메뉴 건너뛰기




Volumn 25, Issue 2, 2014, Pages 93-109

A dispatching algorithm for flexible job-shop scheduling with transfer batches: An industrial application

Author keywords

Dispatching algorithm; Flexible job shop scheduling problem; Transfer batches

Indexed keywords

DISPATCHING ALGORITHM; FLEXIBLE JOB-SHOP SCHEDULING; FLEXIBLE JOB-SHOP SCHEDULING PROBLEM; ON-TIME DELIVERY PERFORMANCE; PRIORITY DISPATCHING RULES; PRODUCTION ORDER; TRANSFER BATCHES; UNEXPECTED EVENTS;

EID: 84889808975     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537287.2013.782846     Document Type: Article
Times cited : (49)

References (46)
  • 2
    • 79961079135 scopus 로고    scopus 로고
    • Resource allocation, batching and dispatching in a stochastic flexible job shop
    • Al-Turki, U. M., S. Arifusalam, M. El-Seliaman, and M. Khand. 2011. "Resource Allocation, Batching and Dispatching in a Stochastic Flexible Job Shop." Advanced Materials Research 264-265: 1758-1763.
    • (2011) Advanced Materials Research , vol.264-265 , pp. 1758-1763
    • Al-Turki, U.M.1    Arifusalam, S.2    El-Seliaman, M.3    Khand, M.4
  • 3
    • 0020013653 scopus 로고
    • A state-of the-art survey of dispatching rules for manufacturing job shop operations
    • Blackstone, J. H., D. T. Phillips, and G. L. Hogg. 1982. "A State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations." International Journal of Production Research 20 (1): 27-45.
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 4
    • 34250084648 scopus 로고
    • Routing and scheduling in a flexible job shop by tabu search
    • Brandimarte, P. 1993. "Routing and Scheduling in a Flexible Job Shop by Tabu Search." Annals of Operations Research 41 (3): 157-183.
    • (1993) Annals of Operations Research , vol.41 , Issue.3 , pp. 157-183
    • Brandimarte, P.1
  • 5
    • 0031530447 scopus 로고    scopus 로고
    • Complexity of scheduling problems with multi-purpose machines
    • Brucker, P., B. Jurisch, and A. Kramer. 1997. "Complexity of Scheduling Problems with Multi-Purpose Machines." Annals of Operations Research 70: 57-73.
    • (1997) Annals of Operations Research , vol.70 , pp. 57-73
    • Brucker, P.1    Jurisch, B.2    Kramer, A.3
  • 6
    • 0025531716 scopus 로고
    • Job-shop scheduling with multipurpose machines
    • Brucker, P., and R. Schlie. 1990. "Job-Shop Scheduling with Multipurpose Machines." Computing 45 (4): 369-375.
    • (1990) Computing , vol.45 , Issue.4 , pp. 369-375
    • Brucker, P.1    Schlie, R.2
  • 7
    • 40849137998 scopus 로고    scopus 로고
    • Reducing lead time in the banking industry: An experimental approach to the loan granting process
    • Caridi, M., R. Cigolini, M. Urciuoli, and A. N. Villa. 2008. "Reducing Lead Time in the Banking Industry: An Experimental Approach to the Loan Granting Process." Production Planning and Control 19 (3): 198-211.
