-
1
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
Allahverdi, A., C. T. Ng, T. C. E. Cheng, and M. Y. Kovalyov. 2008. "A Survey of Scheduling Problems with Setup Times or Costs." European Journal of Operational Research 187 (3): 985-1032.
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
2
-
-
79961079135
-
Resource allocation, batching and dispatching in a stochastic flexible job shop
-
Al-Turki, U. M., S. Arifusalam, M. El-Seliaman, and M. Khand. 2011. "Resource Allocation, Batching and Dispatching in a Stochastic Flexible Job Shop." Advanced Materials Research 264-265: 1758-1763.
-
(2011)
Advanced Materials Research
, vol.264-265
, pp. 1758-1763
-
-
Al-Turki, U.M.1
Arifusalam, S.2
El-Seliaman, M.3
Khand, M.4
-
4
-
-
34250084648
-
Routing and scheduling in a flexible job shop by tabu search
-
Brandimarte, P. 1993. "Routing and Scheduling in a Flexible Job Shop by Tabu Search." Annals of Operations Research 41 (3): 157-183.
-
(1993)
Annals of Operations Research
, vol.41
, Issue.3
, pp. 157-183
-
-
Brandimarte, P.1
-
5
-
-
0031530447
-
Complexity of scheduling problems with multi-purpose machines
-
Brucker, P., B. Jurisch, and A. Kramer. 1997. "Complexity of Scheduling Problems with Multi-Purpose Machines." Annals of Operations Research 70: 57-73.
-
(1997)
Annals of Operations Research
, vol.70
, pp. 57-73
-
-
Brucker, P.1
Jurisch, B.2
Kramer, A.3
-
6
-
-
0025531716
-
Job-shop scheduling with multipurpose machines
-
Brucker, P., and R. Schlie. 1990. "Job-Shop Scheduling with Multipurpose Machines." Computing 45 (4): 369-375.
-
(1990)
Computing
, vol.45
, Issue.4
, pp. 369-375
-
-
Brucker, P.1
Schlie, R.2
-
7
-
-
40849137998
-
Reducing lead time in the banking industry: An experimental approach to the loan granting process
-
Caridi, M., R. Cigolini, M. Urciuoli, and A. N. Villa. 2008. "Reducing Lead Time in the Banking Industry: An Experimental Approach to the Loan Granting Process." Production Planning and Control 19 (3): 198-211.
-
(2008)
Production Planning and Control
, vol.19
, Issue.3
, pp. 198-211
-
-
Caridi, M.1
Cigolini, R.2
Urciuoli, M.3
Villa, A.N.4
-
8
-
-
33744523325
-
Unit sized transfer batch scheduling in an automated two-machine flow-line cell with one transport agent
-
Çetinkaya, J. C. 2006. "Unit sized Transfer Batch Scheduling in an Automated Two-Machine Flow-Line Cell with One Transport Agent." International Journal of Advanced Manufacturing Technology 29 (1-2): 178-183.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.29
, Issue.1-2
, pp. 178-183
-
-
Çetinkaya, J.C.1
-
9
-
-
52649152349
-
A study of the flexible job shop scheduling problem with parallel machines and reentrant process
-
Chen, J. C., K. H. Chen, J. J. Wu, and C. W. Chen. 2008. "A Study of the Flexible Job Shop Scheduling Problem with Parallel Machines and Reentrant Process." International Journal of Advanced Manufacturing Technology 39 (3-4): 344-354.
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.39
, Issue.3-4
, pp. 344-354
-
-
Chen, J.C.1
Chen, K.H.2
Wu, J.J.3
Chen, C.W.4
-
10
-
-
84862798145
-
Flexible job shop scheduling with parallel machines using genetic algorithm and grouping genetic algorithm
-
Chen, J. C., C. C. Wu, C. W. Chen, and K. H. Chen. 2012. "Flexible Job Shop Scheduling with Parallel Machines Using Genetic Algorithm and Grouping Genetic Algorithm." Expert Systems with Applications 39 (11): 10016-10021.
