Flow shop lot streaming

Author keywords

[No Author keywords available]

Indexed keywords


EID: 84890004923     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.1007/978-0-387-47688-9     Document Type: Book
Times cited : (35)

References (40)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., E. Balas and D. Zawack, "The shifting bottleneck procedure for job shop scheduling," Management Science, 34(3): 391-401, 1988
    • (1988) Management Science , vol.34 , Issue.3 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 21844508729 scopus 로고
    • Lot streaming in the two-machine flow shop with setup times
    • Baker, K. R., "Lot streaming in the two-machine flow shop with setup times," Annals of Operations Research, 57: 1-11, 1995
    • (1995) Annals of Operations Research , vol.57 , pp. 1-11
    • Baker, K.R.1
  • 4
    • 84985818856 scopus 로고
    • Solution procedures for the lot-streaming problem
    • Baker, K. R. and D. Pyke, "Solution procedures for the lot-streaming problem," Decision Sciences, 21: 475-491, 1990
    • (1990) Decision Sciences , vol.21 , pp. 475-491
    • Baker, K.R.1    Pyke, D.2
  • 5
    • 0036833214 scopus 로고    scopus 로고
    • Lot splitting to minimize average flow-time in a 2 machine flow-shop
    • Bukchin, J., M. Tzur and M. Jaffe, "Lot splitting to minimize average flow-time in a 2 machine flow-shop." IIE Transactions, 34: 953-970, 2002
    • (2002) IIE Transactions , vol.34 , pp. 953-970
    • Bukchin, J.1    Tzur, M.2    Jaffe, M.3
  • 6
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n-job m-machine sequencing problem
    • Campbell, H. G., R. A. Dudek and M. L. Smith, "A heuristic algorithm for the n-job m-machine sequencing problem," Management Science, 16: B620-B627, 1970
    • (1970) Management Science , vol.16
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 7
    • 0028698198 scopus 로고
    • Lot streaming in a two-stage flow shop with set-up, processing and removal times separated
    • Centinkaya, F. C., "Lot streaming in a two-stage flow shop with set-up, processing and removal times separated," Journal of Operational Research Society, 45(12): 1445-1455, 1994
    • (1994) Journal of Operational Research Society , vol.45 , Issue.12 , pp. 1445-1455
    • Centinkaya, F.C.1
  • 10
    • 0032262156 scopus 로고    scopus 로고
    • Lot streaming with attached setups in three machine flow shops
    • Chen, J. and G. Steiner, "Lot streaming with attached setups in three machine flow shops," IIE Transactions, 30: 1075-1084, 1998
    • (1998) IIE Transactions , vol.30 , pp. 1075-1084
    • Chen, J.1    Steiner, G.2
  • 11
    • 0013289896 scopus 로고    scopus 로고
    • Approximation methods for discrete lot streaming in flow shops
    • Chen, J. and G. Steiner, "Approximation methods for discrete lot streaming in flow shops," Operations Research Letters, 21: 139-145, 1997
    • (1997) Operations Research Letters , vol.21 , pp. 139-145
    • Chen, J.1    Steiner, G.2
  • 12
    • 0031076263 scopus 로고    scopus 로고
    • Lot streaming with detached setups in three-machine flow shops
    • Chen, J. and G. Steiner, "Lot streaming with detached setups in three-machine flow shops," European Journal of Operational Research, 96: 591-611, 1996
    • (1996) European Journal of Operational Research , vol.96 , pp. 591-611
    • Chen, J.1    Steiner, G.2
  • 13
    • 0031186470 scopus 로고    scopus 로고
    • Lot streaming in job-shop scheduling
    • Dauzere-Peres, S. and J. Lasserre, "Lot streaming in job-shop scheduling," Operations Research, 45(4): 584-595, 1997
    • (1997) Operations Research , vol.45 , Issue.4 , pp. 584-595
    • Dauzere-Peres, S.1    Lasserre, J.2
  • 15
    • 0001068310 scopus 로고
    • Sequencing a one state-variable machine: A solvable case of the traveling salesman problem
    • Gilmore, P. C. and R. E. Gomory, "Sequencing a one state-variable machine: A solvable case of the traveling salesman problem," Operations Research, 12: 665-679, 1964
    • (1964) Operations Research , vol.12 , pp. 665-679
    • Gilmore, P.C.1    Gomory, R.E.2
  • 17
    • 0032131709 scopus 로고    scopus 로고
    • Structural properties of lot streaming in a flow shop
    • Glass, C. A. and C. N. Potts, "Structural properties of lot streaming in a flow shop," Mathematics of Operations Research, 23(3): 624-639, 1998
    • (1998) Mathematics of Operations Research , vol.23 , Issue.3 , pp. 624-639
    • Glass, C.A.1    Potts, C.N.2
  • 18
    • 0001738801 scopus 로고
    • Note on manufacturing cycle time determination for a multi stage economic production quantity model
    • Goyal, S. K., "Note on manufacturing cycle time determination for a multi stage economic production quantity model," Management Science, 23: 332-333, 1976
    • (1976) Management Science , vol.23 , pp. 332-333
    • Goyal, S.K.1
  • 19
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • Johnson, S. M., "Optimal two- and three-stage production schedules with setup times included," Naval Research Logistics Quarterly, 1: 61-67, 1954
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-67
    • Johnson, S.M.1
  • 21
    • 0037372761 scopus 로고    scopus 로고