    • (2008) Production Planning and Control , vol.19 , Issue.3 , pp. 198-211
    • Caridi, M.1    Cigolini, R.2    Urciuoli, M.3    Villa, A.N.4
  • 8
    • 33744523325 scopus 로고    scopus 로고
    • Unit sized transfer batch scheduling in an automated two-machine flow-line cell with one transport agent
    • Çetinkaya, J. C. 2006. "Unit sized Transfer Batch Scheduling in an Automated Two-Machine Flow-Line Cell with One Transport Agent." International Journal of Advanced Manufacturing Technology 29 (1-2): 178-183.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , Issue.1-2 , pp. 178-183
    • Çetinkaya, J.C.1
  • 9
    • 52649152349 scopus 로고    scopus 로고
    • A study of the flexible job shop scheduling problem with parallel machines and reentrant process
    • Chen, J. C., K. H. Chen, J. J. Wu, and C. W. Chen. 2008. "A Study of the Flexible Job Shop Scheduling Problem with Parallel Machines and Reentrant Process." International Journal of Advanced Manufacturing Technology 39 (3-4): 344-354.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.39 , Issue.3-4 , pp. 344-354
    • Chen, J.C.1    Chen, K.H.2    Wu, J.J.3    Chen, C.W.4
  • 10
    • 84862798145 scopus 로고    scopus 로고
    • Flexible job shop scheduling with parallel machines using genetic algorithm and grouping genetic algorithm
    • Chen, J. C., C. C. Wu, C. W. Chen, and K. H. Chen. 2012. "Flexible Job Shop Scheduling with Parallel Machines Using Genetic Algorithm and Grouping Genetic Algorithm." Expert Systems with Applications 39 (11): 10016-10021.
    • (2012) Expert Systems with Applications , vol.39 , Issue.11 , pp. 10016-10021
    • Chen, J.C.1    Wu, C.C.2    Chen, C.W.3    Chen, K.H.4
  • 11
    • 0031186470 scopus 로고    scopus 로고
    • Lot streaming in job shop scheduling
    • Dauzere-Peres, S., and J. B. Lasserre. 1997. "Lot Streaming in Job Shop Scheduling." Operations Research 45 (4): 584-595.
    • (1997) Operations Research , vol.45 , Issue.4 , pp. 584-595
    • Dauzere-Peres, S.1    Lasserre, J.B.2
  • 12
    • 0042261208 scopus 로고    scopus 로고
    • An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search
    • Dauzere-Peres, S., and J. Paulli. 1997. "An Integrated Approach for Modeling and Solving the General Multiprocessor Job-Shop Scheduling Problem Using Tabu Search." Annals of Operations Research 70: 281-306.
    • (1997) Annals of Operations Research , vol.70 , pp. 281-306
    • Dauzere-Peres, S.1    Paulli, J.2
  • 13
    • 33747682830 scopus 로고    scopus 로고
    • Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm
    • Gao, J., M. Gen, and L. Sun. 2006. "Scheduling Jobs and Maintenances in Flexible Job Shop with a Hybrid Genetic Algorithm." Journal of Intelligent Manufacturing 17 (4): 493-507.
    • (2006) Journal of Intelligent Manufacturing , vol.17 , Issue.4 , pp. 493-507
    • Gao, J.1    Gen, M.2    Sun, L.3
  • 14
    • 53149147791 scopus 로고    scopus 로고
    • Scheduling of job-shop, make-to-order industries with recirculation and assembly: A milp approach
    • Europe: Managing Engineering, Technology and Innovation for Growth
    • Gomes, M. C., A. P. Barbosa-Povoa, and A. Q. Novais. 2008. "Scheduling of Job-Shop, Make-to-Order Industries with Recirculation and Assembly: A MILP Approach." In IEMC-Europe 2008-2008 IEEE International Engineering Management Conference, 1-6. Europe: Managing Engineering, Technology and Innovation for Growth.
    • (2008) IEMC-Europe 2008-2008 IEEE International Engineering Management Conference , pp. 1-6
    • Gomes, M.C.1    Barbosa-Povoa, A.P.2    Novais, A.Q.3
  • 15
    • 34249973653 scopus 로고
    • A survey of priority-based scheduling
    • Haupt, R. 1989. "A Survey of Priority-Based Scheduling." OR Spectrum 11: 3-16.
    • (1989) OR Spectrum , vol.11 , pp. 3-16
    • Haupt, R.1
  • 16
    • 33751418065 scopus 로고    scopus 로고
    • An effective architecture for learning and evolving flexible job-shop schedules
    • Ho, N. B., J. C. Tay, and E. M. Lai. 2007. "An Effective Architecture for Learning and Evolving Flexible Job-Shop Schedules." International Journal of Production Research 179 (2): 316-333.