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.11
, pp. 10016-10021
-
-
Chen, J.C.1
Wu, C.C.2
Chen, C.W.3
Chen, K.H.4
-
11
-
-
0031186470
-
Lot streaming in job shop scheduling
-
Dauzere-Peres, S., and J. B. Lasserre. 1997. "Lot Streaming in Job Shop Scheduling." Operations Research 45 (4): 584-595.
-
(1997)
Operations Research
, vol.45
, Issue.4
, pp. 584-595
-
-
Dauzere-Peres, S.1
Lasserre, J.B.2
-
12
-
-
0042261208
-
An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search
-
Dauzere-Peres, S., and J. Paulli. 1997. "An Integrated Approach for Modeling and Solving the General Multiprocessor Job-Shop Scheduling Problem Using Tabu Search." Annals of Operations Research 70: 281-306.
-
(1997)
Annals of Operations Research
, vol.70
, pp. 281-306
-
-
Dauzere-Peres, S.1
Paulli, J.2
-
13
-
-
33747682830
-
Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm
-
Gao, J., M. Gen, and L. Sun. 2006. "Scheduling Jobs and Maintenances in Flexible Job Shop with a Hybrid Genetic Algorithm." Journal of Intelligent Manufacturing 17 (4): 493-507.
-
(2006)
Journal of Intelligent Manufacturing
, vol.17
, Issue.4
, pp. 493-507
-
-
Gao, J.1
Gen, M.2
Sun, L.3
-
14
-
-
53149147791
-
Scheduling of job-shop, make-to-order industries with recirculation and assembly: A milp approach
-
Europe: Managing Engineering, Technology and Innovation for Growth
-
Gomes, M. C., A. P. Barbosa-Povoa, and A. Q. Novais. 2008. "Scheduling of Job-Shop, Make-to-Order Industries with Recirculation and Assembly: A MILP Approach." In IEMC-Europe 2008-2008 IEEE International Engineering Management Conference, 1-6. Europe: Managing Engineering, Technology and Innovation for Growth.
-
(2008)
IEMC-Europe 2008-2008 IEEE International Engineering Management Conference
, pp. 1-6
-
-
Gomes, M.C.1
Barbosa-Povoa, A.P.2
Novais, A.Q.3
-
15
-
-
34249973653
-
A survey of priority-based scheduling
-
Haupt, R. 1989. "A Survey of Priority-Based Scheduling." OR Spectrum 11: 3-16.
-
(1989)
OR Spectrum
, vol.11
, pp. 3-16
-
-
Haupt, R.1
-
16
-
-
33751418065
-
An effective architecture for learning and evolving flexible job-shop schedules
-
Ho, N. B., J. C. Tay, and E. M. Lai. 2007. "An Effective Architecture for Learning and Evolving Flexible Job-Shop Schedules." International Journal of Production Research 179 (2): 316-333.
-
(2007)
International Journal of Production Research
, vol.179
, Issue.2
, pp. 316-333
-
-
Ho, N.B.1
Tay, J.C.2
Lai, E.M.3
-
17
-
-
0034161039
-
Efficient jobshop dispatching rules: Further developments
-
Holthaus, O., and C. Rajendran. 2000. "Efficient Jobshop Dispatching Rules: Further Developments." Production Planning and Control 11 (2): 171-178.
-
(2000)
Production Planning and Control
, vol.11
, Issue.2
, pp. 171-178
-
-
Holthaus, O.1
Rajendran, C.2
-
18
-
-
0000062615
-
Tabu search for the job shop scheduling with multi-purpose machines
-
Hurink, E., B. Jurisch, and M. Thole. 1994. "Tabu Search for the Job Shop Scheduling with Multi-Purpose Machines." OR Spectrum 15 (4): 205-215.
-
(1994)
OR Spectrum
, vol.15
, Issue.4
, pp. 205-215
-
-
Hurink, E.1
Jurisch, B.2
Thole, M.3
-
19
-
-
0033102020
-
Deterministic job-shop scheduling: Past, present and future
-
Jain, A. S., and S. Meeran. 1999. "Deterministic Job-Shop Scheduling: Past, Present and Future." European Journal of Production Research 113 (2): 390-434.