    • Constructing near optimal schedules for the flow shop lot streaming problem with sublot-attached setups
    • Kalir, A. and S. C. Sarin, "Constructing near optimal schedules for the flow shop lot streaming problem with sublot-attached setups," Journal of Combinatorial Optimization, 7: 23-44, 2003
    • (2003) Journal of Combinatorial Optimization , vol.7 , pp. 23-44
    • Kalir, A.1    Sarin, S.C.2
  • 22
    • 0013356811 scopus 로고    scopus 로고
    • A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots
    • Kalir, A. and S. C. Sarin, "A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots," Omega: International Journal of Management Science, 29: 577-584, 2001
    • (2001) Omega: International Journal of Management Science , vol.29 , pp. 577-584
    • Kalir, A.1    Sarin, S.C.2
  • 23
    • 0035598113 scopus 로고    scopus 로고
    • Optimal solutions for the single batch, flow shop, lotstreaming problem with equal sublots
    • Kalir, A. and S. C. Sarin, "Optimal solutions for the single batch, flow shop, lotstreaming problem with equal sublots," Decision Sciences, 32(2): 387-397, 2001
    • (2001) Decision Sciences , vol.32 , Issue.2 , pp. 387-397
    • Kalir, A.1    Sarin, S.C.2
  • 24
    • 0033702610 scopus 로고    scopus 로고
    • Evaluation of potential benefits of lot streaming in flow-shop systems
    • Kalir, A. and S. C. Sarin, "Evaluation of potential benefits of lot streaming in flow-shop systems," International Journal of Production Economics, 66: 131-142, 2000
    • (2000) International Journal of Production Economics , vol.66 , pp. 131-142
    • Kalir, A.1    Sarin, S.C.2
  • 25
    • 84889993529 scopus 로고    scopus 로고
    • A unified cost based lot streaming problem for the single batch flow shop with equal sublots
    • Virginia Tech
    • Kalir, A., S. C. Sarin and M. Chen, "A unified cost based lot streaming problem for the single batch flow shop with equal sublots," Grado Department of Industrial and Systems Engineering, Virginia Tech, 2004
    • (2004) Grado Department of Industrial and Systems Engineering
    • Kalir, A.1    Sarin, S.C.2    Chen, M.3
  • 26
  • 28
  • 30
    • 0000659781 scopus 로고
    • A system for managing job-shop production
    • Reiter, S., "A system for managing job-shop production," Journal of Business, 39: 371-393, 1966
    • (1966) Journal of Business , vol.39 , pp. 371-393
    • Reiter, S.1
  • 32
    • 0033363409 scopus 로고    scopus 로고
    • Lot streaming and scheduling multiple products in 2-machine no-wait flowshops
    • Sriskandarajah, C. and E. Wagneur, "Lot streaming and scheduling multiple products in 2-machine no-wait flowshops," IIE Transactions, 31: 695-707, 1999
    • (1999) IIE Transactions , vol.31 , pp. 695-707
    • Sriskandarajah, C.1    Wagneur, E.2
  • 33
    • 0016572027 scopus 로고
    • Manufacturing cycle time determination for a multi stage economic production quantity model
    • Szendrovits, A. Z., "Manufacturing cycle time determination for a multi stage economic production quantity model," Management Science, 22(3): 298-308, 1975
    • (1975) Management Science , vol.22 , Issue.3 , pp. 298-308
    • Szendrovits, A.Z.1
  • 35
    • 0000611941 scopus 로고
    • Basic techniques for lot streaming
    • Trietsch, D. and K. R. Baker, "Basic techniques for lot streaming," Operations Research, 41(6): 1065-1076, 1993
    • (1993) Operations Research , vol.41 , Issue.6 , pp. 1065-1076
    • Trietsch, D.1    Baker, K.R.2
  • 36
    • 0029378595 scopus 로고
    • Optimal lot streaming for multiple products in a two-machine flow shop
    • Vickson, R. G., "Optimal lot streaming for multiple products in a two-machine flow shop," European Journal of Operational Research, 85: 556-575, 1995
    • (1995) European Journal of Operational Research , vol.85 , pp. 556-575
    • Vickson, R.G.1
  • 37
    • 0026896286 scopus 로고
    • Two and three machine flow shop scheduling problems with equal sized transfer batches
    • Vickson, R. G. and B. E. Alfredsson, "Two and three machine flow shop scheduling problems with equal sized transfer batches," International Journal of Production Research, 30(7): 1551-1574, 1992
    • (1992) International Journal of Production Research , vol.30 , Issue.7 , pp. 1551-1574
    • Vickson, R.G.1    Alfredsson, B.E.2
  • 39
    • 0036722157 scopus 로고    scopus 로고
    • Minimizing the mean weighted absolute deviation from due dates in lot streaming flow shop scheduling
    • Yoon, S. H. and J. A. Ventura, "Minimizing the mean weighted absolute deviation from due dates in lot streaming flow shop scheduling," Computers and Operations Research, 29: 1301-1315, 2002
    • (2002) Computers and Operations Research , vol.29 , pp. 1301-1315
    • Yoon, S.H.1    Ventura, J.A.2
  • 40
    • 0036722525 scopus 로고    scopus 로고
    • An application of genetic algorithms to lot streaming flow shop scheduling
    • Yoon, S. H. and J. A. Ventura, "An application of genetic algorithms to lot streaming flow shop scheduling," IIE Transactions, 34: 779-787, 2002
    • (2002) IIE Transactions , vol.34 , pp. 779-787
    • Yoon, S.H.1    Ventura, J.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.