    • (2007) International Journal of Production Research , vol.179 , Issue.2 , pp. 316-333
    • Ho, N.B.1    Tay, J.C.2    Lai, E.M.3
  • 17
    • 0034161039 scopus 로고    scopus 로고
    • Efficient jobshop dispatching rules: Further developments
    • Holthaus, O., and C. Rajendran. 2000. "Efficient Jobshop Dispatching Rules: Further Developments." Production Planning and Control 11 (2): 171-178.
    • (2000) Production Planning and Control , vol.11 , Issue.2 , pp. 171-178
    • Holthaus, O.1    Rajendran, C.2
  • 18
    • 0000062615 scopus 로고
    • Tabu search for the job shop scheduling with multi-purpose machines
    • Hurink, E., B. Jurisch, and M. Thole. 1994. "Tabu Search for the Job Shop Scheduling with Multi-Purpose Machines." OR Spectrum 15 (4): 205-215.
    • (1994) OR Spectrum , vol.15 , Issue.4 , pp. 205-215
    • Hurink, E.1    Jurisch, B.2    Thole, M.3
  • 19
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic job-shop scheduling: Past, present and future
    • Jain, A. S., and S. Meeran. 1999. "Deterministic Job-Shop Scheduling: Past, Present and Future." European Journal of Production Research 113 (2): 390-434.
    • (1999) European Journal of Production Research , vol.113 , Issue.2 , pp. 390-434
    • Jain, A.S.1    Meeran, S.2
  • 21
    • 0038479948 scopus 로고    scopus 로고
    • Generating robust and flexible job shop schedules using genetic algorithms
    • Jensen, M. T. 2003. "Generating Robust and Flexible Job Shop Schedules Using Genetic Algorithms." IEEE Transactions on Evolutionary Computation 7 (3): 275-288.
    • (2003) IEEE Transactions on Evolutionary Computation , vol.7 , Issue.3 , pp. 275-288
    • Jensen, M.T.1
  • 22
    • 34548692311 scopus 로고    scopus 로고
    • A comparison of dispatching rules and genetic algorithms for job shop schedules of standard hydraulic cylinders
    • Kim, I., J. Watada, and I. Shigaki. 2008. "A Comparison of Dispatching Rules and Genetic Algorithms for Job Shop Schedules of Standard Hydraulic Cylinders." Computing 12 (2): 121-128.
    • (2008) Computing , vol.12 , Issue.2 , pp. 121-128
    • Kim, I.1    Watada, J.2    Shigaki, I.3
  • 23
    • 0033894477 scopus 로고    scopus 로고
    • Robust scheduling of a two-machine flow-shop with uncertain processing times
    • Kouvelis, P., R. L. Daniels, and G. Vairaktarakis. 2000. "Robust Scheduling of a Two-Machine Flow-Shop with Uncertain Processing Times." IIE Transactions 32 (5): 421-432.
    • (2000) IIE Transactions , vol.32 , Issue.5 , pp. 421-432
    • Kouvelis, P.1    Daniels, R.L.2    Vairaktarakis, G.3
  • 24
    • 78650621042 scopus 로고    scopus 로고
    • A computational study of a shifting bottleneck heuristic for multi-product complex job shops
    • Lars, M., and J. Zimmermann. 2011. "A Computational Study of a Shifting Bottleneck Heuristic for Multi-Product Complex Job Shops." Production Planning and Control 22 (1): 25-40.
    • (2011) Production Planning and Control , vol.22 , Issue.1 , pp. 25-40
    • Lars, M.1    Zimmermann, J.2
  • 25
    • 70449334365 scopus 로고    scopus 로고
    • Development of simulation- based production execution system in a shipyard: A case study for a panel block assembly shop
    • Lee, K., J. G. Shin, and C. Ryu. 2009. "Development of Simulation- Based Production Execution System in a Shipyard: A Case Study for a Panel Block Assembly Shop." Production Planning and Control 20 (8): 750-768.
    • (2009) Production Planning and Control , vol.20 , Issue.8 , pp. 750-768
    • Lee, K.1    Shin, J.G.2    Ryu, C.3
  • 26
    • 0002577337 scopus 로고    scopus 로고
    • Effective neighborhood function for the flexible job shop problem
    • Mastrolilli, M., and M. Gambardella. 2000. "Effective Neighborhood Function for the Flexible Job Shop Problem." Journal of Scheduling 3 (1): 3-20.