-
(1999)
European Journal of Production Research
, vol.113
, Issue.2
, pp. 390-434
-
-
Jain, A.S.1
Meeran, S.2
-
21
-
-
0038479948
-
Generating robust and flexible job shop schedules using genetic algorithms
-
Jensen, M. T. 2003. "Generating Robust and Flexible Job Shop Schedules Using Genetic Algorithms." IEEE Transactions on Evolutionary Computation 7 (3): 275-288.
-
(2003)
IEEE Transactions on Evolutionary Computation
, vol.7
, Issue.3
, pp. 275-288
-
-
Jensen, M.T.1
-
22
-
-
34548692311
-
A comparison of dispatching rules and genetic algorithms for job shop schedules of standard hydraulic cylinders
-
Kim, I., J. Watada, and I. Shigaki. 2008. "A Comparison of Dispatching Rules and Genetic Algorithms for Job Shop Schedules of Standard Hydraulic Cylinders." Computing 12 (2): 121-128.
-
(2008)
Computing
, vol.12
, Issue.2
, pp. 121-128
-
-
Kim, I.1
Watada, J.2
Shigaki, I.3
-
23
-
-
0033894477
-
Robust scheduling of a two-machine flow-shop with uncertain processing times
-
Kouvelis, P., R. L. Daniels, and G. Vairaktarakis. 2000. "Robust Scheduling of a Two-Machine Flow-Shop with Uncertain Processing Times." IIE Transactions 32 (5): 421-432.
-
(2000)
IIE Transactions
, vol.32
, Issue.5
, pp. 421-432
-
-
Kouvelis, P.1
Daniels, R.L.2
Vairaktarakis, G.3
-
24
-
-
78650621042
-
A computational study of a shifting bottleneck heuristic for multi-product complex job shops
-
Lars, M., and J. Zimmermann. 2011. "A Computational Study of a Shifting Bottleneck Heuristic for Multi-Product Complex Job Shops." Production Planning and Control 22 (1): 25-40.
-
(2011)
Production Planning and Control
, vol.22
, Issue.1
, pp. 25-40
-
-
Lars, M.1
Zimmermann, J.2
-
25
-
-
70449334365
-
Development of simulation- based production execution system in a shipyard: A case study for a panel block assembly shop
-
Lee, K., J. G. Shin, and C. Ryu. 2009. "Development of Simulation- Based Production Execution System in a Shipyard: A Case Study for a Panel Block Assembly Shop." Production Planning and Control 20 (8): 750-768.
-
(2009)
Production Planning and Control
, vol.20
, Issue.8
, pp. 750-768
-
-
Lee, K.1
Shin, J.G.2
Ryu, C.3
-
26
-
-
0002577337
-
Effective neighborhood function for the flexible job shop problem
-
Mastrolilli, M., and M. Gambardella. 2000. "Effective Neighborhood Function for the Flexible Job Shop Problem." Journal of Scheduling 3 (1): 3-20.
-
(2000)
Journal of Scheduling
, vol.3
, Issue.1
, pp. 3-20
-
-
Mastrolilli, M.1
Gambardella, M.2
-
27
-
-
0038269297
-
A modified simulated annealing method for flexible job shop scheduling problem
-
Najid, N. M., S. Dauzere-Peres, and A. Zaidat. 2002. "A Modified Simulated Annealing Method for Flexible Job Shop Scheduling Problem." Proceedings of the IEEE International Conference on Systems, Man and Cybernetics 5: 89-94.
-
(2002)
Proceedings of the IEEE International Conference on Systems, Man and Cybernetics
, vol.5
, pp. 89-94
-
-
Najid, N.M.1
Dauzere-Peres, S.2
Zaidat, A.3
-
28
-
-
33746170213
-
Analysis of gap times in a two-stage stochastic flowshop with overlapping operations
-
Nieuwenhuyse, I. N., and N. Vandaele. 2006. "Analysis of Gap Times in a Two-Stage Stochastic Flowshop with Overlapping Operations." IIE Transactions 38 (9): 777-787.
