Product m-machine Flow Shop Line
    • Bukchin, J., and M., Masin. 2004. “Multi-objective Lot Splitting for a Single Product m-machine Flow Shop Line.” IIE Transactions 36: 191–202
    • (2004) IIE Transactions , vol.36 , pp. 191-202
    • Bukchin, J.1    Masin, M.2
  • 8
    • 84889808975 scopus 로고    scopus 로고
    • A Dispatching Algorithm for Flexible Job-shop Scheduling with Transfer Batches: An Industrial Application
    • Calleja, G., and R., Pastor. 2014. “A Dispatching Algorithm for Flexible Job-shop Scheduling with Transfer Batches: An Industrial Application.” Production Planning & Control 25 (2): 93–109
    • (2014) Production Planning & Control , vol.25 , Issue.2 , pp. 93-109
    • Calleja, G.1    Pastor, R.2
  • 9
    • 20344394416 scopus 로고    scopus 로고
    • Equal Size Lot Streaming to Job-shop Scheduling Problem Using Genetic Algorithms
    • Taipei, September 2--4, and
    • Chan, F. T. S., T. C., Wong, and P. L. Y., Chan. 2004. “Equal Size Lot Streaming to Job-shop Scheduling Problem Using Genetic Algorithms.” In IEEE International Symposium on Intelligent Control, Taipei, September 2--4, 472–476
    • (2004) IEEE International Symposium on Intelligent Control , pp. 472-476
    • Chan, F.T.S.1    Wong, T.C.2    Chan, P.L.Y.3
  • 13
    • 74549175886 scopus 로고    scopus 로고
    • A Hybrid Genetic Algorithm for Flowshop Lot Streaming with Setups and Variable Sublots
    • Defersha, F. M., and M., Chen. 2010. “A Hybrid Genetic Algorithm for Flowshop Lot Streaming with Setups and Variable Sublots.” International Journal of Production Research 48 (6): 1705–1726
    • (2010) International Journal of Production Research , vol.48 , Issue.6 , pp. 1705-1726
    • Defersha, F.M.1    Chen, M.2
  • 14
    • 84865353852 scopus 로고    scopus 로고
    • Mathematical Model and Parallel Genetic Algorithm for Hybrid Flexible Flowshop Lot Streaming Problem
    • Defersha, F. M., and M., Chen. 2012a. “Mathematical Model and Parallel Genetic Algorithm for Hybrid Flexible Flowshop Lot Streaming Problem.” International Journal of Advanced Manufacturing Technology 62 (1): 249–265
    • (2012) International Journal of Advanced Manufacturing Technology , vol.62 , Issue.1 , pp. 249-265
    • Defersha, F.M.1    Chen, M.2
  • 15
    • 84861416467 scopus 로고    scopus 로고
    • Jobshop Lot Streaming with Routing Flexibility, Sequence-dependent Setups, Machine Release Dates and Lag Time
    • Defersha, F. M., and M., Chen. 2012b. “Jobshop Lot Streaming with Routing Flexibility, Sequence-dependent Setups, Machine Release Dates and Lag Time.” International Journal of Advanced Manufacturing Technology 50 (8): 2331–2352
    • (2012) International Journal of Advanced Manufacturing Technology , vol.50 , Issue.8 , pp. 2331-2352
    • Defersha, F.M.1    Chen, M.2
  • 16
    • 84902836669 scopus 로고    scopus 로고
    • An Effective Genetic Algorithm for Flexible Job-shop Scheduling with Overlapping in Operations
    • Demir, Y., and S. K., İşleyen. 2014. “An Effective Genetic Algorithm for Flexible Job-shop Scheduling with Overlapping in Operations.” International Journal of Production Research 52 (13): 3905–3921
    • (2014) International Journal of Production Research , vol.52 , Issue.13 , pp. 3905-3921
    • Demir, Y.1    İşleyen, S.K.2
  • 17
    • 57749084284 scopus 로고    scopus 로고
    • Simulation Analysis of Lot Streaming in Job Shops with Transportation Queue Disciplines