    • (2000) Journal of Scheduling , vol.3 , Issue.1 , pp. 3-20
    • Mastrolilli, M.1    Gambardella, M.2
  • 28
    • 33746170213 scopus 로고    scopus 로고
    • Analysis of gap times in a two-stage stochastic flowshop with overlapping operations
    • Nieuwenhuyse, I. N., and N. Vandaele. 2006. "Analysis of Gap Times in a Two-Stage Stochastic Flowshop with Overlapping Operations." IIE Transactions 38 (9): 777-787.
    • (2006) IIE Transactions , vol.38 , Issue.9 , pp. 777-787
    • Nieuwenhuyse, I.N.1    Vandaele, N.2
  • 29
    • 0032635740 scopus 로고    scopus 로고
    • Delivery date decision support system for the large scale maketo- order manufacturing companies: A korean electric motor company case
    • Park, C., J. Song, J. G. Kim, and I. Kim. 1999. "Delivery Date Decision Support System for the Large Scale Maketo- Order Manufacturing Companies: A Korean Electric Motor Company Case." Production Planning and Control 10 (6): 585-597.
    • (1999) Production Planning and Control , vol.10 , Issue.6 , pp. 585-597
    • Park, C.1    Song, J.2    Kim, J.G.3    Kim, I.4
  • 30
    • 57649199596 scopus 로고    scopus 로고
    • Planning production using mathematical programming: The case of a woodturning company
    • Pastor, R., J. Altimiras, and M. Mateo. 2009. "Planning Production Using Mathematical Programming: The Case of a Woodturning Company." Computers and Operations Research 36 (7): 2173-2178.
    • (2009) Computers and Operations Research , vol.36 , Issue.7 , pp. 2173-2178
    • Pastor, R.1    Altimiras, J.2    Mateo, M.3
  • 31
    • 40249118429 scopus 로고    scopus 로고
    • A genetic algorithm for the flexible job-shop scheduling problem
    • Pezzella, F., G. Morganti, and G. Ciaschetti. 2008. "A Genetic Algorithm for the Flexible Job-shop Scheduling Problem." Computers and Operations Research 35 (10): 3202-3212.
    • (2008) Computers and Operations Research , vol.35 , Issue.10 , pp. 3202-3212
    • Pezzella, F.1    Morganti, G.2    Ciaschetti, G.3
  • 34
    • 78650614174 scopus 로고    scopus 로고
    • A survey of dispatching rules for operational control in wafer fabrication
    • Sarin, S. C., A. Varadarajan, and L. Wang. 2011. "A survey of Dispatching Rules for Operational Control in Wafer Fabrication." Production Planning and Control 22 (1): 4-24.
    • (2011) Production Planning and Control , vol.22 , Issue.1 , pp. 4-24
    • Sarin, S.C.1    Varadarajan, A.2    Wang, L.3
  • 35
    • 0032178227 scopus 로고    scopus 로고
    • Lot streaming in open shops
    • Sen, A., and O. S. Benli. 1999. "Lot Streaming in Open Shops." Operations Research Letters 23 (3-5): 135-142.
    • (1999) Operations Research Letters , vol.23 , Issue.3-5 , pp. 135-142
    • Sen, A.1    Benli, O.S.2
  • 36
    • 7444269591 scopus 로고    scopus 로고
    • Hybrid evolutionary algorithm-based real-world flexible job shop scheduling problem: Application service provider approach
    • Tanev, I. T., T. Uozumi, and Y. Morotome. 2004. "Hybrid Evolutionary Algorithm-Based Real-World Flexible Job Shop Scheduling Problem: Application Service Provider Approach." Applied Soft Computing 5 (1): 87-100.