-
(2006)
IIE Transactions
, vol.38
, Issue.9
, pp. 777-787
-
-
Nieuwenhuyse, I.N.1
Vandaele, N.2
-
29
-
-
0032635740
-
Delivery date decision support system for the large scale maketo- order manufacturing companies: A korean electric motor company case
-
Park, C., J. Song, J. G. Kim, and I. Kim. 1999. "Delivery Date Decision Support System for the Large Scale Maketo- Order Manufacturing Companies: A Korean Electric Motor Company Case." Production Planning and Control 10 (6): 585-597.
-
(1999)
Production Planning and Control
, vol.10
, Issue.6
, pp. 585-597
-
-
Park, C.1
Song, J.2
Kim, J.G.3
Kim, I.4
-
30
-
-
57649199596
-
Planning production using mathematical programming: The case of a woodturning company
-
Pastor, R., J. Altimiras, and M. Mateo. 2009. "Planning Production Using Mathematical Programming: The Case of a Woodturning Company." Computers and Operations Research 36 (7): 2173-2178.
-
(2009)
Computers and Operations Research
, vol.36
, Issue.7
, pp. 2173-2178
-
-
Pastor, R.1
Altimiras, J.2
Mateo, M.3
-
31
-
-
40249118429
-
A genetic algorithm for the flexible job-shop scheduling problem
-
Pezzella, F., G. Morganti, and G. Ciaschetti. 2008. "A Genetic Algorithm for the Flexible Job-shop Scheduling Problem." Computers and Operations Research 35 (10): 3202-3212.
-
(2008)
Computers and Operations Research
, vol.35
, Issue.10
, pp. 3202-3212
-
-
Pezzella, F.1
Morganti, G.2
Ciaschetti, G.3
-
34
-
-
78650614174
-
A survey of dispatching rules for operational control in wafer fabrication
-
Sarin, S. C., A. Varadarajan, and L. Wang. 2011. "A survey of Dispatching Rules for Operational Control in Wafer Fabrication." Production Planning and Control 22 (1): 4-24.
-
(2011)
Production Planning and Control
, vol.22
, Issue.1
, pp. 4-24
-
-
Sarin, S.C.1
Varadarajan, A.2
Wang, L.3
-
35
-
-
0032178227
-
Lot streaming in open shops
-
Sen, A., and O. S. Benli. 1999. "Lot Streaming in Open Shops." Operations Research Letters 23 (3-5): 135-142.
-
(1999)
Operations Research Letters
, vol.23
, Issue.3-5
, pp. 135-142
-
-
Sen, A.1
Benli, O.S.2
-
36
-
-
7444269591
-
Hybrid evolutionary algorithm-based real-world flexible job shop scheduling problem: Application service provider approach
-
Tanev, I. T., T. Uozumi, and Y. Morotome. 2004. "Hybrid Evolutionary Algorithm-Based Real-World Flexible Job Shop Scheduling Problem: Application Service Provider Approach." Applied Soft Computing 5 (1): 87-100.
-
(2004)
Applied Soft Computing
, vol.5
, Issue.1
, pp. 87-100
-
-
Tanev, I.T.1
Uozumi, T.2
Morotome, Y.3
-
37
-
-
38849162891
-
Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems
-
Tay, J. C., and N. B. Ho. 2008. "Evolving Dispatching Rules Using Genetic Programming for Solving Multi-Objective Flexible Job-Shop Problems." Computers and Industrial Engineering 54 (3): 453-473.
-
(2008)
Computers and Industrial Engineering
, vol.54
, Issue.3
, pp. 453-473
-
-
Tay, J.C.1
Ho, N.B.2
-
38
-
-
84889832262
-
Mathematical optimization of a flexible job shop problem including preventive maintenance and availability of fixtures
-
Amsterdam, July
-
Thörnblad, K., T. Almgren, M. Patriksson, and A. B. Strömberg. 2012. "Mathematical Optimization of A Flexible Job Shop Problem Including Preventive Maintenance and Availability of Fixtures." In Proceedings of 4th Production and Operations Management World Conference, Amsterdam, July.