    • Edis, R. S., and M. A., Ornek. 2009a. “Simulation Analysis of Lot Streaming in Job Shops with Transportation Queue Disciplines.” Simulation Modelling Practice and Theory 17 (2): 442–453
    • (2009) Simulation Modelling Practice and Theory , vol.17 , Issue.2 , pp. 442-453
    • Edis, R.S.1    Ornek, M.A.2
  • 18
    • 68849098565 scopus 로고    scopus 로고
    • A Tabu Search-based Heuristic for Single-product Lot Streaming Problems in Flow Shops
    • Edis, R. S., and M. A., Ornek. 2009b. “A Tabu Search-based Heuristic for Single-product Lot Streaming Problems in Flow Shops.” International Journal of Advanced Manufacturing Technology 43: 1202–1213
    • (2009) International Journal of Advanced Manufacturing Technology , vol.43 , pp. 1202-1213
    • Edis, R.S.1    Ornek, M.A.2
  • 19
    • 0000411214 scopus 로고
    • Tabu Search -- Part I
    • Glover, F., 1989. “Tabu Search -- Part I.” ORSA Journal on Computing 1 (3): 190–206
    • (1989) ORSA Journal on Computing , vol.1 , Issue.3 , pp. 190-206
    • Glover, F.1
  • 20
    • 80051694264 scopus 로고    scopus 로고
    • The Flexible Blocking Job Shop with Transfer and Set-up Times
    • Gröflin, H., D. N., Pham, and R., Bürgy. 2011. “The Flexible Blocking Job Shop with Transfer and Set-up Times.” Journal of Combinatorial Optimization 22 (2): 121–144
    • (2011) Journal of Combinatorial Optimization , vol.22 , Issue.2 , pp. 121-144
    • Gröflin, H.1    Pham, D.N.2    Bürgy, R.3
  • 21
    • 74449083168 scopus 로고    scopus 로고
    • Multi-objective Job-shop Scheduling with Lot-splitting Production
    • Huang, R.-H., 2010. “Multi-objective Job-shop Scheduling with Lot-splitting Production.” International Journal of Production Economics 124 (1): 206–213
    • (2010) International Journal of Production Economics , vol.124 , Issue.1 , pp. 206-213
    • Huang, R.-H.1
  • 23
    • 52049090864 scopus 로고    scopus 로고
    • A Comparison of Scheduling Algorithms for Flexible Flow Shop Problems with Unrelated Parallel Machines, Setup Times, and Dual Criteria
    • Jungwattanakit, J., M., Reodecha, P., Chaovalitwongse, and F., Werner. 2009. “A Comparison of Scheduling Algorithms for Flexible Flow Shop Problems with Unrelated Parallel Machines, Setup Times, and Dual Criteria.” Computers & Operations Research 36 (2): 358–378
    • (2009) Computers & Operations Research , vol.36 , Issue.2 , pp. 358-378
    • Jungwattanakit, J.1    Reodecha, M.2    Chaovalitwongse, P.3    Werner, F.4
  • 25
    • 0037372761 scopus 로고    scopus 로고
    • Constructing Near Optimal Schedules for the Flow Shop Lot Streaming Problem with Sublot-attached Setups
    • Kalir, A., and S. C., Sarin. 2003. “Constructing Near Optimal Schedules for the Flow Shop Lot Streaming Problem with Sublot-attached Setups.” Journal of Combinatorial Optimization 7 (1): 23–44
    • (2003) Journal of Combinatorial Optimization , vol.7 , Issue.1 , pp. 23-44
    • Kalir, A.1    Sarin, S.C.2
  • 27
    • 84882321136 scopus 로고    scopus 로고
    • Scheduling Job Shop with Lot Streaming and Transportation through a Modified Artificial Bee Colony
    • Lei, D., and X., Guo. 2013. “Scheduling Job Shop with Lot Streaming and Transportation through a Modified Artificial Bee Colony.” International Journal of Production Research 51 (16): 4930–4941
    • (2013) International Journal of Production Research , vol.51 , Issue.16 , pp. 4930-4941
    • Lei, D.1    Guo, X.2
  • 28
    • 0346243617 scopus 로고    scopus 로고