    • (2004) Applied Soft Computing , vol.5 , Issue.1 , pp. 87-100
    • Tanev, I.T.1    Uozumi, T.2    Morotome, Y.3
  • 37
    • 38849162891 scopus 로고    scopus 로고
    • Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems
    • Tay, J. C., and N. B. Ho. 2008. "Evolving Dispatching Rules Using Genetic Programming for Solving Multi-Objective Flexible Job-Shop Problems." Computers and Industrial Engineering 54 (3): 453-473.
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.3 , pp. 453-473
    • Tay, J.C.1    Ho, N.B.2
  • 39
    • 84889779314 scopus 로고    scopus 로고
    • A genetic algorithm approach for solving a flexible job-shop scheduling problem
    • Vaghefinezhad, S., and K. Y. Wong. 2012. "A Genetic Algorithm Approach for Solving a Flexible Job-Shop Scheduling Problem." International Journal of Computing Science Issues 9 (3): 85-90.
    • (2012) International Journal of Computing Science Issues , vol.9 , Issue.3 , pp. 85-90
    • Vaghefinezhad, S.1    Wong, K.Y.2
  • 40
    • 84855798863 scopus 로고    scopus 로고
    • A tabu search algorithm for solving a multicriteria flexible job shop scheduling problem
    • Vilcot, G., and J. C. Billaut. 2011. "A Tabu Search Algorithm for Solving a Multicriteria Flexible Job Shop Scheduling Problem." International Journal of Production Research 49 (23): 6963-6980.
    • (2011) International Journal of Production Research , vol.49 , Issue.23 , pp. 6963-6980
    • Vilcot, G.1    Billaut, J.C.2
  • 41
    • 0035904351 scopus 로고    scopus 로고
    • Robust short-term scheduling multiproduct batch plants under demand uncertainty
    • Vin, J. P., and M. G. Ierapetritou. 2001. "Robust Short-Term Scheduling Multiproduct Batch Plants Under Demand Uncertainty." Industrial and Engineering Chemistry Research 40 (21): 4543-4554.
    • (2001) Industrial and Engineering Chemistry Research , vol.40 , Issue.21 , pp. 4543-4554
    • Vin, J.P.1    Ierapetritou, M.G.2
  • 43
    • 79955439874 scopus 로고    scopus 로고
    • Application of taguchi method to analyse the impacts of common process and batch size in multistage production system under uncertain conditions
    • Wazed, M. A., S. Ahmed, and Y. Nukman. 2011. "Application of Taguchi Method to Analyse the Impacts of Common Process and Batch Size in Multistage Production System Under Uncertain Conditions." European Journal on Industrial Engineering 5 (2): 215-231.
    • (2011) European Journal on Industrial Engineering , vol.5 , Issue.2 , pp. 215-231
    • Wazed, M.A.1    Ahmed, S.2    Nukman, Y.3
  • 44
    • 14044268702 scopus 로고    scopus 로고
    • An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
    • Xia, W., and Z. Wu. 2005. "An Effective Hybrid Optimization Approach for Multi-Objective Flexible Job-Shop Scheduling Problems." Computers and Industrial Engineering 48 (2): 409-425.
    • (2005) Computers and Industrial Engineering , vol.48 , Issue.2 , pp. 409-425
    • Xia, W.1    Wu, Z.2
  • 45
    • 33747735942 scopus 로고    scopus 로고
    • Multistage-based genetic algorithm for flexible job-shop scheduling problem
    • Zhang, H., and M. Gen. 2005. "Multistage-Based Genetic Algorithm for Flexible Job-Shop Scheduling Problem." Journal of Complexity International 11 (2): 223-232.
    • (2005) Journal of Complexity International , vol.11 , Issue.2 , pp. 223-232
    • Zhang, H.1    Gen, M.2
  • 46
    • 81555213556 scopus 로고    scopus 로고
    • A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times
    • Zhang, Q., H. Manier, and M. A. Manier. 2012. "A Genetic Algorithm with Tabu Search Procedure for Flexible Job Shop Scheduling with Transportation Constraints and Bounded Processing Times." Computers and Operations Research 39 (7): 1713-1723.
    • (2012) Computers and Operations Research , vol.39 , Issue.7 , pp. 1713-1723
    • Zhang, Q.1    Manier, H.2    Manier, M.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.