-
(2012)
Proceedings of 4th Production and Operations Management World Conference
-
-
Thörnblad, K.1
Almgren, T.2
Patriksson, M.3
Strömberg, A.B.4
-
39
-
-
84889779314
-
A genetic algorithm approach for solving a flexible job-shop scheduling problem
-
Vaghefinezhad, S., and K. Y. Wong. 2012. "A Genetic Algorithm Approach for Solving a Flexible Job-Shop Scheduling Problem." International Journal of Computing Science Issues 9 (3): 85-90.
-
(2012)
International Journal of Computing Science Issues
, vol.9
, Issue.3
, pp. 85-90
-
-
Vaghefinezhad, S.1
Wong, K.Y.2
-
40
-
-
84855798863
-
A tabu search algorithm for solving a multicriteria flexible job shop scheduling problem
-
Vilcot, G., and J. C. Billaut. 2011. "A Tabu Search Algorithm for Solving a Multicriteria Flexible Job Shop Scheduling Problem." International Journal of Production Research 49 (23): 6963-6980.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.23
, pp. 6963-6980
-
-
Vilcot, G.1
Billaut, J.C.2
-
41
-
-
0035904351
-
Robust short-term scheduling multiproduct batch plants under demand uncertainty
-
Vin, J. P., and M. G. Ierapetritou. 2001. "Robust Short-Term Scheduling Multiproduct Batch Plants Under Demand Uncertainty." Industrial and Engineering Chemistry Research 40 (21): 4543-4554.
-
(2001)
Industrial and Engineering Chemistry Research
, vol.40
, Issue.21
, pp. 4543-4554
-
-
Vin, J.P.1
Ierapetritou, M.G.2
-
42
-
-
78149430473
-
Robust and satisfactory job shop scheduling under fuzzy processing times and flexible due dates
-
Wang, B., Q. Li, X. Yang, and X. Wang. 2011. "Robust and Satisfactory Job Shop Scheduling Under Fuzzy Processing Times and Flexible Due Dates." IEEE International Conference on Automation and Logistics (ICAL) 2010: 575-580.
-
(2011)
IEEE International Conference on Automation and Logistics (ICAL)
, vol.2010
, pp. 575-580
-
-
Wang, B.1
Li, Q.2
Yang, X.3
Wang, X.4
-
43
-
-
79955439874
-
Application of taguchi method to analyse the impacts of common process and batch size in multistage production system under uncertain conditions
-
Wazed, M. A., S. Ahmed, and Y. Nukman. 2011. "Application of Taguchi Method to Analyse the Impacts of Common Process and Batch Size in Multistage Production System Under Uncertain Conditions." European Journal on Industrial Engineering 5 (2): 215-231.
-
(2011)
European Journal on Industrial Engineering
, vol.5
, Issue.2
, pp. 215-231
-
-
Wazed, M.A.1
Ahmed, S.2
Nukman, Y.3
-
44
-
-
14044268702
-
An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
-
Xia, W., and Z. Wu. 2005. "An Effective Hybrid Optimization Approach for Multi-Objective Flexible Job-Shop Scheduling Problems." Computers and Industrial Engineering 48 (2): 409-425.
-
(2005)
Computers and Industrial Engineering
, vol.48
, Issue.2
, pp. 409-425
-
-
Xia, W.1
Wu, Z.2
-
45
-
-
33747735942
-
Multistage-based genetic algorithm for flexible job-shop scheduling problem
-
Zhang, H., and M. Gen. 2005. "Multistage-Based Genetic Algorithm for Flexible Job-Shop Scheduling Problem." Journal of Complexity International 11 (2): 223-232.
-
(2005)
Journal of Complexity International
, vol.11
, Issue.2
, pp. 223-232
-
-
Zhang, H.1
Gen, M.2
-
46
-
-
81555213556
-
A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times
-
Zhang, Q., H. Manier, and M. A. Manier. 2012. "A Genetic Algorithm with Tabu Search Procedure for Flexible Job Shop Scheduling with Transportation Constraints and Bounded Processing Times." Computers and Operations Research 39 (7): 1713-1723.
-
(2012)
Computers and Operations Research
, vol.39
, Issue.7
, pp. 1713-1723
-
-
Zhang, Q.1
Manier, H.2
Manier, M.A.3
|