    • A Heuristic Method for Discrete Lot Streaming with Variable Sublots in a Flow Shop
    • Liu, S. C., 2003. “A Heuristic Method for Discrete Lot Streaming with Variable Sublots in a Flow Shop.” International Journal of Advanced Manufacturing Technology 22 (9): 662–668
    • (2003) International Journal of Advanced Manufacturing Technology , vol.22 , Issue.9 , pp. 662-668
    • Liu, S.C.1
  • 30
    • 84916608027 scopus 로고    scopus 로고
    • A Study on Integration of Lot Sizing and Flow Shop Lot Streaming Problems
    • Mortezaei, N., and N., Zulkifli. 2014. “A Study on Integration of Lot Sizing and Flow Shop Lot Streaming Problems.” Arabian Journal for Science and Engineering 39 (12): 9283–9300
    • (2014) Arabian Journal for Science and Engineering , vol.39 , Issue.12 , pp. 9283-9300
    • Mortezaei, N.1    Zulkifli, N.2
  • 31
    • 79960640293 scopus 로고    scopus 로고
    • An Estimation of Distribution Algorithm for Lot-streaming Flow Shop Problems with Setup Times
    • Pan, Q. K., and R., Ruiz. 2012. “An Estimation of Distribution Algorithm for Lot-streaming Flow Shop Problems with Setup Times.” Omega 40 (2): 166–180
    • (2012) Omega , vol.40 , Issue.2 , pp. 166-180
    • Pan, Q.K.1    Ruiz, R.2
  • 33
    • 0024925432 scopus 로고
    • Flow Shop Scheduling with Lot Streaming
    • Potts, C. N., and K. R., Baker. 1989. “Flow Shop Scheduling with Lot Streaming.” Operations Research Letters 8 (6): 297–303
    • (1989) Operations Research Letters , vol.8 , Issue.6 , pp. 297-303
    • Potts, C.N.1    Baker, K.R.2
  • 35
    • 84900466232 scopus 로고    scopus 로고
    • Flexible Job Shop Scheduling with Sequence-dependent Setup and Transportation Times by Ant Colony with Reinforced Pheromone Relationships
    • Rossi, A., 2014. “Flexible Job Shop Scheduling with Sequence-dependent Setup and Transportation Times by Ant Colony with Reinforced Pheromone Relationships.” International Journal of Production Economics 153: 253–267
    • (2014) International Journal of Production Economics , vol.153 , pp. 253-267
    • Rossi, A.1
  • 37
    • 43849110246 scopus 로고    scopus 로고
    • A Discrete Particle Swarm Optimization for Lot-streaming Flowshop Scheduling Problem
    • Tseng, C. T., and C. J., Liao. 2008. “A Discrete Particle Swarm Optimization for Lot-streaming Flowshop Scheduling Problem.” European Journal of Operational Research 191 (2): 360–373
    • (2008) European Journal of Operational Research , vol.191 , Issue.2 , pp. 360-373
    • Tseng, C.T.1    Liao, C.J.2
  • 38
    • 84888643125 scopus 로고    scopus 로고
    • A New Genetic Algorithm for Lot-streaming Flow Shop Scheduling with Limited Capacity Buffers
    • Ventura, J. A., and S.-H., Yoon. 2013. “A New Genetic Algorithm for Lot-streaming Flow Shop Scheduling with Limited Capacity Buffers.” Journal of Intelligent Manufacturing 24 (6): 1185–1196
    • (2013) Journal of Intelligent Manufacturing , vol.24 , Issue.6 , pp. 1185-1196
    • Ventura, J.A.1    Yoon, S.-H.2
  • 39
    • 84895406687 scopus 로고    scopus 로고
    • A Survey of Genetic Algorithms for Shop Scheduling Problems
    • Siarry P., (ed), New York: Nova Science Publishers,. edited by
    • Werner, F., 2013. “A Survey of Genetic Algorithms for Shop Scheduling Problems.” In Heuristics: Theory and Applications, edited by P., Siarry, 161–222. New York: Nova Science Publishers
    • (2013) Heuristics: Theory and Applications , pp. 161-222
    • Werner, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.